rfp facilities. facilities facilities section is the first step in division 1 that applies coding to...

Post on 12-Jan-2016

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

RFP Facilities

Facilities

Facilities

Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the selected facilities step the project listed is based on what Facility Type was selected when you started the RFP Wizard project or whenever you go to edit the project. This selection determines what remover is used in 2.0 Scope portion of RFP.

Additional Requirements

Additional RequirementsInformation from the additional Requirements is from two different templates. The replacers are and found in paragraph 2 of RFP and everything else from the Additional Requirements step are for removers found in chapter 5 General Technical Requirements section of RFP.• Replacers:

– SITE_ACRES_AVAILABLE– GFGI_ITEMS

• Removers:– COMMISSIONING_OPTION_1– COMMISSIONING_OPTION_2– COMMISSIONING_OPTION_3– LEED3 – LEED2_2 – WAIVE for parking underdrain system check box– PARKING_OPTION_1– PARKING_OPTION_2– PARKING_OPTION_3– PARKING_OPTION_4– VEHICLE_OPTION_1– VEHICLE_OPTION_2– VEHICLE_OPTION_3– NON_WATER_URINALS– WATER_URINALS– NON_PREF_URINALS

• Removers (cont.)• UMCS_NO• UMCS_BACNET• BACNET• DIACAP_CERT• DIACAP_PART• DIACAP_PART_CERT• WEBBASED• UMCS_INTEGRATE_NO• UMCS_INTEGRATE• INTEGRATE• LNS• STANDALONE• NONE• LONWORKS• NEW• NEW_LNS_NONLNS• STANDALONE_LON• CONFIG_OCC• OCC_MODE• NEW_NO• NEW_LNS_NONLNS_NO• NEW_LNS

Access Control Point

• Facilities– ACP• Facility Subtype• Additional Requirements (same as generic)

Access Control Point • Access Control Point • (ACP) have multiple subtypes listed below. The only major step change is the step

below ACP which list the facility subtype.

• Facility Removers• Gatehouse ACP_GH ACP_GH_NO• Guard Booths ACP_GB ACP_GB_NO• ID Check Area and Canopy ACP_IDCAC ACP_IDCAC_NO• Overwatch Position ACP_OW ACP_OW_NO• Passenger Vehicle Search Area and Canopy ACP_PVSAC ACP_PVSAC_NO• Pedestrian Guard Booth ACP_PGB ACP_PGB_NO• Search Area Building ACP_SAB ACP_SAB_NO• Truck Search Area and Canopy ACP_TSAC ACP_TSAC_NO• Visitor Control Center ACP_VCC ACP_VCC_NO

Access Control Point (ACP)

Gatehouse

Guard Booths

Overwatch Position

Search Area Building

ID Check Area and Canopy

ID Check Area and Canopy

• Removers:– ACP_IDCAC_NO– ACP_IDCAC

• Replacers:– ACP_IDCAC_DEMAND– ACP_IDCAC_NUM_LANES

Advanced Individual Training Complex (AIT)

• Facilities– AIT• Facility Subtype• Additional Requirements (same as generic)

AIT

AIT• This is the same form for all the AITs.• Replacers:

– AIT_HARDWARE_FINISH_CODE– AIT_KEYING_SYSTEM– AIT_KEY_MANUFACTURER

• Removers:– AIT_POV_NO– AIT_POV_YES– AIT_TRASH_DUMP– AIT_RECYC_DUMP– AIT_PT_NO– AIT_PT_YES– AIT_LOCKBOX_NO– AIT_LOCKBOX– SOLARWATER_HEATING_AIT– AIT_SMOKE1– AIT_SMOKE2– AIT_SMOKE3– AIT_SMOKE4– AIT_CW– AIT_SCD– AIT_VM– AIT_AEE– AIT_DUMP

B/COF

CCP

LEB

Army Community Service Center (ACSC)

ACSC Additional Requirements

Army Continuing Education System (ACES)

Army Family Housing

Army Fire Station (AFS)

Automated Combat Pistol/MP Firearms Qualification Course (CPQC/MPFQC)

Downrange Area

Downrange Area• Replacers:

– CPQC_LANES_STD – CPQC_LANES_NONSTD – CPQC_LANES_QTY– CPQC_LANES_WIDTH – CPQC_LANES_PERLANE – CPQC_WALK_GRAVEL– CPQC_WALK_OTHER – CPQC_WALK_SPECIFY – CPQC_MARKERS_LIMIT – CPQC_MARKERS_NIGHT – CPQC_MARKERS_LANE – CPQC_MARKERS_FIRING – CPQC_MARKERS_INTER – CPQC_EMP_BELOW– CPQC_EMP_ABOVE – CPQC_EMP_COMBO – CPQC_EMPMAT_CON – CPQC_EMPMAT_OTHER – CPQC_EMPMAT_SPECIFY – CPQC_POWER_HARD– CPQC_POWER_HARDPLUS– CPQC_POWER_BTRY– CPQC_POWER_OTHER– CPQC_POWER_SPECIFY– CPQC_BARRICADE_CONCRETE– CPQC_BARRICADE_CMU– CPQC_BARRICADE_OTHER– CPQC_BARRICADE_SPECIFY

ROCA

ROC Tower

ROC Tower• Replacers:

– CPQC_TOW_QTY– CPQC_TOW_HEIGHT– CPQC_TOW_OBS– CPQC_TOW_CONS_DISC– CPQC_TOW_CONS_CMU– CPQC_TOW_CONS_METAL– CPQC_TOW_CONS_OTHER– CPQC_TOW_CONS_SPECIFY– CPQC_TOW_BI_EL– CPQC_TOW_BI_DN– CPQC_TOW_BI_LP– CPQC_TOW_BI_C2– CPQC_TOW_BI_PA– CPQC_TOW_BI_TEL– CPQC_TOW_BI_COPFIB– CPQC_TOW_BI_FE– CPQC_TOW_BI_FD– CPQC_TOW_HVAC_POWER– CPQC_TOW_HVAR_BOTH– ZERO_TOW_HVAC_HEAT– CPQC_TOW_HVAC_FREEZE– CPQC_TOW_HVAC_VENT– CPQC_TOW_OTHER

OSB

OSB• Operations Storage Building (OSB)

• Replacers:– CPQC_OSB_QTY – CPQC_OSB_CONS_DISC – CPQC_OSB_CONS_METAL – CPQC_OSB_CONS_OTHER – CPQC_OSB_CONS_SPECIFY – CPQC_OSB_BI_EL– CPQC_OSB_BI_DN – CPQC_OSB_BI_LP – CPQC_OSB_BI_INET – CPQC_OSB_BI_TEL – CPQC_OSB_BI_COPFIB – CPQC_OSB_BI_FE– CPQC_OSB_BI_FD – CPQC_OSB_HVAC_POWER– CPQC_OSB_HVAC_BOTH– CPQC_OSB_HVAC_HEAT – CPQC_OSB_HVAC_FREEZE – CPQC_OSB_HVAC_VENT– CPQC_OSB_OTHER

