Table of Contents

NOR 1 – Notice of Requirement confirmed in the jurisdiction of the Kapiti Coast District Council .................................................................................................................... 5

NOR 2 – Notice of Requirement confirmed in the jurisdiction of the Upper Hutt City Council................................................................................................................................ 10

NOR 3 – Notice of Requirement confirmed in the jurisdiction of the Porirua City Council................................................................................................................................ 14

NOR 4 – Notice of Requirement confirmed in the jurisdiction of the Wellington City Council................................................................................................................................ 18

NOR 5 – Notice of Requirement confirmed in the jurisdiction of the Porirua City Council................................................................................................................................ 22

NOR 6 – Notice of Requirement confirmed in the jurisdiction of the Wellington City Council................................................................................................................................ 26

RC 1 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 31

RC 2 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 35

RC 3 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 39

RC 4 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 43

RC 5 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 47

RC 6 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 51

RC 7 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 55

RC 8 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 59

RC 9 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 63

RC 10 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 67

4 |Certificates | June 2012

RC 11 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 71

RC 12 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 75

RC 13 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 79

RC 14 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 83

RC 15 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 87

RC 16 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 89

NOR 7 – Notice of Requirement confirmed in the jurisdiction of the Porirua City Council................................................................................................................................ 91

NOR 8 – Notice of Requirement confirmed in the jurisdiction of the Porirua City Council................................................................................................................................ 95

RC 17 – Resource Consent granted in the jurisdiction of the Wellington Regional Council................................................................................................................................ 98

RC 18 – Resource Consent granted in the jurisdiction of the Wellington Regional Council.............................................................................................................................. 101

RC 19 – Resource Consent granted in the jurisdiction of the Wellington Regional Council.............................................................................................................................. 104

RC 20 – Resource Consent granted in the jurisdiction of the Wellington Regional Council.............................................................................................................................. 107

RC 21 – Resource Consent granted in the jurisdiction of the Kapiti Coast District Council.............................................................................................................................. 110

RC 22 – Resource Consent granted in the jurisdiction of the Porirua City Council .... 112

6 |Certificates | June 2012

Definitions – NOR 1

AEE Transmission Gully Project Assessment of Effects on the Environment Volumes 1 to 5 dated August 2011

CEMP Construction Environmental Management Plan

Commencement of Works means the time when the works that are the subject of these designations commence

Council means the Kapiti Coast District Council (KCDC)

District means the Kapiti Coast District

District Plan means the Kapiti Coast District Plan

Existing network utilities all network utilities existing at 15 August 2011. Network utility has the same meaning as in section 166 of the RMA

The Manager means the regulatory / consents manager of the Council

Outline Plan (OP) means an Outline Plan prepared in accordance with section 176A of the RMA

Project means the construction, maintenance and operation of the Transmission Gully Main Alignment

Requiring Authority means the New Zealand Transport Agency (NZTA)

RMA or “the Act‟ Resource Management Act 1991

Road Asset Manager

means the KCDC‟s road asset manager

SSEMP means a Site Specific Environmental Management Plan required under the provisions of regional consent conditions

Stage

7 |Certificates | June 2012

means a stage of the Project as nominated by the Requiring Authority

Work means any activity or activities undertaken in relation to the Project

WRC Wellington Regional Council

8 |Certificates | June 2012

Conditions

Conditions attached to NOR 1 Conditions not attached to NOR 1

General Conditions and Administration

NZTA.1 – NZTA.3A NZTA.3B

Outline Plans and Management Plans

NZTA.4 – NZTA.11

Communications and Public Liaison - Construction

NZTA.12 – NZTA.13 NZTA.14 – NZTA.14A

Complaints - Construction

NZTA.15

Archaeology and Heritage

Advice Note NZTA.16 (excluding 16(c), 16(f), 16(g)) NZTA.18 – NZTA.19

16(c), 16(f), 16(g) of NZTA.16 NZTA.17

Construction Environmental Management Plan

Advice Note NZTA.20 – NZTA.21

Traffic Management and Roading - Construction

NZTA.22 – NZTA.23 NZTA.26 – NZTA.30 NZTA.31 – NZTA.34

NZTA.24 – NZTA.25 NZTA. 30A

Construction Noise and Vibration Management

NZTA.35 – NZTA.36

NZTA.37 – NZTA.38

Construction Air Quality (including Dust) Management

NZTA.39 – NZTA.40 NZTA.41 (excluding the words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park.”)

The words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park.” of NZTA.41

Construction Lighting

NZTA.41A

Landscape and Urban Design

NZTA.42 (excluding bullet points 2, 3, 5 and 6 and 42(a)) NZTA.43 – NZTA.45 NZTA.46 (excluding 46(d)(ix) bullet point 3, 46(e),

Bullet points 2, 3, 5 and 6 and 42(a) of NZTA.42 46(d)(ix) bullet point 3, 46(e), 46(f), 46(g), 46(h) of NZTA.46

9 |Certificates | June 2012

46(f), 46(g), 46(h)) NZTA.49 NZTA.50 (excluding the words “Except as specified in Condition NZTA.50A,”)

NZTA.47A – NZTA.48 The words “Except as specified in Condition NZTA.50A,” of NZTA.50 NZTA.50A

Ecology

NZTA.51 (excluding 51(b)(xi) – (xvii)) NZTA.52 – NZTA.56

51(b)(xi) – (xvii) of NZTA.51

Existing Network Utilities

NZTA.57 – NZTA.61 NZTA.63 – NZTA.64

NZTA.62

Transpower Specific Conditions

NZTA.65 – NZTA.70

Operational Noise

NZTA.71 – NZTA.81B

Permanent Lighting

NZTA.82

Traffic Safety Audit

NZTA.83

11 |Certificates | June 2012

Definitions – NOR 2

AEE Transmission Gully Project Assessment of Effects on the Environment Volumes 1 to 5 dated August 2011

