waters of the state map - ehs.umich.edu · sesc permit requirements are reviewed on a case by case...
TRANSCRIPT
H u r o n R i v e rH u r o n R i v e r
£¤23 ""14
£¤23
""14
§̈¦94
£¤23
§̈¦94
§̈¦94
£¤23
£¤23
""14
Plymouth Rd
Plymouth Rd
Fuller Rd Huron Parkway
S Main
St
S Stat
e St
Stadium Blvd
Packard St
Washtenaw Ave
H u r o n R i v e rH u r o n R i v e r
M a l l e t s C r e e kM a l l e t s C r e e k
F l e m i n gF l e m i n gC r e e kC r e e k
S w i f Ru nS w i f Ru n
T r a v e rT r a v e rC r e e kC r e e k
A l l e n D r a i nA l l e n D r a i n
M i l l e r s C r e e kM i l l e r s C r e e k
I0 1,300 2,600 3,900 5,200650
Feet
Waters of the State Map
May 9, 2011
This map is produced in joint collaboration between:
Disclaimer:Information provided on this map is for general planning purposes only. This map is notintended to indicate whether a Soil Erosion and Sedimentation Control (SESC) Plan/Permit isrequired. SESC permit requirements are reviewed on a case by case basis. This map does notinclude wetland areas at this time.
and
Occupational Safety &Environmental Health
ARCHITECTURE, ENGINEERINGAND CONSTRUCTION
PRELIMINARY& ADVISORY
500 ft Buffer
Hydrographic Feature
BasinOtherCreek Shed
UM BuildingsBuildingsBuidings - UndergroundParking Lot
Property
Waters of the State (WOS)
UM PropertyFor earth disturbances within these areas, contactUM-OSEH for determination if a formal SESC plan isrequired. For any project disturbing greater than 1 acre,an OSEH approved SESC plan is required. Pleasesubmit a completed OSEH project notification formASAP but not less than 30 days prior to the expectedproject start date.
Activities causing an earth disturbance within these areaswill require an OSEH approved Soil Erosion andSedimentation Control (SESC) plan before site work canbegin.