Asbestos Inspection Report P-338178 - Targeted Refurbishment Survey 01134 : Intake Farm Primary School Nottinghamshire County Council Printed on 04/07/2019 Survey date : 4-Jul-2019 Re-inspection Due on : 25-Jun-2020

Upload: others

Post on 15-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Asbestos Inspection Report

P-338178 - Targeted Refurbishment Survey

01134 : Intake Farm Primary School

Nottinghamshire County Council

Printed on 04/07/2019

Survey date : 4-Jul-2019

Re-inspection Due on : 25-Jun-2020

Page 2: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Intake Farm Primary School

Asbestos Inspection Report

Armstrong Road

Mansfield

Nottingham

Nottinghamshire

NG19 6JA

Type of survey

Surveyor

Survey date

ConstructionArea (m2)BlockReference Const. Year

0100 CLASP Mark 2 1,008Main School Building 1957

0200 CLASP Mark 5 127Nursery & Store 1976

0300 LB Brick-Trad 144New Classroom 1998

5000 CLASP Mark 2 56Catering Services 1957

Buildings on site

The following table displays details of each of the blocks on site and the construction details. The block

reference should be used in conjunction with the survey details to locate elements on site

04-Jul-2019

TR

Printed on 04/07/2019 at 09:32:30

Page 2 of 89P2.netweb based property management

Page 3: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

ASBESTOS SUMMARY

Main School Building0100

Nursery & Store0200

The following buildings contain asbestos materials on which works can normally only be

carried out by licensed contractors following notification to the HSE:

0100 Main School Building

0200 Nursery & Store

5000 Catering Services

The following buildings contain asbestos cement and other products on which a licence is not

required to carry out work but a safe system of work must still be followed:

New Classroom0300

Asbestos has not been detected in the following buildings:

Printed on 04/07/2019 at 09:32:30

Page 3 of 89P2.netweb based property management

Page 4: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

4-Jul-19

6 m2Quantity sampled

01134-02-005-EE001Sample number

Location

005 Dis WCRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 292

Survey date

Panels to wall edges

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Rooms up to 100m2 (2)

Routinely disturbed (3)

<10m2 or 10m pipe run (1)

4 to 10 (2)

Daily (3)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 4

Banding

Presumed No

Use Asbestos Insulating Board

Low

Remove

Asbestos type

Damage/deterioration

Surface treatment

Product type

4-Jul-19

12 m2Quantity sampled

01134-02-005-EE002Sample number

Location

005 Dis WCRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 293

Survey date

Debris within roof void

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Asbestos Insulating Board

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 4 of 89P2.netweb based property management

Page 5: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

4-Jul-19

6 m2Quantity sampled

01134-02-005-EEP001Sample number

Location

005 Dis WCRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 294

Survey date

Panels to wall edges

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Rooms up to 100m2 (2)

Routinely disturbed (3)

<10m2 or 10m pipe run (1)

4 to 10 (2)

Daily (3)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 4

Banding

Presumed No

Use Asbestos Insulating Board

Low

Remove

Previous sample number 01134-02-05-01

Printed on 04/07/2019 at 09:32:30

Page 5 of 89P2.netweb based property management

Page 6: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

This table lists all the visit records held against this site

Visit history for this site

Visit date Surveyor CommentsVisit type

Building 02, Room 054-Jul-2019 TR

20-May-2019 Re inspection

18-Mar-2019 Re inspection

2-Mar-2019 Refurbishment

23-Dec-2018 Re inspection

Client2-Nov-2018 Re inspection

31-Oct-2018 TR

31-Oct-2018 TR

31-Oct-2018 Refurbishment

31-Oct-2018 TR

27-Oct-2018 Re inspection

28-Aug-2018 Re inspection

8-Aug-2018 Refurbishment

Asbestos Schematic is awaiting updating

by N.C.C. cad technician

following R & D surveys by Acorn Ref;

206 to 215, & Environtec Ref; 216 to 220.

Cad technician has been made aware by

email.

2-May-2018 Management Survey

19-Feb-2018 Refurbishment

26-Apr-2017 Management Survey

24-Feb-2017 Refurbishment & Demolition

Survey

Last input ref 2043-Mar-2016 Management Survey

27-Apr-2015 R&D

11-Mar-2015 Management Survey

30-May-2014 Re inspection

19-May-2014 Refurbishment & Demolition

Survey

1-May-2014 Refurbishment & Demolition

Survey

5-Jan-2014 Refurbishment & Demolition

Survey

25-Sep-2012 Re inspection

1-Dec-2011 Refurbishment and Demolition

Survey

26-Jul-2011 Re inspection

Euro Environmental ltd13-May-2004 Type 2

Printed on 04/07/2019 at 09:32:30

Page 6 of 89P2.netweb based property management

Page 7: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Intake Farm Primary School

Asbestos Inspection Report

Armstrong Road

Mansfield

Nottingham

Nottinghamshire

NG19 6JA

Type of survey

Surveyor

Survey date

ConstructionArea (m2)BlockReference Const. Year

0100 CLASP Mark 2 1,008Main School Building 1957

0200 CLASP Mark 5 127Nursery & Store 1976

0300 LB Brick-Trad 144New Classroom 1998

5000 CLASP Mark 2 56Catering Services 1957

Buildings on site

The following table displays details of each of the blocks on site and the construction details. The block

reference should be used in conjunction with the survey details to locate elements on site

20-May-2019

Re inspection

Printed on 04/07/2019 at 09:32:30

Page 7 of 89P2.netweb based property management

Page 8: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

ASBESTOS SUMMARY

Main School Building0100

Nursery & Store0200

The following buildings contain asbestos materials on which works can normally only be

carried out by licensed contractors following notification to the HSE:

0100 Main School Building

0200 Nursery & Store

5000 Catering Services

The following buildings contain asbestos cement and other products on which a licence is not

required to carry out work but a safe system of work must still be followed:

New Classroom0300

Asbestos has not been detected in the following buildings:

Printed on 04/07/2019 at 09:32:30

Page 8 of 89P2.netweb based property management

Page 9: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

5LMQuantity sampled

01134-01-34-SP05Sample number

Location

034 StorageRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 104

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

High damage (3)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed Yes

Use Cement Fully compressed

sheets

Low

Restrict Access

Cement soffit visible internally from within ceiling void

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1LMQuantity sampled

01134-01-33-SP05Sample number

Location

033 StorageRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 105

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

High damage (3)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 1

Banding

Presumed Yes

Use Cement Fully compressed

sheets

Very Low

Restrict Access

Cement soffit visible internally from within ceiling void

Printed on 04/07/2019 at 09:32:30

Page 9 of 89P2.netweb based property management

Page 10: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4LMQuantity sampled

01134-01-30-SP05Sample number

Location

030 BathroomRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 106

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

High damage (3)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed Yes

Use Cement Fully compressed

sheets

Low

Restrict Access

Cement soffit visible internally from within ceiling void

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

11M2Quantity sampled

01134-01-28-05Sample number

Location

028 ICT SuiteRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 107

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

High damage (3)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed No

Use Cement Fully compressed

sheets

Low

Restrict Access

Cement soffit visible internally from within ceiling void

Printed on 04/07/2019 at 09:32:30

Page 10 of 89P2.netweb based property management

Page 11: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

12

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

<1M2Quantity sampled

01134-01-28-06Sample number

Location

028 ICT SuiteRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 108

Survey date

Type of activity

Therm-Ins,Spray,etc (see Use) (3)