CEMP Construction Environmental Management Plan

Commencement of Works means the time when the works that are the subject of these designations commence

Council means the Upper Hutt City Council (UHCC)

District means the Upper Hutt City District

District Plan means the Upper Hutt City District Plan

Existing network utilities all network utilities existing at 15 August 2011. Network utility has the same meaning as in section 166 of the RMA

The Manager means the regulatory / consents manager of the Council

Outline Plan (OP) means an Outline Plan prepared in accordance with section 176A of the RMA

Project means the construction, maintenance and operation of the Transmission Gully Main Alignment

Requiring Authority means the New Zealand Transport Agency (NZTA)

RMA or “the Act‟ Resource Management Act 1991

Road Asset Manager

means the UHCC‟s road asset manager

SSEMP means a Site Specific Environmental Management Plan required under the provisions of regional consent conditions

Stage means a stage of the Project as nominated by the Requiring Authority

Work means any activity or activities undertaken in relation to the Project

WRC Wellington Regional Council

12 |Certificates | June 2012

Conditions

Conditions attached to NOR 2 Conditions not attached to NOR 2

General Conditions and Administration

NZTA.1 – NZTA.3A NZTA.3B

Outline Plans and Management Plans

NZTA.4 – NZTA.11

Communications and Public Liaison - Construction

NZTA.12 – NZTA.13 NZTA.14 – NZTA.14A

Complaints - Construction

NZTA.15

Archaeology and Heritage

Advice Note NZTA.16 (excluding 16(b), 16(c), 16(e) 16(f), 16(g)) NZTA.19

16(b), 16(c), 16(e) 16(f), 16(g) of NZTA.16 NZTA.17 – NZTA.18

Construction Environmental Management Plan

Advice Note NZTA.20 – NZTA.21

Traffic Management and Roading - Construction

NZTA.22 – NZTA.23 NZTA.26 – NZTA.30 NZTA.31 – NZTA.34

NZTA.24 – NZTA.25 NZTA. 30A

Construction Noise and Vibration Management

NZTA.35 – NZTA.36 NZTA.37 – NZTA.38

Construction Air Quality (including Dust) Management

NZTA.39 – NZTA.40

NZTA.41 (excluding the words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park.”)

The words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park.” of NZTA.41

Construction Lighting

NZTA.41A

Landscape and Urban Design

NZTA.42 (excluding bullet points 2, 3, 5 and 6 and 42(a)) NZTA.43 – NZTA.45 NZTA.46 (excluding: 46(d)(ix) bullet point 3, 46(e), 46(f), 46(g), 46(h)) NZTA.49 – NZTA.50 (excluding the words “Except

Bullet points 2, 3, 5 and 6 and 42(a) of NZTA.42 46(d)(ix) bullet point 3, 46(e), 46(f), 46(g), 46(h) of NZTA.46 NZTA.47A – NZTA.48 The words “Except as specified in

13 |Certificates | June 2012

as specified in Condition NZTA.50A”) Condition NZTA.50A” of NZTA.50 NZTA.50A

Ecology

NZTA.51 (excluding 51(b)(vii) – (ix) and 51(b)(xi) – (xvii)) NZTA.52 – NZTA.56

51(b)(vii) – (ix) and 51(b)(xi) – (xvii) of NZTA.51

Existing Network Utilities

NZTA.57 – NZTA.61 NZTA.64

NZTA.62 - NZTA.63

Transpower Specific Conditions

NZTA.65 – NZTA.70

Operational Noise

NZTA.71 – NZTA.81B

Permanent Lighting

NZTA.82

Traffic Safety Audit

NZTA.83

15 |Certificates | June 2012

Definitions NOR - 3

AEE Transmission Gully Project Assessment of Effects on the Environment Volumes 1 to 5 dated August 2011

CEMP Construction Environmental Management Plan

Commencement of Works means the time when the works that are the subject of these designations commence

Council means the Porirua City Council (PCC)

District means the Porirua City District

District Plan means the Porirua City District Plan

Existing network utilities all network utilities existing at 15 August 2011. Network utility has the same meaning as in section 166 of the RMA

The Manager means the regulatory / consents manager of the Council

Outline Plan (OP) means an Outline Plan prepared in accordance with section 176A of the RMA

Project means the construction, maintenance and operation of the Transmission Gully Main Alignment

Requiring Authority means the New Zealand Transport Agency (NZTA)

RMA or „the Act‟ Resource Management Act 1991

Road Asset Manager

means the PCC‟s road asset manager

SSEMP means a Site Specific Environmental Management Plan required under the provisions of regional consent conditions

Stage means a stage of the Project as nominated by the Requiring Authority

Work means any activity or activities undertaken in relation to the Project

WRC Wellington Regional Council

16 |Certificates | June 2012

Conditions

Conditions attached to NOR 3 Conditions not attached to NOR 3

General Conditions and Administration

NZTA.1 – NZTA.3B

Outline Plans and Management Plans

NZTA.4 – NZTA.11

Communications and Public Liaison - Construction

NZTA.12 – NZTA.13

NZTA.14A

NZTA.14

Complaints - Construction

NZTA.15

Archaeology and Heritage

Advice Note

NZTA.16 (excluding 16(b), 16(e))

NZTA.17

NZTA.19

16(b), 16(e) of NZTA.16 NZTA.18

Construction Environmental Management Plan

Advice Note

NZTA.20 – NZTA.21

Traffic Management and Roading - Construction

NZTA.22 – NZTA.23

NZTA.26 – NZTA.34

NZTA.24 – NZTA.25

Construction Noise and Vibration Management

NZTA.35 – NZTA.36 NZTA.37 – NZTA.38

Construction Air Quality (including Dust) Management

NZTA.39 – NZTA.41

17 |Certificates | June 2012

Construction Lighting

NZTA.41A

Landscape and Urban Design

NZTA.42 – NZTA.46 (excluding 46(e), 46(g), 46(h))

NZTA.47A – NZTA.47 (excluding bullet points 1 – 7 of NZTA.47).

