ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local Government : Bishoftu Urban Local Government Development Project (ULGDP) IDA Credit No-4994 A 6 From Evanjelical church to Aroge ULGDP/Bish/CS/06 CPP/LCB BOQ 5 From 02 kebele office to 01 kebele Betelhem school(800m) ULGDP/Bish/CS/05 /12/13 CPP/LCB BOQ BOQ 4 Back of sun shine factory(450m) ULGDP/Bish/CS/04 /12/13 CPP/LCB BOQ 3 From Addis Abeba asphalt to BCI school (550m) ULGDP/Bish/CS/03 /12/13 CPP/LCB BOQ CPP/LCB BOQ 2 ULGDP/Bish/CS/01 /12/13 CPP/LCB Inova to Kurkura 1(1km) ULGDP/Bish/CS/02 /12/13 PROCUREMENT PLAN FOR CIVIL WORKS 2012/2013(2005 EFY) S.no Descriptions Contract/Package number Lot number Procurement method LS / BOQ 1 Mekelakeya to BCI school(1.1km) Cobblestone roads with side ditches 2005 EFY NEW Projects Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized

Upload: others

Post on 31-Oct-2019

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

ANNEX 10: ULGDP PROCUREMENT PLAN

Ethiopia

Urban Local Government : Bishoftu

Urban Local Government Development Project (ULGDP)

IDA Credit No-4994

A

6From Evanjelical church to Aroge

Kidame(370m)

ULGDP/Bish/CS/06

/12/13CPP/LCB BOQ

5From 02 kebele office to 01 kebele Betelhem

school(800m)

ULGDP/Bish/CS/05

/12/13CPP/LCB BOQ

BOQ

4 Back of sun shine factory(450m)ULGDP/Bish/CS/04

/12/13CPP/LCB BOQ

3From Addis Abeba asphalt to BCI school

(550m)

ULGDP/Bish/CS/03

/12/13CPP/LCB BOQ

CPP/LCB

BOQ

2

ULGDP/Bish/CS/01

/12/13CPP/LCB

Inova to Kurkura 1(1km)ULGDP/Bish/CS/02

/12/13

PROCUREMENT PLAN FOR CIVIL WORKS 2012/2013(2005 EFY)

S.no DescriptionsContract/Package

number

Lot

number

Procurement

methodLS / BOQ

1 Mekelakeya to BCI school(1.1km)

Cobblestone roads with side ditches

2005 EFY NEW Projects

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

8

CPP/LCB BOQ

ULGDP/Bish/CS/09

/12/13

6From Evanjelical church to Aroge

Kidame(370m)

ULGDP/Bish/CS/06

/12/13CPP/LCB BOQ

7 From Asrat shop to Hirna asphalt(380m)ULGDP/Bish/CS/07

/12/13CPP/LCB BOQ

Back of 08 kebele to Ketta school(280m)ULGDP/Bish/CS/10

/12/13CPP/LCB BOQ

From old kebele 11 to used materials shoping

area & Ageda tera, and from Genet Aboye house

to Bole godana(387m)

ULGDP/Bish/CS/08

/12/13CPP/LCB BOQ

9 From old kebele 13 to KVO road(240m) NCB BOQ

10

15From Addis Abeba asphalt to BCI school

(550m)

ULGDP/Bish/CS/15

/12/13CPP/LCB BOQ

11From Dombosco cobblestone road to 03 kebele

youth center(242m)

ULGDP/Bish/CS/11

/12/13CPP/LCB BOQ

13From Shisemania cobblestone road to pilet

project(800m)

14 Inova to Kurkura 1ULGDP/Bish/CS/14

/12/13CPP/LCB BOQ

ULGDP/Bish/CS/13

/12/13

12From 07 kebele to Malaria prevention office and

from old 11 kebele to Bizuneh Hayilu

komando(330m)

ULGDP/Bish/CS/12

/12/13CPP/LCB BOQ

Page 3: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

CPP/LCB BOQ24 From Kettaa school to Addis mender(500m)ULGDP/Bish/CS/24

/12/13

15From Addis Abeba asphalt to BCI school

(550m)

ULGDP/Bish/CS/15

/12/13CPP/LCB BOQ

16 From NOC to Dirre asphalt(650m)ULGDP/Bish/CS/16

/12/13CPP/LCB BOQ

18Infront of Hora school & Beminet

restorant(170m)

ULGDP/Bish/CS/18

/12/13CPP/LCB BOQ

17From Dombosco road to Mr Alemayehu

house(272m)

ULGDP/Bish/CS/17

/12/13CPP/LCB BOQ

19Infront of 05 kebele youth center to Zawuditu

shop and from Alphiya college to deffence

health college(430m)

ULGDP/Bish/CS/19

/12/13CPP/LCB BOQ

20 From old kebele 09 to Photo Solomon(500m)ULGDP/Bish/CS/20

/12/13CPP/LCB BOQ

CPP/LCB BOQ

22ULGDP/Bish/CS/22

/12/13CPP/LCB BOQ

23From Abirari flour mill to Shameta

house(500m)

ULGDP/Bish/CS/23

/12/13

21 From Galma Abba gada to Arabu house(280m)ULGDP/Bish/CS/21

/12/13CPP/LCB BOQ

Infront of Kalkidan Idir(162m)