High damage (3)

Unsealed lagging&sprays (3)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 1

Banding

Presumed No

Use

Low

Restrict Access

Debris to top of wall within ceiling void

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

9M2Quantity sampled

01134-01-28-SP03Sample number

Location

028 ICT SuiteRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 109

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use

Removed

Insulation Board behind timber panels to external walls

Printed on 04/07/2019 at 09:32:30

Page 11 of 89P2.netweb based property management

Page 12: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

5LMQuantity sampled

01134-01-28-SP04Sample number

Location

028 ICT SuiteRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 110

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed Yes

Use Ropes and yarns

Very Low

Restrict Access

String to man made mineral fibre barrier

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

Quantity sampled

01134-01-27-NASample number

Location

027 Plant RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 111

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

()

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Periodic disturbance activity (2)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

Small amounts or items (0)

1 to 3 (1)

Daily (3)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 5

Banding

Presumed No

Use Unknown

Restrict Access

No access to heated / tank room

Printed on 04/07/2019 at 09:32:30

Page 12 of 89P2.netweb based property management

Page 13: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

30LMQuantity sampled

01134-01-26-03Sample number

Location

026 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 112

Survey date

PIPEWORK

()

()

()

Not asbestos (0)

Material score

Banding

Presumed No

Use

No Asbestos Detected

MMMF No Acms.

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-01-26-04Sample number

Location

026 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 113

Survey date

BOILER

()

()

()

Not asbestos (0)

Material score

Banding

Presumed No

Use

No Asbestos Detected

MMMF No Acms

Printed on 04/07/2019 at 09:32:30

Page 13 of 89P2.netweb based property management

Page 14: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

10M2Quantity sampled

01134-01-26-08Sample number

Location

026 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 114

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

Insulation Board wall panels.

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

20M2Quantity sampled

01134-01-26-09Sample number

Location

026 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 115

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use Cement Fully compressed

sheets

Low

Monitor & Manage

Cement ceiling panels.

Printed on 04/07/2019 at 09:32:30

Page 14 of 89P2.netweb based property management

Page 15: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1NOQuantity sampled

01134-01-26-SP01Sample number

Location

026 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 116

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

<1 per year (1)

Priority score 2

Banding

Presumed Yes

Use Ropes and yarns

Removed

Strongly presumed asbestos within old electrics

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

10 X 1M2Quantity sampled

01134-01-24-01Sample number

Location

024 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 118

Survey date

PANEL BELOW WINDOWS

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 7

Banding

Presumed No

Use Asbestos Insulating Board

Removed

A number of panels have either been replaced or encapsulated

with timber.

Printed on 04/07/2019 at 09:32:30

Page 15 of 89P2.netweb based property management

Page 16: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

12M2Quantity sampled

01134-01-24-02Sample number

Location

024 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 119

Survey date

FLOOR

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Flooring

No Asbestos Detected

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

14M2Quantity sampled

01134-01-24-SP03Sample number

Location

024 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 120

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

Printed on 04/07/2019 at 09:32:30

Page 16 of 89P2.netweb based property management

Page 17: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

10 X 1M2Quantity sampled

01134-01-22-01Sample number

Location

022 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 121

Survey date

PANEL BELOW WINDOWS

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>6 hours (3)

Low disturbance (1)

>1 per year (2)

Priority score 7

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

12M2Quantity sampled

01134-01-22-02Sample number

Location

022 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 122

Survey date

FLOOR

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Flooring

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 17 of 89P2.netweb based property management

Page 18: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

12M2Quantity sampled

01134-01-22-SP03Sample number

Location

022 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 123

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

100M2Quantity sampled

01134-01-21-01Sample number

Location

021 HallRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 124

Survey date

WALLS

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Easily disturbed (2)

>50m2 or>50m pipe run (3)

>10 (3)

Daily (3)

>1 to <3 hours (1)

Low disturbance (1)

<1 per year (1)

Priority score 7

Banding

Presumed No

Use

Low

Monitor & Manage

Asbestos insulation board present to walls from floor to ceiling,

including storage area. Cracking of plaster skim by the wall

between Rms 21 and 11. Damaged asbestos in this area has been

sealed previously. (Mar 2016 - this area has been over boarded

with mdf). There are signs of deterioration in one plaster skimmed

panel above rooms 30/33/34.

Printed on 04/07/2019 at 09:32:30

Page 18 of 89P2.netweb based property management

Page 19: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-01-20-SP03Sample number

Location

020 Pupil WCRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 125

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3LMQuantity sampled

01134-01-20-SP05Sample number

Location

020 Pupil WCRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 126

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

High damage (3)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed Yes

Use Cement Fully compressed

sheets

Low

Restrict Access

Cement soffit visible internally from within ceiling void

Printed on 04/07/2019 at 09:32:30

Page 19 of 89P2.netweb based property management

Page 20: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

8

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3LMQuantity sampled

01134-01-20-SP02Sample number

Location

020 Pupil WCRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 127

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 1

Banding

Presumed Yes

Use

Low

Restrict Access

Insulation Board lining to columns

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

10M2Quantity sampled

01134-01-19-01Sample number

Location

019 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 128

Survey date

FLOOR

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Flooring

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 20 of 89P2.netweb based property management

Page 21: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

8

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

9M2Quantity sampled

01134-01-19-02Sample number

Location

019 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 129

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 1

Banding

Presumed No

Use

Low

Restrict Access

Insulation Board lining to columns

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

18M2Quantity sampled

01134-01-19-SP03Sample number

Location

019 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 130

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

Printed on 04/07/2019 at 09:32:30

Page 21 of 89P2.netweb based property management

Page 22: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

26M2Quantity sampled

01134-01-19-SP05Sample number

Location

019 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 131

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

High damage (3)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed Yes

Use Cement Fully compressed

sheets

Low

Restrict Access

Cement soffit visible internally from within ceiling void. Monitor

externally.

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4M2Quantity sampled

01134-01-18-SP04Sample number

Location

018 StorageRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 132

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 1

Banding

Presumed Yes

Use Ropes and yarns

Very Low

Restrict Access

String to man made mineral fibre barrier

Printed on 04/07/2019 at 09:32:30

Page 22 of 89P2.netweb based property management

Page 23: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3M2Quantity sampled

01134-01-17-04Sample number

Location

017 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 133

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 1

Banding

Presumed No

Use Ropes and yarns

Very Low

Restrict Access

String to man made mineral fibre barrier above door to room 01/13

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

10M2Quantity sampled

01134-01-17-SP05Sample number

Location

017 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 134

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

High damage (3)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed Yes

Use Cement Fully compressed

sheets

Low

Restrict Access

Cement soffit visible internally from within ceiling void. Monitor

externally.