NZTA.49 – NZTA.50A (excluding 50A(a))

46(e), 46(g), 46(h) of NZTA.46 Bullet points 1 – 7 of NZTA.47 NZTA.48 50A(a) of NZTA.50A

Ecology

NZTA.51 (excluding 51(b)(vii) – (ix))

NZTA.52 – NZTA.56

51(b)(vii) – (ix) of NZTA.51

Existing Network Utilities

NZTA.57 – NZTA.62 (excluding 62 bullet points 2 – 4)

NZTA.64

Bullet points 2 – 4 of NZTA.62 NZTA.63

Transpower Specific Conditions

NZTA.65 – NZTA.70

Operational Noise

NZTA.71 – NZTA.81B

Permanent Lighting

NZTA.82

Traffic Safety Audit

NZTA.83

19 |Certificates | June 2012

Definitions – NOR 4

AEE Transmission Gully Project Assessment of Effects on the Environment Volumes 1 to 5 dated August 2011

CEMP Construction Environmental Management Plan

Commencement of Works means the time when the works that are the subject of these designations commence

Council means the Wellington City Council (WCC)

District means the Wellington City District

District Plan means the Wellington City District Plan

Existing network utilities all network utilities existing at 15 August 2011. Network utility has the same meaning as in section 166 of the RMA

The Manager means the regulatory / consents manager of the Council

Outline Plan (OP) means an Outline Plan prepared in accordance with section 176A of the RMA

Project means the construction, maintenance and operation of the Transmission Gully Main Alignment

Requiring Authority means the New Zealand Transport Agency (NZTA)

RMA or „the Act‟ Resource Management Act 1991

Road Asset Manager

means the WCC‟s road asset manager

SSEMP means a Site Specific Environmental Management Plan required under the provisions of regional consent conditions

Stage means a stage of the Project as nominated by the Requiring Authority

Work means any activity or activities undertaken in relation to the Project

WRC Wellington Regional Council

20 |Certificates | June 2012

Conditions

Conditions attached to NOR 4 Conditions not attached to NOR 4

General Conditions and Administration

NZTA.1 – NZTA.3A NZTA.3B

Outline Plans and Management Plans

NZTA.4 – NZTA.11

Communications and Public Liaison - Construction

NZTA.12 – NZTA.14 NZTA.14A

Complaints - Construction

NZTA.15

Archaeology and Heritage

Advice Note NZTA.16 (excluding 16(b), 16(c), 16(e), 16(f), 16(g)) NZTA.19

16(b), 16(c), 16(e), 16(f), 16(g) of NZTA.16 NZTA.17 - NZTA.18

Construction Environmental Management Plan

Advice Note NZTA.20 – NZTA.21

Traffic Management and Roading - Construction

NZTA.22 – NZTA.30 NZTA.31 – NZTA.34

NZTA.30A

Construction Noise and Vibration Management

NZTA.35 – NZTA.38

Construction Air Quality (including Dust) Management

NZTA.39 – NZTA.40 NZTA.41 (excluding the words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park.”)

The words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park.” of NZTA.41

Construction Lighting

NZTA.41A

Landscape and Urban Design

NZTA.42 (excluding bullet points 2, 3, 5 and 42(a) NZTA.43 - NZTA.46 (excluding 46(d)(ix) bullet point 3, 46(f),) NZTA.47A – NZTA.47 (excluding bullet points 8 - 9). NZTA.48 - NZTA.50A (excluding 50A(b))

Bullet points 2, 3, 5 and 42(a) of NZTA.42 46(d)(ix), bullet point 3, 46(f), of NZTA.46 Bullet points 8 - 9 of NZTA.47 50A(b) of NZTA.50A

Ecology

21 |Certificates | June 2012

NZTA.51 (excluding 51(b)) NZTA.52 – NZTA.56

51(b) of NZTA.51

Existing Network Utilities

NZTA.57 – NZTA.62 (excluding 62 bullet points 1 – 2) NZTA.64

Bullet points 1 – 2 of NZTA.62 NZTA.63

Transpower Specific Conditions

NZTA.65 – NZTA.70

Operational Noise

NZTA.71 – NZTA.81B

Permanent Lighting

NZTA.82

Traffic Safety Audit

NZTA.83

23 |Certificates | June 2012

Definitions – NOR 5

AEE Transmission Gully Project Assessment of Effects on the Environment Volumes 1 to 5 dated August 2011

CEMP Construction Environmental Management Plan

Commencement of Works means the time when the works that are the subject of these designations commence

Council means the Porirua City Council (PCC)

District means the Porirua City District

District Plan means the Porirua City District Plan

Existing network utilities all network utilities existing at 15 August 2011. Network utility has the same meaning as in section 166 of the RMA

The Manager means the regulatory / consents manager of the Council

Outline Plan (OP) means an Outline Plan prepared in accordance with section 176A of the RMA

Project means the construction, maintenance and operation of the Transmission Gully Main Alignment and/or the Kenepuru Link Road

