Canaan Valley Conference Center
September 29, 2018
CONSTRUCTION UPDATE
Asphalt Pavement Association of West Virginia
2018 Fall Conference
Fall - 2017
Spring/Summer - 2018
Fall - 2018
36,000+ centerline miles
79,000+ lane miles
7,000+ bridges
2% Interstate
5% US Route
10% WV Route
83% County/Local Route
93% of all roadways in WV owned, operated, maintained by WVDOT
6th largest roadway network
mountainous terrain = expensive road construction
least flat state
36,000+ centerline miles
79,000+ lane miles
7,000+ bridges
2% Interstate
5% US Route
10% WV Route
83% County/Local Route
93% of all roadways in WV owned, operated, maintained by WVDOT
6th largest roadway network
mountainous terrain = expensive road construction
$
PRESERVATION
2019 LETTING SCHEDULE
Baseline
(other dates added as needed)
BID SUBMISSION
ESTIMATE PAYMENTS
ESTIMATE PAYMENTS
GENERAL ESTIMATE PAYMENT WORKFLOW – PRIOR TO 10/1/18
Project personnel follow our estimate cutoff schedule which usually occurs every other Friday at Close of Business (COB). By COB of the following Wednesday, the District is required to conduct the following;
1) Generate the estimate for the project
2) Place the estimate into approval phase in Site Manager (SM)
3) Project Supervisor approval of estimate
4) Construction Engineer approval of estimate
5) Office Manager approval of estimate
6) The Office Manager then prints and scans estimate into a program called Application Extender
7) The Office Manager also has to “receipt” amount to be paid in our legacy system called REMIS.
8) The Estimate then is in Finance Division for scrutiny through at least two separate offices and the office of Business Manager and Budget Division
9) The Estimates when approved from step (8) are interfaced into OASIS (nightly) as a General Accounting Expenditure (GAX) document
10) The GAX document then goes to the West Virginia State Auditor’s Office (WVSAO) for their scrutiny.
11) When WVSAO approves estimate it then goes to WV Treasury to be paid
GENERAL ESTIMATE PAYMENT WORKFLOW AFTER 10/1/18 OASIS Go Live
Step 1) thru Step 5) remain unchanged (District approvals)
Then automated interface to OASIS
Step 8) thru Step 11) similar approval process in OASIS
A few less steps to the process, and hopefully more transparent and efficient
Time will tell…
Project
Contractor
AWARD STATUS
DBE PLAN SUBMISSION
PREQUALIFICATION LIMITS
PREQUALIFICATION LIMITS
B D BBILLION DOLLAR BOYD
CONTRACTOR PREQUALIFICATION REVISIONS
PREQUAL REVISIONS
PREQUAL REVISIONS
STAFFING ISSUES
EXTRA WORK – MARK UP
TURNPIKE PROJECTS - ADMINISTRATION
?
STANDARD CONTRACT VS PO CONTRACT
TRAFFICENGINEERING
R/W
DEPUTY –PROG/PLANNING
STATE HIGHWAY ENGINEER
DEPUTY - OPERATIONSDEPUTY – CONST/DEV
CONTRACT ADMINMCS&T DISTRICTS MAINTENANCE
STATE HIGHWAY ENGINEER
DEPUTY - OPERATIONSDEPUTY – CONST/DEV
CONTRACT ADMINMCS&T DISTRICTS MAINTENANCE
STATE HIGHWAY ENGINEER
DEPUTY - OPERATIONSDEPUTY – CONST/DEV
CONTRACT ADMINMCS&TDISTRICT
ENGINEERMAINTENANCE
DISTRICT CONSTRUCTION
DISTRICT MATERIALS
STATE HIGHWAY ENGINEER
DEPUTY - OPERATIONSDEPUTY – CONST/DEV
CONTRACT ADMINMCS&TDISTRICT
ENGINEERMAINTENANCE
DISTRICT CONSTRUCTION
DISTRICT MATERIALS
STATE HIGHWAY ENGINEER
DEPUTY - OPERATIONSDEPUTY – CONST/DEV
CONTRACT ADMINMCS&TDISTRICT
ENGINEERMAINTENANCE
DISTRICT CONSTRUCTION
DISTRICT MATERIALS
Standard Contract
STATE HIGHWAY ENGINEER
DEPUTY - OPERATIONSDEPUTY – CONST/DEV
CONTRACT ADMINMCS&TDISTRICT
ENGINEERMAINTENANCE
DISTRICT CONSTRUCTION
DISTRICT MATERIALS
Standard ContractPO Contract
STATE HIGHWAY ENGINEER
DEPUTY - OPERATIONSDEPUTY – CONST/DEV
CONTRACT ADMINMCS&TDISTRICT
ENGINEERMAINTENANCE
DISTRICT CONSTRUCTION
DISTRICT MATERIALS
Standard ContractPO Contract
STATE HIGHWAY ENGINEER
DEPUTY - OPERATIONSDEPUTY – CONST/DEV
CONTRACT ADMINMCS&TDISTRICT
ENGINEERMAINTENANCE
DISTRICT CONSTRUCTION
DISTRICT MATERIALS
Standard ContractPO Contract
CONFLICT RESOLUTION
C Factor
QUESTIONS?
