annexure ii tech data sheet

4
Sr. No Speicification IOCL Requirement Vendor Reply/ Confirm 1 Maximum ambient temperature 40 Deg C 2 Minimum ambient temperature 9 Deg C 3 Design ambient temperature 40.0 Deg C 4 Relative humidity max/min 96 % / 50% 5 Altitude above MSL 54 m 6 Environment Humid & corrosive 7 Location 03 Bldg. (Inside refinery - Terrace of EWS , CSB & Outside refinery-Admn building of Block A & B * Vendor to make site survey before submitting the tender to analyze the scope. 1 Rated Output To be mentioned by Vendor (To meet total 200KW = (100 +100) KW 2 No. of PV Modules To be mentioned by Vendor 3 No. of series module in one array To be mentioned by Vendor 4 No. of arrays in parallel combination To be mentioned by Vendor 1 PV cell type To be mentioned by Vendor 2 Make of SPV cell To be mentioned by Vendor 3 Make of SPV Module To be mentioned by Vendor 4 Maximum Power Rating of one module To be mentioned by Vendor 5 Rated Current of module To be mentioned by Vendor 6 Rated Voltage of module To be mentioned by Vendor 7 Short Circuit Current of module To be mentioned by Vendor 8 Open Circuit Voltage of module To be mentioned by Vendor 9 Sample I-V curve Submitted (Yes / No) To be mentioned by Vendor 1 Mounting type Roof-mounted 2 Surface azimuth angle of PV Module To be mentioned by Vendor Annexure-II Technical Data Sheet to be compulsorily filled by Vendor - 200KW Solar Panel, Roof top Grid Tie A. Site Condition B. SPV power plant D. Mounting Arrangement C. SPV Module Page 1 of 4

Upload: neera-jain

Post on 13-Sep-2015

13 views

Category:

Documents


5 download

DESCRIPTION

Annexure II Tech Data Sheet

TRANSCRIPT

  • Sr.

    NoSpeicification IOCL Requirement Vendor Reply/ Confirm

    1 Maximum ambient temperature 40 Deg C

    2 Minimum ambient temperature 9 Deg C

    3 Design ambient temperature 40.0 Deg C

    4 Relative humidity max/min 96 % / 50%

    5 Altitude above MSL 54 m

    6 Environment Humid & corrosive

    7 Location 03 Bldg. (Inside refinery -

    Terrace of EWS , CSB &

    Outside refinery-Admn building

    of Block A & B

    * Vendor to make site survey

    before submitting the tender to

    analyze the scope.

    1 Rated Output To be mentioned by Vendor (To

    meet total 200KW = (100 +100)

    KW

    2 No. of PV Modules To be mentioned by Vendor

    3 No. of series module in one array To be mentioned by Vendor

    4 No. of arrays in parallel

    combination

    To be mentioned by Vendor

    1 PV cell type To be mentioned by Vendor

    2 Make of SPV cell To be mentioned by Vendor

    3 Make of SPV Module To be mentioned by Vendor

    4 Maximum Power Rating of one

    module

    To be mentioned by Vendor

    5 Rated Current of module To be mentioned by Vendor

    6 Rated Voltage of module To be mentioned by Vendor

    7 Short Circuit Current of module To be mentioned by Vendor

    8 Open Circuit Voltage of module To be mentioned by Vendor

    9 Sample I-V curve Submitted (Yes

    / No)

    To be mentioned by Vendor

    1 Mounting type Roof-mounted

    2 Surface azimuth angle of PV

    Module

    To be mentioned by Vendor

    Annexure-II

    Technical Data Sheet to be compulsorily filled by Vendor

    - 200KW Solar Panel, Roof top Grid Tie

    A. Site Condition

    B. SPV power plant

    D. Mounting Arrangement

    C. SPV Module

    Page 1 of 4

  • 3 Tilt angle(slope) of PV Module To be mentioned by Vendor

    1 Enclosure To be mentioned by Vendor

    2 Necessary Fuse Protection &

    Surge Protection.

    Yes

    3 Fire Protection IEC 60 695-2-11- UL Subject 94

    (Glow wire test )

    4 Degree of protection against

    mechanical load

    IK 08 (5 Joule)

    5 Rated Insulated Voltage DC 1000V

    6 Dielectric strength 4.65 KV DC

    7 Type Test In accordance to IEC 60364-712

    1 Nomianl output power at site

    based on the site conditions

    Total 200 KW = 2*100KW

    (Note: To be Installed on the

    terrace of 3 no. Bldg to meet total

    200KW output power overall)

    2 Nominal Output array voltage

    *shall be suitable for the MPPT

    range of PCU

    To be mentioned by Vendor

    3 DC Array Input Operating

    Voltage

    (-20% to +15%) of the DC Array

    input voltage

    4 Type of solar charge controller MPPT Based Solar Charge

    Controller

    5 Switching device MOSFET/IGBT based

    6 Continuous inverter Output

    Rating (KVA)

    7 Output Wave Form Pure Sine Wave Output

    8 Total Harmonic distortion < 3% @ nominal power

    9 Output Voltage 3 ph, 415 10 %

    10 Output Frequency 50Hz 3%

    11 Power Factor > 0.9

    12 PCU Efficiency > 90% at nominal voltage &

    power

    13 Inverter efficiency 94% to 98% at full load

    14 No. of Inverters with

    Configuration

    To be provided by Vendor

    (8*25KW, to meet nominal

    output power 4*50KW, at 3 nos.

    bldgs with each having N+1

    configuration or better)

    Each 50KW solar system

    will consist of 3 no. inverter

    modules of min. 25 KW

    each. (* all the inverters

    provided shall be of similar

    rating)

    15 Inverter Type To be mentioned by Vendor

    F. Power Conditioning Unit (PCU) / Inverter

    E. DC Combiner Box / Array Junction Box

    Page 2 of 4

  • 16 Spare Inverter Module 2 no.

    17 Idle Current < 4% of rated capacity

    18 Regulation 2% for DC I/p variation & o/p

    load variation

    19 Overload Features 150% for 1 minute

    20 Cooling Forced Air cooling, with

    temperature controlled

    cooling fan

    21 Operating Temperature 0 to 50 C

    22 Relative Humidity 95% Maximum

    23 LED/LCD Display :

    Indications

    Display shall indicate system

    functional parameters and

    protection functional indicator

    24 Data monitor and display controls RS485, Ethernet OR RS232

    connectivity

    25 Protections

    26 a. Input over voltage

    b. Low/high frequency

    c. Short circuit

    d. Under/over output voltage

    e. Over Temperature

    f. Grid Input under voltage / over

    voltage with auto recovery

    g. DC disconnect device

    h. DC reverse polarity

    i. Anti Islanding Protection as per

    the standard

    27 Enclosure Protection IP 21(for indoor) as per IEC 529

    28 Safety 1. IEC 62103

    2. IEC 62109 Part 1 & 2

    3. Galvanic Isolation at input &

    output through

    transformer

    29 Audible Noise < 45dB at 1 Meter

    30 Power Control MPPT suitable for hybrid

    operation.

    31 Communication peripherals for

    DATA analysis

    LAPTOP (preferably Apple

    make)

    G. Catalogue

    To be submitted along with the

    bid

    H. Drawings(To be submitted compulsorily along with the

    Tender)

    SPV Modules drawings, Solar

    array layout,

    Site & plant layout,

    Page 3 of 4

  • Note: No cell to be kept blank.Vendor to give comments(compliance or non compliance) against each point

    Page 4 of 4