Classroom Facility

Classroom Facility• Replacers:

– CPQC_GIB_QTY – CPQC_GIB_CONS_DISC – CPQC_GIB_CONS_METAL – CPQC_GIB_CONS_OTHER – CPQC_GIB_CONS_SPECIFY – CPQC_GIB_BI_EL– CPQC_GIB_BI_DN – CPQC_GIB_BI_LP – CPQC_GIB_BI_DC– CPQC_GIB_BI_INET – CPQC_GIB_BI_TEL – CPQC_GIB_BI_COPFIB – CPQC_GIB_BI_FE– CPQC_GIB_BI_FD – CPQC_GIB_HVAC_POWER – CPQC_GIB_HVAC_BOTH– CPQC_GIB_HVAC_HEAT – CPQC_GIB_HVAC_FREEZE – CPQC_GIB_HVAC_VENT– CPQC_GIB_OTHER

Covered Mess

Ammunition Breakdown Building

Ammunition Breakdown Building• Replacers:

– CPQC_ABB_QTY– CPQC_ABB_CONS_DISC– CPQC_ABB_CONS_CMU– CPQC_ABB_CONS_METAL– CPQC_ABB_CONS_OTHER– CPQC_ABB_CONS_SPECIFY– CPQC_ABB_BI_EL– CPQC_ABB_BI_DN– CPQC_ABB_BI_LP– CPQC_ABB_BI_FE– CPQC_ABB_BI_FD– CPQC_ABB_HVAC_POWER– CPQC_ABB_HVAC_BOTH– CPQC_ABB_HVAC_HEAT– CPQC_ABB_HVAC_FREEZE– CPQC_ABB_HVAC_VENT– CPQC_ABB_OTHER

Latrine

Latrine• Replacers:

– CPQC_LAT_QTY– CPQC_LAT_AV – CPQC_LAT_WLSEP – CPQC_LAT_WLSEW – CPQC_LAT_OTHER – CPQC_LAT_SPECIFY – CPQC_LAT_PORT– CPQC_LAT_PORT_SIZE– CPQC_LAT_CONS_DISC – CPQC_LAT_CONS_CMU – CPQC_LAT_CONS_METAL – CPQC_LAT_CONS_OTHER – CPQC_LAT_CONS_SPECIFY – CPQC_LAT_BI_EL– CPQC_LAT_BI_DN – CPQC_LAT_BI_LP– CPQC_LAT_BI_WS – CPQC_LAT_BI_LF2SRC – CPQC_LAT_BI_WSW– CPQC_LAT_BI_SEW– CPQC_LAT_BI_LF2TI– CPQC_LAT_BI_FE– CPQC_LAT_BI_FD– CPQC_LAT_HVAC_POWER– CPQC_LAT_HVAC_BOTH– CPQC_LAT_HVAC_HEAT– CPQC_LAT_HVAC_FREEZE– CPQC_LAT_HVAC_VENT– CPQC_LAT_OTHER

Bleacher Enclosure

Non-Standard Building

Non-Standard Building• Replacers:

– CPQC_NSTD_QTY– CPQC_NSTD_NAME– CPQC_NSTD_SIZE– CPQC_NSTD_CONS_DISC– CPQC_NSTD_CONS_CMU– CPQC_NSTD_CONS_METAL– CPQC_NSTD_CONS_OTHER– CPQC_NSTD_CONS_SPECIFY– CPQC_NSTD_BI_EL– CPQC_NSTD_BI_DN– CPQC_NSTD_BI_LP– CPQC_NSTD_BI_PA– CPQC_NSTD_BI_INET– CPQC_NSTD_BI_TEL– CPQC_NSTD_BI_COPFIB– CPQC_NSTD_BI_WS– CPQC_NSTD_BI_LF2SRC– CPQC_NSTD_BI_WSW– CPQC_NSTD_BI_SEW– CPQC_NSTD_BI_LF2TI– CPQC_NSTD_BI_FE– CPQC_NSTD_BI_FD– CPQC_NSTD_HVAC_POWER– CPQC_NSTD_HVAC_BOTH– CPQC_NSTD_HVAC_HEAT– CPQC_NSTD_HVAC_FREEZE– CPQC_NSTD_HVAC_VENT– CPQC_NSTD_OTHER

Automated Record Fire Range (ARF)

Downrange Area

Downrange Area• Replacers:

– ARF_LANES_STD– ARF_LANES_NONSTD – ARF_LANES_QTY– ARF_LANES_WIDTH – ARF_LANES_PERLANE– ARF_FP_FOX – ARF_FP_FOXDROPIN – ARF_FP_FOXWALKIN – ARF_FP_PRONE– ARF_FP_SPECIFY– ARF_FP_NONE – ARF_MARKERS_LIMIT– ARF_MARKERS_NIGHT – ARF_MARKERS_LANE– ARF_MARKERS_FIRING – ARF_MARKERS_INTER – ARF_EMP_BELOW – ARF_EMP_ABOVE – ARF_EMP_COMBO – ARF_EMP_ZERO– ARF_EMP_ZEROSETS– ARF_EMP_NIGHT– ARF_EMP_NIGHT_SPECIFY– ARF_EMPMAT_CON– ARF_EMPMAT_OTHER – ARF_EMPMAT_SPECIFY– ARF_POWER_HARD– ARF_POWER_HARDPLUS – ARF_POWER_BTRY– ARF_POWER_OTHER – ARF_POWER_SPECIFY

ROC Tower

ROC Tower• Replacers:

– ARF_TOW_QTY– ARF_TOW_HEIGHT– ARF_TOW_OBS– ARF_TOW_CONS_DISC– ARF_TOW_CONS_CMU– ARF_TOW_CONS_METAL– ARF_TOW_CONS_OTHER– ARF_TOW_CONS_SPECIFY– ARF_TOW_BI_EL– ARF_TOW_BI_DN– ARF_TOW_BI_LP– ARF_TOW_BI_PA– ARF_TOW_BI_C2– ARF_TOW_BI_TEL– ARF_TOW_BI_COPFIB – ARF_TOW_BI_FE– ARF_TOW_BI_FD– ARF_TOW_HVAC_POWER– ARF_TOW_HVAR_BOTH– ARF_TOW_HVAC_HEAT– ARF_TOW_HVAC_FREEZE– ARF_TOW_HVAC_VENT– ARF_TOW_OTHER

OSB

OSB• Operations Storage Building (OSB)

• Replacers:– ARF_OSB_QTY– ARF_OSB_CONS_DISC– ARF_OSB_CONS_METAL– ARF_OSB_CONS_OTHER– ARF_OSB_CONS_SPECIFY– ARF_OSB_BI_EL– ARF_OSB_BI_DN– ARF_OSB_BI_LP– ARF_OSB_BI_INET– ARF_OSB_BI_TEL– ARF_OSB_BI_COPFIB– ARF_OSB_BI_FE– ARF_OSB_BI_FD– ARF_OSB_HVAC_POWER– ARF_OSB_HVAC_BOTH– ARF_OSB_HVAC_HEAT– ARF_OSB_HVAC_FREEZE– ARF_OSB_HVAC_VENT– ARF_OSB_OTHER

