appendix d water management assessment summary centre... · appendix d water management assessment...

19
Shire of Roebourne Town Planning Scheme No. 8 Amendment No. 29 APPENDIX D WATER MANAGEMENT ASSESSMENT SUMMARY

Upload: letruc

Post on 26-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Shire of RoebourneTown Planning Scheme No. 8Amendment No. 29

APPENDIX D

WATER MANAGEMENT

ASSESSMENT SUMMARY

J5149b 19 September 2012 1

Jim Davies & Associates Pty Ltd

ABN 24 067 295 569Suite 1, 27 York Street, SubiacoPO Box 117, Subiaco WA 6008

Ph: (08) 9388 2436Fx: (08) 9381 9279

[email protected]

To : TME Date : 19 Sept 12 Attention : Kris Kennedy Our Ref : J5149b

Email : [email protected] Pages : 6

LAZY LANDS, KARRATHA

WATER MANAGEMENT SUMMARY – LOT 617 SHADWICK DRIVE, MILLARS WELL (P17)

Kris,

Please find below summary report prepared by JDA Consultant Hydrologists providing hydrological advice to support Scheme Amendment Rezoning of Lot 617 Shadwick Drive, Millars Well (P17), from ‘Parks, Recreation & Drainage’ to ‘Urban’. The report is presented in the following sections:

1. Introduction

2. Lot Details

3. Major Flooding & Storm Surge

4. Catchment Drainage

5. Lot Drainage

6. Conclusions

1. Introduction

The Department of Regional Development and Lands (RDL) through its Pilbara Cities Office (PCO) is carrying out a residential infill program in Karratha known as ‘Lazy Lands’. The Lazy Lands Program seeks to identify vacant Crown Land within existing urban areas that can be quickly brought into the residential land release pipeline to help alleviate the current supply shortage of development-ready land in Karratha.

A total of 61 parcels of land have previously been identified with 7 being targeted for release as a priority under Stage 1. Lot 617 Shadwick Drive, Millars Well, is one of 7 of the Stage 1 priority sites. Lot 617 is denoted as site P17 in Appendix 2-3 of RDL’s tender document for the Lazy Lands Project.

Detailed 2D flood modelling at a 2m x 2m grid is currently being carried out by JDA as part of this study to determine the 100 yr ARI flood levels and extent across Karratha for the current climate scenario (2010). The results will be used to assess any impact of flooding on the sites from any adjacent drain and inform future finished Lot level design. The 2D flood modelling results will be reported in a Local Water Management Strategy (LWMS).

2. Lot Details

Referring to Figure 1, the Lot is 0.09 ha and located 4 km west of the Karratha City centre, within the suburb of Millars Well. Lot access is off Shadwick Drive with an

JDA Consultant Hydrologists

J5149b 19 September 2012 2

JDA

existing residential building located adjacent to the Lot to the west and a footpath to the east.

Existing natural surface contours are shown on Figure 1 indicating the Lot is relatively flat with an elevation of 16.0 mAHD along the south-western boundary with a slight gradient toward the street front at the northern boundary with an elevation of 15.5 mAHD. Lot 617 is part of a Parks, Recreation and Drainage reserve as shown on Figure 1.

3. Major Flood & Storm Surge

The draft Karratha Coastal Vulnerability Study (KCVS) prepared by JDA et. al. (2011) on behalf of LandCorp provides rainfall runoff, storm surge and associated flood level 2-Dimensional (2D) modelling and mapping across the Karratha region. The KCVS was produced to assist and inform future development of the Karratha region at a district scale level of detail. Modelling was undertaken for various climate scenarios including present day (2010) and 50 year (2060) and 100 year (2110). Note that flood levels (in mAHD) produced are based on regional scale modelling and are subject to refinement to the local scale.

Email advice from the Department of Water (DoW) on 10 September 2012 to the Shire of Roebourne is attached. This confirms that the natural surface of the Lot is greater than the 100 year Average Recurrence Interval (ARI) and 500 Year ARI water levels, from storm surge and catchment flooding, for the 2010, 2060 and 2110 climate scenarios from the draft KCVS. DoW notes that this advice is related to storm surge and major flooding only and does not take into account local stormwater drainage.

4. Catchment Drainage

Figure 1 shows that Lot 617 is at the upper reaches of Catchment 8, which is one the smaller catchments in the Karratha area (GHD, 2010), with the boundary to the south along Dampier Road. Lot 617 is not located immediately adjacent to any open drainage channel. The closest open drainage channel starts approximately 140m to the west which is one of the main drainage arteries in Catchment 8 (GHD, 2010).

5. Lot Drainage

Stormwater runoff from the Lot is directed toward Shadwick Drive which then flows northwest with the fall in road elevation. There is very little contributing upstream catchment expected to influence the Lot and all local stormwater runoff is anticipated to be contained within the depth of the road kerb.

