Work Breakdown Structure

(WBS)

Definition

WBS is a deliverables-orientated

collection of project components

It is a categorization and decomposition

of the project deliverables

WBS should be input for the cost

estimation, time planning, risk planning,

quality planning and resource planning.

2

Why WBS is needed

WBS defines the required work to complete

the project

WBS creates a sense of urgency

WBS can help prevent scope creep

WBS provides control

WBS is the scope baseline

3

Building WBS (1)

Divide your project into phases

Phase has deadline, portion of project

that must be complete before another

phase in begin

Define the work package in each phase

4

Building WBS (2)

Work package is the smallest deriverable

in WBS ( 8/80 rules!)

Main output : WBS and WBS Dictionary

At the WBS should get approval from

project sponsor to confirm the series of

activities and the mesh with an

organization.

5

Creating WBS

6

Intranet WBS

Organized by Phase

7

Intranet WBS

Organized by Product

8

Intranet WBS in Tabular Form1.0 Concept

1.1 Evaluate current systems

1.2 Define Requirements

1.2.1 Define user requirements

1.2.2 Define content requirements

1.2.3 Define system requirements

1.2.4 Define server owner requirements

1.3 Define specific functionality

1.4 Define risks and risk management approach

1.5 Develop project plan

1.6 Brief Web development team

2.0 Web Site Design

3.0 Web Site Development

4.0 Roll Out

5.0 Support9

Intranet WBS and Gantt Chart in Project 2000

10

Intranet WBS and Gantt Chart Organized

by Project Management Process Groups

11

Intranet WBS and Gantt Chart Organized

by Project Management Process Groups

12

WBS Dictionary

WBS dictionary gives detail information

for each item on WBS

The level of WBS and WBS dictionary is

depend on project manager and team, as

long as the purpose is met.

13

WBS Approach

Top Down

Bottom up

Analogy approach

Using Guidelines ( depend on the

organization SOP)

Mind Mapping Approach

14

Top Down Approach

Use deductive method

Start from general to spesific

Prefer

15

Bottom Up Approach

Use inductive method

From spesific to general

Ideal for brainstrorming problem solving

16

Mind Mapping Approach

17

Note !

The WBS is not the project plan, the

schedule, or even the activity list. You will

use the WBS to help you schedule and

assign resources. A WBS is a process, as

well as a visual representation of the

work, to help you organize and plan the

action that must be completed for the

project to come to an end.