Classroom Facility

Classroom Facility• Replacers:

– ARF_GIB_QTY– ARF_GIB_CONS_DISC– ARF_GIB_CONS_CMU– ARF_GIB_CONS_METAL– ARF_GIB_CONS_OTHER– ARF_GIB_CONS_SPECIFY– ARF_GIB_BI_EL– ARF_GIB_BI_DN– ARF_GIB_BI_LP– ARF_GIB_BI_DC– ARF_GIB_BI_INET– ARF_GIB_BI_TEL– ARF_GIB_BI_COPFIB– ARF_GIB_BI_FE– ARF_GIB_BI_FD– ARF_GIB_HVAC_POWER– ARF_GIB_HVAC_BOTH– ARF_GIB_HVAC_HEAT– ARF_GIB_HVAC_FREEZE– ARF_GIB_HVAC_VENT– ARF_GIB_OTHER

Covered Mess

Ammunition Breakdown Building

Ammunition Breakdown Building• Replacers:

– ARF_ABB_QTY– ARF_ABB_CONS_DISC– ARF_ABB_CONS_CMU– ARF_ABB_CONS_METAL– ARF_ABB_CONS_OTHER– ARF_ABB_CONS_SPECIFY– ARF_ABB_BI_EL– ARF_ABB_BI_DN– ARF_ABB_BI_LP– ARF_ABB_BI_FE– ARF_ABB_BI_FD– ARF_ABB_HVAC_POWER– ARF_ABB_HVAC_BOTH– ARF_ABB_HVAC_HEAT– ARF_ABB_HVAC_FREEZE– ARF_ABB_HVAC_VENT– ARF_ABB_OTHER

Latrine

Latrine• Replacers:

– ARF_LAT_QTY – ARF_LAT_AV– ARF_LAT_WLSEP– ARF_LAT_WLSEW– ARF_LAT_OTHER– ARF_LAT_SPECIFY– ARF_LAT_PORT– ARF_LAT_PORT_SIZE– ARF_LAT_CONS_DISC– ARF_LAT_CONS_CMU– ARF_LAT_CONS_METAL– ARF_LAT_CONS_OTHER– ARF_LAT_CONS_SPECIFY– ARF_LAT_BI_EL– ARF_LAT_BI_DN– ARF_LAT_BI_LP– ARF_LAT_BI_WS– ARF_LAT_BI_LF2SRC– ARF_LAT_BI_WSW– ARF_LAT_BI_SEW– ARF_LAT_BI_LF2TI– ARF_LAT_BI_FE– ARF_LAT_BI_FD– ARF_LAT_HVAC_POWER– ARF_LAT_HVAC_BOTH– ARF_LAT_HVAC_HEAT– ARF_LAT_HVAC_FREEZE– ARF_LAT_HVAC_VENT– ARF_LAT_OTHER

Bleacher Enclosure

Non-Standard Building

Non-Standard Building• Replacers:

– ARF_NSTD_QTY– ARF_NSTD_NAME– ARF_NSTD_SIZE– ARF_NSTD_CONS_DISC– ARF_NSTD_CONS_CMU– ARF_NSTD_CONS_METAL– ARF_NSTD_CONS_OTHER– ARF_NSTD_CONS_SPECIFY– ARF_NSTD_BI_EL– ARF_NSTD_BI_DN– ARF_NSTD_BI_LP– ARF_NSTD_BI_PA– ARF_NSTD_BI_INET– ARF_NSTD_BI_TEL– ARF_NSTD_BI_COPFIB– ARF_NSTD_BI_WS– ARF_NSTD_BI_LF2SRC– ARF_NSTD_BI_WSW– ARF_NSTD_BI_SEW– ARF_NSTD_BI_LF2TI– ARF_NSTD_BI_FE– ARF_NSTD_BI_FD– ARF_NSTD_HVAC_POWER– ARF_NSTD_HVAC_BOTH– ARF_NSTD_HVAC_HEAT– ARF_NSTD_HVAC_FREEZE– ARF_NSTD_HVAC_VENT– ARF_NSTD_OTHER

Basic 10M-25M Firing Range (ZERO)

• Facilities– ZERO – Basic 10M-25M Firing Range• Downrange Area• ROCA

– ROC Tower– Covered Mess– Ammunition Breakdown Building– Latrine– Bleacher Enclosure– Non-Standard Building

• Additional Requirements

Zero – Basic 10M-25M Firing Range

Downrange Area

Downrange AreaReplacers:

• ZERO_LANES_STD– ZERO_LANES_NONSTD– ZERO_LANES_QTY– ZERO_LANES_WIDTH– ZERO_FP_FOX– ZERO_FP_FOXDROPIN– ZERO_FP_FOXWALKIN– ZERO_FP_PRONE– ZERO_FP_NONE– ZERO_FP_AREA– ZERO_MARKERS_LIMIT– ZERO_MARKERS_NIGHT – ZERO_MARKERS_LANE– ZERO_MARKERS_FIRING– ZERO_TAR_10– ZERO_TAR_25– ZERO_TAR_AUTO– ZERO_EMPMAT_WOOD– ZERO_EMPMAT_OTHER– ZERO_EMPMAT_SPECIFY– ZERO_POWER_NONE

ROCA

ROC Tower

ROC Tower• Replacers:

– ZERO_TOW_QTY– ZERO_TOW_HEIGHT– ZERO_TOW_OBS– ZERO_TOW_CONS_DISC– ZERO_TOW_CONS_CMU– ZERO_TOW_CONS_METAL– ZERO_TOW_CONS_OTHER– ZERO_TOW_CONS_SPECIFY– ZERO_TOW_BI_EL– ZERO_TOW_BI_DN– ZERO_TOW_BI_LP– ZERO_TOW_BI_PA– ZERO_TOW_BI_TEL– ZERO_TOW_BI_COPFIB– ZERO_TOW_BI_FE– ZERO_TOW_BI_FD– ZERO_TOW_HVAC_POWER– ZERO_TOW_HVAR_BOTH– ZERO_TOW_HVAC_HEAT– ZERO_TOW_HVAC_FREEZE– ZERO_TOW_HVAC_VENT– ZERO_TOW_OTHER

Covered Mess

Ammunition Breakdown Building

Ammunition Breakdown Building• Replacers:

– ZERO_ABB_QTY– ZERO_ABB_CONS_DISC– ZERO_ABB_CONS_CMU– ZERO_ABB_CONS_METAL– ZERO_ABB_CONS_OTHER– ZERO_ABB_CONS_SPECIFY– ZERO_ABB_BI_EL– ZERO_ABB_BI_DN– ZERO_ABB_BI_LP– ZERO_ABB_BI_FE– ZERO_ABB_BI_FD– ZERO_ABB_HVAC_POWER– ZERO_ABB_HVAC_BOTH– ZERO_ABB_HVAC_HEAT– ZERO_ABB_HVAC_FREEZE– ZERO_ABB_HVAC_VENT– ZERO_ABB_OTHER

