Public Protection & Safety Branch Operations Division 6534 Airport Road, Fort St. John BC V1J 4M6 Phone (250) 794-5200 Fax (250) 794-5380 Rev. 2016-02-09 TABLETOP EXERCISE AUDIT FORM The BC Oil and Gas Commission audits emergency exercises as part of our safety management program. Through these routine evaluations, the Commission is able to confirm each company has the trained and certified staff and resources identified in their emergency response plan, and that staff participating in the exercise are knowledgeable in their roles and responsibilities during incidents and emergencies. Our intent is to provide each company with a fair and accurate account of how their staff met these expectations, and to identify any areas of concern which the exercise may have highlighted. We are also committed to the dialogue on safety, and welcome feedback on both our evaluation process, and any specific points within an evaluation that your organization would like to clarify. Auditing of emergency management exercises contributes to the Commission’s overall understanding of the safety culture within each company. Combined with other evaluation factors – such as a company’s maintenance of Emergency Response Plans and emergency contact telephone numbers – the Commission is able to best focus inspection and auditing resources on the areas of highest risk. The tool has been designed for use across the full range of exercise types, and there may be occasions when some fields are not applicable due to the type or design of a specific exercise. In such cases, the overall assessment may be adjusted to reflect the elements that were present and evaluated. The purpose of an emergency management exercise – tabletop, functional, or full scale – is to provide all participants with an opportunity to confirm their knowledge, and discover any gaps in plans, expectations and assumptions. This is particularly important when mutual aid forms part of the emergency response, as the quality of communications between organizations determines the effectiveness of a response. It is important that a common vision exists between evaluators and exercise participants of these key objectives: Promote emergency preparedness Test a new plan or amendments to a plan Reveal planning weaknesses Reveal resource gaps Test equipment and standard operating procedures Improve coordination Clarify role and responsibilities Improve individual performance Demonstrate operational capability Fulfill regulatory requirements Additional benefits that may be achieved through emergency management exercises include: Gain public recognition of the emergency management program Develop confidence in the knowledge and skills necessary to act effectively during emergencies. The auditing tool on the following pages has been developed in consultation with representatives of emergency management planning, upstream, mid-stream and downstream aspects of the oil and gas sector in British Columbia.

Upload: others

Post on 22-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Public Protection & Safety Branch Operations Division 6534 Airport Road, Fort St. John BC V1J 4M6 Phone (250) 794-5200 Fax (250) 794-5380 Rev. 2016-02-09

    TABLETOP EXERCISE AUDIT FORM

    The BC Oil and Gas Commission audits emergency exercises as part of our safety management program. Through these

    routine evaluations, the Commission is able to confirm each company has the trained and certified staff and resources

    identified in their emergency response plan, and that staff participating in the exercise are knowledgeable in their roles

    and responsibilities during incidents and emergencies.

    Our intent is to provide each company with a fair and accurate account of how their staff met these expectations, and to

    identify any areas of concern which the exercise may have highlighted. We are also committed to the dialogue on

    safety, and welcome feedback on both our evaluation process, and any specific points within an evaluation that your

    organization would like to clarify.

    Auditing of emergency management exercises contributes to the Commission’s overall understanding of the safety

    culture within each company. Combined with other evaluation factors – such as a company’s maintenance of Emergency

    Response Plans and emergency contact telephone numbers – the Commission is able to best focus inspection and

    auditing resources on the areas of highest risk.

    The tool has been designed for use across the full range of exercise types, and there may be occasions when some fields

    are not applicable due to the type or design of a specific exercise. In such cases, the overall assessment may be adjusted

    to reflect the elements that were present and evaluated.

    The purpose of an emergency management exercise – tabletop, functional, or full scale – is to provide all participants

    with an opportunity to confirm their knowledge, and discover any gaps in plans, expectations and assumptions. This is

    particularly important when mutual aid forms part of the emergency response, as the quality of communications

    between organizations determines the effectiveness of a response.

    It is important that a common vision exists between evaluators and exercise participants of these key objectives:

    Promote emergency preparedness

    Test a new plan or amendments to a plan

    Reveal planning weaknesses

    Reveal resource gaps

    Test equipment and standard operating procedures

    Improve coordination

    Clarify role and responsibilities

    Improve individual performance

    Demonstrate operational capability

    Fulfill regulatory requirements

    Additional benefits that may be achieved through emergency management exercises include:

    Gain public recognition of the emergency management program

    Develop confidence in the knowledge and skills necessary to act effectively during emergencies.