Printed on 04/07/2019 at 09:32:30

Page 23 of 89P2.netweb based property management

Page 24: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

12M2Quantity sampled

01134-01-17-03Sample number

Location

017 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 135

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2LMQuantity sampled

01134-01-16-SP05Sample number

Location

016 StorageRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 136

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

High damage (3)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed Yes

Use Cement Fully compressed

sheets

Low

Restrict Access

Cement soffit visible internally from within ceiling void. Monitor

externally.

Printed on 04/07/2019 at 09:32:30

Page 24 of 89P2.netweb based property management

Page 25: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6LMQuantity sampled

01134-01-16-SP04Sample number

Location

016 StorageRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 137

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 1

Banding

Presumed Yes

Use Ropes and yarns

Very Low

Restrict Access

String to man made mineral fibre barrier

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4M2Quantity sampled

01134-01-15-01Sample number

Location

015 Staff RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 138

Survey date

PANEL BELOW WINDOW

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

4 to 10 (2)

Daily (3)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Printed on 04/07/2019 at 09:32:30

Page 25 of 89P2.netweb based property management

Page 26: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-01-15-SP07Sample number

Location

015 Staff RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 139

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Composite materials (0)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>1 to <3 hours (1)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 5

Banding

Presumed Yes

Use

Low

Monitor & Manage

Insulation Board wall panels from floor to ceiling

REMOVED

2

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2NOQuantity sampled

01134-01-14-01Sample number

Location

014 Staff WCRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 140

Survey date

CISTERN

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Periodic disturbance activity (2)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

1 to 3 (1)

Daily (3)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 4

Banding

Presumed No

Use Reinforced composites

Removed

Printed on 04/07/2019 at 09:32:30

Page 26 of 89P2.netweb based property management

Page 27: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

35M2Quantity sampled

01134-01-13-01Sample number

Location

013 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 141

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Low

Restrict Access

WALL TO EXTERIOR. This wall is now boxed in adjacent to the

stairs.

REMOVED

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3M2Quantity sampled

01134-01-13-SP04Sample number

Location

013 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 142

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 1

Banding

Presumed Yes

Use No asbestos detected

Removed

String to man made mineral fibre barrier above door to room

01/13

Printed on 04/07/2019 at 09:32:30

Page 27 of 89P2.netweb based property management

Page 28: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

8

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1NOQuantity sampled

01134-01-12-SP01Sample number

Location

012 CaretakerRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 143

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

<1 per year (1)

Priority score 2

Banding

Presumed Yes

Use Ropes and yarns

Low

Monitor & Manage

Strongly presumed asbestos containing material within old electric

service head.

2

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

100M2Quantity sampled

01134-01-11-01Sample number

Location

011 DiningRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 144

Survey date

FLOOR

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Occasionally disturbed (1)

>50m2 or>50m pipe run (3)

>10 (3)

Daily (3)

>1 to <3 hours (1)

Minor disturbance (0)

ACM unlikely to de disturbed (0)

Priority score 5

Banding

Presumed No

Use Flooring

Very Low

Monitor & Manage

Possibly still located under blue vinyl floor covering

Printed on 04/07/2019 at 09:32:30

Page 28 of 89P2.netweb based property management

Page 29: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1NOQuantity sampled

01134-01-10-SPSample number

Location

010 Staff WCRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 145

Survey date

CISTERN

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Periodic disturbance activity (2)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

1 to 3 (1)

Daily (3)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 4

Banding

Presumed No

Use Reinforced composites

Removed

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4M2Quantity sampled

01134-01-09-01Sample number

Location

009 ReprographicsRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 146

Survey date

FLOOR

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Flooring

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 29 of 89P2.netweb based property management

Page 30: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2M2Quantity sampled

01134-01-08-01Sample number

Location

008 OfficeRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 147

Survey date

PANEL BELOW WINDOW

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Removed

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-01-08-SP03Sample number

Location

008 OfficeRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 148

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use

Low

Monitor & Manage

Insulation Board behind timber panels to external walls. Due to

office alterations this now refers to small area by window reveal.

Printed on 04/07/2019 at 09:32:30

Page 30 of 89P2.netweb based property management

Page 31: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2M2Quantity sampled

01134-01-07-01Sample number

Location

007 OfficeRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 149

Survey date

REAR WALL BELOW WINDOW

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Removed

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-01-06-SP03Sample number

Location

006 Pupil WCRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 150

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

Printed on 04/07/2019 at 09:32:30

Page 31 of 89P2.netweb based property management

Page 32: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1M2 X 9Quantity sampled

01134-01-05-01Sample number

Location

005 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 151

Survey date

PANEL BELOW WINDOW

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Easily disturbed (2)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 7

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

12M2Quantity sampled

01134-01-05-02Sample number

Location

005 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 152

Survey date

FLOOR

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Flooring

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 32 of 89P2.netweb based property management

Page 33: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

12M2Quantity sampled

01134-01-05-SP03Sample number

Location

005 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 153

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

REMOVED

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2NOQuantity sampled

01134-01-04-01Sample number

Location

004 Pupil WCRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 154

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Periodic disturbance activity (2)

Rooms up to 100m2 (2)

Easily disturbed (2)

Small amounts or items (0)

>10 (3)

Daily (3)

<1 hour (0)

Medium disturbance (2)

>1 per year (2)

Priority score 8

Banding

Presumed No

Use Reinforced composites

Removed

Printed on 04/07/2019 at 09:32:30

Page 33 of 89P2.netweb based property management

Page 34: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-01-04-SP03Sample number

Location

004 Pupil WCRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 155

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

21M2Quantity sampled

01134-01-03-SP03Sample number

Location

003 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 156

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Minor disturbance (0)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

Printed on 04/07/2019 at 09:32:30

Page 34 of 89P2.netweb based property management

Page 35: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

8M2Quantity sampled

01134-01-02-SP03Sample number

Location

002 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 157

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board behind timber panels to external walls

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

>30M2Quantity sampled

01134-01-00-01Sample number

Location

000 External/FixturesRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 158

Survey date

SOFFIT

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Outdoors (0)

Occasionally disturbed (1)

>50m2 or>50m pipe run (3)

None (0)

Daily (3)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 4

Banding

Presumed No

Use Cement Fully compressed

sheets

Very Low

Monitor & Manage

Printed on 04/07/2019 at 09:32:30

Page 35 of 89P2.netweb based property management

Page 36: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

30 m2Quantity sampled

01134-01-00-DN003803Sample number

Location

000 External/FixturesRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 175

Survey date

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

No Asbestos Detected

Bitumen lined paper membrane to rear of tile cladding left side

external of room 21

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

50 m2Quantity sampled

01134-01-00-DN003804Sample number

Location

000 External/FixturesRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 176

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Low disturbance (1)

