Page 1: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

City of Phoenix;

Phoenix Sky Harbor International Airport

Runway 8-26 Keel Reconstruction and Panel Replacement Project

Project No. AV08000078 FAA

Design and CMAR Services

November 16, 2015

Pre-Submittal Meeting

Page 2: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

• Liz Blakley, Contract Specialist,

Street Transportation Department

• Sam Hanna, Project Manager, Design & Construction

Services, Aviation Department

• Candace Huff, Special Projects Administrator, Design

& Construction Services, Aviation Dept.

• Joanne McLaughlin, EO Programs Assistant,

Equal Opportunity Department

• Valerie Churchwell, Small Business Engagement

Manager, Aviation Department

Welcome and Introductions

Page 3: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Meeting Overview

� Sign-in please…copies of sign in sheet will be

available on website:

http://phoenix.gov/streets/procurement/

current-opportunities

� Please hold questions until the Q&A period.

� This is the ONLY opportunity to discuss this

project with City staff.

Page 4: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

• Project Description

• Project Scope of Work

• Design

• CMAR

• DBE Participation

• SOQ Criteria

• Submittal Requirements

• Selection Schedule

• Questions?

Agenda

Page 5: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Project Description

• Replace approximately 450 concrete panels on

the Keel section of Runway 8-26.

• The first area is from west of B4 to B6. The

second area is from B9 to east of B11.

• Both sections are in the aircraft touch-down

areas and each measure approx. 2000 feet long

by 40 feet wide

• There are also approximately 50 additional

panels that contain cracks & spalls requiring

replacement

• Time is of the essence … Runway will be closed only for 30 days.

Page 6: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Project Description

B4 B5 B6 B9 B10 B11

Page 7: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Project Scope of Work - Design

• Design in accordance with all applicable FAA AIP and

Advisory Circulars requirements

• Design appropriate depth of Portland Cement Concrete

Pavement (PCCP) to replace the panels to be removed

• Pavement markings and striping

• Construction estimates, construction safety and phasing

plans & construction management plan

Page 8: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Project Scope of Work - Design

• Geotechnical investigation to validate structural

pavement requirements

• Electrical elements include existing FAA Runway

Status Lights system and lead off lights that may be

affected by replacement the PCCP

• Investigate utility conflicts

• Provide updated plan/profile design

• Advise city on “green building/recycling” options

Page 9: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Project Scope of Work - Design

• Update the design of appropriate airside barricade plan

and service road detours, if needed

• Possible Construction Administrative services that meet

all project requirements including the quality assurance,

testing and certifications for structural subgrade per AIP

and FAA compliance and requirements

• Utilize the City’s web based project management

system, Unifier

Page 10: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

I- Pre-construction Services

• Coordinate efforts with project Engineer, designer,

various City of Phoenix Departments, Aviation

Divisions and other stakeholders

• Address all Federal, State and Local requirements

• Provide project planning, scheduling and estimating

for the various phases of the project - minimizing

impacts to airport operations

• Investigate utility conflicts

• Arrange/manage procurement of materials and long-

lead items, as needed

Project Scope of Work - CMAR

Page 11: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

I- Pre-construction Services (cont.)

• Prepare construction estimates, Guaranteed Maximum

Price(s) (GMP) and schedules for the various phases of

the project

• Advise the city on ways to gain efficiencies in project

execution and delivery

• Perform constructability reviews of the plans and

specifications

• Utilize the City’s web based project management

system, Unifier

Project Scope of Work-CMAR (cont.)

Page 12: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

II- Construction Services

• Manage all construction related contracts while

meeting city bid requirements including DBE program

requirements

• Provide quality control

• Maintain a safe & secure work site for all project

participants

• Schedule and manage site operations

• Coordinate with various City of Phoenix Departments

and other stakeholders.

Project Scope of Work-CMAR (cont.)

Page 13: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

• The Designer and CMAR shall have comprehensive

and extensive Aviation experience

• Flexibility

• Availability

• Promptness

Project Expectations

Page 14: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Questions?

