torrens road to river torrens project - t2t...

1
For all project enquiries call 1300 794 899 email [email protected] visit infrastructure.sa.gov.au/t2t North-South Corridor Torrens Road to River Torrens Project 25,000m 3 OF CONCRETE WILL BE USED 146,000 TONNES OF ASPHALT 2km OF LOWERED MOTORWAY - PROVIDING THREE LANES IN EACH DIRECTION - SET APPROXIMATELY 8m BELOW THE EXISTING SURFACE OF SOUTH ROAD NTERSECTION UPGRADES TO: - TORRENS ROAD - HAWKER STREET - HURTLE STREET - PORT ROAD - GRANGE ROAD - MANTON STREET OUTER HARBOR RAIL OVERPASS STREET LIGHTS EXCAVATION 350,000m 3 OF FILL THE T2T PROJECT WILL INSTALL 17,342m 2 OF FACING PANEL IN THE LOWERED MOTORWAY 3,528m OF PRECAST BARRIER ON THE SURFACE ROADS 17 GANTRIES FOR INTELLIGENT TRANSPORT SYSTEM 150,000m OF CONDUIT 12,500m OF DRAINAGE SYSTEMS 4926 SOIL NAILS DURING CONSTRUCTION 2215 TONNES REINFORCEMENT 2552 TONNES PRECAST BRIDGE BEAMS 3km OF NON-STOP ROADWAY PROJECT LENGTH 3 . 7 km 3.7km 6km OF TEMPORARY TRAFFIC BARRIERS 6km OF BARRIER INSTALLED IN THE LOWERED MOTORWAY 11,800m 2 NOISE WALLS

Upload: others

Post on 12-Aug-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Torrens Road to River Torrens Project - T2T Alliancet2talliance.com.au/wp88/wp-content/uploads/T2T_infographic_HQ.pdf · For all project enquiries call 1300 794 899 email dpti.t2t@sa.gov.au

For all project enquiries call 1300 794 899email [email protected] infrastructure.sa.gov.au/t2t

North-South CorridorTorrens Road to River Torrens Project

25,000m3 OF CONCRETE WILL BE USED

146,000 TONNES OF ASPHALT 2km OF LOWERED MOTORWAY- PROVIDING THREE LANES IN EACH DIRECTION

- SET APPROXIMATELY 8m BELOW THE EXISTING SURFACE OF SOUTH ROAD

NTERSECTION UPGRADES TO:- TORRENS ROAD- HAWKER STREET- HURTLE STREET- PORT ROAD- GRANGE ROAD- MANTON STREETOUTER HARBOR RAIL OVERPASS

STREET LIGHTS

EXCAVATION350,000m3 OF FILL

THE T2T PROJECT WILL INSTALL17,342m2 OF FACING PANEL IN THE LOWERED MOTORWAY

3,528m OF PRECAST BARRIER ON THE SURFACE ROADS

17 GANTRIES FOR INTELLIGENT TRANSPORT SYSTEM

150,000m OF CONDUIT

12,500m OF DRAINAGE SYSTEMS

4926 SOIL NAILS

DURING CONSTRUCTION

2215TONNES

REINFORCEMENT

2552TONNES

PRECAST BRIDGE BEAMS

3km OF NON-STOP ROADWAY

PROJECT LENGTH

3.7km3.7km

6km

OF TEMPORARY TRAFFIC BARRIERS

6km

OF BARRIER INSTALLED IN THE LOWERED

MOTORWAY

11,800m2

NOISE WALLS