During development, it is envisaged that stormwater runoff will continue to discharge directly into the Shadwick Drive local road drainage system at the front of the Lot. Detail design of management of stormwater will be presented in a Stormwater Management Plan, required by the Shire of Roebourne, to be submitted with the Development Application. Criteria to be addressed include;

2D flood modelling 100 yr ARI water level in adjacent drain

Finished Lot level design

Local stormwater management

Runoff direction

Erosion control

JDA Consultant Hydrologists

J5149b 19 September 2012 3

JDA

6. Conclusions

For Major Flood & Storm Surge, DoW has advised that the natural surface of Lot 617 is above the 100 year ARI and 500 year ARI events.

For Catchment Drainage, Lot 617 is located within Catchment 8 (GHD, 2010) which is one the smaller catchments in the Karratha area. There are no adjacent open drainage channels.

For Lot Drainage, stormwater runoff is directed toward Shadwick Drive at the northern boundary of the Lot which then flows northwest within the width of the road extent. Stormwater runoff is anticipated to be contained with the depth of the road kerb.

A Stormwater Management Plan will be required by the Shire of Roebourne to support a future Development Application for Lot 617.

This Water Management Summary supports the proposed Scheme Amendment and Rezoning from ‘Parks, Recreation & Drainage’ to ‘Urban’.

References

GHD (2010), Report on Karratha Drainage Assessment - Drainage Management Plan; for Shire of Roebourne JDA Consultant Hydrologists, GEMS, Damara WA, Coastal Zone Management & DHI Water & Environment (2011) Karratha Coastal Vulnerability Study (Draft); for LandCorp

If you have any queries, please do not hesitate to contact Matthew Yan or Damien Slack.

Yours sincerely,

JDA CONSULTANT HYDROLOGISTS DISCLAIMER

This document is published in accordance with and subject to an agreement between JDA Consultant Hydrologists (“JDA”) and the client for whom it has been prepared (“Client”), and is restricted to those issues that have been raised by the Client in its engagement of JDA. It has been prepared using the skill and care ordinarily exercised by Consultant Hydrologists in the preparation of such documents.

Any person or organisation that relies on or uses the document for purposes or reasons other than those agreed by JDA and the Client without first obtaining a prior written consent of JDA, does so entirely at their own risk and JDA denies all liability in tort, contract or otherwise for any loss, damage or injury of any kind whatsoever (whether in negligence or otherwise) that may be suffered as a consequence of relying on this document for any purpose other than that agreed with the Client.

16

15.5

16.5

15

14

14.5 13.5

16

14.5

15.5

15.5

1616

.5

16.5

16

16

15

15

480,

450

480,

450

480,

500

480,

500

480,

550

480,

550

7,705,850

7,705,850

7,705,900

7,705,900

7,705,950

7,705,950

Dep

artm

ent o

f Reg

iona

l Dev

elop

men

t and

Lan

dsLa

zy L

ands

, Kar

rath

a - W

ater

Man

agem

ent S

umm

ary

Figu

re 1

: Lot

617

Sha

dwic

k D

rive,

Mill

ars

Wel

l (P1

7)±

Job

No.

J51

49

© C

OP

YRIG

HT

JIM

DAV

IES

& A

SSO

CIA

TES

PTY

. LTD

. 201

2

Dat

a S

ourc

e: N

earm

ap A

eria

l Im

ager

y (2

012)

, GH

D (2

010)

Rep

ort o

n K

arra

tha

Dra

inag

e A

sses

smen

t - D

rain

age

Man

agem

ent P

lan

020

4060

80M

etre

s

Sca

le:1

:1,0

00@

A4

97

1

196

168

18

1311

15

3

17

1210

145

4 2

Kar

rath

a To

wns

ite

Cat

chm

ent L

ocat

ion

& D

rain

age

1:10

0,00

0

1:10

,000

GH

D (2

010)

Cat

chm

ent B

ound

ary

Prio

rity

Sta

ge 1

Rel

ease

Lot

s

Topo

grap

hic

Con

tour

s (m

AH

D)

Par

ks, R

ecre

atio

n &

Dra

inag

e R

eser

ve

Site

Pla

n Lots

for F

utur

e R

elea

seP

17

Dra

in /

Wat

erco

urse

From: SMYTHE Toni [mailto:[email protected]]Sent: Monday, 10 September 2012 9:25 AM To: Monica Sullivan Subject: RE: Flood advice for Lazy Lands sites

Hi Monica,

Please find the below advice for Lot 617 Shadwick Drive in Millars Well.

The Department of Water, in carrying out its role in floodplain management, provides advice andrecommends guidelines for development on floodplains with the object of minimising flood risk anddamage.

The preliminary results of the Karratha Coastal Vulnerability Study show that in this area theinundation levels for large storm surge events are expected to be:

100 year ARI 500 year ARIAt 2010 14.3m AHD 14.6m AHDAt 2060 14.3m AHD 14.8m AHDAt 2110 14.3m AHD 14.9m AHD

The estimates include flooding generated from storm surge and catchment flooding, and theestimates for 2060 and 2110 include an allowance of 0.3 metres and 0.9 metres respectively forpossible future sea level rise.

