For all project enquiries call 1300 794 899email dpti.t2t@sa.gov.auvisit infrastructure.sa.gov.au/t2t

North-South CorridorTorrens Road to River Torrens Project

25,000m3 OF CONCRETE WILL BE USED

146,000 TONNES OF ASPHALT 2km OF LOWERED MOTORWAY- PROVIDING THREE LANES IN EACH DIRECTION

- SET APPROXIMATELY 8m BELOW THE EXISTING SURFACE OF SOUTH ROAD

NTERSECTION UPGRADES TO:- TORRENS ROAD- HAWKER STREET- HURTLE STREET- PORT ROAD- GRANGE ROAD- MANTON STREETOUTER HARBOR RAIL OVERPASS

STREET LIGHTS

EXCAVATION350,000m3 OF FILL

THE T2T PROJECT WILL INSTALL17,342m2 OF FACING PANEL IN THE LOWERED MOTORWAY

3,528m OF PRECAST BARRIER ON THE SURFACE ROADS

17 GANTRIES FOR INTELLIGENT TRANSPORT SYSTEM

150,000m OF CONDUIT

12,500m OF DRAINAGE SYSTEMS

4926 SOIL NAILS

DURING CONSTRUCTION

2215TONNES

REINFORCEMENT

2552TONNES

PRECAST BRIDGE BEAMS

3km OF NON-STOP ROADWAY

PROJECT LENGTH

3.7km3.7km

6km

OF TEMPORARY TRAFFIC BARRIERS

6km

OF BARRIER INSTALLED IN THE LOWERED

MOTORWAY

11,800m2

NOISE WALLS