Requiring Authority means the New Zealand Transport Agency (NZTA)

RMA or “the Act‟ Resource Management Act 1991

Road Asset Manager

means the PCC‟s road asset manager

SSEMP means a Site Specific Environmental Management Plan required under the provisions of regional consent conditions

Stage means a stage of the Project as nominated by the Requiring Authority

Work means any activity or activities undertaken in relation to the Project

WRC Wellington Regional Council

24 |Certificates | June 2012

Conditions

Conditions attached to NOR 5 Conditions not attached to NOR 5

General Conditions and Administration

NZTA.1 – NZTA.3A NZTA.3B

Outline Plans and Management Plans

NZTA.4 – NZTA.11

Communications and Public Liaison - Construction

NZTA.12 – NZTA.13 NZTA.14 – NZTA.14A

Complaints - Construction

NZTA.15

Archaeology and Heritage

Advice Note NZTA.16 (excluding 16(b), 16(c), 16(e), 16(f), 16(g)) NZTA.19

16(b), 16(c), 16(e), 16(f), 16(g) of NZTA.16 NZTA.17 - NZTA.18

Construction Environmental Management Plan

Advice Note NZTA.20 – NZTA.21

Traffic Management and Roading - Construction

NZTA.22 – NZTA.23 NZTA.26 – NZTA.30 NZTA.31 – NZTA.34

NZTA.24 – NZTA.25 NZTA. 30A

Construction Noise and Vibration Management

NZTA.35 – NZTA.36 NZTA.37 – NZTA.38

Construction Air Quality (including Dust) Management

NZTA.39 – 40 NZTA.41 (excluding the words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park.”)

The words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park.” of NZTA.41

Construction Lighting

NZTA.41A

Landscape and Urban Design

NZTA.42 (excluding bullet points 2, 3, 5 and 42(a)) NZTA.43 – NZTA.46 (excluding 46(d)(ix) bullet point 3, 46(e), 46(f) 46(g), 46(h)) NZTA.49 – NZTA.50 (excluding the words “Except as specified in Condition NZTA.50A”)

Bullet points 2, 3, 5 and 42(a) of NZTA.42 46(d)(ix) bullet point 3, 46(e), 46(f) 46(g), 46(h) of NZTA.46 NZTA.47A - NZTA.48 The words “Except as specified in Condition NZTA.50A” of NZTA.50

25 |Certificates | June 2012

NZTA.50A

Ecology

NZTA.51 (excluding 51(b)) NZTA.52 – NZTA.56

51(b) of NZTA.51

Existing Network Utilities

NZTA.57 – NZTA.62 (excluding bullet points 1,3, 4 of NZTA.62) NZTA.64

Bullet points 1,3, 4 of NZTA.62 NZTA.63

Transpower Specific Conditions

NZTA.65 – NZTA.70

Operational Noise

NZTA.71 – NZTA.81B

Permanent Lighting

NZTA.82

Traffic Safety Audit

NZTA.83

27 |Certificates | June 2012

Definitions – NOR 6

AEE

Transmission Gully Project Assessment of Effects on the Environment Volumes 1 to 5 dated August 2011

CEMP

Construction Environmental Management Plan

Commencement of Works

means the time when the works that are the subject of these designations commence

Council

means the Wellington City Council (WCC)

District

means the Wellington City District

District Plan

means the Wellington City District Plan

Existing network utilities

all network utilities existing at 15 August 2011. Network utility has the same meaning as in section 166 of the RMA

The Manager

means the regulatory / consents manager of the Council

Outline Plan (OP)

means an Outline Plan prepared in accordance with section 176A of the RMA

Project

means the construction, maintenance and operation of the Transmission Gully Main Alignment and/or the Kenepuru Link Road

Requiring Authority

means the New Zealand Transport Agency (NZTA)

RMA or “the Act‟

28 |Certificates | June 2012

Resource Management Act 1991

Road Asset Manager

means the WCC‟s road asset manager

SSEMP

means a Site Specific Environmental Management Plan required under the provisions of regional consent conditions

Stage

means a stage of the Project as nominated by the Requiring Authority

Work

means any activity or activities undertaken in relation to the Project

WRC

Wellington Regional Council

29 |Certificates | June 2012

Conditions

Conditions attached to NOR 6 Conditions not attached to NOR 6

General Conditions and Administration

NZTA.1 – NZTA.3A NZTA.3B

Outline Plans and Management Plans

NZTA.4 – NZTA.11

Communications and Public Liaison - Construction

NZTA.12 – NZTA.13 NZTA.14 – NZTA.14A

Complaints - Construction

NZTA.15

Archaeology and Heritage

Advice Note NZTA.16 (excluding 16(b), 16(c), 16(e), 16(f), 16(g)) NZTA.19

16(b), 16(c), 16(e), 16(f), 16(g) of NZTA.16 NZTA.17 - NZTA.18

Construction Environmental Management Plan

Advice Note NZTA.20 – NZTA.21

Traffic Management and Roading - Construction

NZTA.22 – NZTA.23 NZTA.26 – NZTA.30 NZTA.31 – NZTA.34

NZTA.24 – NZTA.25 NZTA. 30A

Construction Noise and Vibration Management

NZTA.35 – NZTA.36 NZTA.37 – NZTA.38

Construction Air Quality (including Dust) Management

NZTA.39 – NZTA.40 NZTA.41 (excluding the words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park”)

The words “; and Battle Hill Eventing where works are being undertaken within Battle Hill Farm Forest Park” of NZTA.41