The available contour information for the area shows the general natural surface level of the lot tobe between ~15.5 m AHD and 16.5 m AHD (see attached plan).

Please note that this advice is related to storm surge and major flooding only and does not take intoaccount local stormwater drainage.

For further information please contact Simon Rodgers on (08)6364 6923 or via email [email protected].

Kind regards,

Toni SmytheEngineer, Floodplain ManagementDepartment of WaterTelephone: (08) 6364 7413E mail: [email protected]

1516

15.5

16.5

1717

.5

18

14

14.5

13.5

14.5

15.5

16.5

16.5

15

15.5

15.5

16

15.5

15.5

16

16

16.5

14

DA

MPI

ER R

D

SHADWICK DR

REE

D C

T

CROC

KETT

WAY

ROSEMARY RD

GLEES

ON PL

GR

AY C

T

4199

6921

3808

4690

2070

617

2071

2648

2075

2076

2073

2069

7

2072

3820

2077

2068

2066

2078

2079

2056

3817

2080

3

2064

2055

2054

2060

2053

2081

3809

4

2063

52

2087

6

2052

2135

2062

3821

2088

LEG

END

Lot 6

17 S

hadw

ick

Dr

Mill

ars

Wel

l

´

LOC

ALI

TY M

AP

# SK

AR

RA

THA

This

map

is a

pro

duct

of t

he D

epar

tmen

t of W

ater

,A

sses

smen

t & A

lloca

tion

and

was

prin

ted

on 7

/09/

2012

.

This

map

was

pro

duce

d w

ith th

e in

tent

that

it b

e us

edfo

r di

spla

y pu

rpos

es a

t the

sca

le o

f 1:1

,500

whe

npr

intin

g at

A4.

Whi

le th

e D

epar

tmen

t of W

ater

has

mad

e al

lre

ason

able

effo

rts to

ens

ure

the

accu

racy

of t

his

data

,th

e de

part

men

t acc

epts

no

resp

onsi

bilit

y fo

r any

inac

cura

cies

and

per

sons

rel

ying

on

this

dat

a do

so

at th

eir o

wn

risk.

SOU

RC

ES

Spa

tial C

adas

tral

Dat

abas

e - L

andg

ate

- 06/

02/1

2R

oad

Cen

trelin

es, D

LI -

Land

gate

- 13

/01/

2010

Wes

tern

Aus

tral

ian

Tow

ns -

Land

gate

- 1

2/07

/200

1

The

Dep

artm

ent o

f Wat

er a

ckno

wle

dges

the

follo

win

g da

tase

ts a

nd th

eir c

usto

dian

s in

the

prod

uctio

n of

this

map

:

Dat

um a

nd P

roje

ctio

n In

form

atio

nVe

rtica

l Dat

um: A

ustra

lian

Hei

ght D

atum

(AH

D71

)H

oriz

onta

l Dat

um: G

DA

94 M

GA

z50

Proj

ectio

n: U

nive

rsal

Tra

vers

e M

erca

tor (

UTM

)Sp

hero

id: G

eode

tic R

efer

ence

Sys

tem

(GR

S80

)

Proj

ect I

nfor

mat

ion

Clie

nt:

Map

Aut

hor:

Toni

Sm

ythe

Task

ID: B

1305

Com

pila

tion

date

: 7/0

9/20

12Ed

ition

: Ver

sion

1

Path

: J:\g

ispr

ojec

ts\P

roje

ct\B

_Ser

ies\

B130

5\00

01_F

PM_E

nqui

res\

mxd

\Kar

rath

a\FP

M K

arra

tha

Lot 6

17 S

hadw

ick

Dr e

nq.m

xd

Surfa

ce C

onto

urs

(m A

HD

)

Cad

astre

Lot 6

17 S

hadw

ick

Dr

010

2030

405

Met

res

J5149f 19 September 2012 1

Jim Davies & Associates Pty Ltd

ABN 24 067 295 569Suite 1, 27 York Street, SubiacoPO Box 117, Subiaco WA 6008

Ph: (08) 9388 2436Fx: (08) 9381 9279

[email protected]

To : TME Date : 19 Sept 12 Attention : Kris Kennedy Our Ref : J5149f

Email : [email protected] Pages : 6

LAZY LANDS, KARRATHA

WATER MANAGEMENT SUMMARY – LOT 655 WARRIER STREET, BULGARRA (P55)

Kris,

Please find below summary report prepared by JDA Consultant Hydrologists providing hydrological advice to support Scheme Amendment Rezoning of Lot 655 Warrier Street, Bulgarra (P55), from ‘Parks, Recreation & Drainage’ to ‘Urban’. The report is presented in the following sections:

1. Introduction

2. Lot Details

3. Major Flooding & Storm Surge

4. Catchment Drainage

5. Lot Drainage

6. Conclusions

1. Introduction

The Department of Regional Development and Lands (RDL) through its Pilbara Cities Office (PCO) is carrying out a residential infill program in Karratha known as ‘Lazy Lands’. The Lazy Lands Program seeks to identify vacant Crown Land within existing urban areas that can be quickly brought into the residential land release pipeline to help alleviate the current supply shortage of development-ready land in Karratha.