ACM unlikely to de disturbed (0)

Priority score 2

Banding

Presumed No

Use Asbestos Insulating Board

Very Low

Restrict Access

Insulation board behind bitumen lined paper membrane to rear of

tile cladding left side external of room 21

Printed on 04/07/2019 at 09:32:30

Page 36 of 89P2.netweb based property management

Page 37: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

25 mQuantity sampled

01134-01-00-DN003805Sample number

Location

000 External/FixturesRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 177

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Outdoors (0)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to de disturbed (0)

Priority score 1

Banding

Presumed No

Use Cement Pre-formed products

Very Low

Monitor & Manage

Cement soffit

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

14 mQuantity sampled

01134-01-11-DN003795Sample number

Location

011 DiningRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 178

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Confined spaces (3)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Low disturbance (1)

ACM unlikely to de disturbed (0)

Priority score 4

Banding

Presumed No

Use AIB cores/linings of

composite

Low

Restrict Access

Insulation board column linings

Printed on 04/07/2019 at 09:32:30

Page 37 of 89P2.netweb based property management

Page 38: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

8

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

14 m2Quantity sampled

01134-01-13-DN003796Sample number

Location

013 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 179

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Confined spaces (3)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

<1 per year (1)

Priority score 4

Banding

Presumed No

Use Ropes and yarns

Low

Restrict Access

String to MMMF fire break and associated debris within ceiling void

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

8 mQuantity sampled

01134-01-13-SPDN003795Sample number

Location

013 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 180

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 4

Banding

Presumed Yes

Use

Low

Restrict Access

Insulation board column linings

Printed on 04/07/2019 at 09:32:30

Page 38 of 89P2.netweb based property management

Page 39: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 mQuantity sampled

01134-01-13-P01Sample number

Location

013 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 181

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Confined spaces (3)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

<1 per year (1)

Priority score 3

Banding

Presumed Yes

Use Asbestos Insulating Board

Very Low

Monitor & Manage

Presumed external cement soffit penetrating into ceiling void

obscured by RSJ. Sampled externally. Monitor externally.

8

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

12 mQuantity sampled

01134-01-02-SPDN003796Sample number

Location

002 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 182

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Confined spaces (3)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 4

Banding

Presumed Yes

Use Ropes and yarns

Low

Restrict Access

String to MMMF fire break within ceiling void

Printed on 04/07/2019 at 09:32:30

Page 39 of 89P2.netweb based property management

Page 40: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

16 mQuantity sampled

01134-01-02-DN003798Sample number

Location

002 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 183

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Confined spaces (3)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 4

Banding

Presumed No

Use Asbestos Insulating Board

Low

Restrict Access

Insulation board column linings

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 mQuantity sampled

01134-01-02-P01Sample number

Location

002 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 184

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Confined spaces (3)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

<1 per year (1)

Priority score 4

Banding

Presumed Yes

Use

Very Low

Monitor & Manage

Presumed external cement soffit penetrating into ceiling void

obscured by RSJ. Sampled externally. Monitor externally.

Printed on 04/07/2019 at 09:32:30

Page 40 of 89P2.netweb based property management

Page 41: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

25 m2Quantity sampled

01134-01-21-DN003799Sample number

Location

021 HallRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 185

Survey date

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

No Asbestos Detected

Insulation board ceiling

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

25 m2Quantity sampled

01134-01-21-DN003800Sample number

Location

021 HallRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 186

Survey date

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

No Asbestos Detected

Insulation board ceiling

Printed on 04/07/2019 at 09:32:30

Page 41 of 89P2.netweb based property management

Page 42: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

25 m2Quantity sampled

01134-01-21-DN003801Sample number

Location

021 HallRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 187

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Confined spaces (3)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 4

Banding

Presumed No

Use Asbestos Insulating Board

Low

Restrict Access

Insulation board walls, rear visible via ceiling void in room 02

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

25 m2Quantity sampled

01134-01-21-DN003802Sample number

Location

021 HallRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 188

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

>10 (3)

Daily (3)

>1 to <3 hours (1)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Low

Monitor & Manage

Insulation board walls

Printed on 04/07/2019 at 09:32:30

Page 42 of 89P2.netweb based property management

Page 43: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

9 m2Quantity sampled

01134-01-26-HO000615Sample number

Location

026 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 189

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Medium damage (2)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

()

()

()

()

Priority score

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Insulation board wall panels to left hand side wall

3

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

20 m2Quantity sampled

01134-01-26-HO000616Sample number

Location

026 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 190

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use Cement Pre-formed products

Very Low

Monitor & Manage

Cement ceiling panels

Printed on 04/07/2019 at 09:32:30

Page 43 of 89P2.netweb based property management

Page 44: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVEDAsbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

8 m2Quantity sampled

01134-01-26-HO000617Sample number

Location

026 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 191

Survey date

Therm-Ins,Spray,etc (see Use) (3)

Medium damage (2)

Unsealed AIB,enc Lagging&Spray (2)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

Removed

Insulation to boiler

REMOVEDAsbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

8 m2Quantity sampled

01134-01-26-HO000618Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 192

Survey date

Therm-Ins,Spray,etc (see Use) (3)

Medium damage (2)

Unsealed AIB,enc Lagging&Spray (2)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

Removed

Insulation to boiler

Printed on 04/07/2019 at 09:32:30

Page 44 of 89P2.netweb based property management

Page 45: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVEDAsbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

8 m2Quantity sampled

01134-01-26-HO000619Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 193

Survey date

Therm-Ins,Spray,etc (see Use) (3)

Medium damage (2)

Unsealed AIB,enc Lagging&Spray (2)

Not asbestos (0)

Material score

Banding

Presumed Yes

Use No asbestos detected

Removed

Insulation to boiler

REMOVED

10

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

13 mQuantity sampled

01134-01-26-HO000620Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 194

Survey date

Type of activity

Therm-Ins,Spray,etc (see Use) (3)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

<1 per year (1)

Priority score

Banding

Presumed No

Use Debris

Removed

Residues to pipework beneath metal clad MMMF

Printed on 04/07/2019 at 09:32:30

Page 45 of 89P2.netweb based property management

Page 46: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

10

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6 mQuantity sampled

01134-01-26-HO000621Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 195

Survey date

Type of activity

Therm-Ins,Spray,etc (see Use) (3)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

()

()

()

()

Priority score

Banding

Presumed No

Use Debris

Removed

Residues to pipework painted white

REMOVED

11

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

13 mQuantity sampled

01134-01-26-HO000622Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 196

Survey date

Type of activity

Therm-Ins,Spray,etc (see Use) (3)

High damage (3)

Unsealed lagging&sprays (3)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

()

()

()

()

Priority score

Banding

Presumed No

Use Debris

Removed

Residues to pipework beneath metal clad MMMF

Printed on 04/07/2019 at 09:32:30

Page 46 of 89P2.netweb based property management

Page 47: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

11

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

13 mQuantity sampled

01134-01-26-HO000623Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 197

Survey date

Type of activity

Therm-Ins,Spray,etc (see Use) (3)