Construction Lighting

NZTA.41A

Landscape and Urban Design

NZTA.42 (excluding bullet points 2, 3, 5 and 42(a)) NZTA.43 – NZTA.46 (excluding 46(d)(ix) bullet point 3, 46(e), 46(f) 46(g), 46(h)) NZTA.49 – NZTA.50 (excluding the words “Except as specified in Condition NZTA.50A”)

Bullet points 2, 3, 5 and 42(a) of NZTA.42 46(d)(ix) bullet point 3, 46(e), 46(f) 46(g), 46(h) of NZTA.46 NZTA.47A - NZTA.48 The words “Except as specified in Condition NZTA.50A” of NZTA.50

30 |Certificates | June 2012

NZTA.50A

Ecology

NZTA.51 (excluding 51(b)) NZTA.52 – NZTA.56

51(b) of NZTA.51

Existing Network Utilities

NZTA.57 – NZTA.61 NZTA.64

NZTA.62 – NZTA.63

Transpower Specific Conditions

NZTA.65 – NZTA.70

Operational Noise

NZTA.71 – NZTA.81B

Permanent Lighting

NZTA.82

Traffic Safety Audit

NZTA.83

32 |Certificates | June 2012

Dated:

Conditions attached to RC1 Conditions not attached to RC1

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5 G.6

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

Construction Environmental Management Plan

33 |Certificates | June 2012

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Earthworks area limit conditions

E.1 – E.2

Erosion and Sediment Control Peer Review Panel

Advice Note

E.6

Erosion and Sediment Control Objectives, Standards and Design Criteria

E.7 – E.10

Erosion and Sediment Control Plan

E.11 – E.22

Progressive Stabilisation Trials

E.23

Chemical Treatment (Flocculation) Plan

E.24 – E.26

Forestry Harvesting Management Plan

E.27

Fill Standards

E.28

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

34 |Certificates | June 2012

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

G.39 – G.39A

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

36 |Certificates | June 2012

Conditions attached to RC2

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5 - G.6

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

Construction Environmental Management Plan

37 |Certificates | June 2012

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Earthworks area limit conditions

E.1 – E.2

Erosion and Sediment Control Peer Review Panel

Advice Note

E.6

Erosion and Sediment Control Objectives, Standards and Design Criteria

E.7 – E.10

Erosion and Sediment Control Plan

E.11 – E.22

Progressive Stabilisation Trials

E.23

Chemical Treatment (Flocculation) Plan

E.24 – E.26

Forestry Harvesting Management Plan

E.27

Fill Standards

E.28

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

38 |Certificates | June 2012

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

G.39 – G.39A

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

40 |Certificates | June 2012

Conditions attached to RC3

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5 - G.6

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

Construction Environmental Management Plan

41 |Certificates | June 2012

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Earthworks area limit conditions

E.1 – E.2

Erosion and Sediment Control Peer Review Panel

Advice Note

E.6

Erosion and Sediment Control Objectives, Standards and Design Criteria

E.7 – E.10

Erosion and Sediment Control Plan

E.11 – E.22

Progressive Stabilisation Trials

E.23

Chemical Treatment (Flocculation) Plan

E.24 – E.26

Forestry Harvesting Management Plan

E.27

Fill Standards

E.28

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

42 |Certificates | June 2012

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

G.39 – G.39A

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

44 |Certificates | June 2012

Conditions attached to RC4 Conditions not attached to RC4

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5

G.6 (except in relation to the reclamation aspects of the consent)

G.6 (for the reclamation aspects of the consent)

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

45 |Certificates | June 2012

Construction Environmental Management Plan

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

46 |Certificates | June 2012

G.39 – G.39A

Baseline

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.3

WS.7 – WS.8

WS.4 – WS.6

WS.9

48 |Certificates | June 2012

Conditions attached to RC5 Conditions not attached to RC5

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5

G.6 (except in relation to the reclamation aspects of the consent)

G.6 (for the reclamation aspects of the consent)

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

Construction Environmental Management Plan

49 |Certificates | June 2012

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

G.39 – G.39A

50 |Certificates | June 2012

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.3

WS.7 – WS.9

WS.4 – WS.6

52 |Certificates | June 2012

Conditions attached to RC6 Conditions not attached to RC6

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5 G.6 (except in relation to the reclamation aspects of the consent)

G.6 (for the reclamation aspects of the consent)

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

Construction Environmental Management Plan

53 |Certificates | June 2012

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

G.39 – G.39A

54 |Certificates | June 2012

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.3 WS.7 – WS.8

WS.4 – WS.6

WS.9

56 |Certificates | June 2012

Conditions attached to RC7 Conditions not attached to RC7

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5

G.6 (except in relation to the reclamation aspects of the consent)

G.6 (for the reclamation aspects of the consent)

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

57 |Certificates | June 2012

Construction Environmental Management Plan

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

58 |Certificates | June 2012

G.39 – G.39A

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.3

WS.7 – WS.8

WS.4 – WS.6

WS.9

60 |Certificates | June 2012

Conditions attached to RC8 Conditions not attached to RC8

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5 - G.6

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

Construction Environmental Management Plan

61 |Certificates | June 2012

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

G.39 – G.39A

62 |Certificates | June 2012

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.3

WS.7 – WS.8

WS.4 – WS.6

WS.9

64 |Certificates | June 2012

Conditions attached to RC9 Conditions not attached to RC9

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5

G.6 (except in relation to the reclamation aspects of the consent)

G.6 (for the reclamation aspects of the consent)

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

65 |Certificates | June 2012

Construction Environmental Management Plan

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

66 |Certificates | June 2012

G.39 – G.39A

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.3

WS.7 – WS.8

WS.4 – WS.6

WS.9

68 |Certificates | June 2012

Conditions attached to RC10 Conditions not attached to RC10

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5

G.6 (except in relation to the reclamation aspects of the consent)

