coal fired ge tobin

Upload: ravindrababu-banothu

Post on 02-Apr-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 Coal Fired GE Tobin

    1/22

    CombustionOptimization for

    Coal-Fired Boilers

    2nd U.S.-China NOx WorkshopDalian, China

    August 2005

    James TobinNeil Widmer

    GE Energy

  • 7/27/2019 Coal Fired GE Tobin

    2/22

    The problem

  • 7/27/2019 Coal Fired GE Tobin

    3/22

    3GE Energy

    August 2005

    Poor combustion result in many

    performance issues.

    Reduced

    Througput (Load)

    High Metal

    Temperatures

    Increased FEGT(Furnace Exit Gas Temperature)

    Reduced

    Efficiency

    ~Coal

    Supply

    CoalCrushe

    r

    Mill

    CoalSilos

    Boiler

    AirHeater

    Stack

    IDFan

    FDFan

    Turbine Generator

    Local Fouling

    Increased

    Steam Spray

    Local Slagging

    Local Hot Spots

    Increased

    Excess O2

    High COHigh CO

    Combustion profile as monitored

    by Spatial Sensors

    Economizer

    O2 Imbalance

    Local Corrosion

    High Carbon in

    Ash, eg. LOI(Loss on Ignition)

    High NOx

  • 7/27/2019 Coal Fired GE Tobin

    4/22

    4GE Energy

    August 2005

    The major lost opportunities result from

    poor combustion.Fleet-wide lost opportunity

    cost can be over $80 MMper year.

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Boiler Fleet

    AnnualLossOpportu

    nityContribu

    tions

    Condensate System

    Opacity

    Controls Chemistry

    Seasonal Derate

    Feedwater System

    Slag & Ash Removal

    PRB Derate

    Air Supply

    Fuel Quality

    Mill/Feeders

    Turbine

    Tube Leaks

    Contributing Factors:

  • 7/27/2019 Coal Fired GE Tobin

    5/22

    5GE Energy

    August 2005

    Improved burner operation drives

    performance gains.

    Fuel Savings

    Comfort

    Zone

    Initial A/FInitial A/F

    FEGT

    ImprovedImprovedA/FA/F

    High CO Burners LimitPerformance

    Emissions Credits

    Availability & Peak Power

    Output (Throughput)

  • 7/27/2019 Coal Fired GE Tobin

    6/22

    Solutions

  • 7/27/2019 Coal Fired GE Tobin

    7/22

    7GE Energy

    August 2005

    Zonal combustion control system

    Combustion (O2/CO)Monitors

    Output

    NOx

    AvailabilityBurnerAirflow

    Controls

    CombustionTuningControls

    Efficiency

    CombustionDiagnostic

    ZonalFuel and AirOptimization

    BurnerAdjustments

    1

    2

    3

    object

    BurnerCoal FlowControls

  • 7/27/2019 Coal Fired GE Tobin

    8/22

    8GE Energy

    August 2005

    Combustion

    Sensors

    CombustionTuning Model

    Burner AirflowControls

    Coal Flow

    Sensors

    Coal FlowDampers

    Components

    Zonal Combustion

    Controls

  • 7/27/2019 Coal Fired GE Tobin

    9/22

    9GE Energy

    August 2005

    Zonal combustion control system

    how fuel & air controls work together.Zonal CO Trim - fine controlsfor combustion balancing :

    > Trim furnace zonal air/fuelratios based on sensor grid

    Balance CO

    Reduce hot spots

    Reduce delayedcombustion

    Maintain burner flame Reduce LOI

    Reduce excess O2

    Zonal Fuel Trim - coarsecontrols for combustionshaping :

    > Optimize wall-burner firing

    Reduce impingement

    > Reshape tangential fireball

    Centered and round

    > Tune furnace fueldistribution

    Balance economizer O2 Divert heat loading from

    peak FEGT & slag regions

  • 7/27/2019 Coal Fired GE Tobin

    10/22

    10GE Energy

    August 2005

    Fuel control can reduce temperature

    and CO zones the precursors to slag.AfterBefore

    CO Profile

    Max = 2088 Max = 2023

    Gas Temp. Profile

  • 7/27/2019 Coal Fired GE Tobin

    11/22

    11GE Energy

    August 2005

    Automatic Fuel Trim controls are

    successful at tightening distribution.

    -25%-20%

    -15%

    -10%

    -5%

    0%

    5%

    10%

    15%

    Burner CoalFlow Bias

    As-Found Manual Automatic

    Coal Distribution

    Burner C1

    Burner C2

    Burner C3

    Burner C4

    Burner C5

    First Demonstration August 2003

  • 7/27/2019 Coal Fired GE Tobin

    12/22

    12GE Energy

    August 2005

    Balanced and optimized coal flow

    distribution reduced peak FEGT 60F.

