TRANSCRIPT

Scanlon Creek Operations CentreRenovation Project Update

Brian Kemp – GM, Conservation Lands

LSRCA Board of Directors

June 26, 2020

2

OVERVIEW• Project Status

• The Plan

• What Things Are Looking Like

• Questions

CurrentNature Centre

Future Home of Nature Centre

Scanlon CreekOps Centre

3

Project Status• Project was tracking well at beginning of 2020

• Shut down site due to Covid-19 restrictions - April 6th

• Commenced construction again - May 19th

• Virtual Site Meetings - every two weeks

• Constant (almost daily) communication - in-person, telephone, email, RForm

• Project Completion - targeting July 6th, 2020

4

The Plan – Upper Level

5

The Plan – Lower Level

6

What Are Things Looking Like(as of June 23rd)

Front Entrance

Reception/Foyer

7

What Are Things Looking Like(as of June 23rd)

Waiting Area

Feature Wall

8

What Are Things Looking Like(as of June 23rd)

Staff Lunchroom

Running Water!!!

9

What Are Things Looking Like(as of June 23rd)

Inclined Platform Lift

Accessible Gender-Neutral Washroom

10

What Are Things Looking Like(as of June 23rd)

Boardroom

11

What Are Things Looking Like(as of June 23rd)

Open Office Concept

12

What Are Things Looking Like(as of June 23rd)

Watershed Science Workroom

13

What Are Things Looking Like(as of June 23rd)

Manager OfficeAdministration Office

14

What Are Things Looking Like(as of June 23rd)

Storage Space – Lower Level

15

Questions