Arlington Public Schools Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November 5, 2014 1

Upload: others

Post on 31-May-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

TJWG Meeting, November 5, 2015

Arlington Public SchoolsThomas Jefferson Site Evaluation

Parking Supply and Demand Estimates

Thomas Jefferson Working Group Meeting #5November 5, 2014

1

Page 2: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

INTRODUCTION

TJWG Meeting, November 5, 20142

Page 3: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

• Goal of our work: determine a range of parking space needs for a new elementary school and at-capacity middle school

• Also considered expanded middle school• Parking estimates used for

– Site planning– Cost estimates– Community relations

TJWG Meeting, November 5, 20143

Page 4: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

• Start by reviewing parking information– Shared at previous Working Group Meetings– Community Center survey

TJWG Meeting, November 5, 20144

Page 5: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

• On‐site: 364 spaces, including 11 ADA spaces

• Lots west of middle school• Community center lot• Tennis court lot• Shared lot (corner of 2nd Street & 

S. Old Glebe)• Kitchen/facilities lot

• On‐street: spaces available throughout neighborhood

TJWG Meeting, November 5, 20145

Page 6: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

90% of staff drive to school*

• 96% park in middle school lots

• 1% park in the community center lots

• 3% park on-street

*from APS GO! Survey, spring 2014

86% of patrons drive to the community center*

• 90% parked in community center lots**

• 9% parked on-street• <1% parked in middle

school lots• <1% parked elsewhere

*from survey conducted**tennis courts (2%), community center (84%), shared lot (3.5%)

TJWG Meeting, November 5, 20146

Page 7: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

*Shows parking before dismissal (~1:30PM) on a typical day

14%

47%42% 44%

0%5%10%15%20%25%30%35%40%45%50%

Occupancy of Lots

Parking Occupancy

TJWG Meeting, November 5, 20147

Page 8: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

WHAT HAVE WE HEARD ABOUT PARKING FROM PUBLIC INPUT?

TJWG Meeting, November 5, 20148

Page 9: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Ensure adequate consideration is given to neighborhood impacts of traffic and parking• Provide an amount of off-street parking

adequate to serve the regular needs of the school/s, theatre, community center and parkland

• Provide adequate parking facilities on-site for shared use between the school and the public at different hours of the day and night

TJWG Meeting, November 5, 20149

Page 10: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

In your opinion, which are the THREE most critical elements related to parking in considering the viability of locating a new elementary school on the TJ site. (96)• Ensure that adequate and conveniently

located parking is available for users of the park and community center/theater (57)

• [Consider locating] some of the required parking below or partially below grade (52)

• Provide all required parking on-site (52)

TJWG Meeting, November 5, 201410

Page 11: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

HOW DO WE DETERMINE PARKING NEED?

TJWG Meeting, November 5, 201411

Page 12: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Parking Supply: How many parking spaces are there on-site and on-street, immediately adjacent to the school and park? Parking Demand: How many parking spaces will be used on a typical school day?

How many spaces are needed on-site compared to the existing

number of spaces?

TJWG Meeting, November 5, 201412

Page 13: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

How many spaces are there currently on-site and on adjacent streets?

On‐site lots Current Supply (# of spaces) 

On‐site

Community Center Lot 61

Tennis Court Lot 62

Shared Lot 22

Middle School Lots 219

On‐site Subtotal 364On Street

Available Supply* 

(# of spaces) 

On‐street Old Glebe 

Street 12

2nd Street 6

On‐street Subtotal 18

*Assumes up to 85% occupancy of on‐street spaces and does not include cars that currently park during a typical school day 

TJWG Meeting, November 5, 201413

Page 14: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

TOTAL

Middle School (982 students) 154

Elementary School (725 Students) 104

TOTAL  258

How many cars would park at a new elementary school and an at-capacity middle school?

TJWG Meeting, November 5, 2014

• Includes parking for both staff and visitors• Based on counts of existing parking at the middle school,

County zoning and data collected at other County elementary schools.

14

Page 15: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

How many cars park associated with the community center while school is in session?