G.6 (for the reclamation aspects of the consent)

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

69 |Certificates | June 2012

Construction Environmental Management Plan

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

70 |Certificates | June 2012

G.39 – G.39A

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.3

WS.6 – WS.8

WS.4 – WS.5

WS.9

72 |Certificates | June 2012

Conditions attached to RC11 Conditions not attached to RC11

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5

G.6 (except in relation to the reclamation aspects of the consent)

G.6 (for the reclamation aspects of the consent)

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

73 |Certificates | June 2012

Construction Environmental Management Plan

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

74 |Certificates | June 2012

G.39 – G.39A

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.4

WS.7 – WS.8

WS.5 – WS.6

WS.9

76 |Certificates | June 2012

Conditions attached to RC12 Conditions not attached to RC12

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5

G.6 (except in relation to the reclamation aspects of the consent)

G.6 (for the reclamation aspects of the consent)

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

77 |Certificates | June 2012

Construction Environmental Management Plan

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

78 |Certificates | June 2012

G.39 – G.39A

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Streamworks conditions

WS.1 – WS.3

WS.5

WS.7 – WS.8

WS.4

WS.6

WS.9

80 |Certificates | June 2012

Conditions attached to RC13

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5 - G.6

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

Construction Environmental Management Plan

81 |Certificates | June 2012

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

G.39 – G.39A

82 |Certificates | June 2012

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Duck Creek Conditions

Duck.1

84 |Certificates | June 2012

Conditions attached to RC14

G.1 – G.2

Pre-construction Administration Conditions

G.3 – G.4

Consent Lapse and Expiry

G.5 – G.6

Review Condition

G.7

Archaeology

G.8

Complaints

G.9

Incidents

G.10 – G.10A

Staff Training

G.11

Staging and Programme Conditions

G.12 – G.13

Annual Reporting

G.14

Management Plans - General

G.15 – G.18

Construction Environmental Management Plan

85 |Certificates | June 2012

Advice Note

G.19A – G.19

Contaminated Land Management Plan

G.20

Ecological Management and Monitoring Plan

G.21 – G.25

Site Specific Environmental Management Plans (SSEMPs)

G.26 – G.30

Land Protection – Specific Requirements

G.31 – G.31B

Replacement of Existing Culverts – Specific Requirements

G.32 – G.33

Ecological Monitoring - General

G.34

Ecological Outcome Monitoring

G.35

Revegetation Monitoring

G.36

Lizard Translocation Monitoring and Management

G.37

Bat Monitoring

G.38

Erosion and Sediment Control Monitoring - General

Advice Note

G.39 – G.39A

86 |Certificates | June 2012

Baseline Sediment Monitoring – Pre-construction

G.40

Erosion and Sediment Control Monitoring – During Construction

G.41 – G.43

Marine Conditions

G.44A – G.49

Freshwater Conditions

G.50 – G.57

Temporary Culvert Conditions

S.1 – S.4

88 |Certificates | June 2012

Conditions attached to RC15

Administration

CBP.1

Expiry

CBP.2

Review Condition

CBP.3

Complaints

CBP.4

Incidents

CBP.5 – CBP.9

Limit Conditions

CBP.10 – CBP.12

Operation and Process Conditions

CBP.13 – CBP.20

Monitoring and Site Management Conditions

CBP.21 – CBP.26

Monitoring and Reporting Conditions

CBP.27 – CBP.29

90 |Certificates | June 2012

Conditions attached to RC16 Conditions not attached to RC16

Administration

CBP.1

Expiry

CBP.2 (excluding the words “to air”) The words “to air” from CBP.2

Review Condition

CBP.3

Complaints

CBP.4

Incidents

CBP.5 – CBP.9

Limit Conditions

CBP.10 – CBP.12

Operation and Process Conditions

CBP.13 – CBP.20

Monitoring and Site Management Conditions

CBP.21 – CBP.26

Monitoring and Reporting Conditions

CBP.27 – CBP.29

92 |Certificates | June 2012

Definitions – NOR 7

AEE Transmission Gully Project Assessment of Effects on the Environment Volumes 1 to 5 dated August 2011

CEMP Construction Environmental Management Plan

Commencement of Works means the time when the works that are the subject of these designations commence

Council means the Porirua City Council (PCC)

District means the Porirua City District

District Plan means the Porirua City District Plan

Existing network utilities all network utilities existing at 15 August 2011. Network utility has the same meaning as in section 166 of the RMA

The Manager means the regulatory / consents manager of the Council

Outline Plan (OP) means an Outline Plan prepared in accordance with section 176A of the RMA

Project means the construction, maintenance and operation of the Whitby Link Road

Requiring Authority means the Porirua City Council

RMA or “the Act‟ Resource Management Act 1991

Road Asset Manager

means the PCC‟s road asset manager

SSEMP means a Site Specific Environmental Management Plan required under the provisions of regional consent conditions