Latrine

Latrine• Replacers:

– ZERO_LAT_QTY– ZERO_LAT_AV– ZERO_LAT_WLSEP– ZERO_LAT_WLSEW– ZERO_LAT_OTHER– ZERO_LAT_SPECIFY– ZERO_LAT_PORT– ZERO_LAT_PORT_SIZE– ZERO_LAT_CONS_DISC– ZERO_LAT_CONS_CMU– ZERO_LAT_CONS_METAL– ZERO_LAT_CONS_OTHER– ZERO_LAT_CONS_SPECIFY– ZERO_LAT_BI_EL– ZERO_LAT_BI_DN– ZERO_LAT_BI_LP– ZERO_LAT_BI_WS– ZERO_LAT_BI_LF2SRC– ZERO_LAT_BI_WSW– ZERO_LAT_BI_SEW– ZERO_LAT_BI_LF2TI– ZERO_LAT_BI_FE– ZERO_LAT_BI_FD– ZERO_LAT_HVAC_POWER– ZERO_LAT_HVAC_BOTH– ZERO_LAT_HVAC_HEAT– ZERO_LAT_HVAC_FREEZE– ZERO_LAT_HVAC_VENT– ZERO_LAT_OTHER– ZERO_LAT_SPECIFY

Bleacher Enclosure

Non-Standard Building

Non-Standard Building• Replacers:

– ZERO_NSTD_QTY– ZERO_NSTD_NAME– ZERO_NSTD_SIZE– ZERO_NSTD_CONS_DISC– ZERO_NSTD_CONS_CMU– ZERO_NSTD_CONS_METAL– ZERO_NSTD_CONS_OTHER– ZERO_NSTD_CONS_SPECIFY– ZERO_NSTD_BI_EL– ZERO_NSTD_BI_DN– ZERO_NSTD_BI_LP– ZERO_NSTD_BI_PA– ZERO_NSTD_BI_INET– ZERO_NSTD_BI_TEL– ZERO_NSTD_BI_COPFIB– ZERO_NSTD_BI_WS– ZERO_NSTD_BI_LF2SRC– ZERO_NSTD_BI_WSW– ZERO_NSTD_BI_SEW– ZERO_NSTD_BI_LF2TI– ZERO_NSTD_BI_FE– ZERO_NSTD_BI_FD– ZERO_NSTD_HVAC_POWER– ZERO_NSTD_HVAC_BOTH– ZERO_NSTD_HVAC_HEAT– ZERO_NSTD_HVAC_FREEZE– ZERO_NSTD_HVAC_VENT– ZERO_NSTD_OTHER

Basic Training and One Station Unit Training Complex (BTOSUT)

Basic Training and One Station Unit Training Complex (BTOSUT)

• Here is a list of the Basic Training (BT) and One Station Unit Training (OSUT) Complex removers based on the facility selection. All the BTOSUT have the sub step titled BTOSUT underneath Facilities in the RFP Wizard hierarchy.

• Facility (with Removers underneath)– Barracks/Company Operations Facility

• BTCOF• BTCOF_NO

– Battalion Headquarters Facility• BTBN• BTBN_NO

– Central Cooling Plant• BTCCP• BTCCP_NO

– Dining Facility• BTDF• BTDF_NO

– Lawn Equipment Building• BTLEB• BTLEB_NO

BTOSUT

BTOSUT• Replacers:

– BTOSUT_KEYING– BTOSUT_LOCKBOX_DESCRIPTION

• Removers:– BTOSUT_LOCKBOX– BTOSUT_LOCKBOX_NO– BTOSUT_CW– BTOSUT_SCD– BTOSUT_VM– BTOSUT_AEE– BTOSUT_DUMP– BTOSUT_POV_NO– BTOSUT_POV_YES– BTOSUT_TRASH_DUMP– BTOSUT_RECYC_DUMP– BTOSUT_PT_NO– BTOSUT_PT_YES

B/COF

CCP

LEB

Battalion Headquarters

• Facilities– Battalion– Bde/Bn Additional Reqs– Additional Requirements

Battalion

Bde/Bn Additional Reqs

Bde/Bn Additional Reqs• This slide is the same for three facility types (Battalion Headquarters, Brigade

Headquarters, and Brigade and Battalion Headquarters). The only difference is the top portion there is a check box to consolidate into one facility and the maximum gross area input area is grayed out except when the facility type is the Brigade and Battalion Headquarters. This is also when the “Consolidate” remover is used.

• Replacers:– BDEBN_MAX_AREA

• Removers:– CONSOLIDATE– CONSOLIDATE_NO– HQ_POV_OTHER– HQ_POV_GOV

Battlefield Weather Support Facility (BWF)

Brigade and Battalion Headquarters

• Facilities– Battalion– Bde/Bn Additional Reqs– Brigade– Additional Requirements

• This is a combination of the Brigade step and the Battalion step . One difference is the step Bde/Bn Additional Reqs shows the consolidated button as active and checked. It is grayed out when the facility type is Battalion Headquarters or Brigade Headquarters.

Brigade

Brigade Headquarters

• When Brigade Headquarters facility is selected it has the same steps as the Brigade and Battalion Headquarters facility except without the Battalion step and the consolidate portion in the Bde/Bn Additional Reqs is grayed out.

• Facilities– Bde/Bn Additional Reqs– Brigade– Additional Requirements

Chapel Facility

Chaplain Family LifeCenter (CFLC)

• CFLC has is same as standard version with only the Additional Requirements step.

• Facilities– Additional Requirements

• Removers:– CFLC

Child Development Center

Classroom XX1

Command and Control Facility

• Facilities– C2F• Spatial• Equipment

– Additional Requirements

C2F

C2F• Replacers:– C2F_MAX_AREA– C2F_OTHER_TYPE– C2F_OTHER_OP_LONG– C2F_OTHER_OP_SHORT – C2F_STRUCTURAL– C2F_PLANNING_ROOMS– C2F_NUMBER_HMMWV– C2F_NUMBER_SHELTER– C2F_NUMBER_HMMWV_TRAILERS – C2F_GOV– C2F_GO – C2F_VIP– C2F_MALE_PERCENT– C2F_FEMALE_PERCENT

• Removers:– C2F– C2F_DIV– C2F_CORPS– C2F_NUMA– C2F_DRU– C2F_DRU_OTHER– C2F_DRU_OTHER_NOT– C2F_ASCC (group based on drop down list of type of command)– C2F_ACOM– C2F_OTHER– C2F_OCONUS_THREE– C2F_OCONUS_FOUR– C2F_ANTENNA– C2F_ANTENNA_NOT– C2F_HELI– C2F_HELI_NOT– C2F_CLASS– C2F_CLASS_NOT– C2F_DEPLOYED – C2F_DEPLOYED_NOT