Page 4: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

NCB BOQ25Construction of culverts at

01,02,03,04,05,06,07,08 & 09 kebeles

ULGDP/Bish/Cw/0

1/12/13

26 Construction of drainage phase III

NCB BOQ

ULGDP/Bish/Cw/0

2/12/13NCB BOQ

27 Construction of production premises & shades ULGDP/Bish/Cw/0

3/12/13

From 08 kebele office to Rufael church I

From Hagemaf to meto amist II

28 Construction of street light phase IIULGDP/Bish/Cw/0

4/12/13NCB BOQ

29Construction of water wall for Landfill site

sanitation

ULGDP/Bish/Cw/0

5/12/13NCB BOQ

30 Parking & Greenery developmentULGDP/Bish/Cw/0

6/12/13NCB BOQ

31 Construction of car parking & street signULGDP/Bish/Cw/0

7/12/13NCB BOQ

32 Construction of bridge & retaining wallULGDP/Bish/Cw/0

8/12/13NCB BOQ

Page 5: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Ethiopia

Urban Local Government : Bishoftu

Urban Local Government Development Project (ULGDP)

33 Construction of Land fill siteULGDP/Bish/Cw/0

2/08/09NCB BOQ

34 Construction of drainage phase II(on going)ULGDP

/Bish/cw/01/11/12NCB BOQ

35Construction of drainage Kejima to Iyasu Meda

connecting to drainage(1100m)I

36Construction of drainage construction Bank

passing at the bach of mosque connecting to

KVO road(3550m)

II

37Construction of drainage from sun Jorge to

cheleleka (500m)III

Construction of street lightULGDP

/Bish/cw/05/11/12NCB BOQ

38Construction of public toilet at 01,05,06, & 08

kebeles

ULGDP

/Bish/cw/02/11/12NCB BOQ

2004 EFY Onging Projects

BOQ39 Phase two Market center at kebele 01ULGDP

/Bish/cw/04/11/12NCB

40

Page 6: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

IDA Credit No-4994

PROCUREMENT PLAN FOR Substential completion of CIVIL WORKS 2011/2012(2004 E.C)

1 Cobblestone roads with side ditch phase I

S.no DescriptionsContract/Package

number

Lot

number

Procurement

methodLS / BOQ

1.2 Addis Abeba asphalt road to lize mender(800m)ULGDP/Bish/CS/03

/11/12NCB BOQ

1.1Addis Abeba asphalt road to sunshine up to

International School(800m)

ULGDP/Bish/CS/01

/11/12NCB BOQ

1.4Tokuma School to Dire asphalt with two

interconection and Dire Road to drainage Lot-

1(490m)

ULGDP/Bish/CS/06

/11/12CPP/LCB BOQ

1.3Selam mander (shisamania) to Dombosco

condomminiam(467m)

ULGDP/Bish/CS/05

/11/12CPP/LCB BOQ

1.6 Betesab clinic to Circle(389m)ULGDP/Bish/CS/08

/11/12CPP/LCB BOQ

1.5Bishoftu Hospital to old Ada’a wereda court

office (extension) and Near workers and Social

affairs offic(400m)

ULGDP/Bish/CS/07

/11/12CPP/LCB BOQ

Page 7: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

1.8Old Kebele11 to Mosque and curved to Kebele

08 Rufel Church cobblestone road(674m)

ULGDP/Bish/CS/11

/11/12CPP/LCB BOQ

1.7Bishoftu High School to Millennium

School(317m)

ULGDP/Bish/CS/09

/11/12NCB BOQ

1.1Model School up to Gebeya (near Rufal

church)(425m)

ULGDP/Bish/CS/14

/11/12CPP/LCB BOQ

1.9 Back of Kebele 08 to Health Center (755m)ULGDP/Bish/CS/12

/11/12NCB BOQ

1.12Beza school to KVO road passing in front of

Ada'a wereda police station(500m

ULGDP/Bish/CS/16

/11/12CPP/LCB BOQ

1.11Genesis cobblestone road up to tedla

clinic(547m)

ULGDP/Bish/CS/15

/11/12CPP/LCB BOQ

1.13Defence Colletge to Gebeya (near Rufal

church)(425m)

ULGDP/Bish/CS/17

/11/12CPP/LCB BOQ

1.14Oxford to Interlakes International School

(connecting the two)(865m)

ULGDP/Bish/CS/18

/11/12NCB BOQ

Cobblestone Roads with side ditch phase II

Page 8: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

1.15 Dombosco to Habitat mander(585m)ULGDP/Bish/CS/20

/11/12CPP/LCB BOQ

1.14Oxford to Interlakes International School

(connecting the two)(865m)

ULGDP/Bish/CS/18

/11/12NCB BOQ

1.17Kidane Mihihiret cobblestone road to Hirna

asphalt passing in front of Cheleleka School

(330m)

ULGDP/Bish/CS/22

/11/12CPP/LCB BOQ

1.16Addis Abeba Road connecting with cobblestone

road near Lema milk to Erfora (300m)

ULGDP/Bish/CS/21

/11/12CPP/LCB BOQ

1.18 Silsa mazoria to Commissary(300m)ULGDP/Bish/CS/23

/11/12CPP/LCB BOQ

1.21Old bus station to Dobosco cobblestone

road(590m)

ULGDP/Bish/CS/27

/11/12NCB BOQ

1.2Youth Center cobblestone road to Kebele 08

Rufael Church cobblestone road(650m)

ULGDP/Bish/CS/25

/11/12NCB BOQ

1.23Ada’a Midire Genet Hotel to Mosque and

curved to Dam flour mill(429m)

ULGDP/Bish/CS/30

/11/12CPP/LCB BOQ

1.22Shoa cobblestone road to Kidane Mehiret new

cobblestone(245m)

ULGDP/Bish/CS/29

/11/12CPP/LCB BOQ

Page 9: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

1.24 Abirari mill house to Gurage Amba (600m)ULGDP/Bish/CS/31

/11/12CPP/LCB BOQ

1.26Back of 08 kebele to Beza school to to Belete

Hotel (600m)

