weber ewi training guide

Post on 29-Jan-2016

235 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

 

TRANSCRIPT

For perfect external wall insulation every time...just follow the Saint-Gobain Weber advice!

1

Introduction...This Training Guide supplements the trainingprovided by WWeebbeerr and is a quick reference tothe key stages in the installation of wweebbeerr..tthheerrmmExternal Wall Insulation systems.

For full technical details on all wweebbeerr..tthheerrmmsystems, please refer to Site Application Guides,WWeebbeerr’s Render Solutions handbook and ourwebsite www.netweber.co.uk

WWeebbeerr can provide technical and applicationsupport for all house types including a widerange of non-traditional and system builtconstruction types.

Training Guide Contents...Introduction and contents 1Health and safety 2Preparation... 3-5Preparation... beads, sills and trims 6Preparation... base bead fixing 7-8Preparation... fixings 9-12Preparation... boarding around windows 13Preparation... preparation for rendering 14Preparation... weather working 15-16wweebbeerr..tthheerrmm XXMM... basecoat 17-18wweebbeerr..tthheerrmm XXMM... rendering 19-20wweebbeerr..tthheerrmm XXMM... topcoat finishes 21wweebbeerr..tthheerrmm XXMM... RB brick effect 22wweebbeerr..tthheerrmm XXPP... 23wweebbeerr..tthheerrmm XXPP... scraped finish 24wweebbeerr..tthheerrmm XXPP... ashlar cutting 25wweebbeerr..tthheerrmm XXPP... spray rough cast 26wweebbeerr..tthheerrmm XXPP... dry dash finish 27wweebbeerr..tthheerrmm XXPP... 28

Copyright SSaaiinntt--GGoobbaaiinn WWeebbeerr - not to be reproduced without permission

2

Health and safety...Health and safety is the number one priority at WWeebbeerr.

This applies to our behaviour on construction sites, inour factories and offices, and on the road.

We also want to ensure that our customers are safe - so please follow the use of Personal ProtectiveEquipment shown in this Training Guide at all times.

3

Preparation...

4

5

6

Preparation... beads, sills and trims

7

Preparation... base bead fixing

For below DPC, WWeebbeerr has specific detailing recommendations.Please refer to Site Packages for details

8

9

Preparation... fixings

10

All insulation boards should be fixed with fivefixings per board. Cut boards should be fullysupported with fixings at sides and corners as appropriate.

Fixing types are contract-specific with thermalfixings being the most commonly required.Non-standard substrates may rquire specialfixings - if in doubt consult WWeebbeerr for advice.

11

For full boards, fixings should be150mm from all board edges.

12

13

Preparation... boarding around windows

14

Preparation... preparing for rendering

15

Preparation... weather working

16

17

wweebbeerr..tthheerrmm XXMM... basecoat

18

19

wweebbeerr..tthheerrmm XXMM... rendering

20

21

wweebbeerr..tthheerrmm XXMM... topcoat finishesSynthetic top coat Dash top coat

22

wweebbeerr..tthheerrmm XXMM... RB brick effect

23

wweebbeerr..tthheerrmm XXPP...

24

wweebbeerr..tthheerrmm XXPP... scraped finish

25

wweebbeerr..tthheerrmm XXPP... ashlar cutting

26

wweebbeerr..tthheerrmm XXPP... spray rough cast

27

wweebbeerr..tthheerrmm XXPP... dry dash finish

28

wweebbeerr..tthheerrmm XXPP...

Our other activities...

ConstructionMortar Products

Tile FixingProducts

Render & DecorativeFinishes

FlooringSystems

Saint-Gobain Weber Ltd

GB Head OfficeTel: 08703 330070Fax: 01525 718988mail@netweber.co.ukwww.netweber.co.uk

IrelandTel: 00 44 (0)28 9335 2999NI: mail@netweber.co.ukwww.netweber.co.ukROI: mail@weber.iewww.weber.ie

top related