    The auditing tool on the following pages has been developed in consultation with representatives of emergency

    management planning, upstream, mid-stream and downstream aspects of the oil and gas sector in British Columbia.

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter1

    aamarcelTypewriter

  • Permit Holder Name:

    Date & Time (start and end) Date: Start Time: End Time:

    OGC Auditor(s) in Attendance:

    Copy of Exercise scenario given to OGC representative Yes No N/A

    Other Agencies in Attendance:

    Person & Company Conducting Exercise

    Name of ERP used for Exercise

    Describe the Type of Tabletop Exercise (question based, role playing, etc)

    Exercise for which fields or facility:

    (Confirm with PH at exercise)

    Was this the first exercise held for this field(s) or facility? Yes No

    Date and type of Last Exercise

    Date:

    Type:

    Full Scale Exercise Due (if applicable):

    PERSONNEL: Field ICP EOC

    ________ ________ ________

    ________ ________ ________

    ________ ________ ________

    # of responding employees work in field / facility:

    # of responding employees in attendance:

    Percent of employees participating:

    What is the permit holder’s plan for exercising field personnel not in attendance today?

    Was this the first exercise for any participants? Yes No If Yes, how many? _______________

    Was the EOC part of the exercise? Yes No

    Location of Exercise

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter2

  • Item Meets Statement

    = Y

    Score 0-4

    Not Observed

    or Not Applicable

    Needs Improvement

    Observations & Times

    Measurement Statements

    PREPARATION Pre-Exercise 1 Was there a sign in sheet for

    participants? Y N

    ☐ ☐ Y-Attendance was recorded of participants

    N-No attendance was recorded of participants

    2 Did the exercise have objectives? Y N

    ☐ ☐

    Y- There were objectives N-There were no objectives

    3 Were rules set out for the exercise? Y N

    ☐ ☐

    Y-Rules were communicated to participants N-Rules were not communicated to participants

    4 Does the company use the ICS system?

    0 1 2 3 4 ☐ ☐

    0-Does not use ICS 1-Permit Holder uses a few roles but no EOC structure 2-Permit Holder uses some roles from ICS and has an EOC structure 3-Permit Holder has the 7 basic roles but EOC is different 4- Permit Holder uses the complete ICS and EOC roles

    5 Were inputs used in the exercise?

    0 1 2 3 4 ☐ ☐

    0-Initial input given but no further inputs given 1-Inputs given ad hoc 2-Planned inputs given at appropriate times but not to appropriate roles 3-Planned Inputs given to appropriate roles but not at appropriate times 4-Inputs were given to appropriate roles in a planned sequence at appropriate times

    Emergency Response Plan 6 Do all ERP’s have the same

    date ? Y N

    ☐ ☐ Y-All manuals have same date on cover and

    same last revision list as PP&S manual N-Some manuals do not have the same date

    7 Has the ERP(s) been updated in the last year? Y N

    ☐ ☐ Y-The ERP(s) are have been updated within the

    last year N-The ERP(s) are more than a year old

    8 Did all roles have an ERP manual?

    0 2 4 ☐ ☐

    0-No roles had an ERP or a form of it 2- Some roles had an ERP or a form of it 4- All roles had an ERP or a form of it

    EXERCISE Internal Communication 9 Was mode of

    communication discussed? Y N ☐ ☐ Y – Method of communication was discussed.

    N – Method of communication was not discussed.

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter3

  • Item Meets Statement

    = Y

    Score 0-4

    Not Observed

    or Not Applicable

    Needs Improvement

    Observations & Times

    Measurement Statements

    Emergency Level 10 Was the level of emergency

    selected promptly? Y N

    ☐ ☐

    Y–Level of emergency was declared within the first 30 minutes of the incident N-Level of emergency was not declared within the first 30 minutes of the incident

    11 Was the risk matrix applied correctly? Y N

    ☐ ☐

    Y-The risk matrix was applied correctly N-The risk matrix was not applied correctly

    Action Plan 12 Was an action plan discussed

    and determined ? Y N ☐ ☐ Y- An action plan was discussed and determined

    N-An action plan was not discussed and determined

    Response Priorities 13 Was the correct response

    priorities used? 1. Responder Safety, 2. Public Safety, 3. Control of Incident

    Y N

    ☐ ☐

    Y-The correct response priorities were used when responding to the incident N-The correct response priorities were not used when responding to the incident.