Canaan Valley Conference Center
September 29, 2018
MATERIALS UPDATE
Asphalt Pavement Association of West Virginia
2018 Fall Conference
Independent Assurance (IA)
WVDOH IA History
1) The IA program pertained exclusively to WVDOH sampling and testing (Acceptance Sample).
2) The IA program incorporated a project approach.
3) Included only projects on the NHS.
4) IA sampling frequency was 10% of Acceptance Samples.
5) IA materials: asphalt, concrete, and aggregate.
FHWA Process Review
Because contractor samples (Quality Control) are used for acceptance the WVDOH IA program must incorporate Quality Control sampling and testing.
Proposed IA Changes
1) The IA program will go from a project approach to a system approach.
2) A system approach checks the active material samplers and testers.
3) The frequency is a percent of the total number of material samplers and testers.
4) States typically set a goal of 90% .
5) Tie the technician and inspector certifications into the IA program.
Asphalt
1) WVDOH performs all acceptance sampling and testing on PWLprojects.
2) Projects on the NHS are predominately PWL projects.
Concrete
1) Have IA testing dates throughout the year and state.
2) Testing at each District once per year.
3) Slump and air testing.
Aggregate
1) Perform AASHTOResource (AMRL) aggregate proficiency samples.
2) Gradation/Sieve Analysis.
Canaan Valley Conference Center
September 29, 2018
PAVEMENTS UPDATE
Asphalt Pavement Association of West Virginia
2018 Fall Conference
Percent Within Limits
• All NHS Routes
• We have some work to do getting our Designers to make sure that
it’s reasonable. (ie, not 1,100 tons of skip paving)
• Half of the GARVEE projects are using PWL
• Many projects have not been complete to date
• 5 - 2 lane NHS (complete)
• Test Results are promising
Percent Within Limits – 2-Lane Data
85.8
102
95.9
82.35
99.25
95.4
50
60
70
80
90
100
Sub Lot 1' Sub Lot 2' Sub Lot 3 Sub Lot 4* Sub Lot 5 Sub Lot 6
Average Pay FactorAverage Pay Factor
Average = 93.45%
Percent Within Limits – 2-Lane Data
85.8
102
95.9
82.35
99.25
95.4
50
60
70
80
90
100
Sub Lot 1' Sub Lot 2' Sub Lot 3 Sub Lot 4* Sub Lot 5 Sub Lot 6
Average Pay Factor Density PWL AC PWL #200 PWL
Average Pay Factor
Section 720 Specification
• Is the department supposed to be IRI data in all jobs when the
spec applies?
• Yes.
• What happens if the department fails to test the project prior to paving?
Section 720 Specification
• Does Section 720 apply to Purchase Orders?
• If the PO contract references the 2018 Supplemental Specification
Friction Research• West Virginia DOH has partnered with the National Center for
Asphalt Technology (NCAT) to test increased percentages of
Dolomitic Limestone in our asphalt mixes. Two sections of the
NCAT track will have mixes from WV with aggregate donated
by our aggregate suppliers. Extensive laboratory testing will
be done with varying percentages as well.
Update to Soundness Materials Procedure
• MP 703.00.22 was last updated in 1995
• Currently the 2018 update has passed the MP committee and
is awaiting FHWA approval
Bond Strength Testing
113
153
117
149
104115
0
20
40
60
80
100
120
140
160
2013 2014 2015 2016 2017 2018
Average Bond Strength (psi) • This includes
the zeros in
the average.
• 2018 with out
the zeros
• 160 psi
Bond Strength Testing
0
10
20
30
40
50
60
70
80
90
100
12 14 7 10 27 14 45 57 61 87 60 7
Nu
mb
er o
f Te
sts
Test per Project
Non-Zeros
Zeros
• 401 Bond Tests
• 122 were Zero
• 30%
• 69 from a
single project
• With out that
project 13%
2018
Compaction Testing
• A proposal was made to return to a procedure which
utilizes lot by lot testing with the target density
established from a roller pass procedure. Any thoughts
or updates on this subject and proposal?
• We have reached out to others on this type of procedure.
We’ve not yet compiled the input.