Application Procedures

and Performance

Page 2: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 2/22

l Two epoxy components.

l

100% solid epoxy.l 19.4% Flexibility.

l 1 year & 2 years shelf life

components.

l

Resists fire up 1100°Cl Corrosion resistance.

l Acids & Solvent

Resistance.

Page 3: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 3/22

 Agenda Agendal Surface Preparation (blasting)

l Primer 

l

Mesh Installationl Spraying

l Troweling

l Film Build

l Surface Appearancel Film Thickness Measurement

l Topcoating

Page 4: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 4/22

OverviewOverviewl Durable Epoxy Coating

l F-l-e-x-i-b-l-e (19% Elongation)

l Contractor Friendly

l Solvent Free Airless Application

l Excellent Adhesion

Page 5: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 5/22

SURFACE PREPARATION

SSPC-SP6 (NACE No.6)------------------- CleanlinessGrade fine to Medium G, 1.5-2.0 mil------- Roughness

Page 6: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 6/22

Primer Application

• Epoxy 2.0 mil

• Zinc Epoxy 2.5 mil

+ Epoxy Tie 1.0 mil

• Thermal Sprayed

Aluminum 8.0 mil

• + Sealer 1.0 mil

Primer 

Page 7: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 7/22

Steel Mesh Installation (Round Sections)

Install steel mesh direct to primed steel

• Install galvanized hex mesh

• Butt join mesh

• Lace or tie together 

• Mesh shall be tight

Lace Detail Tie Wire Detail

Page 8: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 8/22

Steel Mesh Installation (“I” Sections)

• Cut and pre-bend ½ x ½” x 19 gage galvanized mesh to fit steel sections.

• Install mesh sections to flange tips after primer has cured, butt together.

• Two inch maximum gap.

• Use steel for UL1709 ratings >1 hour 

Mesh edge piece

cross section

3-4

inch

Flange thickness

Page 9: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 9/22

Mastic Pump (Single Pump)Mastic Pump (Single Pump)

Page 10: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 10/22

Dual PumpsDual Pumps

l 1 Spray-Equip

Dual Pump

l AirTech Dual

Pump

Page 11: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 11/22

Apply Pitt-Char XP ® Coating to Steel Mesh

Plural Airless Application• Apply 5mm (0.2”) per coat

• No Airborne Solvents

Page 12: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 12/22

Apply Pitt-Char XP ® Coating to Primed Steel To half 

thickness for fiberglass meshPlural Airless Application

• Apply 5mm (0.2”) per coat

• No Airborne Solvents

Page 13: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 13/22

Trowel Coating.Trowel Coating.• Eliminates Irregularities

• Ensures Good Wetting

• Consistent Thickness

Page 14: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 14/22

Fiberglass/Fabric MeshFiberglass/Fabric Mesh

InstallationInstallation

Page 15: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 15/22

Mesh Installation

• Fabric or Fiberglass Mesh

• Cuts with shears

• Install in Wet Coating

• Roll Mesh 100%

• Eliminate Wrinkles,Bubbles, Voids

• Overlap Seams 50mm +

Page 16: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 16/22

Apply Remaining Coats of  Pitt-Char XP ®

Coating to achieve Specified DFT• Shore A, 50 or D, 25

 before recoat

• Recoat within 24 hours

Page 17: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 17/22

Trowel Coating

• Eliminates Irregularities

• Ensures Good Wetting

• Consistent Thickness

Page 18: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 18/22

Solvent

Surface Finish

• Roll with Short Nap Cover 

• Use Approved Solvent

• Use Minimal Solvent

• Achieve Desired Finish per Reference Sample

Page 19: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 19/22

Measure Film Thickness

• Average Thickness or 

• Specified Thickness

• Every 4-6 Linear Feet(Structural Members)

• Every 100 Ft²

(Large Flat Areas)

0.2”0.25”

1 2 3 4 5 6 7 8 9 10

Page 20: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 20/22

 Acceptable Acceptable SprayedSprayed FinishFinish

Page 21: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 21/22

 Acceptable Acceptable RolledRolled FinishFinish

Page 22: Application Procedures & PerformAppance.pdf

7/29/2019 Application Procedures & PerformAppance.pdf

http://slidepdf.com/reader/full/application-procedures-performappancepdf 22/22

Topcoating (If Required)

Safety Colors• Aesthetics

• Epoxy or Polyurethane

2-4 mil