High damage (3)

Unsealed lagging&sprays (3)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

()

()

()

()

Priority score

Banding

Presumed No

Use Debris

Removed

Residues to pipework beneath metal clad MMMF

REMOVED

11

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

13 mQuantity sampled

01134-01-26-HO000624Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 198

Survey date

Type of activity

Therm-Ins,Spray,etc (see Use) (3)

High damage (3)

Unsealed lagging&sprays (3)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

()

()

()

()

Priority score

Banding

Presumed No

Use Debris

Removed

Residues to pipework beneath metal clad MMMF

Printed on 04/07/2019 at 09:32:30

Page 47 of 89P2.netweb based property management

Page 48: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVEDAsbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 mQuantity sampled

01134-01-26-HO000625Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 199

Survey date

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

Removed

Gasket to flue at rear of boiler

REMOVEDAsbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 m2Quantity sampled

01134-01-26-HO000626Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 200

Survey date

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

Removed

Gaskets to pipe work and pump valves

Printed on 04/07/2019 at 09:32:30

Page 48 of 89P2.netweb based property management

Page 49: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVEDAsbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 mQuantity sampled

01134-01-26-HO000627Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 201

Survey date

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

Removed

Seal behind fire cement on flue

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 no.Quantity sampled

01134-01-26-SP01Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 202

Survey date

Type of activity

Therm-Ins,Spray,etc (see Use) (3)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

()

()

()

()

Priority score

Banding

Presumed Yes

Use

Removed

Strongly presumed asbestos within live boiler and flue

Printed on 04/07/2019 at 09:32:30

Page 49 of 89P2.netweb based property management

Page 50: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 m2Quantity sampled

01134-01-26-SP02Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 203

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

()

()

()

()

Priority score

Banding

Presumed Yes

Use Cloth

Removed

Strongly presumed asbestos within live electrics

REMOVED

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 m2Quantity sampled

01134-01-26-SP03Sample number

Location

26 Boiler RoomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 204

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

()

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

1 to 3 (1)

()

()

()

()

Priority score

Banding

Presumed Yes

Use

Removed

Strongly presumed asbestos within sealed gaskets

Printed on 04/07/2019 at 09:32:30

Page 50 of 89P2.netweb based property management

Page 51: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

3

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

Quantity sampled

01134-01-999-01Sample number

Location

001 CirculationRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 205

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

>50m2 or>50m pipe run (3)

>10 (3)

Daily (3)

>6 hours (3)

Minor disturbance (0)

ACM unlikely to de disturbed (0)

Priority score 5

Banding

Presumed Yes

Use Reinforced composites

Very Low

Monitor & Manage

Bldg 1 rm 3 and 5. While laying new vinyl flooring it was found

that tiles had been laid on top of existing tiles. Be aware that

through out the building there may be more than one floor tile

affixed to the screed. TREAT WITH CAUTION.

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2m2Quantity sampled

01334-01-05-03Sample number

Location

005 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 216

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite,Chrysotile (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Periodic disturbance activity (2)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 7

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Panel above heating

Printed on 04/07/2019 at 09:32:30

Page 51 of 89P2.netweb based property management

Page 52: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1m2Quantity sampled

01334-01-11-02Sample number

Location

011 DiningRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 217

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite,Chrysotile (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>6 hours (3)

Medium disturbance (2)

>1 per month (3)

Priority score 8

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Panel above heater

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4m2Quantity sampled

01334-01-21-02Sample number

Location

021 HallRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 218

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite,Chrysotile (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Daily (3)

>6 hours (3)

Medium disturbance (2)

>1 per year (2)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Low

Monitor & Manage

Panel above heater and to lining

Printed on 04/07/2019 at 09:32:30

Page 52 of 89P2.netweb based property management

Page 53: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1m2Quantity sampled

01334-01-21-P03Sample number

Location

021 HallRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 219

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Medium damage (2)

Unsealed AIB,enc Lagging&Spray (2)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Daily (3)

>6 hours (3)

Medium disturbance (2)

>1 per year (2)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Low

Monitor & Manage

Panel above heater

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2m2Quantity sampled

01334-01-24-03Sample number

Location

024 ClassroomRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 220

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite,Chrysotile (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Low

Monitor & Manage

Panel above heater cupboard

Printed on 04/07/2019 at 09:32:30

Page 53 of 89P2.netweb based property management

Page 54: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

Quantity sampled

01134-01-11-03Sample number

Location

011 DiningRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 227

Survey date

()

()

()

Not asbestos (0)

Material score

Banding

Presumed No

Use Millboard

No Asbestos Detected

Plasterboard

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

Quantity sampled

01134-01-11-04Sample number

Location

011 DiningRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 228

Survey date

()

()

()

Not asbestos (0)

Material score

Banding

Presumed No

Use Millboard

No Asbestos Detected

Plasterboard

Printed on 04/07/2019 at 09:32:30

Page 54 of 89P2.netweb based property management

Page 55: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 m linearQuantity sampled

01134-01-033-EE016Sample number

Location

033 StorageRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 251

Survey date

Ceiling void - External soffit

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Enc Lagging&Sprays,AIB,etc (1)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>1 to <3 hours (1)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 3

Banding

Presumed No

Use Cement Pre-formed products

Very Low

Remove

Reverse side of external soffit board is visible from within the

ceiling void.

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 m2Quantity sampled

01134-01-033-EEX003Sample number

Location

033 StorageRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 252

Survey date

Ceiling void - Bitumen remains to s

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Bitumen products

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 55 of 89P2.netweb based property management

Page 56: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 NumberQuantity sampled

01134-01-033-EEX004Sample number

Location

033 StorageRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 253

Survey date

Columns - Impregnated bitumen pa

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Bitumen products

No Asbestos Detected

Paper lining to columns was observed from within the ceiling void.

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6 m linearQuantity sampled

01134-01-011-EEX006Sample number

Location

011 DiningRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 254

Survey date

Ceiling void - Remains to timber fra

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use

No Asbestos Detected

Remains/ residue was observed to the timber framework above

and behind the Servery.

Printed on 04/07/2019 at 09:32:30

Page 56 of 89P2.netweb based property management

Page 57: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

8 Approx NumberQuantity sampled

01134-01-011-EEX004Sample number

Location

011 DiningRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 255

Survey date

Columns - Impregnated bitumen pa

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Bitumen products

No Asbestos Detected

Paper lining to columns was observed from within the ceiling void.

8

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4 m linearQuantity sampled

01134-01-011-EEX007Sample number

Location

011 DiningRoomGFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 256

Survey date

Ceiling void - String ties to MMMF f

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

>10 (3)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use Cloth

Low

Restrict Access

Printed on 04/07/2019 at 09:32:30

Page 57 of 89P2.netweb based property management

Page 58: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

10

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 m2Quantity sampled

01134-01-012-EEP005Sample number

Location

012 CaretakerRoomFloor

01 00 Main School BuildingBuilding :

Material assessment

Reference 257

Survey date

Ceiling void - Heater unit

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 4

Banding

Presumed No

Use

Medium

Remove

Asbestos insulating board debris and lining panel to heater unit

below were observed via the ceiling void - No physical access to

sample.