Stage means a stage of the Project as nominated by the Requiring Authority

Work means any activity or activities undertaken in relation to the Project

WRC Wellington Regional Council

93 |Certificates | June 2012

Conditions

Conditions attached to NOR 7 Conditions not attached to NOR 7

General Conditions and Administration

PCC.1 – PCC.3A

Outline Plans and Management Plans

PCC.4 – PCC.10

Communications and Public Liaison - Construction

PCC.11 – PCC.12

Complaints - Construction

PCC.13

Archaeology and Heritage

PCC.14

Construction Environmental Management Plan

Advice Note

PCC.15 – PCC.16

Traffic Management and Roading - Construction

PCC.17 - PCC.22

Construction Noise and Vibration Management

PCC.23

Construction Air Quality (including Dust) Management

PCC.24 - PCC.25

Construction Lighting

PCC.25A

Landscape and Urban Design

94 |Certificates | June 2012

PCC.26 (excluding “-15” from PCC.26(a)) PCC.27 - PCC.29 (excluding the words “Waitangirua Community Park Design Team, Cannons‟ Creek Residents‟ and Ratepayers Association,” and “Maraeroa Marae Executive, and Tokelauan Christian Church” in PCC.29 and 29(c)(xvi) - (xvii)) PCC.30 – PCC.31

“-15” from NZTA.26(a)

The words “Waitangirua Community Park Design Team, Cannons‟ Creek Residents‟ and Ratepayers Association,” and “Maraeroa Marae Executive, and Tokelauan Christian Church” and 29(c)(xvi) - (xvii) of PCC.29

Ecology

PCC.32

Existing Network Utilities

PCC.33 – PCC.37 PCC.39

PCC.38

Transpower Specific Conditions

PCC.40 – PCC.44

Permanent Lighting

PCC.45

96 |Certificates | June 2012

Definitions – NOR 8

AEE Transmission Gully Project Assessment of Effects on the Environment Volumes 1 to 5 dated August 2011

CEMP Construction Environmental Management Plan

Commencement of Works means the time when the works that are the subject of these designations commence

Council means the Porirua City Council (PCC)

District means the Porirua City District

District Plan means the Porirua City District Plan

Existing network utilities all network utilities existing at 15 August 2011. Network utility has the same meaning as in section 166 of the RMA

The Manager means the regulatory / consents manager of the Council

Outline Plan (OP) means an Outline Plan prepared in accordance with section 176A of the RMA

Project means the construction, maintenance and operation of the Waitangirua Link Road

Requiring Authority means the Porirua City Council

RMA or “the Act‟ Resource Management Act 1991

Road Asset Manager

means the PCC‟s road asset manager

SSEMP means a Site Specific Environmental Management Plan required under the provisions of regional consent conditions

Stage means a stage of the Project as nominated by the Requiring Authority

Work means any activity or activities undertaken in relation to the Project

WRC Wellington Regional Council

97 |Certificates | June 2012

Conditions

Conditions attached to NOR 8 Conditions not attached to NOR 8

General Conditions and Administration

PCC.1 – PCC.3A

Outline Plans and Management Plans

PCC.4 – PCC.10

Communications and Public Liaison - Construction

PCC.11 – PCC.12

Complaints - Construction

PCC.13

Archaeology and Heritage

PCC.14

Construction Environmental Management Plan

Advice Note PCC.15 – PCC.16

Traffic Management and Roading - Construction

PCC.17 - PCC.22

Construction Noise and Vibration Management

PCC.23

Construction Air Quality (including Dust) Management

PCC.24 - PCC.25

Construction Lighting

PCC.25A

Landscape and Urban Design

PCC.26 – PCC.29 (excluding the words “Whitby Residents‟ Association” in PCC.29) PCC.30 – PCC.31

The words “Whitby Residents‟ Association” of PCC.29

Ecology

PCC.32 (excluding 32(a), 32(b), 32(c) and the preceding words “This includes:”)

32(a), 32(b), 32(c) and the preceding words “This includes:” of PCC.32

Existing Network Utilities

PCC.33 – PCC.39

Transpower Specific Conditions

PCC.40 – PCC.44

Permanent Lighting

PCC.45

99 |Certificates | June 2012

Conditions

Conditions attached to RC17 Conditions not attached to RC17

PCC.E.1 - PCC.E.2

Pre-construction and Administration Conditions

PCC.E.3 – PCC.E.4

Consent Lapse and Expiry

PCC.E.5 PCC.E.6

Review Condition

PCC.E.7

Archaeology

PCC.E.8

Complaints

PCC.E.9

Incidents

PCC.E.10 - PCC.E.10A

Staff Training

PCC.E.11

Staging and Programme Conditions

PCC.E.12 – PCC.E.13

Management Plans - General

PCC.E.14 – PCC.E.17

Construction Environmental Management Plan

Advice Note, PCC.E.18A - PCC.E.18

Erosion and Sediment Control Plan

PCC.E.19 – PCC.E.20

Earthworks Limit Conditions

PCC.E.21

Erosion and Sediment Control Objectives and Design Criteria

PCC.E.23 – PCC.E.31

Chemical Treatment (Flocculation)

PCC.E.32 – PCC.E.34

Fill Standards

PCC.E.35

Ecological Management and Monitoring Plan

PCC.E.36 – PCC.E.38

100 |Certificates | June 2012

Site Specific Environmental Management Plans (SSEMPs)

PCC.E.39 – PCC.E.40

Erosion and Sediment Control Monitoring

Advice Note, PCC.E.41 - PCC.E.44

Contaminated Land Management Plan

PCC.E.46

102 |Certificates | June 2012

Conditions

Conditions attached to RC18 Conditions not attached to RC18

PCC.E.1 - PCC.E.2

Pre-construction and Administration Conditions

PCC.E.3 – PCC.E.4

Consent Lapse and Expiry

PCC.E.5 – PCC.E.6

Review Condition

PCC.E.7

Archaeology

PCC.E.8

Complaints

PCC.E.9

Incidents

PCC.E.10 -PCC.E.10A

Staff Training

PCC.E.11

Staging and Programme Conditions

PCC.E.12 – PCC.E.13

Management Plans - General

PCC.E.14 – PCC.E.17

Construction Environmental Management Plan

Advice Note PCC.E.18A - PCC.E.18

Erosion and Sediment Control Plan

PCC.E.19 – PCC.E.20

Earthworks Limit Condition

PCC.E.21

Erosion and Sediment Control Objectives and Design Criteria

PCC.E.23 – PCC.E.31

Chemical Treatment (Flocculation)