    2375

    2400

    2425

    2450

    2475

    2500

    2525

    FurnaceExitGas

    Tempera

    ture(deg.

    F)

    Baseline Balanced OptimizedCoal Distribution

    Ash FusionPoint

    PeakFEGTReduction

    10MWCapa

    cityIncrease

  • 7/27/2019 Coal Fired GE Tobin

    13/22

    13GE Energy

    August 2005

    20F Peak FEGT limited boiler capacity

    approximately 10MW.

    2,150

    2,200

    2,250

    2,300

    2,350

    2,400

    2,450

    2,500

    2,550

    2,600

    2,650

    2,700

    220 240 260 280 300 320 340 360 380 400

    Load, MWg

    FurnaceExitGasTemperature,

    degF

    FEGT West

    FEGT East

    FEGT Average

    Turbine Capacity

    Boiler Limit

  • 7/27/2019 Coal Fired GE Tobin

    14/22

    14GE Energy

    August 2005

    Zonal combustion monitoring system

    Interface Display

    Modeling

    (upgrade)

    Flow and

    Control PanelSensor Array

  • 7/27/2019 Coal Fired GE Tobin

    15/22

    15GE Energy

    August 2005

    Zonal combustion model-based

    control system.Combustion Trim ModelMonitoring & Control Interface

  • 7/27/2019 Coal Fired GE Tobin

    16/22

    16GE Energy

    August 2005

    Zonal combustion tuning system

    demonstration.

    Burner

    Tuning

    CombustionSensors

    Boiler Model

    Initial CO

    Tuned CO

    Tunin

    e

    mo

    gD

  • 7/27/2019 Coal Fired GE Tobin

    17/22

    17GE Energy

    August 2005

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1000

    COLe

    vel,ppm

    CO#11

    CO#6

    CO#12

    CO#7

    CO#14

    CO#13

    CO#1

    CO#9

    CO#8

    CO#10

    CO#4

    CO#15

    CO#5

    CO#2

    CO#3

    Combustion Sensors

    Initial Tuned

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    Fly-As

    hLOI,%

    West Middle East

    Flue Gas Duct

    Initial Tuned

    Systematic tuning balanced CO and

    fly-ash LOI synergistic with Hg control.

  • 7/27/2019 Coal Fired GE Tobin

    18/22

    18GE Energy

    August 2005

    Zonal combustion control system

    features:> Faster tuning experience

    > One system for managing Zonal combustion

    > Improves quality through systematic methods

    > Advises burner adjustments> Stores preferred burner setting by operating

    mode> Diagnoses combustion performance

  • 7/27/2019 Coal Fired GE Tobin

    19/22

    Benefits

  • 7/27/2019 Coal Fired GE Tobin

    20/22

    20GE Energy

    August 2005

    Combustion Optimization Case Study

    Sunflower Electric 380 MW BoilerScope:> GE coal flow monitors & control

    > GE combustion sensors> GE boiler tuning services

    > GE control software

    System Benefits:> Reduced peak FEGT 60F

    Eliminated barrier to increasingoutput 10 MW worth $1M/yr

    > Reduced high CO and temperaturezones

    Avoid future slag outage 1weeks worth ~ $2.5M/yr

    > Reduced NOx and Heat Rate

    Furnace Combustion

    Balancing

    Burner Fuel/Air Flow

    Sensors & Auto-Control

    Coal

    Flow

    Sensor

    Coal

    Damper

    Furnace

    Combustion

    Sensor Arrays

    COSensor

    Burner Air

    Control

  • 7/27/2019 Coal Fired GE Tobin

    21/22

    21GE Energy

    August 2005

    Zonal combustion controls benefits:

    9Reduce average and peak FEGT

    9Reduce fuel rich (CO) zones

    9Reduce corrosion

    9Reduce slagging

    9Reduce LOI

    9Reduced NOx

  • 7/27/2019 Coal Fired GE Tobin

    22/22

    22GE Energy

    August 2005

    Good combustion provides significant

    benefits.

    0

    500

    1,0001,500

    2,000

    2,500

    100 300 500 700 900

    Boiler Load, MWe

    A

    nnua

    lBene

    fits

    ,k$/yr

    Emissions Heat Rate

    Peak Power Availability

    Improvements :

    > Excess O2: 0.5% reduction> Emissions (NOx): 15% reduction

    > Heat Rate: 0.4% improvement

    > Peak Power: 2.3% increase> Availability: 1 week avoided

    outage

    Economic assumptions provided in notes

    Economic benefits are site-specific. Your plants benefits may vary.