• Removers: (additional)– C2F_SCIF (portion based on select which additional spaces are required for the

facility”)– C2F_SCIF_NOT– C2F_STO– C2F_DT_CBT– C2F_DT_CBT_NOT– C2F_LAYOUT_INCLUDED– C2F_FIGURE1 (portion based on drop down list of “select how the preferred

locations and distribution of these spaces will be depicted”)– C2F_DESIGN_CHARRETTE– C2F_OPEN_STORAGE– C2F_ELECTRONIC– C2F_NOHEAT– C2F_FOREIGN_NAT– C2F_FOREIGN_NAT_NOT– C2F_INSTALLATION_NOT– C2F_INSTALLATION – C2F_AVCOMBINED– C2F_AVCOMBINED_NOT– C2F_SITE_PLAN– C2F_FIRE_GOV– C2F_FIRE_CONTR– C2F_DRAWINGS– C2F_SPACE_PROGRAM– C2F_VEND_LOBBY– C2F_VEND_BREAK– C2F_VEND_DRAWINGS– C2F_OTHER_OPERATIONAL– C2F_AUTHORIZED_NOT– C2F_AUTHORIZED– C2F_AVCAB– C2F_AVCONTROL– C2F_LOAD– C2F_NOC– C2F_NOC_NOT

Spatial

Equipment

Equipment• Replacers:

– C2F_CONFERENCEROOM_ADD– C2F_MULTIPURPOSEROOM_ADD– C2F_WARROOM_ADD– C2F_OC_ADD– C2F_NOC_ADD – C2F_BRIEFINGROOM_ADD – C2F_SCIF_ADD– C2F_AVCOMBINED_ADD– C2F_AVCOMBINED_NOT_ADD

• Removers:– C2F_CONFSCREEN– C2F_CONFVCR– C2F_CONFDVD– C2F_CONFCONTROL– C2F_CONFPODIUM– C2F_CONFSMARTWHITE– C2F_CONFPA– C2F_CONFADJLIGHT– C2F_CONFVTC– C2F_CONFWHITE– C2F_CONFSHADES– C2F_MULTIWHITE– C2F_WARSCREEN– C2F_WARVCR– C2F_WARDVD– C2F_WARCONTROL– C2F_WARPODIUM– C2F_WARSMARTWHITE– C2F_WARPA– C2F_WARADJLIGHT– C2F_WARVTC– C2F_WARNETWORK– C2F_WARWHITE– C2F_WARSHADES– C2F_OCVIDEO– C2F_OCSCREEN– C2F_OCVCR– C2F_OCDVD– C2F_OCCONTROL– C2F_OCPODIUM– C2F_OCSMARTWHITE

• Removers: (cont.)– C2F_OCPA– C2F_OCADJLIGHT– C2F_OCVTC– C2F_OCNETWORK– C2F_OCWHITE– C2F_OCSHADES– C2F_NOCCAB– C2F_NOCPROJ– C2F_BRIEFSCREEN– C2F_BRIEFVCR– C2F_BRIEFDVD– C2F_BRIEFCONTROL– C2F_BRIEFPODIUM– C2F_BRIEFSMARTWHITE– C2F_BRIEFPA– C2F_BRIEFADJLIGHT– C2F_BRIEFVTC– C2F_BRIEFWHITE– C2F_BRIEFSHADE– C2F_SCIFSCREEN– C2F_SCIFVCR– C2F_SCIFDVD– C2F_SCIFCONTROL– C2F_SCIFPODIUM– C2F_SCIFSMARTWHITE– C2F_SCIFPA– C2F_SCIFADJLIGHT– C2F_SCIFVTC– C2F_SCIFWHITE– C2F_SCIFSHADES– C2F_STO_SHREDDER– C2F_STO_COMMS– C2F_STO_WORKSTATION– C2F_STO_VTCOIP– C2F_STO_VOIP– C2F_STO_SCANNER– C2F_STO_PRINTER– C2F_STOVTC_WORKSTATION– C2F_STOVTC_VOIP– C2F_STOVTC_DISPLAY– C2F_AVCAB– C2F_AVCONTROL

Company Operations Facility (COF)

Company Operations Facility (COF)• Replacers:

– COF_SHOWER_ACCESS– COF_TOTAL_COMPANIES– COF_BATTALION_NAME– COF_COMPANY_LETTER– COF_NUMBER_COMPANY_PERSONNEL– COF_COMPANY_PERSONNEL_RATIO– COF_BATTALION_ADMIN_AREA– COF_BATTALION_READINESS_AREA– COF_BATTALION_HARDSTAND_AREA– COF_DESIGN_CONCEPT– COF_REPEAT– COF_TAS_REQUIRED– COF_BATTALION_NAME_WITH_TAS

• Removers:– COF_POV_OTHER– COF_POV_GOV– COF_REPEAT– COF_REPEAT_CO– COF_TAS– COF_AC– COF_AC_NO

Criminal Investigation Division Command (CIDC)

Department of Emergency Services (formerly CFSS)

• Facilities– DES(CFSS)– Additional Requirement

• Additional Requirement

DES(CFSS)

Additional Requirements (DES/CFSS)

Dining Facility

Enlisted Unaccompanied Personnel Housing

• Facilities– UEPH• Additional Requirements

– Additional Requirements

UEPH

Additional Requirements (UEPH)

Additional Requirements (UEPH)• Replacers:

– UEPH_KEYING_SYSTEM– UEPH_KEY_MANUFACTURER– UEPH_KEYCARD_DESCRIPTION– UEPH_LOCKBOX_DESCRIPTION

• Removers:– UEPH_LAUNDRY_DWELL– UEPH_LAUNDRY_CENTRAL– UEPH_OPERABLE– UEPH_SEALED– UEPH_ENTRYDOORS_HM– UEPH_ENTRYDOORS_HM_NOT– UEPH_ENTRYDOORS_WD– UEPH_ENTRYDOORS_WD_NOT– UEPH_KEY_NO– UEPH_KEY_YES– UEPH_KNOX_NO– UEPH_KNOX– UEPH_MAIL_EXT– UEPH_MAIL_KIOSK– UEPH_MAIL_EXT_NOT– UEPH_MAIL_LOB– UEPH_MAIL_LOB_NOT– UEPH_MASS_YES– UEPH_MASS_NO– UEPH_DUCTLESS

• Removers (cont.)– UEPH_DUCTLESS_NOT– UEPH_DUCTED– UEPH_DUCTED_NOT– UEPH_ZONE1B– UEPH_ZONE1A– UEPH_ZONE2B– UEPH_ZONE2A– UEPH_ZONE3B– UEPH_ZONE3A– UEPH_ZONE4B– UEPH_ZONE4A– UEPH_ZONE5B– UEPH_ZONE5A– UEPH_ZONE6B– UEPH_ZONE6A– UEPH_ZONE7A– UEPH_ZONE8A– UEPH_SMOKE1– UEPH_SMOKE2– UEPH_SMOKE3– UEPH_SMOKE4– UEPH_RANGE– UEPH_TWOBURNER– UEPH_FOURBURNER– UEPH_DISPOSER

General Instruction Building (GIB)

Live Fire Exercise Shoothouse• Facilities

– LFSH • Downrange Area • ROCA

– AAR– OSB– Ammunition Breakdown Building– Latrine– Non-Standard Building

– Additional Requirements

• Note: The Live Fire Exercise Shoothouse steps are similar to the ZERO steps because it has ROCA steps. They have different replacers due to the naming convention but the ROCA steps are similar except LFSH has AAR step and the OSB step whereas the ZERO ROCA steps do not. The OSB step is also found in the (CPQC/MPFQC) facility ROCA steps. Since all the ROCA steps are the same I only included the steps LFSH, downrange area and AAR . The replacers for the ROCA steps are in the following slides.