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1NOQuantity sampled

01134-02-06-P01Sample number

Location

006 StorageRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 99

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

<1 per year (1)

Priority score 2

Banding

Presumed Yes

Use

Low

Monitor & Manage

Strongly Presumed asbestos containing material within boiler

Printed on 04/07/2019 at 09:32:30

Page 58 of 89P2.netweb based property management

Page 59: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

8

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

0.25 SQ MQuantity sampled

01134-02-06-P03Sample number

Location

006 StorageRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 100

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

Small amounts or items (0)

None (0)

Weekly (2)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Lining to extractor fan casing at high level.

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3 SQ MQuantity sampled

01134-02-06-02Sample number

Location

006 StorageRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 101

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Unsealed AIB,enc Lagging&Spray (2)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

None (0)

Monthly (1)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 2

Banding

Presumed No

Use Asbestos Insulating Board

Very Low

Monitor & Manage

Wall to left hand side when facing boiler, and door lining.

See Environtec DEC 2011 report.

Printed on 04/07/2019 at 09:32:30

Page 59 of 89P2.netweb based property management

Page 60: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

20M2Quantity sampled

01134-02-01-01Sample number

Location

001 NurseryRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 102

Survey date

FLOOR

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Flooring

No Asbestos Detected

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-02-01-01ENVSample number

Location

001 NurseryRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 103

Survey date

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use

No Asbestos Detected

Insulation Board ceiling tiles to heater vents

01134-02-01-01(Environtec)

Printed on 04/07/2019 at 09:32:30

Page 60 of 89P2.netweb based property management

Page 61: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1m2Quantity sampled

01134-02-01-02Sample number

Location

001 NurseryRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 221

Survey date

()

()

()

Not asbestos (0)

Material score

Banding

Presumed No

Use Bitumen products

No Asbestos Detected

Bitumen residue to metal corrugated sheet roof to flue pipe

penetration.

REMOVED

9

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1m2Quantity sampled

01134-02-06-03Sample number

Location

006 StorageRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 222

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

None (0)

Daily (3)

<1 hour (0)

Medium disturbance (2)

>1 per year (2)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Insulating board debris to floor to old handle.

Printed on 04/07/2019 at 09:32:30

Page 61 of 89P2.netweb based property management

Page 62: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 Lin MQuantity sampled

01134-02-06-04Sample number

Location

006 StorageRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 223

Survey date

()

()

()

Not asbestos (0)

Material score

Banding

Presumed No

Use Reinforced composites

No Asbestos Detected

Mastic seal within live boiler.

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 Lin MQuantity sampled

01134-02-06-05Sample number

Location

006 StorageRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 224

Survey date

()

()

()

Not asbestos (0)

Material score

Banding

Presumed No

Use Ropes and yarns

No Asbestos Detected

Woven seal within live boiler.

Printed on 04/07/2019 at 09:32:30

Page 62 of 89P2.netweb based property management

Page 63: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1m2Quantity sampled

01134-02-06-06Sample number

Location

006 StorageRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 225

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

None (0)

Daily (3)

<1 hour (0)

Medium disturbance (2)

>1 per year (2)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Insulating board linings to vent to back wall.

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 UnitsQuantity sampled

01134-02-06-SP01Sample number

Location

006 StorageRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 226

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Unsealed AIB,enc Lagging&Spray (2)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

None (0)

Daily (3)

<1 hour (0)

Medium disturbance (2)

>1 per year (2)

Priority score 6

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulating board linings to lower vent to back wall behind boiler x2.

Printed on 04/07/2019 at 09:32:30

Page 63 of 89P2.netweb based property management

Page 64: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

3

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4m2Quantity sampled

01134-02-04-01Sample number

Location

004 Staff WCRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 287

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Confined spaces (3)

Routinely disturbed (3)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

High disturbance (3)

>1 per year (2)

Priority score 5

Banding

Presumed No

Use Bitumen products

Removed

Bitumen debris on ceiling tiles

3

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4m2Quantity sampled

01134-02-04-SP01Sample number

Location

004 Staff WCRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 288

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Confined spaces (3)

Routinely disturbed (3)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

<1 hour (0)

High disturbance (3)

>1 per year (2)

Priority score 5

Banding

Presumed Yes

Use Bitumen products

Very Low

Monitor & Manage

Bitumen felt to pipework penetration to roof

Printed on 04/07/2019 at 09:32:30

Page 64 of 89P2.netweb based property management

Page 65: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 Lin MQuantity sampled

01134-02-05-01Sample number

Location

005 Dis WCRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 289

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Confined spaces (3)

Routinely disturbed (3)

Small amounts or items (0)

None (0)

Infrequent (0)

3 (0)

High disturbance (3)

>1 per year (2)

Priority score 5

Banding

Presumed No

Use Asbestos Insulating Board

Low

Monitor & Manage

Insulating board panel within ceiling void above entrance door

area.

Encapsulation of A B within ceiling void to Room 5.

Carried out by MJW Asbestos and Acorn Analytical Services

20.05.2019.

B-22671

2

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

5m2Quantity sampled

01134-02-00-01Sample number

Location

000 External/FixturesRoomFloor

02 00 Nursery & StoreBuilding :

Material assessment

Reference 290

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Outdoors (0)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

None (0)

Infrequent (0)

3 (0)

Minor disturbance (0)

<1 per year (1)

Priority score 2

Banding

Presumed No

Use Cement

Semi-compressed sheets

Very Low

Monitor & Manage

Cement infill panels above windows

Printed on 04/07/2019 at 09:32:30

Page 65 of 89P2.netweb based property management

Page 66: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

50m2Quantity sampled

01134-03-00-01Sample number

Location

000 External/FixturesRoomFloor

03 00 New ClassroomBuilding :

Material assessment

Reference 291

Survey date

()

()

()

Not asbestos (0)

Material score

Banding

Presumed No

Use Cement

Semi-compressed sheets

No Asbestos Detected

Cement fascia boards to perimeter of building

2

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2M2Quantity sampled

01134-50-05-01Sample number

Location

005 Staff WCRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 87

Survey date

W.C FLOOR

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

<1 hour (0)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 4

Banding

Presumed No

Use Flooring

Very Low

Monitor & Manage

Possibly still located under vinyl floor covering.

Printed on 04/07/2019 at 09:32:30

Page 66 of 89P2.netweb based property management

Page 67: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1NOQuantity sampled

01134-50-05-05Sample number

Location

005 Staff WCRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 88

Survey date

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Low damage (1)

Composite materials (0)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

Small amounts or items (0)

>10 (3)

Daily (3)

<1 hour (0)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use Reinforced composites

Removed

Toilet Cisterns

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2M2Quantity sampled

01134-50-04-02Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 89

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Kitchen Office panel below window

Printed on 04/07/2019 at 09:32:30

Page 67 of 89P2.netweb based property management

Page 68: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2M2Quantity sampled

01134-50-04-01Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 90

Survey date

KITCHEN OFFICE

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Flooring

No Asbestos Detected

Possibly still located under vinyl floor covering.