    Hazard Assessment 14 Was a hazard assessment

    discussed? Y N ☐ ☐

    Y-A hazard assessment for the personnel was discussed N-A hazard assessment for the personnel was not discussed

    15 Were the hazard procedures referenced in the ERP? Y N

    Y-Hazard procedures were referenced in the ERP N-Hazard procedures were not referenced in the ERP

    Map & Hazard Response Zone (HRZ) 16 Was the map pulled out and

    referenced when incident started?

    0 2 4 ☐ ☐ 0-The map was not pulled out

    2-The map was pulled out but not referenced 4-The map was pulled out and referenced

    17 Was an HRZ determined quickly?

    Y N

    ☐ ☐

    Y-The HRZ was determined within the first 15 minutes N-The HRZ was not determined within the first 15 minutes

    18 Was an HRZ for the hazard determined correctly ? (especially if non H2S incident)

    Y N

    ☐ ☐

    Y-The calculated HRZ was correctly determined N-The calculated HRZ was not correctly determined

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter4

  • 19 Were personnel able to

    interpret the map well?

    0 2 4 ☐ ☐

    0-Personnel were not able to interpret map well

    2- Some personnel were able to interpret the map well 4-All personnel were able to interpret the map well (tenure holder boundaries, cross reference

    entities on the map with information in the binder, etc.)

    20 Was the map correct and did it contain all pertinent

    information? Y N

    ☐ ☐

    Y-The map was correct and contained all pertinent information.

    N-The map was not correct and it was missing pertinent information.

    21 Was an inventory of the HRZ performed correctly?

    Y N

    ☐ ☐

    Y-The inventory of the HRZ was performed correctly (tenure holders, permit holders, residents, waterways, railroads, etc.)

    N-The inventory of the HRZ was not performed correctly.

    Roadblocks &Closure Order 22 Were roadblocks

    determined in correct

    locations? Y N

    ☐ ☐ Y-Roadblocks were placed in correct locations

    N-Roadblocks were not placed in correct

    locations

    23 Were roadblocks set up in a timely manner?

    Y N

    ☐ ☐

    Y-Roadblocks were set up in a timely manner appropriate to the circumstances N-Roadblocks were not set up in a timely manner appropriate to the circumstances

    24 Was there a discussion of a

    closure order from the applicable agency in a timely manner?

    Y N

    ☐ ☐

    Y-Road closure from applicable agency was

    discussed N-Road closure form applicable agency was not discussed

    Checklist 25 Did the checklists of the

    roles get discussed or used? Y N ☐ ☐ Y

    -The checklists were discussed or used N-The checklists were not discussed or used

    Roles 26 Did the different roles get

    discussed? Y N

    ☐ ☐ Y-The roles were discussed?

    N-The roles were not discussed?

    27 Did the participants have a good understanding of the

    roles? Y N

    ☐ ☐

    Y- The participants have a good working knowledge of the roles and their duties

    N-The participants did not have a good working knowledge of the roles and their duties

    Forms 28 Did the forms get discussed?

    Y N ☐ ☐ Y - The forms were discussed.

    N- The forms were not discussed

    Item Meets Statement

    = Y

    Score 0-4

    Not Observed

    or Not Applicable

    Needs Improvement

    Observations & Times

    Measurement Statements

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter5

  • Residents, Transients, Evacuation, Sheltering 29 Was the resident section of

    the ERP referenced? Y N

    ☐ ☐

    Y- The resident section of the ERP was referenced N-The resident section of the ERP was not referenced

    30 Was there a discussion regarding evacuation/sheltering of residents?

    Y N

    ☐ ☐

    Y-There was discussion about the evacuation and sheltering of residents. N- There was no discussion about the evacuation and sheltering of residents.

    31 Did the company identify all other public potentially affected by the incident

    such as non-resident landowners/renters, other operators, tenure holders, recreational users, etc.

    Y N

    ☐ ☐

    Y-All known transients were identified N-Not all known transients were identified

    32 Was consideration given to notification of schools and school buses? Y N

    ☐ ☐

    Y -Consideration was given to notification of the

    school children and their buses. N-Consideration was not given to notification of

    the school children and their buses. 33 Were rovers discussed?

