barents 2020 final report
DESCRIPTION
DRAFT 2011-12-11. Barents 2020 Final Report. RN01 “Co-ordination of Deliverables” Moscow 14 December 2011. Presented by Vladimir Vernikovskij, Russian Coordinator of RN01. RN01 Participants. Co-ordinators. 2. RN01 - Mandate for Phase IV. - PowerPoint PPT PresentationTRANSCRIPT
Barents 2020 Final Report
RN01“Co-ordination of
Deliverables” Moscow 14 December 2011
Presented by Vladimir Vernikovskij,Russian Coordinator of RN01
DRAFT 2011-12-11
2
RN01 Participants
Name Company
Vladimir Vernikovskiy GAZPROM / TK23
Denis Tikhomirov VNIIGAZ
Alexander Ermakov SDAG
Annie Audibert-Hayet TOTAL
Jan Gustaf Eriksson STANDARDS NORWAY
Alf Reidar Johansen OGP
Per Eirik Fosen STATOIL
Morten Bøhlerengen Moss Maritime
Anatoly Baryshnikov ENI E&P (NCOC)
Tore Sildnes DNV
Name Company
Vladimir Vernikovskiy GAZPROM / TK23
Denis Tikhomirov VNIIGAZ
Alexander Ermakov SDAG
Annie Audibert-Hayet TOTAL
Jan Gustaf Eriksson STANDARDS NORWAY
Alf Reidar Johansen OGP
Per Eirik Fosen STATOIL
Morten Bøhlerengen Moss Maritime
Anatoly Baryshnikov ENI E&P (NCOC)
Tore Sildnes DNV
Co-ordinators
RN01 - Mandate for Phase IV
1. Recommend how deliverables should be structured and published
2.Review deliverables for compliance with the recommendations, – prepare roadmaps for implementation of deliverables
3. Create awareness among the potential recipients as to what is coming– (e.g. standards organisations)
4. Provide proposal for an Arctic long term international standards program – (ref. ISO/TC67 MC Ad-hoc group Arctic Operations)
Task 1: Recommendation of deliverables
• Report developed and delivered to Steering Committee 7th Dec. 2010
• Recommendations presented at B2020 Conference 9th Dec. 2010
Task 2
Review of deliverables and
recommendation for implementation
RN02 - Ice LoadsRecipientDeliverable Application
RN02 - Commentary
RN03 – Risk ManagementDeliverable Recipient
RN03 - Commentary
RN04 – Evacuation & RescueRecipientDeliverable Application
RN04 - Commentary
RN05 – Human FactorsRecipientDeliverable Application
RN05 - Commentary
RN06 – Ice ManagementRecipientDeliverable Application
RN06 - Commentary
RN07 – Operational Emissions & Discharges
RecipientDeliverable Application
RN07 - Commentary
18
Task 3: Creating Awareness
InitiativesRN01 participation and presentations:•Plenary meeting of ISO TC67/SC7
– Singapore, Jan. 2011
• ISO/TC67/Management Committee meeting– San Francisco, June 2011 – where the formation of ISO/TC67 MC AHG “Arctic Operations” were discussed
•Norwegian Sector Board for Petroleum Standardisation•OGP Standards committee meetings•OGP Arctic Co-ordination TF meetings
Article in OGP Standards bulletin 2011
18
Task 4 – Proposal for Arctic Long Term Standardisation
1 2 3 4
RN01 Recommendations to ISO:11 New Work Item Proposals
20
Working group Deliverables 2012 2013 2014 2015 2016 2017 2018
RN01: Recommendation
for structuring, editing and
publishing of phase IV
deliverables
PNGI – Arctic operations – Ice loads in structural design
PNGI – Arctic Operations – Topside facilities, add. tech. requirements
PNGI – Arctic operations – Working environment
PNGI – Arctic operations – Escape, evacuation and rescue
PNGI – Arctic operations – Onshore logistics
PNGI – Arctic operations – Offshore logistics
PNGI – Arctic operations – Staff management
PNGI – Arctic operations – Maintenance of structures
PNGI – Arctic operations – Offshore structures corrosion protection
PNGI – Arctic operations – Plant security
PNGI – Arctic operations – Ice management
1
ISO AHG
• The ISO/TC67 MC Ad-hoc group on Arctic Operations used the Barents 2020 RN01 report as a basis for their recommendations
• Recommended to the ISO/TC67 plenary meeting in Moscow, 14-15th September 2011: – to set up a new subcommittee for Arctic Operations – to invite Russia to propose a chairman and secretary.
• Re. ISO/TC67 N 1148 Report ISO TC67 MC AHG Arctic operations, dated: 2011-09-07.
• .
2
3 – IOS plenary meeting
• The plenary meeting of ISO/TC67 took a resolution in its meeting 2011-09-15 to establish SC8 “Arctic Operations”.
• The SC8 work programme will be developed on the basis of the abovementioned work items.
• The formal establishment of SC8 has been approved by ISO Technical Management Board
• Preparations for the first meeting can start. Detailed new work item proposals are being prepared.
3
ISO TC67 SC8• SC 8 work programme to start with about 15 work
items, which should include the following subjects and/or standards:– Working environment in connection with cold-climate conditions (1
standard ready in late 2014);– Escape, evacuation and rescue (1 standard ready in early 2014));– Maintenance of onshore and offshore structures (2 standards ready in
late 2014);– Ice management (6 standards ready in 2015);– Onshore and offshore logistics (2 standards ready in late 2014);– Plant security (1 standard ready in early 2014).
• The detailed new work item proposals are being prepared.
4
Thank you for your attention !
25
Options for final reporting 1. Barents 2020 technical report 2. Proposal for Guideline(s) or Recommended Practice(s)
– GAZPROM (STO)– DNV (RP)– OGP
3. Proposal for identical Russian and Norwegian national supplementary standard to an ISO standard
– GOST R Standard, Recommendation or “set of rules”– NS or NORSOK standard
4. Proposal for national annex to adopted ISO or EN-ISO standard5. Proposal for ISO Technical Specification (TS)6. Proposal for ISO Technical Report (TR)7. Proposal for ISO Publicly Available Specification (PAS)8. Proposal for ISO International Workshop Agreement (IWA)9. Proposal for ISO Amendment to existing standard (Amd)