REMOVED

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4M2Quantity sampled

01134-50-04-SP01Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 91

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

>10 (3)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 7

Banding

Presumed Yes

Use Asbestos Insulating Board

Removed

Insulation Board wall panels to external walls

Printed on 04/07/2019 at 09:32:30

Page 68 of 89P2.netweb based property management

Page 69: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2M2Quantity sampled

01134-50-02-01Sample number

Location

002 StorageRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 92

Survey date

STORE INTERNAL PARTITION WA

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Removed

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3M2Quantity sampled

01134-50-01-02Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 93

Survey date

KITCHEN PANEL BELOW WINDOW

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

4 to 10 (2)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Printed on 04/07/2019 at 09:32:30

Page 69 of 89P2.netweb based property management

Page 70: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

4

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

16M2Quantity sampled

01134-50-01-01Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 94

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

>10 (3)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 7

Banding

Presumed No

Use Asbestos Insulating Board

Removed

Insulation Board wall panels to external walls

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

40M2Quantity sampled

01134-50-01-03Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 95

Survey date

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Asbestos Insulating Board

No Asbestos Detected

Insulation Board ceiling panels

Printed on 04/07/2019 at 09:32:30

Page 70 of 89P2.netweb based property management

Page 71: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-50-01-04Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 96

Survey date

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Asbestos Insulating Board

No Asbestos Detected

Insulation Board panels to extraction hood

REMOVED

7

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

46M2Quantity sampled

01134-50-01-P01Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 97

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good condition (0)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Confined spaces (3)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

None (0)

Infrequent (0)

<1 hour (0)

Minor disturbance (0)

<1 per year (1)

Priority score 3

Banding

Presumed Yes

Use

Removed

Strongly Presumed asbestos within Insulation Board above

encapsulated ceiling panels

Printed on 04/07/2019 at 09:32:30

Page 71 of 89P2.netweb based property management

Page 72: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6M2Quantity sampled

01134-50-01-02ENVSample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 98

Survey date

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Composite materials (0)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

>10 (3)

Daily (3)

>6 hours (3)

Low disturbance (1)

<1 per year (1)

Priority score 7

Banding

Presumed No

Use

Removed

Insulation Board partition wall, both sides.

01134-50-01-02(Environtec)

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

9 m2Quantity sampled

01134-50-2-P24Sample number

Location

002 StorageRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 206

Survey date

Insulating board panels to dividing

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

Printed on 04/07/2019 at 09:32:30

Page 72 of 89P2.netweb based property management

Page 73: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVEDAsbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 m2Quantity sampled

01134-50-2-P28Sample number

Location

002 StorageRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 207

Survey date

Insulating board to ceiling

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

Removed

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4 m2Quantity sampled

01134-50-3-P31Sample number

Location

003 KitchenRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 208

Survey date

Insulating board to ceiling

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 73 of 89P2.netweb based property management

Page 74: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3 m2Quantity sampled

01134-50-4-P41Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 209

Survey date

Insulating board panels below win

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use

Removed

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 m2Quantity sampled

01134-50-4-P42Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 210

Survey date

Insulating board to ceiling

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 74 of 89P2.netweb based property management

Page 75: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 m2Quantity sampled

01134-50-5-P51Sample number

Location

005 Staff WCRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 211

Survey date

Insulating board to ceiling

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

No Asbestos Detected

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

50 m2Quantity sampled

01134-50-01-BR001087Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 212

Survey date

Insulating board to ceiling

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 75 of 89P2.netweb based property management

Page 76: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

9 m2Quantity sampled

01134-50-01-BR001088Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 213

Survey date

Insulating board panels to dividing

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

REMOVED

6

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

20 m2Quantity sampled

01134-50-01-BR001089Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 214

Survey date

Insulating board panels below win

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Low damage (1)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activiy (1)

Large rooms/well ventilated (1)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 6

Banding

Presumed No

Use

Removed

Printed on 04/07/2019 at 09:32:30

Page 76 of 89P2.netweb based property management

Page 77: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3 m2Quantity sampled

01134-50-01-BR001090Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 215

Survey date

Bitumen to sinks

Asb-Reinfd comps,etc (see Use) (1)

Good condition (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use No asbestos detected

No Asbestos Detected

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

50 m2Quantity sampled

01134-50-001-EE003Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 229

Survey date

Ceiling void - Bitumen debris

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Bitumen products

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 77 of 89P2.netweb based property management

Page 78: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6 Approx NumberQuantity sampled

01134-50-001-EE004Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 230

Survey date

Columns - Impregnated bitumen pa

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Bitumen products

No Asbestos Detected

Paper lining to columns was observed from within the ceiling void

of Gas Meter Room 033.

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

30 m linearQuantity sampled

01134-50-001-EE005Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 231

Survey date

Ceiling void - String ties to MMMF p

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Cloth

No Asbestos Detected

2 No pipes appear to extend the full length of the Kitchen block.

Printed on 04/07/2019 at 09:32:30

Page 78 of 89P2.netweb based property management

Page 79: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6 m linearQuantity sampled

01134-50-001-EE006Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 232

Survey date

Ceiling void - Remains to timber fra

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use

No Asbestos Detected

Remains/ residue was observed to the timber framework above

and behind the Servery.

8

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6 m linearQuantity sampled

01134-50-001-EE007Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 233

Survey date

Ceiling void - String ties to MMMF f

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use Cloth

Low

Restrict Access

Printed on 04/07/2019 at 09:32:30

Page 79 of 89P2.netweb based property management

Page 80: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

25 m2Quantity sampled

01134-50-001-EE008Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 234

Survey date

Ceiling - Panels

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use

No Asbestos Detected

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

25 m2Quantity sampled

01134-50-001-EE009Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 235

Survey date

Ceiling - Panels

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 80 of 89P2.netweb based property management

Page 81: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

5 m2Quantity sampled

01134-50-001-EE010Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 236

Survey date

Wall panels - External wall beneat

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good-no damage (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

12 m2Quantity sampled

01134-50-001-EE011Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 237

Survey date

Wall panels - Adjoining Store 002

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good-no damage (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

>10m2 to <50m2 or >10m to <50m (2)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

Insulating board wall panels are double sided.

Printed on 04/07/2019 at 09:32:30

Page 81 of 89P2.netweb based property management

Page 82: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

5 NumberQuantity sampled

01134-50-001-EE012Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 238

Survey date

Work units - Bitumen paint

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Bitumen products

No Asbestos Detected

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 m2Quantity sampled

01134-50-002-EE014Sample number

Location

002 StorageRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 239

Survey date

Ceiling - Panels

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use

No Asbestos Detected

Printed on 04/07/2019 at 09:32:30

Page 82 of 89P2.netweb based property management

Page 83: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4 m2Quantity sampled

01134-50-002-EEX011Sample number

Location

002 StorageRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 240

Survey date

Wall panels - Adjoining Kitchen 00

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good-no damage (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>1 to <3 hours (1)

Low disturbance (1)

<1 per year (1)

Priority score 4

Banding

Presumed No

Use

Removed

Insulating board wall panels are double sided.

