SR 0001 Sec DTBTownship Line Road over SEPTA

Route 100Case Study – Final Design Considerations

Karl W. Schreiter, PE

March 4, 2015

May 3, 2023SR 0001 Sec DTB Page 2

US Route 1 over SEPTA Route 100

May 3, 2023SR 0001 Sec DTB Page 3

US Route 1 over SEPTA Route 100

Final Design Project Considerations

– Temporary Pedestrian Bridge

– SEPTA Coordination & Right-of-Way Acquisition

– PECO Relocation

– Philadelphia Department of Parks & Recreation

– Curb Ramp ADA Review

May 3, 2023SR 0001 Sec DTB Page 4

Temporary Pedestrian Bridge and Walkways

– Accommodate SEPTA customers and occasional pedestrians

– Includes temporary walkways and stairways

May 3, 2023SR 0001 Sec DTB Page 5

Temporary Pedestrian Bridge and Walkways

May 3, 2023SR 0001 Sec DTB Page 6

Temporary Pedestrian Bridge and Walkways Construction

May 3, 2023SR 0001 Sec DTB Page 7

Construction photos courtesy of JBC Associates, Inc.

Temporary Pedestrian Bridge and Walkways Construction

May 3, 2023SR 0001 Sec DTB Page 8

Temporary Pedestrian Bridge and Walkways Construction

May 3, 2023SR 0001 Sec DTB Page 9

SEPTA Coordination

– Route 100 Norristown High Speed Line

– Connects 69th Street (Philadelphia) and Norristown

May 3, 2023SR 0001 Sec DTB Page 10

SEPTA Coordination

– ROW acquisition for guide rail at access driveway

– Temporary Construction Easement for access road

– Drainage Easement for pipe outlets south of bridge

May 3, 2023SR 0001 Sec DTB Page 11

SEPTA Coordination

May 3, 2023SR 0001 Sec DTB Page 12

PECO Relocation

– Relocate four PECO aerial electric poles away from roadway before construction

May 3, 2023SR 0001 Sec DTB Page 13

Phila. Dept. of Parks & Recreation

– Northeast quadrant of bridge

– Requested weathering steel guide rail

– Special plantings

– Permits

May 3, 2023SR 0001 Sec DTB Page 14

Curb Ramp ADA Review

May 3, 2023SR 0001 Sec DTB Page 15

– Existing sub-standard curb ramp at Grove Place intersection

Curb Ramp ADA Review

May 3, 2023SR 0001 Sec DTB Page 16

– PennDOT District ADA Review

– Form CS-4401

Curb Ramp ADA Review

May 3, 2023SR 0001 Sec DTB Page 17

113th US Open – Merion Golf Club

– June 2013 – Delayed start of construction

May 3, 2023SR 0001 Sec DTB Page 18