ULGDP/Bish/CS/33

/11/13CPP/LCB BOQ

1.25 Back of 08 kebele office to Yerosan

school(600m)

ULGDP/Bish/CS/32

/11/12CPP/LCB BOQ

1.28 Qetena 6 Hirna asphalt to Kidane Mehiret

cobblestone to Teshale Getachew house (600m)

ULGDP/Bish/CS/35

/11/12CPP/LCB BOQ

1.27Old 13 Kebele Ato Indale Mekonnin House to

Gebeya (400m)

ULGDP/Bish/CS/34

/11/12CPP/LCB BOQ

1.3 Gulit gebeya to Payilet (500m)ULGDP/Bish/CS/37

/11/12CPP/LCB BOQ

1.29 Infiront of Meirab Idir to Tokkuma cobblestone

(300m)

ULGDP/Bish/CS/36

/11/12CPP/LCB BOQ

1.31At the back of Tedila Clinic to Ada'a mill flour

factory(490m)

ULGDP/Bish/CS/38

/11/12CPP/LCB BOQ

Cobblestone Roads with side ditch phase III(New)

Page 10: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

1.32 Beminet Restaurant to social affairs(150m)ULGDP/Bish/CS/39

/11/13CPP/LCB BOQ

1.31At the back of Tedila Clinic to Ada'a mill flour

factory(490m)

ULGDP/Bish/CS/38

/11/12CPP/LCB BOQ

3 Construction of MSE premises(market center)ULGDP/Bish/Cw/0

1/10/11NCB BOQ

2 Construction of Drainage ULGDP/Bish/Cw/0

1/08/09III NCB BOQ

3.2Construction of MSE Selling & display

Premises II

3.1Construction of MSE Selling & display

Premises I

3.3 Construction of production premises III

5Construction of culverts at

01,02,03,04,05,06,07,08 & 09 kebeles

ULGDP

/Bish/cw/03/11/12NCB BOQ

4Construction of public toilet at 01,05,06, & 08

kebeles

ULGDP

/Bish/cw/02/11/12NCB BOQ

Page 11: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

spec.procu.Noti

ce Advert

Prep. &

submission

No

objection

date

on line UNDB

get way Nat

press

Bid invitation

date

Plan Oct24/12 N/A Oct29/12 Oct29/12

Revised

Actual

Plan Oct24/12 N/A Oct29/12 Oct29/12

Revised

Actual

Plan Oct24/12 N/A Oct29/12 Oct29/12

Revised

Actual

Plan Oct24/12 N/A Oct29/12 Oct29/12

Revised

Actual

Plan Nov01/12 N/A Nov08/12 Nov08/12

Revised

Actual

Plan Nov01/12 N/A Nov08/12 Nov08/12

71,594.57 PostPost

Post Post

Post Post 133,393.02

49,965.11

82,830.65 PostPost

Bidding period

Prior/Post

Review

Plans vs

Actual

Draft bid

Docum.including spec.&

PROCUREMENT PLAN FOR CIVIL WORKS 2012/2013(2005 EFY)

Post Post

Post 148,807.18

Pre/Post qualification

Cobblestone roads with side ditches

Estimated

amount in US $

2005 EFY NEW Projects

Post

160,994.45

Page 12: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Revised

Actual

Plan Nov01/12 N/A Nov08/12 Nov08/12

Revised

Actual

Plan Nov01/12 N/A Nov08/12 Nov08/12

Revised

Actual

Plan Oct29/12 N/A Nov01/12 Nov01/12

Revised

Actual

Plan Oct29/12 N/A Nov01/12 Nov01/12

Revised

Actual

Plan Oct29/12 N/A Nov01/12 Nov01/12

Revised

Actual

Plan Oct29/12 N/A Nov01/12 Nov01/12

Revised

Actual

Plan Nov07/12 N/A Nov14/12 Nov14/12

Revised

Actual

Plan Nov07/12 N/A Nov14/12 Nov14/12

Revised

Actual

Plan Nov07/12 N/A Nov14/12 Nov14/12

Post

Post Post 49,965.11

Post 51,931.37

Post Post 51,684.23

Post Post

91,856.03

Post

Post

Post 30,133.43

Post28,897.46

Post Post

Post Post 25,842.99

Post

133,112.11

161,239.90 Post

Post Post 35,077.30

Page 13: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Revised

Actual

Plan Nov07/12 N/A Nov14/12 Nov14/12

Revised

Actual

Plan Nov30/12 N/A Dec07/12 Dec07/12

Revised

Actual

Plan Nov30/12 N/A Dec07/12 Dec07/12

Revised

Actual

Plan Nov30/12 N/A Dec07/12 Dec07/12

Revised

Actual

Plan Nov30/12 N/A Dec07/12 Dec07/12

Revised

Actual

Plan Dec07/12 N/A Dec14/12 Dec14/12

Revised

Actual

Plan Dec07/12 N/A Dec14/12 Dec14/12

Revised

Actual

Plan Dec07/12 N/A Dec14/12 Dec14/12

Revised

Actual

Plan Dec07/12 N/A Dec14/12 Dec14/12

Revised

Actual

Post Post 78,095.56

91,856.03 Post Post

Post Post 100,538.71

Post Post

29,346.90

22,303.62

Post Post

Post Post

Post Post

50,282.53

74,347.41

Post

Post Post

Post

Post Post

72,337.39

24,206.40

16,256.87

Page 14: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Plan Jan16/13 N/A Jan21/13 Jan21/13

