Application Procedures
and Performance
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 2/22
l Two epoxy components.
l
100% solid epoxy.l 19.4% Flexibility.
l 1 year & 2 years shelf life
components.
l
Resists fire up 1100°Cl Corrosion resistance.
l Acids & Solvent
Resistance.
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 3/22
Agenda Agendal Surface Preparation (blasting)
l Primer
l
Mesh Installationl Spraying
l Troweling
l Film Build
l Surface Appearancel Film Thickness Measurement
l Topcoating
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 4/22
OverviewOverviewl Durable Epoxy Coating
l F-l-e-x-i-b-l-e (19% Elongation)
l Contractor Friendly
l Solvent Free Airless Application
l Excellent Adhesion
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 5/22
SURFACE PREPARATION
SSPC-SP6 (NACE No.6)------------------- CleanlinessGrade fine to Medium G, 1.5-2.0 mil------- Roughness
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 6/22
Primer Application
• Epoxy 2.0 mil
• Zinc Epoxy 2.5 mil
+ Epoxy Tie 1.0 mil
• Thermal Sprayed
Aluminum 8.0 mil
• + Sealer 1.0 mil
Primer
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 7/22
Steel Mesh Installation (Round Sections)
Install steel mesh direct to primed steel
• Install galvanized hex mesh
• Butt join mesh
• Lace or tie together
• Mesh shall be tight
Lace Detail Tie Wire Detail
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 8/22
Steel Mesh Installation (“I” Sections)
• Cut and pre-bend ½ x ½” x 19 gage galvanized mesh to fit steel sections.
• Install mesh sections to flange tips after primer has cured, butt together.
• Two inch maximum gap.
• Use steel for UL1709 ratings >1 hour
Mesh edge piece
cross section
3-4
inch
Flange thickness
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 9/22
Mastic Pump (Single Pump)Mastic Pump (Single Pump)
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 10/22
Dual PumpsDual Pumps
l 1 Spray-Equip
Dual Pump
l AirTech Dual
Pump
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 11/22
Apply Pitt-Char XP ® Coating to Steel Mesh
Plural Airless Application• Apply 5mm (0.2”) per coat
• No Airborne Solvents
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 12/22
Apply Pitt-Char XP ® Coating to Primed Steel To half
thickness for fiberglass meshPlural Airless Application
• Apply 5mm (0.2”) per coat
• No Airborne Solvents
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 13/22
Trowel Coating.Trowel Coating.• Eliminates Irregularities
• Ensures Good Wetting
• Consistent Thickness
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 14/22
Fiberglass/Fabric MeshFiberglass/Fabric Mesh
InstallationInstallation
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 15/22
Mesh Installation
• Fabric or Fiberglass Mesh
• Cuts with shears
• Install in Wet Coating
• Roll Mesh 100%
• Eliminate Wrinkles,Bubbles, Voids
• Overlap Seams 50mm +
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 16/22
Apply Remaining Coats of Pitt-Char XP ®
Coating to achieve Specified DFT• Shore A, 50 or D, 25
before recoat
• Recoat within 24 hours
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 17/22
Trowel Coating
• Eliminates Irregularities
• Ensures Good Wetting
• Consistent Thickness
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 18/22
Solvent
Surface Finish
• Roll with Short Nap Cover
• Use Approved Solvent
• Use Minimal Solvent
• Achieve Desired Finish per Reference Sample
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 19/22
Measure Film Thickness
• Average Thickness or
• Specified Thickness
• Every 4-6 Linear Feet(Structural Members)
• Every 100 Ft²
(Large Flat Areas)
0.2”0.25”
1 2 3 4 5 6 7 8 9 10
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 20/22
Acceptable Acceptable SprayedSprayed FinishFinish
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 21/22
Acceptable Acceptable RolledRolled FinishFinish
7/29/2019 Application Procedures & PerformAppance.pdf
http://slidepdf.com/reader/full/application-procedures-performappancepdf 22/22
Topcoating (If Required)
Safety Colors• Aesthetics
• Epoxy or Polyurethane
2-4 mil