uc riverside testing facilities
Post on 12-Feb-2016
61 Views
Preview:
DESCRIPTION
TRANSCRIPT
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 1
UC Riverside Testing Facilities
Patrick GartungUniversity of California, Riverside
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 2
Testing Readiness
• UC Riverside will investigate hybrids and modules failing production tests at UCSB
• Well equipped cleanroom available• Used for testing Dzero silicon wedge detectors
• ARC and DAQ equipment on order• Currently working at UCSB to help set up DAQ system
for long term tests of modules and rods• Will set up testing equipment at UC Riverside when it
arrives
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 3
Cleanroom
•Level 10000 clean room•29 feet X 13 feet
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 4
Probe Stations
•Allesi REL-4500 semi-automatic analytic probe station and motion table •Panasonic WV-CL120 video camera•Hitachi VY-150A Color Video Printer
•Wentworth Laboratories Motion Table•Nikon SMZ+10 Microscope
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 5
Storage
top related