TRANSCRIPT

Settlement Stability2015 Q3 Update to COPS

Austin J. RoselERCOT

COPS10/14/2015

2

8.2(c)(i) Track number of price changes

Notes:

Reporting Period: 2015 Q3

Operating Day

# of Corrected Settlement Point Prices # of Intervals Affected

DASPP RTSPP RTRMPRORDC Adders

DASPP RTSPP RTRMPRORDC Adders

6/4/2015 - 1206 982 4 - 2 2 2

6/6/2015 - 7236 5892 12 - 12 12 12

6/7/2015 - 11457 9329 29 - 19 19 19

6/8/2015 - 15075 12275 40 - 25 25 25

6/9/2015 - 7236 5892 21 - 12 12 12

6/10/2015 - 10854 8838 29 - 18 18 18

6/11/2015 - 8442 6874 24 - 14 14 14

6/12/2015 - 12663 10311 25 - 21 21 21

6/13/2015 - 19296 15712 45 - 32 32 32

6/14/2015 - 3618 2946 6 - 6 6 6

6/15/2015 - 18693 15221 55 - 31 31 31

7/31/2015 14 - - - 14 - - -

8/5/2015 - 1211 963 - - 3 3 -

Notes:

• Price corrections for OD between 06/04/2015 and 06/23/2015 due to data error (mean and standard deviation). Approved for Resettlement at 8/11/2015 Board. The remaining corrections (6/16-19,6/23) will be executed in Q4.

• Price corrections for OD 7/31/2015 corrected HE1-14 for PENA_ALL Settlement Point.

• Price corrections for OD 8/5/2015 were due to a system issue.

3

8.2(c)(ii) Track number and types of disputes submitted

YEAR 2015

QUARTER Q1-Q3

Row Labels Denied GrantedGranted w/Exc. Open

Total Submitted

Congestion Revenue Rights-RTM 1 3 4

Energy-DAM 1 1

Energy-RTM 15 9 24Emergency Operations-RTM 9 7 1 17

Ancillary Services-RTM 3 1 4

Grand Total 29 16 1 4 50

4

8.2(c)(iii) Compliance with timeliness of response to disputes

YEAR 2015  QUARTER Q1-Q3

Row Labels Final TRUE-UPGrand Total

Congestion Revenue Rights-RTM 100% 100%

Energy-DAM 100% 100%

Energy-RTM 100% 100% 100%Emergency Operations-RTM 100% 100%Ancillary Services-RTM 100% 100%

Grand Total 100% 100% 100%

5

8.2(c)(iv) Other Settlement metrics

NOTE: ERS Final settlement OD data is not represented in graph.

Average percent change per year

Year Final True Up

2011 3.65% 0.42%

2012 2.56% 0.41%

2013 2.83% 0.34%

2014 3.18% 0.32%

2015 2.92% 0.17%

6

8.2(c)(iv) Other Settlement metrics

NOTE: “Total of Charges” represents the sum of statements that are a net charge to the Market Participant (i.e., the amount due to ERCOT)

2011 2012 2013 2014 2015Q1-Q3

AVERAGE$7.06 $4.29 $5.41 $6.46 $4.79

MEDIAN$3.85 $3.67 $5.11 $5.66 $4.20

MIN$1.81 $1.70 $2.96 $1.96 $1.86

MAX$108.69 $26.21 $19.45 $47.93 $42.34

7

8.2(c)(iv) Other Settlement metrics

NOTE: “Total of Charges” represents the sum of statements that are a net charge to the Market Participant (i.e., the amount due to ERCOT)

2011 2012 2013 2014 2015Q1-Q3

AVERAGE$7.19 $5.19 $6.61 $8.21 $6.14

MEDIAN$4.69 $4.51 $5.97 $7.15 $5.13

MIN$2.38 $2.34 $2.98 $3.32 $2.90

MAX$173.66 $63.34 $40.52 $123.68 $33.61

8

8.2(c)(v) Availability of ESIID consumption data

9

8.2(c)(v) Availability of ESIID consumption data

10

8.2(c)(v) Availability of ESIID consumption data

11

8.2(c)(v) Availability of ESIID consumption data

12

8.2(c)(v) Availability of ESIID consumption data

13

8.2(c)(v) Availability of ESIID consumption data

14

8.2(g) Net Allocation to Load

Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15

Total Auction Distribution -$44.22 -$35.10 -$30.75 -$22.51 -$25.09 -$22.65 -$21.25 -$25.37 -$31.61 -$34.48 -$35.57 -$38.03 -$36.98 -$31.14Balancing Account Payout to Load -$9.30 -$0.97 -$1.00 -$2.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$4.33 -$5.58 -$3.45RUC Settlement -0.01 $0.00 -$0.06 -$0.12 $0.00 -$0.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$0.17Ancillary Services Settlement $42.68 $25.76 $41.11 $44.68 $21.59 $17.58 $19.26 $33.60 $31.90 $26.10 $25.02 $39.91 $89.07 $18.55Black Start Service Settlement $0.60 $0.59 $0.61 $0.60 $0.63 $0.62 $0.56 $0.63 $0.61 $0.63 $0.61 $0.63 $0.63 $0.61Voltage Services Settlement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00RMR Settlement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00RMR Capacity $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Revenue Neutrality Total $3.72 $8.19 $1.21 $2.02 $0.48 $2.73 $0.22 $2.01 $0.98 $2.36 $2.62 $2.74 $0.03 $4.74Emergency Energy Charges $0.11 $0.39 $0.34 $0.20 $0.10 $0.03 $0.08 $0.08 $0.06 $0.07 $0.04 $0.04 $0.12 $0.05Base Point Deviation Payments -$0.33 -$0.29 -$0.34 -$0.23 -$0.23 -$0.24 -$0.34 -$0.21 -$0.18 -$0.24 -$0.24 -$0.26 -$0.26 -$0.21ORDC Settlement $0.20 $0.05 $0.08 $0.04 $0.07 $0.05 $0.18 $0.30 $0.34 $0.20 $0.09 -$0.42 -$0.85 $0.33ERCOT Admin Fee Settlement $16.74 $14.48 $12.83 $11.51 $12.09 $13.43 $11.70 $11.81 $11.49 $13.01 $15.09 $17.22 $17.19 $14.95Block Load Transfer Settlement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$0.10 -$0.06 $0.00ERS Settlement $0.00 $0.00 $19.46 $0.00 $0.00 $0.00 $14.69 $0.00 $0.00 $0.00 $14.24 $0.00 $0.00 $0.00MW Charge for Excep. Fuel Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Net Allocation to Load $10.2 $13.1 $43.5 $33.9 $9.6 $11.5 $25.1 $22.9 $13.6 $7.7 $21.9 $17.4 $63.3 $4.3

NET ALLOCATION TO LOAD ($ in Mil)