work breakdown structure (wbs) extended table of contents
DESCRIPTION
Work Breakdown Structure (WBS) Extended Table of contents. Introduction The project triangle. Product (result, features, quality). Resources. Time. Introduction The project triangle. Product (result, features, quality) What: . Resources Who. Time When. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/1.jpg)
Work Breakdown Structure (WBS) Extended Table of contents
![Page 2: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/2.jpg)
IntroductionThe project triangle
Product (result, features, quality)
TimeResources
2
![Page 3: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/3.jpg)
IntroductionThe project triangle
Product (result, features, quality) What:
Time WhenResources Who
3
![Page 4: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/4.jpg)
The project triangleThe relation between product, time and resources
Product
Resources Time
Change in one part – will have consequences for other parts
4
![Page 5: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/5.jpg)
Works Breakdown Structure is:
• A method for organizing tasks for a project• Focuses on tasks and what needs to be done in a hierarchical way –
top down (headlines not importance)• Most of the time - says nothing about time (sequence and time needed)
• From distance the elephant doesn’t look that big – but when it comes closer
• But bite the elephant into smaller pieces
5
![Page 6: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/6.jpg)
WBSWhy breaking the project into tasks?
• Clear plan of the work-sequence towards completion of promised deliverables
• Easier to manage -> plan, execute and control• Easier to decide what kind of skills/resources are needed +
estimate resource (time, manpower and machinery)• Easier to communicate and understand
6Project planning and control
![Page 7: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/7.jpg)
WBS: Ground rules for WBS
• Define the work as independent tasks that can be sequenced, assigned, scheduled and monitored
• Define the tasks at a level of detail appropriate for the length and complexity of the project
• Think parallel tasks, but be aware of dependencies, joint decision and completion points
• Present the hierarchy of tasks in a easy understood format• Verify that the tasks cover the attainment of project goals and objectives
7Project planning and control
![Page 8: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/8.jpg)
IntroductionFrom structure into a plan
• From distance the elephant doesn’t look that big – but when it comes closer !!! - ???
• ... bite the elephant into smaller pieces
8Project planning and control
![Page 9: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/9.jpg)
Work Breakdown Structure IStepwise or gradually planning process.
Structuring according to:• Physical/geographical location• Type of work• Functions• Systems• Organisational belonging
![Page 10: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/10.jpg)
Work Breakdown Structure IIUse e.g. your function tree or mind –map to split your project tasks into even smaller tasks.
Determine in which order you will solve the different tasks.
![Page 11: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/11.jpg)
Example of a WBS
![Page 12: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/12.jpg)
• An Extended Table of contents is an Extended Table of contents • Table of contents known from reports and word!• ETOC is used for helping you discuss and structure your project –
before you start writing on your project (probably not now)• Consist typically of:
– Content– Arguments– Literature/method based upon– Number of pages / extent– Responsible
Extended Table of Contents
![Page 13: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/13.jpg)
Extended Table of Contents•1. Introduction • Background of the car
• When and how was it invented• Cars statistics (Number, nations, segments)• Environmental status of the earth (both pollution and energy) -> rationale• Pollution and cars• We need to improve the cars from an environmental point of view -> Interface to purpose
Based upon different UN reports
• Lise is responsible, proposed length = 1 page
2. Purpose
![Page 14: Work Breakdown Structure (WBS) Extended Table of contents](https://reader033.vdocuments.site/reader033/viewer/2022050911/5681656a550346895dd7fa5f/html5/thumbnails/14.jpg)
To the next time
• Hand in preliminary project description – October 1rst (to your supervisor and upload to fronter) –
– ALL 7 sections must be included (Planning tools next time)– Approximately 10 pages– Everyone from the group must “deliver” and participate in the work