PCC.E.32 – PCC.E.34

Fill Standards

PCC.E.35

Ecological Management and Monitoring Plan

PCC.E.36 – PCC.E.38

103 |Certificates | June 2012

Site Specific Environmental Management Plans (SSEMPs)

PCC.E.39 – PCC.E.40

Erosion and Sediment Control Monitoring

Advice Note, PCC.E.41 - PCC.E.44

Contaminated Land Management Plan

PCC.E.46

105 |Certificates | June 2012

Conditions

Conditions attached to RC19

PCC.E.1 - PCC.E.2

Pre-construction and Administration Conditions

PCC.E.3 – PCC.E.4

Consent Lapse and Expiry

PCC.E.5 – PCC.E.6

Review Condition

PCC.E.7

Archaeology

PCC.E.8

Complaints

PCC.E.9

Incidents

PCC.E.10 - PCC.E.10A

Staff Training

PCC.E.11

Staging and Programme Conditions

PCC.E.12 – PCC.E.13

Management Plans - General

PCC.E.14 – PCC.E.17

Construction Environmental Management Plan

Advice Note, PCC.E.18A - PCC.E.18

Erosion and Sediment Control Plan

PCC.E.19 – PCC.E.20

Earthworks Limit Condition

PCC.E.21

Erosion and Sediment Control Objectives and Design Criteria

PCC.E.23 – PCC.E.31

Chemical Treatment (Flocculation)

PCC.E.32 – PCC.E.34

Fill Standards

PCC.E.35

Ecological Management and Monitoring Plan

PCC.E.36 – PCC.E.38

106 |Certificates | June 2012

Site Specific Environmental Management Plans (SSEMPs)

PCC.E.39 – PCC.E.40

Erosion and Sediment Control Monitoring

Advice Note, PCC.E.41 - PCC.E.44

Contaminated Land Management Plan

PCC.E.46

108 |Certificates | June 2012

Conditions

Conditions attached to RC20 Conditions not attached to RC20

PCC.E.1 - PCC.E.2

Pre-construction and Administration Conditions

PCC.E.3 – PCC.E.4

Consent Lapse and Expiry

PCC.E.5 – PCC.E.6

Review Condition

PCC.E.7

Archaeology

PCC.E.8

Complaints

PCC.E.9

Incidents

PCC.E.10 -PCC.E.10A

Staff Training

PCC.E.11

Staging and Programme Conditions

PCC.E.12 – PCC.E.13

Management Plans - General

PCC.E.14 – PCC.E.17

Construction Environmental Management Plan

Advice Note, PCC.E.18A - PCC.E.18

Erosion and Sediment Control Plan

109 |Certificates | June 2012

PCC.E.19 – PCC.E.20

Earthworks Limit Condition

PCC.E.21

Erosion and Sediment Control Objectives and Design Criteria

PCC.E.23 – PCC.E.31

Chemical Treatment (Flocculation)

PCC.E.32 – PCC.E.34

Fill Standards

PCC.E.35

Ecological Management and Monitoring Plan

PCC.E.37 – PCC.E.38 PCC.E.36

Site Specific Environmental Management Plans (SSEMPs)

PCC.E.39 – PCC.E.40

Erosion and Sediment Control Monitoring

Advice Note, PCC.E.41 - PCC.E.43 PCC.E.44

Stream Works Conditions

PCC.WS.0 – PCC.WS.3

Contaminated Land Management Plan

PCC.E.46

111 |Certificates | June 2012

Conditions attached to RC21:

Note

These conditions relate to works located within both the Kapiti Coast and Porirua Districts. Towers 1 – 11 fall within the jurisdiction of the Kapiti Coast District Council and Towers 12 – 49A fall within the jurisdiction of the Porirua City Council. Where conditions are specific to particular towers, the Council with jurisdiction in that area is responsible for any required approval or certification required under these consents.

General

TL1 – TL5

Tower and Access Track Design

TL6 – TL7

Location and Height of the Transmission Line Support Structures

TL8 – TL12A

Ecological

TL13

Historic Heritage

TL14 – TL15B

Construction Environmental Management Plan

TL16 – TL21

Noise and Vibration

TL22 – TL24

Clearance of Trees and Vegetation

TL25 – TL26

Erosion and Sediment Control

TL27 – TL29

Restoration of the Land

TL30

Electric and Magnetic Fields (EMF)

TL31

113 |Certificates | June 2012

Conditions attached to RC22:

Note

These conditions relate to works located within both the Kapiti Coast and Porirua Districts. Towers 1 – 11 fall within the jurisdiction of the Kapiti Coast District Council and Towers 12 – 49A fall within the jurisdiction of the Porirua City Council. Where conditions are specific to particular towers, the Council with jurisdiction in that area is responsible for any required approval or certification required under these consents.

General

TL1 – TL5

Tower and Access Track Design

TL6 – TL7

Location and Height of the Transmission Line Support Structures

TL8 – TL12A

Ecological

TL13

Historic Heritage

TL14 – TL15B

Construction Environmental Management Plan

TL16 – TL21

Noise and Vibration

TL22 – TL24

Clearance of Trees and Vegetation

TL25 – TL26

Erosion and Sediment Control

TL27 – TL29

Restoration of the Land

TL30

Electric and Magnetic Fields (EMF)

TL31