A total of 61 parcels of land have previously been identified with 7 being targeted for release as a priority under Stage 1. Lot 655 Warrier Street, Bulgarra, is one of 7 of the Stage 1 priority sites. Lot 655 is denoted as site P55 in Appendix 2-3 of RDL’s tender document for the Lazy Lands Project.

Detailed 2D flood modelling at a 2m x 2m grid is currently being carried out by JDA as part of this study to determine the 100 yr ARI flood levels and extent across Karratha for the current climate scenario (2010). The results will be used to assess any impact of flooding on the Lot from the adjacent drain and inform future finished Lot level design. The 2D flood modelling results will be reported in a Local Water Management Strategy (LWMS).

2. Lot Details

Referring to Figure 1, the Lot is 0.3 ha and located 2.2 km east of the Karratha City centre, within the

JDA Consultant Hydrologists

J5149f 19 September 2012 2

JDA

suburb of Bulgarra. The Lot is fronted by Warrier Street to the west and an open drain to the east. There are existing residential buildings located adjacent to the Lot to the north and south.

Existing natural surface contours are shown on Figure 1 indicating the Lot is relatively flat with a south to north sloping gradient with elevations ranging from 9.0 mAHD to 8.5 mAHD respectively. Lot 655 is part of a Parks, Recreation and Drainage reserve as shown on Figure 1.

3. Major Flood & Storm Surge

The draft Karratha Coastal Vulnerability Study (KCVS) prepared by JDA et. al. (2011) on behalf of LandCorp provides rainfall runoff, storm surge and associated flood level 2-Dimensional (2D) modelling and mapping across the Karratha region. The KCVS was produced to assist and inform future development of the Karratha region at a district scale level of detail. Modelling was undertaken for various climate scenarios including present day (2010) and 50 year (2060) and 100 year (2110). Note that flood levels (in mAHD) produced are based on regional scale modelling and are subject to refinement to the local scale.

Email advice from the Department of Water (DoW) on 10 September 2012 to the Shire of Roebourne is attached. This confirms that the natural surface of the Lot is greater than the 100 year Average Recurrence Interval (ARI) and 500 Year ARI water levels, from storm surge and catchment flooding, for the 2010, 2060 and 2110 climate scenarios from the draft KCVS. DoW notes that this advice is related to storm surge and major flooding only and does not take into account local stormwater drainage.

4. Catchment Drainage

Figure 1 shows that Lot 655 is located at the midpoint of drainage Catchment 19, one of the larger catchments in the Karratha area (GHD, 2010). The main open drainage channel for this catchment is located immediately to the east of Lot 655 and flows in a northerly direction. The drainage reserve for this channel is approximately 40m wide, with the main channel being approximately 10m wide with an approximate flood depth of 0.5m. The invert of the main channel is approximately 0.5m lower than the adjacent lot level.

Desktop assessment indicates that flooding in a 100 Year ARI rainfall event does not exceed 0.5m. There is an opportunity to increase the width and hence capacity of the main drainage channel within the existing 40m width of the drainage reserve, if required.

5. Lot Drainage

Stormwater runoff from the Lot currently flows east toward the open drainage channel. During development, it is envisaged that stormwater runoff will discharge to either the local road drainage system at the front of the Lot, or alternatively a flow path is provided to discharge directly into the open drainage channel at the rear of the Lot.

Detail design of management of stormwater will be presented in a Stormwater Management Plan, required by the Shire of Roebourne, to be submitted with the Development Application. Criteria to be addressed include;

2D flood modelling 100 yr ARI water level in adjacent drain

Finished Lot level design

JDA Consultant Hydrologists

J5149f 19 September 2012 3

JDA

Local stormwater management

Runoff direction

Erosion control

6. Conclusions

For Major Flood & Storm Surge, DoW has advised that the natural surface of Lot 655 is above the 100 year ARI and 500 year ARI events.

For Catchment Drainage, Lot 655 is located within Catchment 19 (GHD, 2010) which is one of the larger catchments in the Karratha area. There is an adjacent open drainage channel to the east with the invert of the main channel being approximately 0.5m lower than the Lot. Desktop assessment indicates that flooding in a 100 Year ARI rainfall event does not exceed 0.5m.

For Lot Drainage, stormwater runoff flows east toward the open drainage channel which then flows in a northerly direction.

A Stormwater Management Plan will be required by the Shire of Roebourne to support a future Development Application for Lot 655.

This Water Management Summary supports the proposed Scheme Amendment and Rezoning from ‘Parks, Recreation & Drainage’ to ‘Urban’.

References

GHD (2010), Report on Karratha Drainage Assessment - Drainage Management Plan; for Shire of Roebourne JDA Consultant Hydrologists, GEMS, Damara WA, Coastal Zone Management & DHI Water & Environment (2011) Karratha Coastal Vulnerability Study (Draft); for LandCorp

If you have any queries, please do not hesitate to contact Matthew Yan or Damien Slack.