    Y N

    ☐ ☐ Y-Rovers were discussed

    N-Rovers were not discussed 34 Was consideration given to

    dispatching a helicopter to help with roving?

    Y N

    ☐ ☐

    Y-Consideration was given to dispatching a helicopter N-Consideration was not given to dispatching a helicopter

    35 Were actions taken to prevent access into the HRZ by other means such as railways, water courses, etc.

    Y N

    ☐ ☐

    Y-Actions were taken to prevent access to the HRZ from other means. N-Actions were not taken to prevent access to

    the HRZ from other means.

    NOTAM Order 36 Was consideration given for

    a NOTAM order? (to be considered where there is a release of a toxic substance for flammable product)

    Y N

    ☐ ☐

    Y-A NOTAM order was considered N-A NOTAM order was not considered

    Item Meets Statement

    = Y

    Score 0-4

    Not Observed

    or Not Applicable

    Needs Improvement

    Observations & Times

    Measurement Statements

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter6

  • External Communication 37 Were all relevant

    government agencies

    contacted? EMBC MOT/Public Works Local Gov. Authority Local Health Authority WorkSafe MOE (through EMBC) RCMP MFNLRO School District

    Y N

    ☐ ☐

    Y-All relevant government agencies were

    contacted. N-All relevant government agencies were not contacted.

    Command Posts 38 Were command posts

    established? ICP, Offsite Command Post, EOC

    Y N

    ☐ ☐

    Y -Command Posts were established N-Command Posts were established

    39 Was a staging area

    established to effectively manage for external resources to report to?

    Y N

    ☐ ☐

    Y-A staging area was established N-A staging area was not established

    Air Monitoring 40 Was mobile air monitoring

    considered/discussed? Y N

    ☐ ☐ Y-Mobile air monitoring was discussed

    N-Mobile air monitoring was not discussed

    Ignition 41 Was consideration given for

    ignition by referencing the ignition criteria? Y N

    ☐ ☐

    Y-Ignition was considered by referencing the ignition criteria. N-Ignition was not considered by referencing the ignition criteria.

    Equipment 42 Was necessary external

    equipment and resources

    discussed? Y N ☐ ☐

    Y-The necessary external equipment and

    resources were discussed. N- The necessary external equipment and resources were not discussed

    Media 43 Was media discussed?

    Y N

    ☐ ☐ Y-Media was discussed

    N-Media was not discussed

    Post Incident 44 Was there discussion to

    downgrade/stand-down the incident in consultation with OGC?

    Y N

    ☐ ☐

    Y -The decision to downgrade/stand-down in consultation with OGC was discussed N-The decision to downgrade/stand-down in consultation with OGC was not discussed

    Item Meets Statement

    = Y

    Score 0-4

    Not Observed

    or Not Applicable

    Needs Improvement

    Observations & Times

    Measurement Statements

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter7

  • 45 Did discussion take place

    regarding securing the site and evidence for investigation?

    Y N

    ☐ ☐

    Y-Site security was discussed for evidence

    preservation post incident N- Site security was not discussed for evidence preservation post incident

    ERP 46 Did the participants have

    good knowledge about their ERP?

    0 2 4 ☐ ☐

    0-No one had a good knowledge of their ERP 2-Some participants had a good knowledge of their ERP 4-All participants had a good knowledge of their

    ERP

    47 Were the participants able to find information in the ERP easily?

    0 2 4 ☐ ☐

    0-Particpants were not able to easily find information in the ERP 2-Some participants were able to easily find information in the ERP

    4-All participants were able to easily find information in the ERP

    48 Did participants open the ERP manual during the

    exercise? Y N

    ☐ ☐

    Y-Participants used their ERP or a form of it during the exercise N-Not all participants used their ERP or a form

    of it during the exercise.

    EMERGENCY OPERATION CENTRE 49 Did the personnel at the

    EOC understand their role? (support to IC) Y N

    ☐ ☐

    Y-The EOC understood their role as a support role to the ICP N-The EOC did not understand their role as a support role to the ICP

    POST EXERCISE 50 Did the exercise execute

    and flow well? Y N

    ☐ ☐

    Y-The exercise executed and flowed in a systematic and methodical manner N-The exercise was not executed or flowing in a

    systematic and methodical manner

    51 Was an exercise debriefing meeting held to state what went well and what areas need improvements?

    Y N

    ☐ ☐

    Y-A debriefing meeting was held N-A debriefing was not held

    52 Were debriefing

    comments and action items captured? Y N

    ☐ ☐

    Y-Debriefing comments and action items were

    captured N-Debriefing comments and action items were not captured

    53 Were the exercise goals and objectives met? Y N

    ☐ ☐ Y-The exercise objectives and goals were met

    N-The exercise objectives and goals were not met

    54 Were the action items from the last exercise completed? Y N

    ☐ ☐

    Y-The action items from the last exercise were completed N-The action items from the last exercise were not completed.