Revised

Actual

Plan Jan16/13 N/A Jan21/13 Jan21/13

Revised

Actual

Plan Nov02/12 N/A Nov12/12 Nov12/12

Revised

Actual

Plan Nov26/12 N/A Nov30/12 Nov30/12

Revised

Actual

Plan Nov02/12 N/A Nov12/12 Nov12/12

Revised

Actual

Plan Nov26/12 N/A Nov30/12 Nov30/12

Revised

Actual

Plan Dec03/12 N/A Dec11/12 Dec11/12

Revised

Actual

Plan Dec03/12 N/A Dec11/12 Dec11/12

Revised

Actual

95,506.69 Post Post

Post660,794.05 Post

245,714.29 Post Post

946,666.99 Post Post

84,270.61 Post Post

81,208.78 Post Post

16,854.12 Post Post

236,705.75 Post Post

Page 15: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Plan Sep30/09 Oct 10/09 Sep30/10 Oct10/10

Revised

Actual Jan11/10 Feb19/10 March3/10 March3/10

Plan Dec 26/11 N/A Dec 29/11 Dec 29/11

Revised

Actual Feb10/12 N/A Feb17/12 Feb17/12

Plan Dec 26/11 N/A Dec 29/11 Dec 29/11

Revised

Actual Feb10/12 N/A Feb17/12 Feb17/12

Plan Dec 26/11 N/A Dec 29/11 Dec 29/11

Revised

Actual Feb10/12 N/A Feb17/12 Feb17/12

Plan Dec 26/11 N/A Dec 29/11 Dec 29/11

Revised

Actual Feb10/12 N/A Feb17/12 Feb17/12

Plan Dec 09/11 N/A Dec 22/11 Dec 22/11

Revised

Actual Dec20/11 N/A Dec25/11 Dec25/11

Plan Dec 15/11 NA Dec 21/11 Dec 21/11

Revised

Actual Dec-11 N/A Dec25/11 Dec25/11

Plan Dec 15/11 NA Dec 21/11 Dec 21/11

Revised

Actual Feb10/12 N/A Feb17/12 Feb17/12

930,266.67 Post Post

451,526.71 Post Post

114,911.76 Post

Post

Post

Post

2004 EFY Onging Projects

305,882.16

352,941.18 Post

Post

Page 16: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

S.no

Prep. &

submission

No

objection

date

on line UNDB

get way Nat

press

Bid invitation

date

Plan Dec01/11 N/A Dec 12/11 Dec 12/11

Revised

Actual Dec 09/11 N/A Feb26/12 Feb26/12

Plan Dec01/11 N/A Dec 12/11 Dec 12/11

Revised

Actual Dec 09/11 N/A Feb26/12 Feb26/12

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec 09/11 N/A Dec15/11 Dec15/11

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec 09/11 N/A Dec15/11 Dec15/11

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec 09/11 N/A Dec15/11 Dec15/11

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec 09/11 N/A Dec15/11 Dec15/11

PROCUREMENT PLAN FOR Substential completion of CIVIL WORKS 2011/2012(2004 E.C)

Prior/Post

Review

Plans vs

Actual

Draft bid Bidding period

Estimated

amount in US $Pre/Post qualification

145,339.94 Post Post

149,825.00 Post Post

74,900.00 Post Post

74,440.00 Post Post

72,809.00 Post Post

75,645.00 Post Post

Page 17: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Plan Dec 12/11 N/A Dec 23/11 Dec 23/11

Revised

Actual Dec 09/11 N/A Feb26/12 Feb26/12

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec10/11 N/A Dec15/11 Dec15/11

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec 09/11 N/A Feb26/12 Feb26/12

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec 09/11 N/A Feb23/12 Feb23/12

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec 09/11 N/A Dec15/11 Dec15/11

Plan Dec01/11 N/A Dec05/11 Dec05/11

Revised

Actual Dec 09/11 N/A Feb23/12 Feb23/12

Plan Jan20/12 N/A N/A Jan23/12

Revised

Actual Dec 09/11 N/A N/A Jan07/12

Plan Dec 12/11 N/A Dec 19/11 Dec 23/11

Revised

74,400.00 Post Post

146,848.00 Post Post

72,871.00 Post Post

149,390.00 Post Post

73,333.00 Post Post

72,230.00 Post Post

73,636.00 Post Post

147,762.00 Post Post

Cobblestone Roads with side ditch phase II

Page 18: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Actual Dec 09/11 N/A Feb26/12 Feb26/12

Plan Jan20/12 N/A Jan23/12 Jan23/12

Revised

Actual Dec 09/11 N/A Feb23/12 Feb23/12

Plan Jan20/12 N/A Jan23/12 Jan23/12

Revised

Actual Dec 09/11 N/A Jan07/12 Jan07/12

Plan Jan20/12 N/A Jan23/12 Jan23/12

Revised

Actual Dec 09/11 N/A Jan07/12 Jan07/12

Plan Jan20/12 N/A Jan23/12 Jan23/12

Revised

Actual Dec 09/11 N/A Jan07/12 Jan07/12

Plan Jan 2/12 N/A Jan 13/12 Jan 13/12

Revised

Actual Dec 09/11 N/A Feb26/12 Feb26/12

Plan Jan 2/12 N/A Jan 13/12 Jan 13/12

Revised

Actual Dec 09/11 N/A Feb26/12 Feb26/12

Plan Jan20/12 N/A Jan23/12 Jan23/12

Revised

Actual Dec 09/11 N/A Jan07/12 Jan07/12

Plan Jan20/12 N/A Jan23/12 Jan23/12

Revised

Actual Dec 09/11 N/A Feb23/12 Feb23/12

75,040.00 Post Post

147,762.00 Post Post

74,200.00 Post Post

74,407.00 Post Post

72,522.00 Post Post

145,800.00 Post Post

146,368.00 Post Post

74,111.00 Post Post

73,372.53 Post Post

Page 19: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Plan May 18/12 N/A May 21/12 May 21/12