REMOVED

10

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 m2Quantity sampled

01134-50-002-EEP001Sample number

Location

002 StorageRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 241

Survey date

Ceiling void - Asbestos insulating

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>1 to <3 hours (1)

High disturbance (3)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

Asbestos insulating board debris was observed from within the

Kitchen ceiling void along with enclosure remains, therefore no

intrusive inspections were made through the fixed ceiling as the

assistance of a removal contractor is required.

Printed on 04/07/2019 at 09:32:30

Page 83 of 89P2.netweb based property management

Page 84: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 NumberQuantity sampled

01134-50-001-EE013Sample number

Location

001 KitchenRoomGFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 242

Survey date

Radiator - Control knob

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Reinforced composites

No Asbestos Detected

REMOVED

10

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

6 m2Quantity sampled

01134-50-003-EEP002Sample number

Location

003 KitchenRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 243

Survey date

Ceiling void - Asbestos insulating

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Rare disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>1 to <3 hours (1)

High disturbance (3)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

Asbestos insulating board debris was observed from within the

Kitchen ceiling void along with enclosure remains, therefore no

intrusive inspections were made through the fixed ceiling as the

assistance of a removal contractor is required.

Printed on 04/07/2019 at 09:32:30

Page 84 of 89P2.netweb based property management

Page 85: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

10

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3 m2Quantity sampled

01134-50-005-EEP003Sample number

Location

005 Staff WCRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 244

Survey date

Ceiling void - Asbestos insulating

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>1 to <3 hours (1)

High disturbance (3)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

Asbestos insulating board debris was observed from within the

Kitchen ceiling void along with enclosure remains, therefore no

intrusive inspections were made through the fixed ceiling as the

assistance of a removal contractor is required.

2

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

3 m2Quantity sampled

01134-50-005-EE015Sample number

Location

005 Staff WCRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 245

Survey date

Floor - Bitumen adhesive beneath

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>1 to <3 hours (1)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 3

Banding

Presumed No

Use Bitumen products

Very Low

Remove

Printed on 04/07/2019 at 09:32:30

Page 85 of 89P2.netweb based property management

Page 86: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

REMOVED

10

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4 m2Quantity sampled

01134-50-004-EEP004Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 246

Survey date

Ceiling void - Asbestos insulating

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

High damage (3)

Unsealed AIB,enc Lagging&Spray (2)

Crocidolite (3)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

High disturbance (3)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

Asbestos insulating board debris was observed from within the

Kitchen ceiling void along with enclosure remains, therefore no

intrusive inspections were made through the fixed ceiling as the

assistance of a removal contractor is required.

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 Approx NumberQuantity sampled

01134-50-004-EEX004Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 247

Survey date

Columns - Impregnated bitumen pa

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Bitumen products

No Asbestos Detected

Paper lining to columns was observed via removal of plaster

reveals.

Printed on 04/07/2019 at 09:32:30

Page 86 of 89P2.netweb based property management

Page 87: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

1 NumberQuantity sampled

01134-50-004-EEX013Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 248

Survey date

Radiator - Control knob

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Not asbestos (0)

Material score

Banding

Presumed No

Use Reinforced composites

No Asbestos Detected

REMOVED

5

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

2 m2Quantity sampled

01134-50-004-EEX010Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 249

Survey date

Wall panels - External wall beneat

Type of activity

AIB,Textiles,Rope,etc(see Use) (2)

Good-no damage (0)

Enc Lagging&Sprays,AIB,etc (1)

Amphibole ex. Crocidolite (2)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Occasionally disturbed (1)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Low disturbance (1)

<1 per year (1)

Priority score 5

Banding

Presumed No

Use

Removed

Printed on 04/07/2019 at 09:32:30

Page 87 of 89P2.netweb based property management

Page 88: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

Site 01134 : Intake Farm Primary School

Asbestos Register Detail

2

Asbestos type

Damage/deterioration

Surface treatment

Product type

20-May-19

4 m2Quantity sampled

01134-50-004-EEX015Sample number

Location

004 OfficeRoomFloor

50 00 Catering ServicesBuilding :

Material assessment

Reference 250

Survey date

Floor - Bitumen adhesive beneath

Type of activity

Asb-Reinfd comps,etc (see Use) (1)

Good-no damage (0)

Composite materials (0)

Chrysotile (1)

Location

Accessibility

Priority assessment

Extent

Occupants using space

Frequency of use

Average time of use

Type of maintenance

Frequency of maintenance

Material score

Low disturbance activity (0)

Rooms up to 100m2 (2)

Usually inaccessible/unlikely (0)

<10m2 or 10m pipe run (1)

1 to 3 (1)

Daily (3)

>3 to<6 hours (2)

Minor disturbance (0)

ACM unlikely to be disturbed (0)

Priority score 3

Banding

Presumed No

Use Bitumen products

Very Low

Remove

Printed on 04/07/2019 at 09:32:30

Page 88 of 89P2.netweb based property management

Page 89: Asbestos Inspection Report - Nottinghamshire · 8-Aug-2018 Refurbishment Asbestos Schematic is awaiting updating by N.C.C. cad technician following R & D surveys by Acorn Ref; 206

This table lists all the visit records held against this site

Visit history for this site

Visit date Surveyor CommentsVisit type

Building 02, Room 054-Jul-2019 TR

20-May-2019 Re inspection

18-Mar-2019 Re inspection

2-Mar-2019 Refurbishment

23-Dec-2018 Re inspection

Client2-Nov-2018 Re inspection

31-Oct-2018 TR

31-Oct-2018 TR

31-Oct-2018 Refurbishment

31-Oct-2018 TR

27-Oct-2018 Re inspection

28-Aug-2018 Re inspection

8-Aug-2018 Refurbishment

Asbestos Schematic is awaiting updating

by N.C.C. cad technician

following R & D surveys by Acorn Ref;

206 to 215, & Environtec Ref; 216 to 220.

Cad technician has been made aware by

email.

2-May-2018 Management Survey

19-Feb-2018 Refurbishment

26-Apr-2017 Management Survey

24-Feb-2017 Refurbishment & Demolition

Survey

Last input ref 2043-Mar-2016 Management Survey

27-Apr-2015 R&D

11-Mar-2015 Management Survey

30-May-2014 Re inspection

19-May-2014 Refurbishment & Demolition

Survey

1-May-2014 Refurbishment & Demolition

Survey

5-Jan-2014 Refurbishment & Demolition

Survey

25-Sep-2012 Re inspection

1-Dec-2011 Refurbishment and Demolition

Survey

26-Jul-2011 Re inspection

Euro Environmental ltd13-May-2004 Type 2

Printed on 04/07/2019 at 09:32:30