    Item Meets Statement

    = Y

    Score 0-4

    Not Observed

    or Not Applicable

    Needs Improvement

    Observations & Times

    Measurement Statements

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter8

  • TOTAL SCORE:

    OGC Observations (items mentioned at debrief) Successes Opportunities for improvement

    OGC Recommendations:

    OGC SIGN OFF

    OGC Staff Member: _____________________________________________ Date: ______________________________ OGC Staff Member: _____________________________________________ Date: ______________________________

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter9

  • COMPANY REPRESENTATIVE RECEIVING FORM

    COMMENTS: (plans to address deficiencies, comments on form, comments on evaluation, etc)

    Acknowledgement of receipt and contents of the Audit: Senior Company Representative Name:___________________________________________________________ Senior Company Representative:________________________________________________________________ Date:__________________________________________

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter10

  • TIME AND EVENT LOG OF THE EXERCISE TIME EVENT

    aamarcelTypewriterBC Oil & Gas Commission

    aamarcelTypewriter11

    Field: ICP: of responding employees work in field facility: fill_0: fill_1: of responding employees work in field facility1: fill_2: fill_3: of responding employees in attendance: If Yes how many: Permit Holder Name: OGC Auditors in Attendance: Other Agencies in Attendance: Person Company Conducting Exercise: Name of ERP used for Exercise: Describe the Type of Tabletop Exercise question basedrole playing etc: Exercise for which fields or facilityConfirm with PH at exercise: Location of Exercise: Y N1: Y N3: Y N5: 0 1 2 3 4: 0 1 2 3 41: Y N7: Y N9: 0 2 4: Y N11: fill_4: Offfill_5: Offfill_6: Offfill_7: Offfill_8: Offfill_9: Offfill_10: Offfill_11: Offfill_12: Offfill_13: Offfill_14: Offfill_15: Offfill_16: Offfill_17: Offfill_18: Offfill_19: Offfill_20: Offfill_21: OffY N13: Y N15: Y N17: Y N19: Y N21: Y N25: 0 2 41: Y N27: Y N29: fill_22: Offfill_23: Offfill_24: Offfill_25: Offfill_26: Offfill_27: Offfill_28: Offfill_29: Offfill_30: Offfill_31: Offfill_32: Offfill_33: Offfill_34: Offfill_35: Offfill_36: Offfill_37: Off0 2 42: Y N31: Y N33: Y N35: Y N37: Y N39: Y N41: Y N43: Y N45: Y N47: fill_38: Offfill_39: Offfill_40: Offfill_41: Offfill_42: Offfill_43: Offfill_44: Offfill_45: Offfill_46: Offfill_47: Offfill_48: Offfill_49: Offfill_50: Offfill_51: Offfill_52: Offfill_53: Offfill_54: Offfill_55: Offfill_56: Offfill_57: OffY N49: Y N51: Y N53: Y N55: Y N57: Y N59: Y N61: Y N63: fill_58: Offfill_59: Offfill_60: Offfill_61: Offfill_62: Offfill_63: Offfill_64: Offfill_65: Offfill_66: Offfill_67: Offfill_68: Offfill_69: Offfill_70: Offfill_71: Offfill_72: Offfill_73: OffY N65: Y N67: Y N69: Y N71: Y N73: Y N75: Y N77: Y N79: fill_74: Offfill_75: Offfill_76: Offfill_77: Offfill_78: Offfill_79: Offfill_80: Offfill_81: Offfill_82: Offfill_83: Offfill_84: Offfill_85: Offfill_86: Offfill_87: Offfill_88: Offfill_89: OffY N81: 0 2 43: 0 2 44: Y N83: Y N85: Y N87: Y N89: Y N91: Y N93: Y N95: fill_90: Offfill_91: Offfill_92: Offfill_93: Offfill_94: Offfill_95: Offfill_96: Offfill_97: Offfill_98: Offfill_99: Offfill_100: Offfill_101: Offfill_102: Offfill_103: Offfill_104: Offfill_105: Offfill_106: Offfill_107: Offfill_108: Offfill_109: OffOGC Staff Member: OGC Staff Member1: Date: TOTAL SCORE: Successes: Opportunities for improvement: OGC Recommendations2: Senior Company Representative Name: Senior Company Representative: Date1: TIME: EVENT: TIME1: EVENT1: TIME2: EVENT2: TIME3: EVENT3: TIME4: EVENT4: TIME5: EVENT5: TIME6: EVENT6: TIME7: EVENT7: TIME8: EVENT8: TIME9: EVENT9: TIME10: EVENT10: TIME11: EVENT11: TIME12: EVENT12: TIME13: EVENT13: TIME14: EVENT14: TIME15: EVENT15: TIME16: EVENT16: TIME17: EVENT17: TIME18: EVENT18: TIME19: EVENT19: TIME20: EVENT20: TIME21: EVENT21: TIME22: EVENT22: TIME23: EVENT23: TIME24: EVENT24: TIME25: EVENT25: TIME26: EVENT26: Text Field0: Text Field1: Text Field2: Check Box0: OffCheck Box1: OffCheck Box2: OffCheck Box3: OffCheck Box4: OffText Field3: Text Field4: Text Field5: Text Field6: Check Box5: OffCheck Box6: OffCheck Box7: OffCheck Box8: OffCheck Box9: OffCheck Box10: OffCheck Box11: OffCheck Box12: OffCheck Box13: OffCheck Box14: OffCheck Box15: OffCheck Box16: OffCheck Box17: OffCheck Box18: OffCheck Box19: OffCheck Box20: OffCheck Box21: OffCheck Box22: OffCheck Box23: OffCheck Box24: OffCheck Box25: OffCheck Box26: OffCheck Box27: OffCheck Box28: OffCheck Box29: OffCheck Box30: OffCheck Box31: OffCheck Box32: OffCheck Box33: OffCheck Box34: OffCheck Box35: OffCheck Box36: OffCheck Box37: OffCheck Box38: OffCheck Box39: OffCheck Box40: OffCheck Box41: OffCheck Box42: OffCheck Box43: OffCheck Box44: OffCheck Box45: OffCheck Box46: OffCheck Box47: OffCheck Box48: OffCheck Box49: OffCheck Box50: OffCheck Box51: OffCheck Box52: OffCheck Box53: OffCheck Box54: OffCheck Box55: OffCheck Box56: OffCheck Box57: OffCheck Box58: OffCheck Box59: OffCheck Box60: OffCheck Box61: OffCheck Box62: OffCheck Box63: OffCheck Box64: OffCheck Box65: OffCheck Box66: OffCheck Box67: OffCheck Box68: OffCheck Box69: OffCheck Box70: OffCheck Box71: OffCheck Box72: OffCheck Box73: OffCheck Box74: OffCheck Box75: OffCheck Box76: OffCheck Box77: OffCheck Box78: OffCheck Box79: OffCheck Box80: OffCheck Box81: OffCheck Box82: OffCheck Box83: OffCheck Box84: OffCheck Box85: OffCheck Box86: OffCheck Box87: OffCheck Box88: OffCheck Box89: OffCheck Box90: OffCheck Box91: OffCheck Box92: OffCheck Box93: OffCheck Box94: OffCheck Box95: OffCheck Box96: OffCheck Box97: OffCheck Box98: OffCheck Box99: OffCheck Box100: OffCheck Box101: OffCheck Box102: OffCheck Box103: OffCheck Box104: OffCheck Box105: OffCheck Box106: OffCheck Box107: OffCheck Box108: OffCheck Box109: OffCheck Box110: OffCheck Box111: OffCheck Box112: OffCheck Box113: OffCheck Box114: OffCheck Box115: OffCheck Box116: OffCheck Box117: OffCheck Box118: OffCheck Box119: OffCheck Box120: OffCheck Box121: OffCheck Box122: OffCheck Box123: OffCheck Box124: OffCheck Box125: OffCheck Box126: OffCheck Box127: OffCheck Box128: OffCheck Box129: OffCheck Box130: OffCheck Box131: OffCheck Box132: OffCheck Box133: OffCheck Box134: OffCheck Box135: OffCheck Box136: OffText Field7: fill_110: Offfill_111: Off