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan May 18/12 N/A May 21/12 May 21/12

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan May 18/12 N/A May 21/12 May 21/12

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan May 18/12 N/A May 21/12 May 21/12

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan May 18/12 N/A May 21/12 May 21/12

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan May 18/12 N/A May 28/12 May 28/12

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan May 18/12 N/A May 28/12 May 28/12

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan May 18/12 N/A May 28/12 May 28/12

88,300.00 Post Post

89,152.00 Post Post

87,300.00 Post Post

86,100.00 Post Post

88,000.00 Post Post

87,020.71 Post Post

89,366.00 Post Post

87,975.00 Post Post

Cobblestone Roads with side ditch phase III(New)

Page 20: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan May 18/12 N/A May 28/12 May 28/12

Revised

Actual May 18/12 N/A May23/12 May23/12

Plan Sep30/09 N/A Oct 5/09 Oct 5/09

Revised

Actual Sep30/09 N/A Jan17/10 Jan17/10

Plan Jan05/11 NA Feb14/11 Feb14/11

Revised

Actual Dec19/10 N/A Dec23/10 Dec23/10

Plan Dec 09/11 N/A Dec 22/11 Dec 22/11

Revised

Actual Dec20/11 N/A Dec25/11 Dec25/11

Plan Dec 09/11 N/A Dec 22/11 Dec 22/11

Revised

Actual Dec20/11 N/A Dec25/11 Dec25/11

74,010.00 Post Post

87,975.00 Post Post

687,873.03 Post Post

833,844.23 Post Post

76,470.59 Post Post

114,911.76 Post Post

Page 21: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Bid closing-

opening

submission of bid

evaluation report

No

objection

date

Contract amount

in US $

Contract award

date

Date contrct

signed

Mobilization

advance

payment

Substantial

completion

Nov12/12 Nov19/12 N/A Nov26/12 Nov03/12 Nov 18/12 April2/13

Nov12/12 Nov19/12 N/A Nov26/12 Nov03/12 Nov 18/12 April2/13

Nov12/12 Nov19/12 N/A Nov26/12 Nov03/12 Nov 18/12 April2/13

Nov12/12 Nov19/12 N/A Nov26/12 Nov03/12 Nov 18/12 April2/13

Nov22/12 Nov29/12 N/A Dec10/12 Dec17/12 Dec21/12 March21/13

Nov22/12 Nov29/12 N/A Dec10/12 Dec17/12 Dec21/12 March21/13

Bidding period Bid Evaluation

Cobblestone roads with side ditches

2005 EFY NEW Projects

Contract ImplementaionContract finalization

Page 22: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Nov22/12 Nov29/12 N/A Dec10/12 Dec17/12 Dec21/12 March21/13

Nov22/12 Nov29/12 N/A Dec10/12 Dec17/12 Dec21/12 March21/13

Nov23/12 Dec7/12 N/A Dec14/12 Dec21/12 Dec25/12 March25/13

Nov23/12 Dec7/12 N/A Dec14/12 Dec21/12 Dec25/12 March25/13

Nov23/12 Dec7/12 N/A Dec14/12 Dec21/12 Dec25/12 March25/13

Nov23/12 Dec7/12 N/A Dec14/12 Dec21/12 Dec25/12 March25/13

Nov28/12 Dec14/12 N/A Dec17/12 Dec25/12 Dec31/12 March29/13

Nov28/12 Dec14/12 N/A Dec17/12 Dec25/12 Dec31/12 March29/13

Nov28/12 Dec14/12 N/A Dec17/12 Dec25/12 Dec31/12 March29/13

Page 23: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Nov28/12 Dec14/12 N/A Dec17/12 Dec25/12 Dec31/12 March29/13

Dec24/12 Dec31/12 N/A Jan08/13 Jan14/13 Jan21/13 Apr. 22/13

Dec24/12 Dec31/12 N/A Jan08/13 Jan14/13 Jan21/13 Apr. 22/13

Dec24/12 Dec31/12 N/A Jan08/13 Jan14/13 Jan21/13 Apr. 22/13

Dec24/12 Dec31/12 N/A Jan08/13 Jan14/13 Jan21/13 Apr. 22/13

Dec28/12 Jan10/13 N/A Jan15/13 Jan21/13 Feb04/13 May03/13

Dec28/12 Jan10/13 N/A Jan15/13 Jan21/13 Feb04/13 May03/13

Dec28/12 Jan10/13 N/A Jan15/13 Jan21/13 Feb04/13 May03/13

Dec28/12 Jan10/13 N/A Jan15/13 Jan21/13 Feb04/13 May03/13

Page 24: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Feb. 21/13 Feb. 28/13 N/A March07/13 March 14/13 March 21/13 June 21/13

Feb. 21/13 Feb. 28/13 N/A March07/13 March 14/13 March 21/13 Oct. 21/13

Dec13/12 Dec28/12 N/A Jan09/13 Jan18/13 Feb11/13 June20/13

Dec31/12 Jan21/13 N/A Jan25/13 Jan31/13 Feb20/13 June28/13

Dec13/12 Dec28/12 N/A Jan09/13 Jan18/13 Feb11/13 June20/13

Dec31/12 Jan21/13 N/A Jan25/13 Jan31/13 Feb20/13 June28/13

Jan10/13 Jan21/13 N/A Jan25/13 Feb07/13 Feb28/13 June28/13

Jan10/13 Jan21/13 N/A Jan25/13 Feb07/13 Feb28/13 June28/13

Page 25: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Oct15/10 Nov15/10 Nov22/10 Dec17/12 Dec21/12 Dec27/12 May31/13

