waters of the state map - ehs.umich.edu · sesc permit requirements are reviewed on a case by case...

Post on 03-Jul-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

H u r o n R i v e rH u r o n R i v e r

£¤23 ""14

£¤23

""14

§̈¦94

£¤23

§̈¦94

§̈¦94

£¤23

£¤23

""14

Plymouth Rd

Plymouth Rd

Fuller Rd Huron Parkway

S Main

St

S Stat

e St

Stadium Blvd

Packard St

Washtenaw Ave

H u r o n R i v e rH u r o n R i v e r

M a l l e t s C r e e kM a l l e t s C r e e k

F l e m i n gF l e m i n gC r e e kC r e e k

S w i f Ru nS w i f Ru n

T r a v e rT r a v e rC r e e kC r e e k

A l l e n D r a i nA l l e n D r a i n

M i l l e r s C r e e kM i l l e r s C r e e k

I0 1,300 2,600 3,900 5,200650

Feet

Waters of the State Map

May 9, 2011

This map is produced in joint collaboration between:

Disclaimer:Information provided on this map is for general planning purposes only. This map is notintended to indicate whether a Soil Erosion and Sedimentation Control (SESC) Plan/Permit isrequired. SESC permit requirements are reviewed on a case by case basis. This map does notinclude wetland areas at this time.

and

Occupational Safety &Environmental Health

ARCHITECTURE, ENGINEERINGAND CONSTRUCTION

PRELIMINARY& ADVISORY

500 ft Buffer

Hydrographic Feature

BasinOtherCreek Shed

UM BuildingsBuildingsBuidings - UndergroundParking Lot

Property

Waters of the State (WOS)

UM PropertyFor earth disturbances within these areas, contactUM-OSEH for determination if a formal SESC plan isrequired. For any project disturbing greater than 1 acre,an OSEH approved SESC plan is required. Pleasesubmit a completed OSEH project notification formASAP but not less than 30 days prior to the expectedproject start date.

Activities causing an earth disturbance within these areaswill require an OSEH approved Soil Erosion andSedimentation Control (SESC) plan before site work canbegin.

top related