applications of project management in public health · 2015. 8. 26. · applications of project...

29
8/26/2015 Mohit Arora, MS, PMP Applications of Project Management in Public Health Mohit Arora, MS, PMP [email protected]

Upload: others

Post on 01-Apr-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Applications of Project Management in Public Health

Mohit Arora, MS, PMP [email protected]

Page 2: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Agenda

• Background – Definitions + Characteristics

• Case Studies – Application of PM techniques in Public Health

• Project Management Tools

Page 3: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Background

Definitions + Characteristics

Page 4: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Which of these is a project?

Managing the daily tasks of a community clinic

Periodically testing the quality of city water

Continuous surveillance of population health and disease outbreaks

Creating a public health educational Campaign

Icons made by Freepik from www.flaticon.com licensed by CC BY 3.0

Page 5: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

What is a Project?

“a temporary endeavor undertaken

to create a unique product, service, or result”

Page 6: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Characteristics of Projects

• Unique purpose

• Temporary

• Requires resources

• Developed using progressive elaboration

• Involves uncertainty

Page 7: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Managing the daily tasks of a community clinic

Periodically testing the quality of city water

Continuous surveillance of population health and disease outbreaks

Creating a public health educational Campaign

Which of these is a project? Icons made by Freepik from www.flaticon.com

licensed by CC BY 3.0

Page 8: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Managing the daily tasks of a community clinic

Periodically testing the quality of city water

Continuous surveillance of population health and disease outbreaks

Creating a public health educational Campaign

Which of these is a project? Icons made by Freepik from www.flaticon.com

licensed by CC BY 3.0

Page 9: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Examples of Public Health Projects

• A community health center creates an in-house lab to expedite test results and minimize testing cost

• A hospital develops a program to reduce readmission rates by identifying and monitoring high-risk patient discharges

• A research team develops a smart phone application to assist diabetics and performs usability and field testing

• A health department launches a maternal and child health wellness program

• A health research-funding agency designs and launches a new grant program

Page 10: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Project constraints

Scope

Budget Schedule

Page 11: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

What is Project Management?

“the application of knowledge, skills, tools and techniques to project activities to meet project requirements”

Page 12: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Role of a Project Manager

Scope

Schedule

Budget

Quality

Risk

Communication

Stakeholders

Procurement

Human Resources

Page 13: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Case Studies

Application of PM techniques in Public Health

Page 14: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

NYC preventing teenage pregnancy campaign

Risk management

Page 15: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

NYC preventing teenage pregnancy campaign

• Public education campaign targeting teenage pregnancy

• Two years - $400,000

• Offended several groups including Planned Parenthood of New York City

– Stigmatized teen parents and their children

– Reinforced negative stereotypes

– Did not offer any prevention information

Page 16: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

CDC Biosense

The need for project management

Page 17: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

CDC Biosense

• Version 1 initiated in 2003

• Limited involvement from public health and preparedness stakeholders

• State and localities found it minimally acceptable – low quality, non-

useful data

• Version 2 initiated in 2010 incorporating concepts from PM

– Stakeholder engagement from the very beginning

– Improved internal contract management

Page 18: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Healthcare.gov

“broke every rule of project management”

Page 19: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Healthcare.gov

• Biggest new social program in the US since the 1960s

• Initial budget - $93.7 million Final cost - $292 million

• 1% of interested people were able to enroll in the first week of operations

• Problems – unrealistic requirements, technical complexity, fragmented authority, loose metrics, inadequate testing, aggressive schedules, administrative blindness

Page 20: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Project Management Tools

Page 21: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Scope Management

• Planning

– Requirements Analysis – interviews, walk-throughs, observation, focus groups, brainstorming, mind maps

– Work break down structure

• Monitoring

– Change management

– Watch out for scope-creep!

Page 22: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Schedule Management

Step 1

2 days

Step 2

5 days

Step 3

3 daysStart End

10 days

Page 23: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Schedule Management

Step 1

2 days

Step 2

5 days

Step 3

3 daysStart End

8 days

Page 24: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Step 1

2 days

Step 2

5 days

Step 3

3 daysStart End

Schedule Management

8 days

Critical Path

Page 25: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Schedule Management – Gantt charts

Image from http://www.idealware.org/blog/tools-gantt-charts

Page 26: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Cost Management

• Planning / Project prioritization (is something worth doing?)

– Net present value

– Return on investment

• Monitoring (is everything going as planned?)

– Earned value

– Cost Variance

Page 27: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Conclusion

Page 28: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

Conclusion

• Healthcare industry is poised for change – organizations are becoming more customer-focused

• Success of new projects is dependent on stakeholder engagement and effective planning and management

• Good project management can ensure that projects have clear goals, a good plan to meet those goals, and a good path for integrating the project into an organization’s regular workflow.

Page 29: Applications of Project Management in Public Health · 2015. 8. 26. · Applications of Project Management in Public Health Mohit Arora, MS, PMP mohit.arora@sph.cuny.edu . 8/26/2015

8/26/2015 Mohit Arora, MS, PMP

References

• Schwalbe, K., & Furlong, D. (2013). Healthcare Project Management. Schwalbe Publishing.

• Abandoned NHS IT system has cost £10bn so far. (2013, September 18). Retrieved August 23, 2015, from http://www.theguardian.com/society/2013/sep/18/nhs-records-system-10bn

• Taylor, K. (2013, March 6). Posters on Teenage Pregnancy Draw Fire. Retrieved August 23, 2015, from http://www.nytimes.com/2013/03/07/nyregion/city-campaign-targeting-teenage-pregnancy-draws-criticism.html?_r=0

• CDC's BioSense 2.0: Bringing Together the Science and Practice of Public Health Surveillance. (2011, November 15). Retrieved August 23, 2015, from https://ajpmonline.wordpress.com/2011/11/15/cdc’s-biosense-2-0-bringing-together-the-science-and-practice-of-public-health-surveillance-4/

• Insight - As Obamacare tech woes mounted, contractor payments soared. (2013, October 17). Retrieved August 23, 2015, from http://uk.reuters.com/article/2013/10/17/uk-usa-healthcare-technology-insight-idUKBRE99G06120131017

• Thompson, L. (2013, December 3). HealthCare.gov Diagnosis: The Government Broke Every Rule Of Project Management. Retrieved August 23, 2015, from http://www.forbes.com/sites/lorenthompson/2013/12/03/healthcare-gov-diagnosis-the-government-broke-every-rule-of-project-management/

• Tools for Gantt Charts. (n.d.). Retrieved August 23, 2015, from http://www.idealware.org/blog/tools-gantt-charts