Yours sincerely,

JDA CONSULTANT HYDROLOGISTS DISCLAIMER

This document is published in accordance with and subject to an agreement between JDA Consultant Hydrologists (“JDA”) and the client for whom it has been prepared (“Client”), and is restricted to those issues that have been raised by the Client in its engagement of JDA. It has been prepared using the skill and care ordinarily exercised by Consultant Hydrologists in the preparation of such documents.

Any person or organisation that relies on or uses the document for purposes or reasons other than those agreed by JDA and the Client without first obtaining a prior written consent of JDA, does so entirely at their own risk and JDA denies all liability in tort, contract or otherwise for any loss, damage or injury of any kind whatsoever (whether in negligence or otherwise) that may be suffered as a consequence of relying on this document for any purpose other than that agreed with the Client.

9

8.5

9.5

8

10

10.5

11

7.5

9

8

8.5

9.5

10

486,

000

486,

000

486,

100

486,

100

7,707,500

7,707,500

7,707,600

7,707,600

7,707,700

7,707,700

Dep

artm

ent o

f Reg

iona

l Dev

elop

men

t and

Lan

dsLa

zy L

ands

, Kar

rath

a - W

ater

Man

agem

ent S

umm

ary

Figu

re 1

: Lot

655

War

rier S

tree

t, B

ulga

rra

(P55

Job

No.

J51

49

© C

OP

YRIG

HT

JIM

DAV

IES

& A

SSO

CIA

TES

PTY

. LTD

. 201

2

Dat

a S

ourc

e: N

earm

ap A

eria

l Im

ager

y (2

012)

, GH

D (2

010)

Rep

ort o

n K

arra

tha

Dra

inag

e A

sses

smen

t - D

rain

age

Man

agem

ent P

lan

020

4060

8010

0 Met

res

Sca

le:1

:1,5

00@

A4

97

1

196

168

18

1311

15

3

17

1210

145

4 2

Kar

rath

a To

wns

ite

Cat

chm

ent L

ocat

ion

& D

rain

age

1:10

0,00

0

1:12

,000

GH

D (2

010)

Cat

chm

ent B

ound

ary

Prio

rity

Sta

ge 1

Rel

ease

Lot

s

Topo

grap

hic

Con

tour

s (m

AH

D)

Par

ks, R

ecre

atio

n &

Dra

inag

e R

eser

ve

Site

Pla

n

Lots

for F

utur

e R

elea

se

Dra

in /

Wat

erco

urse

P55

From: SMYTHE Toni [mailto:[email protected]]Sent: Friday, 7 September 2012 3:37 PM To: Monica Sullivan Subject: RE: Flood advice for Lazy Lands sites

Hi Monica,

Please find the below advice for Lot 655 Warrier St in Bulgarra.

The Department of Water, in carrying out its role in floodplain management, provides advice andrecommends guidelines for development on floodplains with the object of minimising flood risk anddamage.

The preliminary results of the Karratha Coastal Vulnerability Study show that in this area theinundation levels for large storm surge events are expected to be:

100 year ARI 500 year ARIAt 2010 7.8m AHD 7.9m AHDAt 2060 7.8m AHD 7.9m AHDAt 2110 7.8m AHD 8m AHD

The estimates include flooding generated from storm surge and catchment flooding, and theestimates for 2060 and 2110 include an allowance of 0.3 metres and 0.9 metres respectively forpossible future sea level rise.

The available contour information for the area shows the general natural surface level of the lot tobe greater than 8 m AHD (see attached plan).

Please note that this advice is related to storm surge and major flooding only and does not take intoaccount local stormwater drainage.

For further information please contact Simon Rodgers on (08)6364 6923 or via email [email protected].

Kind regards,

Toni SmytheEngineer, Floodplain ManagementDepartment of WaterTelephone: (08) 6364 7413E mail: [email protected]

9

8

10

9.5

8.57.

5

11

10.5

1211

.5

7

10

8 8

9

9.5

WARRIER ST

EMM

A S

T

HU

NT

WAY

MEL

AK

ST

DO

LPH

IN W

AY

AN

DO

VER

WAY

681

1

58365

5

656

756

725

724

582

584

784

50950

7

757

693

511

723

722

587

581

58658

0

585

57954

954

8

542

544

547

55054

154

3

754

755

728

727

753

726

783

758

513

51250

450

6

510

503

505

695

694

787

545

546

759

786

616

696

617

782

578

618

721

619

502

588

514

LEG

END

Lot 6

55 W

arrie

r St

Bulg

arra

´

LOC

ALI

TY M

AP

# SK

AR

RA

THA

This

map

is a

pro

duct

of t

he D

epar

tmen

t of W

ater

,A

sses

smen

t & A

lloca

tion

and

was

prin

ted

on 7

/09/

2012

.

This

map

was

pro

duce

d w

ith th

e in

tent

that

it b

e us

edfo

r di

spla

y pu

rpos

es a

t the

sca

le o

f 1:1

,500

whe

npr

intin

g at

A4.

