the loft at tobin lake

Post on 16-Apr-2017

320 Views

Category:

Art & Photos

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

The Loft at Tobin Lake

2008

2009

2010Ready to start

The walls are built

The walls are up

Time to cutout the windows and doors

Windows, doors, and corner posts

Hip rafters are up (whew!)

Half rafters, creepers, and fascia (whew!! again)

Half rafters, creepers, and some nogging

Half rafters, creepers, and all the nogging

Sheeting is half done

Sheeting is done

Still a little airy

Windows, and doors are in…

…and shingles are done!

End of season 2010 Looking good

Electrical is done

Walls are insulated…

…and now they’re covered.

Ceiling is insulated…

…and now it’s covered. Looking good!

The floor is down

Furniture and window covering

Log siding is going on…More to come!