OSB (LFSH)• Replacers

– LFSH_OSB_QTY– LFSH_OSB_CONS_DISC – LFSH_OSB_CONS_CMU– LFSH_OSB_CONS_METAL – LFSH_OSB_CONS_OTHER – LFSH_OSB_CONS_SPECIFY – LFSH_OSB_BI_EL – LFSH_OSB_BI_DN – LFSH_OSB_BI_LP– LFSH_OSB_BI_INET – LFSH_OSB_BI_TEL– LFSH_OSB_BI_COPFIB – LFSH_OSB_BI_FE – LFSH_OSB_BI_FD– LFSH_OSB_HVAC_POWER – LFSH_OSB_HVAC_BOTH – LFSH_OSB_HVAC_HEAT– LFSH_OSB_HVAC_FREEZE – LFSH_OSB_HVAC_VENT– LFSH_AAR_OTHER

Ammunition Breakdown Building (LFSH)

• Replacers :– LFSH_ABB_QTY– LFSH_ABB_CONS_DISC – LFSH_ABB_CONS_CMU – LFSH_ABB_CONS_METAL – LFSH_ABB_CONS_OTHER – LFSH_ABB_CONS_SPECIFY – LFSH_ABB_BI_EL– LFSH_ABB_BI_DN – LFSH_ABB_BI_LP – LFSH_ABB_BI_FE – LFSH_ABB_BI_FD – LFSH_ABB_HVAC_POWER – LFSH_ABB_HVAC_BOTH– LFSH_ABB_HVAC_HEAT – LFSH_ABB_HVAC_FREEZE – LFSH_ABB_HVAC_VENT– LFSH_ABB_OTHER

Latrine (LFSH)• Replacers:

– LFSH_LAT_QTY– LFSH_LAT_AV – LFSH_LAT_WLSEP – LFSH_LAT_WLSEW – LFSH_LAT_OTHER – LFSH_LAT_SPECIFY – LFSH_LAT_PORT– LFSH_LAT_PORT_SIZE – LFSH_LAT_CONS_DISC – LFSH_LAT_CONS_CMU – LFSH_LAT_CONS_METAL – LFSH_LAT_CONS_OTHER – LFSH_LAT_CONS_SPECIFY – LFSH_LAT_BI_EL– LFSH_LAT_BI_DN – LFSH_LAT_BI_LP – LFSH_LAT_BI_WS – LFSH_LAT_BI_LF2SRC – LFSH_LAT_BI_WSW– LFSH_LAT_BI_SEW – LFSH_LAT_BI_LF2TI – LFSH_LAT_BI_FE– LFSH_LAT_BI_FD – LFSH_LAT_HVAC_POWER – LFSH_LAT_HVAC_BOTH– LFSH_LAT_HVAC_HEAT – LFSH_LAT_HVAC_FREEZE – LFSH_LAT_HVAC_VENT– LFSH_LAT_OTHER

Non-Standard Building (LFSH)

• Replacers:– LFSH_NSTD_QTY– LFSH_NSTD_NAME – LFSH_NSTD_SIZE– LFSH_NSTD_CONS_DISC – LFSH_NSTD_CONS_CMU– LFSH_NSTD_CONS_METAL – LFSH_NSTD_CONS_OTHER – LFSH_NSTD_CONS_SPECIFY – LFSH_NSTD_BI_EL – LFSH_NSTD_BI_DN – LFSH_NSTD_BI_LP – LFSH_NSTD_BI_PA– LFSH_NSTD_BI_INET – LFSH_NSTD_BI_TEL– LFSH_NSTD_BI_COPFIB – LFSH_NSTD_BI_WS– LFSH_NSTD_BI_LF2SRC – LFSH_NSTD_BI_WSW – LFSH_NSTD_BI_SEW – LFSH_NSTD_BI_LF2TI – LFSH_NSTD_BI_FE – LFSH_NSTD_BI_FD– LFSH_NSTD_HVAC_POWER – LFSH_NSTD_HVAC_BOTH – LFSH_NSTD_HVAC_HEAT– LFSH_NSTD_HVAC_FREEZE – LFSH_NSTD_HVAC_VENT – LFSH_NSTD_OTHER

LFSH

Downrange Area

Downrange Area• Replacers:

– LFSH_CONFIG_STD– LFSH_CONFIG_NONSTD– LFSH_ROOMS– LFSH_HALLWAYS– LFSH_LIGHTNING_PROTECTION– LFSH_WM_SHOCK_ABCON– LFSH_WM_MS– LFSH_WM_SAND– LFSH_CANOPY_STD– LFSH_PARTIAL_WALLS– LFSH_BALLISTIC_CEILING– LFSH_CANOPY_OTHER– LFSH_POWER_HARD– LFSH_POWER_HARDPLUS– LFSH_POWER_BTRY– LFSH_POWER_OTHER– LFSH_POWER_SPECIFY

AAR

AAR• Replacers:

– LFSH_AAR_QTY– LFSH_AAR_CONS_DISC– LFSH_AAR_CONS_CMU– LFSH_AAR_CONS_METAL– LFSH_AAR_CONS_OTHER– LFSH_AAR_CONS_SPECIFY– LFSH_AAR_BI_EL– LFSH_AAR_BI_DN– LFSH_AAR_BI_LP– LFSH_AAR_BI_PA– LFSH_AAR_BI_C2– LFSH_AAR_BI_TEL– LFSH_AAR_BI_COPFIB– LFSH_AAR_BI_FE– LFSH_AAR_BI_FD– LFSH_AAR_HVAC_POWER– LFSH_AAR_HVAC_BOTH– LFSH_AAR_HVAC_HEAT– LFSH_AAR_HVAC_FREEZE– LFSH_AAR_HVAC_VENT– LFSH_AAR_OTHER

AAC HGR

UAS HGR

Modified Record Fire Range

• Facilities– MRF

• Downrange Area• ROCA

– Range Control Tower – Small Arms– OSB– Classroom Facility– Covered Mess– Ammunition Breakdown Building– Latrine– Bleacher Enclosure – Non-Standard Building

• Note: The Modified Record Fire Range (MRF) steps are similar to the CPQC steps because it has the same ROCA steps. They have different replacers due to the naming convention .