Whi

le th

e D

epar

tmen

t of W

ater

has

mad

e al

lre

ason

able

effo

rts to

ens

ure

the

accu

racy

of t

his

data

,th

e de

part

men

t acc

epts

no

resp

onsi

bilit

y fo

r any

inac

cura

cies

and

per

sons

rel

ying

on

this

dat

a do

so

at th

eir o

wn

risk.

SOU

RC

ES

Spa

tial C

adas

tral

Dat

abas

e - L

andg

ate

- 06/

02/1

2R

oad

Cen

trelin

es, D

LI -

Land

gate

- 13

/01/

2010

Wes

tern

Aus

tral

ian

Tow

ns -

Land

gate

- 1

2/07

/200

1

The

Dep

artm

ent o

f Wat

er a

ckno

wle

dges

the

follo

win

g da

tase

ts a

nd th

eir c

usto

dian

s in

the

prod

uctio

n of

this

map

:

Dat

um a

nd P

roje

ctio

n In

form

atio

nVe

rtica

l Dat

um: A

ustra

lian

Hei

ght D

atum

(AH

D71

)H

oriz

onta

l Dat

um: G

DA

94 M

GA

z50

Proj

ectio

n: U

nive

rsal

Tra

vers

e M

erca

tor (

UTM

)Sp

hero

id: G

eode

tic R

efer

ence

Sys

tem

(GR

S80

)

Proj

ect I

nfor

mat

ion

Clie

nt:

Map

Aut

hor:

Toni

Sm

ythe

Task

ID: B

1305

Com

pila

tion

date

: 7/0

9/20

12Ed

ition

: Ver

sion

1

Path

: J:\g

ispr

ojec

ts\P

roje

ct\B

_Ser

ies\

B130

5\00

01_F

PM_E

nqui

res\

mxd

\Kar

rath

a\FP

M K

arra

tha

Lot 6

55 W

arrie

r St e

nq.m

xd

Surfa

ce C

onto

urs

(m A

HD

)

Cad

astre

Lot 6

55 W

arrie

r St

010

2030

405

Met

res

J5149g 19 September 2012 1

Jim Davies & Associates Pty Ltd

ABN 24 067 295 569Suite 1, 27 York Street, SubiacoPO Box 117, Subiaco WA 6008

Ph: (08) 9388 2436Fx: (08) 9381 9279

[email protected]

To : TME Date : 19 Sept 12 Attention : Kris Kennedy Our Ref : J5149g

Email : [email protected] Pages : 6

LAZY LANDS, KARRATHA

WATER MANAGEMENT SUMMARY – LOT 1926 RIDLEY STREET, BULGARRA (P60)

Kris,

Please find below summary report prepared by JDA Consultant Hydrologists providing hydrological advice to support Scheme Amendment Rezoning of Lot 1926 Ridley Street, Bulgarra (P60), from ‘Parks, Recreation & Drainage’ to ‘Urban’. The report is presented in the following sections:

1. Introduction

2. Lot Details

3. Major Flooding & Storm Surge

4. Catchment Drainage

5. Lot Drainage

6. Conclusions

1. Introduction

The Department of Regional Development and Lands (RDL) through its Pilbara Cities Office (PCO) is carrying out a residential infill program in Karratha known as ‘Lazy Lands’. The Lazy Lands Program seeks to identify vacant Crown Land within existing urban areas that can be quickly brought into the residential land release pipeline to help alleviate the current supply shortage of development-ready land in Karratha.

A total of 61 parcels of land have previously been identified with 7 being targeted for release as a priority under Stage 1. Lot 1926 Ridley Street, Bulgarra, is one of 7 of the Stage 1 priority sites. Lot 1926 is denoted as site P60 in Appendix 2-3 of RDL’s tender document for the Lazy Lands Project.

Detailed 2D flood modelling at a 2m x 2m grid is currently being carried out by JDA as part of this study to determine the 100 yr ARI flood levels and extent across Karratha for the current climate scenario (2010). The results will be used to assess any impact of flooding on the sites from any adjacent drain and inform future finished Lot level design. The 2D flood modelling results will be reported in a Local Water Management Strategy (LWMS).

2. Lot Details

Referring to Figure 1, the Lot is 0.5 ha and located 2.0 km east of the Karratha City centre, within the

JDA Consultant Hydrologists

J5149g 19 September 2012 2

JDA

suburb of Bulgarra. The Lot is fronted by Ridley Street to the north Millstream Road to the south. There are existing residential buildings located adjacent to the Lot to the east and west.

Existing natural surface contours are shown on Figure 1 indicating the Lot has a south to north sloping gradient with elevations ranging from 16.0 mAHD to 13.5 mAHD respectively. Lot 1926 is part of a Parks, Recreation and Drainage reserve as shown on Figure 1.

3. Major Flood & Storm Surge

The draft Karratha Coastal Vulnerability Study (KCVS) prepared by JDA et. al. (2011) on behalf of LandCorp provides rainfall runoff, storm surge and associated flood level 2-Dimensional (2D) modelling and mapping across the Karratha region. The KCVS was produced to assist and inform future development of the Karratha region at a district scale level of detail. Modelling was undertaken for various climate scenarios including present day (2010) and 50 year (2060) and 100 year (2110). Note that flood levels (in mAHD) produced are based on regional scale modelling and are subject to refinement to the local scale.

