South Road – T2T Geotechnical, Pavement and Contamination Investigation for the South Road Upgrade from Torrens Road to River Torrens
South Road – Torrens to Torrens, T2T
South Road T2T Geotechnical, Pavement and Contamination Investigation
3.7 km length of South Road between Torrens Road and River Torrens
2
Image courtesy of DPTI
South Road – Torrens to Torrens, T2T
South Road T2T Geotechnical, Pavement and Contamination Investigation
3
Image courtesy of DPTI
Excavations to 8-10 m deep required for grade separation at: – Grange Road – Port Road – Outer Harbor Rail Line – Possibly also Hawker Street
Approx 1.7 km long lowered road
South Road – Torrens to Torrens, T2T
South Road T2T Geotechnical, Pavement and Contamination Investigation
Subsurface investigations comprised: – 125 Geotechnical Boreholes (ranging up to 40 m deep) – 246 Pavement Boreholes (ranging up to 10 m deep) – 195 Dedicated environmental contamination boreholes
(ranging up to 6 m deep) – Total drilling length of all boreholes = 5.3 km – In-situ testing, comprising 72 CPT and 37 DMT – Geophysical Investigation – Groundwater Level Monitoring – Groundwater Contamination Investigation
4
South Road – Torrens to Torrens, T2T
South Road T2T Geotechnical, Pavement and Contamination Investigation
Geophysical Investigation:
- Combination of Multichannel Analysis of Surface Waves (MASW) and Seismic refraction methods used over 17 profiles along the corridor
- Program conducted at night to minimise traffic noise
- Data processed and interpreted, to provide information on presence or capability of holding perched groundwater
- Correlated with geotechnical borehole data
5
South Road – Torrens to Torrens, T2T
South Road T2T Geotechnical, Pavement and Contamination Investigation
6
South Road – Torrens to Torrens, T2T
South Road T2T Geotechnical, Pavement and Contamination Investigation
Groundwater monitoring wells installed in 20 boreholes
– Piezometers installed with hollow auger drilling methods under environmental protocols along the corridor length
– Groundwater levels recorded when struck during drilling
– Periodic monitoring of groundwater levels for at least 1 year
– Groundwater samples collected for chemical analysis and contamination investigation
Historical groundwater well level monitoring – Up to 9 years of sporadic data for
some monitoring wells installed by URS in 2006
7
South Road – Torrens to Torrens, T2T
South Road T2T Geotechnical, Pavement and Contamination Investigation
Seasonal variation in groundwater levels of typically up to about 400 mm over the last 12-18 months in groundwater wells installed during this investigation
8
South Road – Torrens to Torrens, T2T
South Road T2T Geotechnical, Pavement and Contamination Investigation
Groundwater level variations of ~1.2 m over the last 9 years in historically installed groundwater wells monitored by DPTI and also URS during this investigation
9