For all project enquiries call 1300 794 899email [email protected] infrastructure.sa.gov.au/t2t
North-South CorridorTorrens Road to River Torrens Project
25,000m3 OF CONCRETE WILL BE USED
146,000 TONNES OF ASPHALT 2km OF LOWERED MOTORWAY- PROVIDING THREE LANES IN EACH DIRECTION
- SET APPROXIMATELY 8m BELOW THE EXISTING SURFACE OF SOUTH ROAD
NTERSECTION UPGRADES TO:- TORRENS ROAD- HAWKER STREET- HURTLE STREET- PORT ROAD- GRANGE ROAD- MANTON STREETOUTER HARBOR RAIL OVERPASS
STREET LIGHTS
EXCAVATION350,000m3 OF FILL
THE T2T PROJECT WILL INSTALL17,342m2 OF FACING PANEL IN THE LOWERED MOTORWAY
3,528m OF PRECAST BARRIER ON THE SURFACE ROADS
17 GANTRIES FOR INTELLIGENT TRANSPORT SYSTEM
150,000m OF CONDUIT
12,500m OF DRAINAGE SYSTEMS
4926 SOIL NAILS
DURING CONSTRUCTION
2215TONNES
REINFORCEMENT
2552TONNES
PRECAST BRIDGE BEAMS
3km OF NON-STOP ROADWAY
PROJECT LENGTH
3.7km3.7km
6km
OF TEMPORARY TRAFFIC BARRIERS
6km
OF BARRIER INSTALLED IN THE LOWERED
MOTORWAY
11,800m2
NOISE WALLS