• Since all the steps are the same I only included the steps MRF.

Downrange Area (MRF)• Replacers:

– MRF_LANES_STD– MRF_LANES_NONSTD– MRF_LANES_QTY– MRF_LANES_WIDTH– MRF_LANES_PERLANE – MRF_FP_FOX– MRF_FP_FOXDROPIN– MRF_FP_FOXWALKIN– MRF_FP_PRONE– MRF_FP_SPECIFY– MRF_FP_NONE– MRF_MARKERS_LIMIT– MRF_MARKERS_NIGHT– MRF_MARKERS_LANE– MRF_MARKERS_FIRING– MRF_MARKERS_INTER– MRF_EMP_BELOW– MRF_EMP_ABOVE– MRF_EMP_COMBO– MRF_EMP_ZERO– MRF_EMP_ZEROSETS– MRF_EMP_NIGHT– MRF_EMP_NIGHT_SPECIFY– MRF_EMPMAT_CON– MRF_EMPMAT_OTHER– MRF_EMPMAT_SPECIFY– MRF_POWER_HARD– MRF_POWER_HARDPLUS– MRF_POWER_BTRY– MRF_POWER_OTHER– MRF_POWER_SPECIFY

Range Control Tower - Small Arms (MRF)

• Replacers:– MRF_TOW_QTY– MRF_TOW_HEIGHT– MRF_TOW_OBS– MRF_TOW_CONS_DISC– MRF_TOW_CONS_CMU– MRF_TOW_CONS_METAL– MRF_TOW_CONS_OTHER– MRF_TOW_CONS_SPECIFY– MRF_TOW_BI_EL– MRF_TOW_BI_DN– MRF_TOW_BI_LP– MRF_TOW_BI_PA– MRF_TOW_BI_C2– MRF_TOW_BI_TEL– MRF_TOW_BI_COPFIB– MRF_TOW_BI_FE– MRF_TOW_BI_FD– MRF_TOW_HVAC_POWER– MRF_TOW_HVAR_BOTH– MRF_TOW_HVAC_HEAT– MRF_TOW_HVAC_FREEZE– MRF_TOW_HVAC_VENT– MRF_TOW_OTHER

Classroom (MRF)

• Replacers:– MRF_GIB_QTY– MRF_GIB_CONS_DISC– MRF_GIB_CONS_CMU– MRF_GIB_CONS_METAL– MRF_GIB_CONS_OTHER– MRF_GIB_CONS_SPECIFY– MRF_GIB_BI_EL– MRF_GIB_BI_DN– MRF_GIB_BI_LP– MRF_GIB_BI_DC– MRF_GIB_BI_INET– MRF_GIB_BI_TEL– MRF_GIB_BI_COPFIB– MRF_GIB_BI_FE– MRF_GIB_BI_FD– MRF_GIB_HVAC_POWER– MRF_GIB_HVAC_BOTH– MRF_GIB_HVAC_HEAT– MRF_GIB_HVAC_FREEZE– MRF_GIB_HVAC_VENT– MRF_GIB_OTHER

Ammunition Breakdown Building

• Replacers:– MRF_ABB_QTY– MRF_ABB_CONS_DISC– MRF_ABB_CONS_CMU– MRF_ABB_CONS_METAL– MRF_ABB_CONS_OTHER– MRF_ABB_CONS_SPECIFY– MRF_ABB_BI_EL– MRF_ABB_BI_DN– MRF_ABB_BI_LP– MRF_ABB_BI_FE– MRF_ABB_BI_FD– MRF_ABB_HVAC_POWER– MRF_ABB_HVAC_BOTH– MRF_ABB_HVAC_HEAT– MRF_ABB_HVAC_FREEZE– MRF_ABB_HVAC_VENT– MRF_ABB_OTHER

Latrine (MRF)• Replacers:

– MRF_LAT_QTY– MRF_LAT_AV– MRF_LAT_WLSEP– MRF_LAT_WLSEW– MRF_LAT_OTHER– MRF_LAT_SPECIFY– MRF_LAT_PORT– MRF_LAT_PORT_SIZE– MRF_LAT_CONS_DISC– MRF_LAT_CONS_CMU– MRF_LAT_CONS_METAL– MRF_LAT_CONS_OTHER– MRF_LAT_CONS_SPECIFY– MRF_LAT_BI_EL– MRF_LAT_BI_DN– MRF_LAT_BI_LP– MRF_LAT_BI_WS– MRF_LAT_BI_LF2SRC– MRF_LAT_BI_WSW– MRF_LAT_BI_SEW– MRF_LAT_BI_LF2TI– MRF_LAT_BI_FE– MRF_LAT_BI_FD– MRF_LAT_HVAC_POWER– MRF_LAT_HVAC_BOTH– MRF_LAT_HVAC_HEAT– MRF_LAT_HVAC_FREEZE– MRF_LAT_HVAC_VENT– MRF_LAT_OTHER

Non-Standard Building(MRF)

• Replacers:– MRF_NSTD_QTY– MRF_NSTD_NAME– MRF_NSTD_SIZE– MRF_NSTD_CONS_DISC– MRF_NSTD_CONS_CMU– MRF_NSTD_CONS_METAL– MRF_NSTD_CONS_OTHER– MRF_NSTD_CONS_SPECIFY– MRF_NSTD_BI_EL– MRF_NSTD_BI_DN– MRF_NSTD_BI_LP– MRF_NSTD_BI_PA– MRF_NSTD_BI_INET– MRF_NSTD_BI_TEL– MRF_NSTD_BI_COPFIB– MRF_NSTD_BI_WS– MRF_NSTD_BI_LF2SRC– MRF_NSTD_BI_WSW– MRF_NSTD_BI_SEW– MRF_NSTD_BI_LF2TI– MRF_NSTD_BI_FE– MRF_NSTD_BI_FD– MRF_NSTD_HVAC_POWER– MRF_NSTD_HVAC_BOTH– MRF_NSTD_HVAC_HEAT– MRF_NSTD_HVAC_FREEZE– MRF_NSTD_HVAC_VENT– MRF_NSTD_OTHER

MRF

Operational Readiness Training Complex (ORTC)

• Facilities– Additional Requirements– Operational Readiness Training Complex (ORTC) have multiple subtypes listed

below. The only major step change is the step below ORTC which list the facility subtype.

– Note: 2 facility subtypes have additional information ( Barracks and Dining Facility)

• Facility Removers• Barracks ORTCUEPH• Battalion Headquarters Building ORTCBN• Brigade Headquarters Building ORTCBDE• Company Headquarters Building ORTCCOF• Company Shed (Note: Removes as of 4/5/12) ORTCCS• Dining Facility ORTCDF• Officer Quarters ORTCNCO• Vehicle Maintenance ORTCVBW

ORTC Barracks

ORTC DF

Physical Fitness Facility

Physical Fitness Facility• There are a couple hidden windows

based on what check box you select. For example selecting Gymnasium and or Structured Activity opens up another section that is selectable.