Page 15: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

.

The City of Phoenix strives to advance the economic

growth of local businesses through its Disadvantaged Business Enterprise (DBE) Program.

Through a coordinated effort among several city

departments, the DBE Program provides DBE

certification, procurement opportunities, construction

subcontracting utilization, small business management

and technical assistance and educational services and

networking opportunities.

The City encourages the participation of DBE firms

whenever possible, and throughout all phases of this

contract.

DBE Requirements

Page 16: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

� Project is in part funded by FAA and is subject to 49 CFR Part 26 and USDOT DBE Program.

� Attachment A - Statement of Outreach Commitment All Submitters must provide at the time of submittal.

� Attachment B - Documentation of Outreach Efforts Successful Submitter must provide within 30 days following the award of contract, along with the related supporting documentation.

� Attachment C – Small Business Utilization Commitment Successful Submitter must provide within 30 days following the award of contract.

DBE Requirements

Page 17: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

DBE Requirements

� Current focus is Small Business Outreach

� The FAA approved a triennial DBE goal of 7.42 percent for fiscal years 2013-16, to be achieved through fostering Small Business participation and outreach requirements.

� The City has not established a race- and gender-conscious DBE participation goal.

Page 18: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

DBE Requirements• To participate in this opportunity as a DBE,

only firms certified by the City or another AZUCP member in the specified scopes of work shall be considered in calculating DBE participation.

• All eligible DBEs can be found at:

www.phoenix.diversitycompliance.comor

www.adot.dbesystem.com

Page 19: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

QUESTIONS?

Page 20: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

The selection of the Design Professional will be based on

the following qualifications:

� General Information

� Experience of the Prime Firm

� CA Experience of Prime Firm (Design Only)

� Experience of Key Personnel and Subconsultants

� Project Understanding and Approach

� Overall Evaluation

Statement of Qualifications

Page 21: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

� Each page side with criteria information will be counted.

� Pages that have photos, charts, and graphs will be

counted toward maximum number of pages.

� Front and back cover, Table of Contents and tab dividers

will NOT be counted toward the maximum page limit,

UNLESS they include information that may be

considered by the selection panel.

Statement of Qualifications, Cont.

Page 22: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

� Submit 7 copies of the SOQ

� SOQ due:

� 12:00 p.m. Noon – Arizona Local Time

� Friday, December 4, 2015

City Engineer

CITY OF PHOENIX

200 W. Washington Street, 6th Floor

Phoenix, AZ 85003

c/o Liz Blakley

Statement of Qualifications, Cont.

Page 23: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

� Grounds for Disqualification:

� Receipt of submittal after specified cut-off date and

time

� Too few copies of the submittal

� Deposit of submittal in the wrong location

� Missing DBE Attachment A (Submit in a separate

sealed envelope)

Statement of Qualifications, Cont.

Page 24: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

� Cover Letter (company name, address and contact

information)

� Evaluation Criteria (including project organizational chart)

� Additional Content (resumes or other information)

� MAXIMUM pages permitted is 12 pages:

+ Evaluation Criteria (including organizational chart)

+ Additional Content (resumes or other information)

= 12 MAXIMUM pages permitted

Submittal Requirements

Page 25: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

• SOQs due at 12:00 p.m. December 4, 2015

• Scope Meeting January 2016

Selection Schedule

Page 26: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

�Request for Qualifications

�Notifications

�Power Point Presentation

�Plan Holder List

�Award

http://phoenix.gov/streets/procurement/bid-results

Streets Transportation Webpage

Page 27: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Liz Blakley, Contracts Specialist

(602) 273-2108

[email protected]

Questions After Today

Page 28: AV08000078 Design-CMAR Presubmittal PPT final …...Microsoft PowerPoint - AV08000078 Design-CMAR Presubmittal PPT final REVISED.ppt [Read-Only] [Compatibility Mode] Author: 056830

Questions?