Dec31/12

March26/10 April20/10 Oct26/10 Nov09/10 Nov24/10 Dec15/10

Jan 30/12 Feb 10/12 N/A Feb 15/12 March01/12 March22/12 June01/12

Dec31/12

March19/12 Aprl03/12 N/A April 17/12 April20/12 May11/12

Jan 30/12 Feb 10/12 N/A Feb 15/12 March01/12 March22/12 June01/12

Dec31/12

March19/12 Aprl03/12 N/A April 17/12 April20/12 May11/12

Jan 30/12 Feb 10/12 N/A Feb 15/12 March01/12 March22/12 June01/12

Dec31/12

March19/12 Aprl03/12 N/A April 17/12 April20/12 May11/12

Jan 30/12 Feb 10/12 N/A Feb 15/12 March01/12 March22/12 June01/12

Dec31/12

March19/12 Aprl03/12 N/A April 17/12 April20/12 May11/12

Jan24/12 Feb 06/12 N/A Feb 13/12 Feb 28/12 March21/12 June20/12

Nov30/12

Jan30/12 Feb21/12 N/A Feb24/12 Feb27/12 March19/12

Jan 23/12 Feb 03/12 N/A Feb 08/12 Feb 23/12 March14/12 June29/12

Dec31/12

Jan27/12 March05/12 N/A March20/12 March26/12 Aprl17/12

Jan 23/12 Feb 03/12 N/A Feb 08/12 Feb 23/12 March14/12 June29/12

Dec31/12

March19/12 Aprl03/12 N/A April 17/12 April20/12 May15/12

427,220.65

271,670.62

574,275.97

184,504.39

118,100.96

2004 EFY Onging Projects

102,160.25

366,963.95

223,036.21

Page 26: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Bid closing-

opening

submission of bid

evaluation report

No

objection

date

Contract amount

in US $

Contract award

date

Date contrct

signed

Mobilization

advance

payment

Substantial

completion

Jan 9/12 Jan 23/12 N/A Jan 30/12 Feb 6/12 Feb 20/12 May 21/12

March27/12 April11/12 N/A April25/12 May 11/12 May23/12 July 4/12

Jan 9/12 Jan 23/12 N/A Jan 30/12 Feb 6/12 Feb 20/12 May 21/12

March27/12 April11/12 N/A April25/12 May 11/12 May23/12 July 4/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May10/12

Dec29/11 Jan27/12 N/A Jan31/12 Feb13/12 Feb23/12 May 14/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May 13/12

Dec29/11 Jan27/12 N/A Jan31/12 Feb13/12 Feb23/12 May 14/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May10/12

Dec29/11 Jan27/12 N/A Jan31/12 Feb13/12 Feb23/12 May 14/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May10/12

Dec29/11 Jan27/12 N/A Jan31/12 Feb13/12 Feb23/12 May 14/12

Bidding period Bid Evaluation Contract finalization Contract Implementaion

130,811.80

138,783.76

63,509.41

74,703.97

85,614.41

72,240.68

Page 27: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Jan 20/12 Jan 30/12 N/A Feb 3/12 Feb 10/12 Feb 24/12 May 30/12

March27/12 April11/12 N/A April25/12 May 11/12 April27/12 July 28/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May10/12

Dec29/11 Jan27/12 N/A Jan31/12 Feb13/12 Feb23/12 May 14/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May10/12

March27/12 April11/12 N/A April25/12 May 11/12 April27/12 July 28/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May10/12

March08/12 March26/12 N/A March28/12 Aprl02/12 Aprl05/12 May27/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May10/12

