MTD SA, Route de Muraz 16, CH 3960 Sierre, Switzerland

[email protected] / www.m-td.com

ANALYSIS OF DIE BREAKAGE CAUSES

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

The customer designed a die for an aluminium profile in alloy 7108.

The die broke on the press and the customer wants to know the root causes of breakage

THE SITUATION

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

We realize a complete extrusion simulation:

Aluminium flow and pressure

Aluminium and die temperature

Die stresses and deformations

THE M-TD SERVICE PROVIDED

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

INPUT DATA

To realize the analysis we received from customer the necessary data: 3D CAD models of the die

2D drawing of the ring and the bolster

Process parameters

THE M-TD SERVICE : ANALYSIS

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

ANALYSIS PREPARATION

1. Adjust model the die including addition of ring and bolster

2. Modeling the aluminium by subtraction of die

TIME SPENT : 45 minutes

THE M-TD SERVICE : ANALYSIS OF FIRST VERSION

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

ANALYSIS PREPARATION

3. Mesh parameter preparation

4. Meshing the aluminum and the die

TIME SPENT : 1h 15

THE M-TD SERVICE : ANALYSIS

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

ANALYSIS CALCULATION

We proceed in 4 steps to run the complete analysis:

1. Run flow and pressure

2. Run alloy and die temperature

3. Run die stresses

4. Run displacement

TIME SPENT : 2h

THE M-TD SERVICE : ANALYSIS

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

1. Profile velocity:

THE M-TD SERVICE : RESULTS ANALYSIS

The flow is globally well balanced Adjustments are need on bearing length

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

2. Pressure:

THE M-TD SERVICE : RESULTS ANALYSIS

Pressure is high Press parameters must be adjusted to reduce it

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

3. Aluminium temperature:

THE M-TD SERVICE : RESULTS ANALYSIS

Temperature is ok for this alloy.

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

4. die temperature:

THE M-TD SERVICE : RESULTS ANALYSIS

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

5. Die stress:

THE M-TD SERVICE : RESULTS ANALYSIS

Crack lines observed on the die appear clearly on the simulation results

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

5. Die stress:

THE M-TD SERVICE : RESUTLS ANALYSIS

The different cuts has shown that tress into bridges are too high (more than 900 Mpa). Stress is concentrated at the junction of the mandrel core and bridge due to shear effect.

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

6. die displacement:

THE M-TD SERVICE : RESULTS ANALYSIS

Z movement of mandrel cores is around 0.55mm.

Shearing effect : The mandrel core is moving higher than bridges

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

6. die deformation:

THE M-TD SERVICE : RESULTS ANALYSIS

Movement of mandrel core appear clearly

MTD SA, Route de Muraz 16, CH 3960 Sierre,Switzerland [email protected] / www.m-td.com

The simulation has reflected the results observed on the press

Die design needed be reviewed to reduce shear effect

Our advices were to modify bridges shape:

Increase the depth

Enlarge the top of the bridge

Take care about grinding

Increase aluminium temperature

THE M-TD SERVICE : CONCLUSION