Email advice from the Department of Water (DoW) on 10 September 2012 to the Shire of Roebourne is attached. This confirms that the natural surface of the Lot is greater than the 100 year Average Recurrence Interval (ARI) and 500 Year ARI water levels, from storm surge and catchment flooding, for the 2010, 2060 and 2110 climate scenarios from the draft KCVS. DoW notes that this advice is related to storm surge and major flooding only and does not take into account local stormwater drainage.

4. Catchment Drainage

Figure 1 shows that Lot 1926 is located at the midpoint of drainage Catchment 19, one of the larger catchments in the Karratha area (GHD, 2010). Lot 1926 is not located immediately adjacent to any open drainage channel. The closest open drainage channel is located approximately 320m to the east which is one the main drainage arteries in Catchment 19 (GHD, 2010).

5. Lot Drainage

Stormwater runoff from the Lot is directed toward Ridley Street which then flows to the east with the fall in road elevation. There is little contributing upstream catchment expected to influence the Lot and all local stormwater runoff is anticipated to be contained within the depth of the road kerb.

During development, it is envisaged that stormwater runoff will continue to discharge directly into the Ridley Street local road drainage system at the front of the Lot. Detail design of management of stormwater will be presented in a Stormwater Management Plan, required by the Shire of Roebourne, to be submitted with the Development Application. Criteria to be addressed include;

2D flood modelling 100 yr ARI water level in adjacent drain

Finished Lot level design

Local stormwater management

Runoff direction

Erosion control

JDA Consultant Hydrologists

J5149g 19 September 2012 3

JDA

6. Conclusions

For Major Flood & Storm Surge, DoW has advised that the natural surface of Lot 1926 is above the 100 year ARI and 500 year ARI events.

For Catchment Drainage, Lot 1926 is located within Catchment 19 (GHD, 2010) which is one of the larger catchments in the Karratha area. There are no adjacent open drainage channels.

For Lot Drainage, stormwater runoff is directed onto Ridley Street at the northern boundary of the Lot which then flows east within the width of the road extent. Stormwater runoff is anticipated to be contained within the depth of the road kerb.

A Stormwater Management Plan will be required by the Shire of Roebourne to support a future Development Application for Lot 1926.

This Water Management Summary supports the proposed Scheme Amendment and Rezoning from ‘Parks, Recreation & Drainage’ to ‘Urban’.

References

GHD (2010), Report on Karratha Drainage Assessment - Drainage Management Plan; for Shire of Roebourne JDA Consultant Hydrologists, GEMS, Damara WA, Coastal Zone Management & DHI Water & Environment (2011) Karratha Coastal Vulnerability Study (Draft); for LandCorp

If you have any queries, please do not hesitate to contact Matthew Yan or Damien Slack.

Yours sincerely,

JDA CONSULTANT HYDROLOGISTS DISCLAIMER

This document is published in accordance with and subject to an agreement between JDA Consultant Hydrologists (“JDA”) and the client for whom it has been prepared (“Client”), and is restricted to those issues that have been raised by the Client in its engagement of JDA. It has been prepared using the skill and care ordinarily exercised by Consultant Hydrologists in the preparation of such documents.

Any person or organisation that relies on or uses the document for purposes or reasons other than those agreed by JDA and the Client without first obtaining a prior written consent of JDA, does so entirely at their own risk and JDA denies all liability in tort, contract or otherwise for any loss, damage or injury of any kind whatsoever (whether in negligence or otherwise) that may be suffered as a consequence of relying on this document for any purpose other than that agreed with the Client.

14

15

16

17

19

18

13

15.5

14.5

13.5

16.5

18.5

17.5

12.5

2019

.5

13.5

17

19

17

19.5

485,

700

485,

700

485,

800

485,

800

7,707,300

7,707,300

7,707,400

7,707,400

Dep

artm

ent o

f Reg

iona

l Dev

elop

men

t and

Lan

dsLa

zy L

ands

, Kar

rath

a - W

ater

Man

agem

ent S

umm

ary

Figu

re 1

: Lot

192

6 R

idle

y St

reet

, Bul

garr

a (P

60)

±Jo

b N

o. J

5149

© C

OP

YRIG

HT

JIM

DAV

IES

& A

SSO

CIA

TES

PTY

. LTD

. 201

2

Dat

a S

ourc

e: N

earm

ap A

eria

l Im

ager

y (2

012)

, GH

D (2

010)

Rep

ort o

n K

arra

tha

Dra

inag

e A

sses

smen

t - D

rain

age

Man

agem

ent P

lan

020

4060

8010

0 Met

res

Sca

le:1

:1,5

00@

A4

97

1

196

168

18

1311

15

3

17

1210

145

4 2

Kar

rath

a To

wns

ite

Cat

chm

ent L

ocat

ion

& D

rain

age

1:10

0,00

0

1:12

,000

GH

D (2

010)

Cat

chm

ent B

ound

ary

Prio

rity

Sta

ge 1

Rel

ease

Lot

s

Topo

grap

hic

Con

tour

s (m

AH

D)

Par

ks, R

ecre

atio

n &

Dra

inag

e R

eser

ve

Site

Pla

n

Lots

for F

utur

e R

elea

se

Dra

in /

Wat

erco

urse

P60

From: SMYTHE Toni [mailto:[email protected]]Sent: Monday, 10 September 2012 9:48 AM To: Monica Sullivan Subject: RE: Flood advice for Lazy Lands sites

Hi Monica,

Please find the below advice for Lot 1926 Ridley St in Bulgarra.