Dec29/11 Jan27/12 N/A Jan31/12 Feb13/12 Feb23/12 May 14/12

Dec 20/11 Jan02/12 N/A Jan06/12 Jan23/12 Feb10/12 May10/12

March08/12 March26/12 N/A March28/12 Aprl02/12 Aprl05/12 May27/12

Feb08/12 Feb21/12 N/A Feb24/12 March09/12 March30/12 June25/12

Jan23/12 Feb20/12 N/A Feb24/12 Feb27/12 Feb27/12 May27/12

Jan 20/12 Jan 30/12 N/A Feb 3/12 Feb 10/12 Feb 24/12 May 30/12

85,352.15

87,044.97

102,761.70

73,307.46

81,947.21

53,179.53

82,238.53

135,437.09

Cobblestone Roads with side ditch phase II

Page 28: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

March27/12 April11/12 N/A April25/12 April26/12 May 11/12 May27/12

Feb08/12 Feb21/12 N/A Feb24/12 March09/12 March30/12 June25/12

March08/12 March26/12 N/A March28/12 Aprl02/12 Aprl05/12 May27/12

Feb08/12 Feb21/12 N/A Feb24/12 March09/12 March30/12 June25/12

Jan23/12 Feb20/12 N/A Feb24/12 Feb27/12 Feb27/12 May27/12

Feb08/12 Feb21/12 N/A Feb24/12 March09/12 March30/12 June25/12

Jan23/12 Feb20/12 N/A Feb24/12 Feb27/12 Feb27/12 May27/12

Feb08/12 Feb21/12 N/A Feb24/12 March09/12 March30/12 June25/12

Jan23/12 Feb20/12 N/A Feb24/12 Feb27/12 Feb27/12 May27/12

Feb 10/12 Feb 20/12 N/A Feb 27/12 Mar 2/12 Mar 16/12 June25/12

March27/12 April11/12 N/A April25/12 May 11/12 April27/12 July 28/12

Feb 10/12 Feb 20/12 N/A Feb 27/12 Mar 2/12 Mar 16/12 June25/12

March27/12 April11/12 N/A April25/12 May 11/12 April27/12 July 28/12

Feb08/12 Feb21/12 N/A Feb24/12 March09/12 March30/12 June25/12

Jan23/12 Feb20/12 N/A Feb24/12 Feb27/12 Feb27/12 May27/12

Feb08/12 Feb21/12 N/A Feb24/12 March09/12 March30/12 June25/12

March08/12 March26/12 N/A Feb24/12 Aprl02/12 Aprl05/12 May27/12

135,437.09

65,411.83

37,165.18

54,092.47

64,026.94

81,231.65

99,181.85

40,954.53

61,426.88

Page 29: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Jun 4/12 Jun 11/12 N/A June 18/12 June25/12 July 2/12 Sep 4/12

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Jun 4/12 Jun 11/12 N/A June 18/12 June25/12 July 2/12 Sep 4/12

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Jun 4/12 Jun 11/12 N/A June 18/12 June25/12 July 2/12 Sep 4/12

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Jun 4/12 Jun 11/12 N/A June 18/12 June25/12 July 2/12 Sep 4/12

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Jun 4/12 Jun 11/12 N/A June 18/12 June25/12 July 2/12 Sep 4/12

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Jun 11/12 Jun 18/12 N/A June 25/12 July4/12 July11/12 Sept 11/12

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Jun 11/12 Jun 18/12 N/A June 25/12 July4/12 July11/12 Sept 11/12

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Jun 11/12 Jun 18/12 N/A June 25/12 July4/12 July11/12 Sept 11/12

58,104.12

71,027.06

63,228.24

66,149.88

44,514.53

45,260.42

57,501.76

59,976.47

Cobblestone Roads with side ditch phase III(New)

Page 30: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Jun 11/12 Jun 18/12 N/A June 25/12 July4/12 July11/12 Sept 11/12

June08/12 June14/12 N/A June15/12 June15/12 June16/12 July06/12

Nov05/09 Nov 12/09 N/A April07/10 April27/10 May18/10 Dec20/10

March02/10 April04/10 N/A April15/10 April27/10 June30/10 June21/12

Feb16/11 Feb28/11 N/A Feb28/11 March01/11 March11/11 March22/11

Jan21/11 Feb22/11 N/A March06/11 March27/11 April06/11 April04/12

Jan24/12 Feb 06/12 N/A Feb 13/12 Feb 28/12 March21/12 June20/12

Nov30/12

Jan30/12 Feb21/12 N/A Feb24/12 Feb27/12 March19/12

Jan24/12 Feb 06/12 N/A Feb 13/12 Feb 28/12 March21/12 June20/12

Jan30/12 Feb23/12 N/A Feb24/12 Feb29/12 March20/12 June19/12

59,976.47

39,077.00

420,254.30

1,022,506.00

49,634.34

102,160.25

Page 31: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Final

acceptanceFinal cost

April2/14

April2/14

April2/14

April2/14

March21/14

March21/14

Cobblestone roads with side ditches

2005 EFY NEW Projects

Contract Implementaion

Page 32: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

March21/14

March21/14

March25/14

March25/14

March25/14

March25/14

March29/14

March29/14

March29/14

Page 33: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

March29/14

Apr21/14

Apr21/14

Apr21/14

Apr21/14

May03/14

May03/14

May03/14

May03/14

Page 34: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

June 21/14

Oct. 21/14

June20/14

June27/2014

June20/14

June27/2014

June30/14

June30/14

Page 35: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

May26/14

Dec. 30/13

June04/13

Dec. 30/13

June04/13

Dec. 30/13

June04/13

Dec. 30/13

June04/13

Dec. 30/13

June20/13

Nov29/13

June28/13

Dec. 30/13

June28/13

Dec. 30/13

2004 EFY Onging Projects

Page 36: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Final

acceptanceFinal cost

May 21/13

July 4/13

May 21/13

July 4/13

May10/13

May 13/13

May10/13

May 13/13

May10/13

May 13/13

May10/13

May 13/13

Contract Implementaion

Page 37: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

May 30/13

July26/13

May10/13

May 13/13

May10/13

July26/13

May10/13

May 27/13

May10/13

May 13/13

May10/13

May 27/13

June25/13

May 27/13

May 30/13

May 27/13

Page 38: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

June25/13

May 27/13

June25/13

May 27/13

June25/13

May 27/13

June25/13

May 27/13

June25/13

July26/13

June25/13

July26/13

June25/13

May 27/13

June25/13

May 27/13

Page 39: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Sep 4/13

July04/13

Sep 4/13

July04/13

Sep 4/13

July04/13

Sep 4/13

July04/13

Sep 4/13

July04/13

Sept 11/13

July04/13

Sept 11/13

July04/13

Sept 11/13

Cobblestone Roads with side ditch phase III(New)

Page 40: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

July04/13

Sept 11/13

July04/13

Dec20/11

June21/13

June25/11

April02/13

June20/13

Nov29/13

June20/13

June19/13

Page 41: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Revised ULGDP PROCUREMENT PLAN

Ethiopia - Urban Local Government Development Project(ULGDP)

Project/Programme: If Post-Review, No-objection Dates are not needed

Loan #:Contract

Type

DescriptionsSelection

Method

Lumpsu

m

or

Time-

Based

Estimated Amount

in US$

Prior/Post

Review

Plan vs.