0

10

20

30

40

50

60

70

80

6:25 AM

6:45 AM

7:45 AM

8:45 AM

9:45 AM

10:45 AM

11:45 AM

12:45 PM

1:45 PM

2:45 PM

3:45 PM

4:45 PM

5:45 PM

6:45 PM

7:45 PM

8:45 PM

9:45 PM

Coun

ts (#)

Time

Peak at 9:45AM

Scho

ol starts

Scho

ol end

s

Lot  # Cars Parked at 10 AM

Community Center Lot 58

Tennis Court Lot 23

2nd & Old Glebe Lot 14

TOTAL  95

Weekday Community Center Activity

TJWG Meeting, November 5, 201415

Page 16: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

What is the total parking demand of a new elementary school, at-capacity middle school, and community center?

Use # Cars

Middle School (982 students) 154*

Elementary School (725 Students) 104*

Community Center (10AM)  95

TOTAL  353

TJWG Meeting, November 5, 201416

* Arlington County Zoning requirements are 156 spaces for an 982-student middle school and 115 spaces for an 725-student elementary school

Page 17: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Variables

On‐site/on‐street Are the total number of spaces located on‐site only or a mix of on‐site and on‐street? 

Transportation Demand Management

How can TDM affect the number of staff that drive to school?  

Several scenarios were considered to develop a range of parking needs using different answers to the following two questions:

Assumption

All scenarios assume that sufficient, convenient parking is provided to meet the expected demand for each use 

TJWG Meeting, November 5, 201417

Page 18: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Number of spaces needed on-site: 306 total spaces (or 58 fewer spaces)

Variables

On‐site/on‐street Mix of on‐site and on‐street with a max of 85%occupancy of on‐street spaces

Transportation Demand Management

10% reduction in staff parking demand

TJWG Meeting, November 5, 201418

Page 19: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Number of spaces needed on-site: 335 total spaces (or 29 fewer spaces)

Variables

On‐site/on‐street Mix of on‐site and on‐street with a max of 85%occupancy of on‐street spaces

Transportation Demand Management

No reduction in staff parking demand

TJWG Meeting, November 5, 201419

Page 20: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Number of spaces needed on-site: 324 total spaces (or fewer 40 spaces)

Variables

On‐site/on‐street All on‐site

Transportation Demand Management

10% reduction in staff parking demand

TJWG Meeting, November 5, 201420

Page 21: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Number of spaces needed on-site: 353 total spaces (or fewer 11 spaces)

Variables

On‐site/on‐street All on‐site

Transportation Demand Management

No reduction in staff parking demand

TJWG Meeting, November 5, 201421

Page 22: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Scenario A(On‐Street & TDM)

Scenario B(On‐street & No TDM)

Scenario C(On‐site & TDM)

Scenario D(On‐site & No 

TDM)RANGE

New Elementary School & at‐capacity Middle School‐58 ‐29 ‐40 ‐11 ‐58 to ‐11

Number of spaces needed on‐site:* 

TJWG Meeting, November 5, 2014

*compared to the existing 364 spaces

22

Page 23: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

What is the total parking demand of a new elementary school, expanded middle school, and community center?

Use # Cars

Middle School (982 students) 194*

Elementary School (725 Students) 104*

Community Center (10AM)  95

TOTAL  393

TJWG Meeting, November 5, 201423

* Arlington County Zoning requirements are 206 spaces for an 1300-student middle school and 115 paces for an 725-student elementary school

Page 24: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

Scenario A(On‐Street & TDM)

Scenario B(On‐street & No TDM)

Scenario C(On‐site & TDM)

Scenario D(On‐site & No 

TDM)RANGE

New Elementary School & expanded Middle School‐15 +11 +3 +29 ‐15 to +29

Number of spaces needed on‐site:* 

TJWG Meeting, November 5, 2014

* compared to the existing 364 spaces

24

Page 25: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

HOW DOES THIS AFFECT SITE DESIGN AND PARKING-RELATED PROGRAMS?

TJWG Meeting, November 5, 201425

Page 26: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

• Sampling of parking management strategies– Reduce demand: TDM program – Support convenient parking for school staff:

designated school spaces during school hours

– Protect on-street parking for residences: Residential Parking Permit Program

TJWG Meeting, November 5, 201426

Page 27: Arlington Public Schools Thomas Jefferson Site Evaluation ... · Thomas Jefferson Site Evaluation Parking Supply and Demand Estimates Thomas Jefferson Working Group Meeting #5 November

• Consider how to balance through site design– Conveniently located parking– All parking on-site: On-street parking for

shorter term use– Structured parking?

TJWG Meeting, November 5, 201427