The Department of Water, in carrying out its role in floodplain management, provides advice andrecommends guidelines for development on floodplains with the object of minimising flood risk anddamage.

The preliminary results of the Karratha Coastal Vulnerability Study show that in this area theinundation levels for large storm surge events are expected to be:

100 year ARI 500 year ARIAt 2010 12.7 m AHD 12.7 m AHDAt 2060 12.7 m AHD 13 m AHDAt 2110 12.7 m AHD 13.1 m AHD

The estimates include flooding generated from storm surge and catchment flooding, and theestimates for 2060 and 2110 include an allowance of 0.3 metres and 0.9 metres respectively forpossible future sea level rise.

The available contour information for the area shows the general natural surface level of the lot tovary from ~13.5 m AHD to 16 m AHD (see attached plan).

Please note that this advice is related to storm surge and major flooding only and does not take intoaccount local stormwater drainage.

For further information please contact Simon Rodgers on (08)6364 6923 or via email [email protected].

Kind regards,

Toni SmytheEngineer, Floodplain ManagementDepartment of WaterTelephone: (08) 6364 7413E mail: [email protected]

15

16

14

13

12

17

19

18

11.5

15.5

14.5

13.5

16.5

12.5

18.5

17.5

19.5

20

11

2120

.5

17

13.5

19

17

1716

.5

19.5

RID

LEY

ST

MEL

AK

ST

MIL

LSTR

EAM

RD

COWRIE CT

1

680

1926

7

2

6

3

84

9

611

5

606

610

631

634

614

608

612

629

609

623

627

625

613

604

607

635

605

626

624

632

630

615

628

633

616

603

636

11

587

10

588

622

589

590

591

LEG

END

Lot 1

926

Rid

ley

StBu

lgar

ra

´

LOC

ALI

TY M

AP

# SK

AR

RA

THA

This

map

is a

pro

duct

of t

he D

epar

tmen

t of W

ater

,A

sses

smen

t & A

lloca

tion

and

was

prin

ted

on 7

/09/

2012

.

This

map

was

pro

duce

d w

ith th

e in

tent

that

it b

e us

edfo

r di

spla

y pu

rpos

es a

t the

sca

le o

f 1:1

,500

whe

npr

intin

g at

A4.

Whi

le th

e D

epar

tmen

t of W

ater

has

mad

e al

lre

ason

able

effo

rts to

ens

ure

the

accu

racy

of t

his

data

,th

e de

part

men

t acc

epts

no

resp

onsi

bilit

y fo

r any

inac

cura

cies

and

per

sons

rel

ying

on

this

dat

a do

so

at th

eir o

wn

risk.

SOU

RC

ES

Spa

tial C

adas

tral

Dat

abas

e - L

andg

ate

- 06/

02/1

2R

oad

Cen

trelin

es, D

LI -

Land

gate

- 13

/01/

2010

Wes

tern

Aus

tral

ian

Tow

ns -

Land

gate

- 1

2/07

/200

1

The

Dep

artm

ent o

f Wat

er a

ckno

wle

dges

the

follo

win

g da

tase

ts a

nd th

eir c

usto

dian

s in

the

prod

uctio

n of

this

map

:

Dat

um a

nd P

roje

ctio

n In

form

atio

nVe

rtica

l Dat

um: A

ustra

lian

Hei

ght D

atum

(AH

D71

)H

oriz

onta

l Dat

um: G

DA

94 M

GA

z50

Proj

ectio

n: U

nive

rsal

Tra

vers

e M

erca

tor (

UTM

)Sp

hero

id: G

eode

tic R

efer

ence

Sys

tem

(GR

S80

)

Proj

ect I

nfor

mat

ion

Clie

nt:

Map

Aut

hor:

Toni

Sm

ythe

Task

ID: B

1305

Com

pila

tion

date

: 7/0

9/20

12Ed

ition

: Ver

sion

1

Path

: J:\g

ispr

ojec

ts\P

roje

ct\B

_Ser

ies\

B130

5\00

01_F

PM_E

nqui

res\

mxd

\Kar

rath

a\FP

M K

arra

tha

Lot 1

926

Rid

ley

St e

nq.m

xd

Surfa

ce C

onto

urs

(m A

HD

)

Lot 1

926

Rid

ley

St

Cad

astre

010

2030

405

Met

res