Actual

Prep &

Submission

by Ex Ag

No-

objection

Date

Norm Duration of Proc

Steps3 - 6 wks 1 - 2 wks

Plan Nov25/11 N/A

Revised

Actual Jan10/12 N/A

Plan Dec 1/11 N/A

Revised

Actual Jan10/12 N/A

Plan Dec 1/11 N/A

Revised

Actual Jan10/12 N/A

Plan Dec 12/11 N/A

Revised

Actual Jan10/12 N/A

Plan Dec 12/11 N/A

Revised

Actual Jan10/12 N/A

Note

All consultancy services are onging projects.

IDA Credit No 4994

Preparation

Request for Proposals

LCS LS Post

Post1. Design & supervission of

Drainage phase IIIQCBS LS 76,470.59

2. Supervision for

construction of Drainage

phase II (lot1, 2 & 3)

55,600.00

Post

PROCUREMENT PLAN FOR CONSULTANTS 2012/2013(2005 E.C)

Post5. Supervision for market

center at kebele 01 phase IILCS LS 17,647.10

3. Liquid waste treatment

study & design QCBS LS 41,176.47

Post4.Solid Waste management LCS LS 17,647.10

Page 42: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

On-line

UNDB

Gateway

Nat Press

Lead-time

before

shortlist

Submission

Date

No-

objection

Date

Invitation

Date

Submission/

Opening

Date

Submission

Evaluation

Report (T)

No-

objection

Evaluation

Report (T)

1 - 1.5 wks 2 wks 1 - 2 wks 4 to 12 wks 2 - 3 wks 0.5 - 2 wks

Dec14/11 Jan03/12 Jan13/12 N/A Jan16/12 Feb16/12 March1/12 N/A

Jan 26/12 Feb19/12 Feb27/12 NA Apr15/12 May15/12 May20/12 N/A

Dec 9/11 Dec 23/11 Dec 30/11 N/A Jan 2/12 Jan 30/12 Feb 06/12 N/A

Jan 26/12 Feb19/12 Feb27/12 N/A Feb28/12 March15/12 March20/12 N/A

Dec 9/11 Dec 23/11 Dec 30/11 N/A Jan 2/12 Jan 30/12 Feb 06/12 N/A

Jan 26/12 Feb19/12 Feb27/12 N/A Feb28/12 March29/12 June01/12 N/A

Dec 19/11 Jan 2/12 Jan 9/12 N/A Jan 16/12 Feb 13/12 Feb 20/12 N/A

Jan 26/12 Feb19/12 Feb27/12 N/A Feb28/12 March29/12 Apr 10/12 N/A

Dec 19/11 Jan 2/12 Jan 9/12 N/A Jan 16/12 Feb 13/12 Feb 20/12 N/A

Jan 26/12 Feb19/12 Feb27/12 N/A Feb28/12 March15/12 Feb 25/12 N/A

All consultancy services are onging projects.

Request for EOI

(where required)Short

List

Consultant

Proposals

PROCUREMENT PLAN FOR CONSULTANTS 2012/2013(2005 E.C)

Proposal Evaluation and Negotiation for Projects

Technical (T) & Financial (F) and Negotions (N)

Page 43: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Opening

Financial

Proposals

Preparation

Eval Report

(T) (F)

Negotiation

s (N)

Draft

contractSub

mission

Date

No-

objection

Date

Contract Amount in

US$

Contract

Award

Contract

Signature

2 wks 1 - 2 wks 2 wks 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks

March15/12 March22/12 N/A Mar26/12 N/A Apri3/12 Apr18/12

May25/12 June10/12 N/A June18/12 N/A 27,328.96 June22/12 July20/12

Feb 10/12 Feb 17/12 N/A Feb 17/12 N/A Feb 24/12 Mar 2/12

March23/12 March27/12 N/A Apr01/12 N/A 32,626.77 Apr03/12April10/12

Feb 10/12 Feb 17/12 N/A Feb 17/12 N/A Feb 24/12 Mar 2/12

June05/12 June10/12 N/A June12/12 N/A 120,637.65 June13/12 July20/12

Feb 27/12 Mar 5/12 N/A Mar 5/12 N/A Mar 12/12 Mar 19/12

May03/12 May31/12 N/A June10/12 N/A 24,159.71 June13/12 June21/12

Feb 27/12 Mar 5/12 N/A Mar 5/12 N/A Mar 12/12 Mar 19/12

March23/12 March27/12 N/A Apr01/12 N/A 16,819.48 Apr03/12 April10/12

PROCUREMENT PLAN FOR CONSULTANTS 2012/2013(2005 E.C)

Proposal Evaluation and Negotiation for Projects

Technical (T) & Financial (F) and Negotions (N)Draft Contract Contract Finalization

Page 44: ANNEX 10: ULGDP PROCUREMENT PLAN Ethiopia Urban Local ...documents.worldbank.org/curated/pt/137161468252275948/pdf/NonAscii...CPP/LCB BOQ 17 From Dombosco road to Mr Alemayehu house(272m)

Mobilization

Advance

Payment

Draft

Report

Final

Report

Final

Cost

May13/12 May20/14 June20/14

May23/13 June30/13

Aug10/12

Mar 9/12 May02/13 June04/13

Dec30/12 Jan30/13

April20/12

Mar 9/12 June20/12 July 31/12

Feb28/13 March27/13

Aug10/12

Mar 26/12 June02/12 July 31/12

Dec20/12 Jan21/13

June26/12

Mar 26/12 June02/12 July 31/12

Dec30/12 Jan28/13

April20/12

PROCUREMENT PLAN FOR CONSULTANTS 2012/2013(2005 E.C)

Contract Implementation