• Replacers:– PFF_TYPE– PFF_CUSTOM– PFF_TOTAL_NET– INDOOR_JOGGING_TRACK_AREA– NATATORIUM_AREA– RAQUET_NUM_COURT– SMALL_GROUP_AREA– SPIN_AREA– CONCESSIONS_AREA– STRUCT_OTHER– STRUCT_OTHER2– STRUCT_OTHER3– STRUCT_OTHER4– ADDITIONAL_MODULE_DETAILS

• Removers:– PFF_NONSTD– NATATORIUM– NATATORIUM_NO– FIT_MOD– EX_MOD– GYM_MOD– GY1– GY2– GY3– GY4– GY5– GY6– GY7– GY8– GY9– GY10– GY11– GY12– GY13– GY14– GY15– GY16– GY17– GY18– STRUCT_MOD

Physical Fitness Facility (cont.)• Removers (cont)

– SA_RC1– SA_RC2– SA_RC3 – SA_RC4 – SA_SGF800– SA_SGF1200 – SA_SGF1600– SA_SGF2000– SA_C01– SA_CO2– SA_ICC600– SA_ICC900 – SA_ICC1200– SA_ICC1500 – SA_CW600– SA_CW1000– SA_CW1400– SA_CW1800 – SA_FT1000

• Removers (cont)– SA_FT1500 – SA_FT2000 – SA_FT2500– SA_SSR150– SA_SSR200– SA_SSR250– PT1– PT2– PT3– PT4– PT5– PO1– PO2– PO3– PO4– PO5– PO6– PO7– PO8– PO9– PO10– NATATORIUM_NO

Religious Education Facility (REF)

Training Support Center

Unique Facility

Urban Assault Course (UAC)• Facilities

– UAC – Urban Assault Course• Downrange Area • ROCA

– OSB– Ammunition Breakdown Building– Latrine– Non-Standard Building

– Additional Requirements• The Urban Assault Course (UAC) is similar to Live Fire Exercise Shoothouse (LFSH)

steps because it has ROCA steps. They have different replacers due to the naming convention but the steps are similar except LFSH facility has the step AAR. Since all the steps are the same I have not additional slides except the UAC slide and Downrange Area (due to different naming convention and inputs).

• Removers– UAC

OSB - (UAC)• Replacers

– UAC_OSB_QTY– UAC_OSB_CONS_DISC – UAC_OSB_CONS_CMU– UAC_OSB_CONS_METAL – UAC_OSB_CONS_OTHER – UAC_OSB_CONS_SPECIFY – UAC_OSB_BI_EL – UAC_OSB_BI_DN – UAC_OSB_BI_LP – UAC_OSB_BI_PA – UAC_OSB_BI_TEL– UAC_OSB_BI_COPFIB – UAC_OSB_BI_FE – UAC_OSB_BI_FD– UAC_OSB_HVAC_POWER – UAC_OSB_HVAC_BOTH – UAC_OSB_HVAC_HEAT– UAC_OSB_HVAC_FREEZE – UAC_OSB_HVAC_VENT – UAC_OSB_OTHER

Ammunition Breakdown Building - (UAC)

• Replacers:– UAC_ABB_QTY– UAC_ABB_CONS_DISC – UAC_ABB_CONS_CMU– UAC_ABB_CONS_METAL – UAC_ABB_CONS_OTHER – UAC_ABB_CONS_SPECIFY – UAC_ABB_BI_EL – UAC_ABB_BI_DN – UAC_ABB_BI_LP – UAC_ABB_BI_FE – UAC_ABB_BI_FD– UAC_ABB_HVAC_POWER – UAC_ABB_HVAC_BOTH – UAC_ABB_HVAC_HEAT– UAC_ABB_HVAC_FREEZE – UAC_ABB_HVAC_VENT – UAC_ABB_OTHER

Latrine - (UAC)• Replacers:

– UAC_LAT_QTY – UAC_LAT_AV – UAC_LAT_WLSEP – UAC_LAT_WLSEW – UAC_LAT_OTHER – UAC_LAT_SPECIFY – UAC_LAT_PORT– UAC_LAT_PORT_SIZE – UAC_LAT_CONS_DISC – UAC_LAT_CONS_CMU– UAC_LAT_CONS_METAL – UAC_LAT_CONS_OTHER – UAC_LAT_CONS_SPECIFY – UAC_LAT_BI_EL – UAC_LAT_BI_DN – UAC_LAT_BI_LP – UAC_LAT_BI_WS– UAC_LAT_BI_LF2SRC – UAC_LAT_BI_WSW – UAC_LAT_BI_SEW – UAC_LAT_BI_LF2TI – UAC_LAT_BI_FE – UAC_LAT_BI_FD– UAC_LAT_HVAC_POWER– UAC_LAT_HVAC_BOTH – UAC_LAT_HVAC_HEAT– UAC_LAT_HVAC_FREEZE – UAC_LAT_HVAC_VENT – UAC_LAT_OTHER

Non-Standard Building – (UAC)• Replacers:

– UAC_NSTD_QTY– UAC_NSTD_NAME – UAC_NSTD_SIZE – UAC_NSTD_CONS_DISC – UAC_NSTD_CONS_CMU – UAC_NSTD_CONS_METAL– UAC_NSTD_CONS_OTHER– UAC_NSTD_CONS_SPECIFY– UAC_NSTD_BI_EL – UAC_NSTD_BI_DN– UAC_NSTD_BI_LP– UAC_NSTD_BI_PA – UAC_NSTD_BI_INET– UAC_NSTD_BI_TEL– UAC_NSTD_BI_COPFIB– UAC_NSTD_BI_WS– UAC_NSTD_BI_LF2SRC– UAC_NSTD_BI_WSW– UAC_NSTD_BI_SEW– UAC_NSTD_BI_LF2TI– UAC_NSTD_BI_FE– UAC_NSTD_BI_FD– UAC_NSTD_HVAC_POWER– UAC_NSTD_HVAC_BOTH– UAC_NSTD_HVAC_HEAT– UAC_NSTD_HVAC_FREEZE– UAC_NSTD_HVAC_VENT– UAC_NSTD_OTHER

UAC - Urban Assault Course

UAC - Downrange Area

UAC - Downrange Area

• Replacers:– UAC_STATION1 – UAC_STATION2 – UAC_STATION3 – UAC_STATION4 – UAC_STATION5– UAC_MARKERS_LIMIT – UAC_MARKERS_NIGHT – UAC_EMPMAT_CON– UAC_EMPMAT_OTHER– UAC_EMPMAT_SPECIFY – UAC_POWER_HARD– UAC_POWER_HARDPLUS – UAC_POWER_BTRY– UAC_POWER_OTHER – UAC_POWER_SPECIFY

Vehicle Maintenance Shop

• Facilities– TEMF– Additional Requirements

TEMF

TEMF• Removers

– TEMF– TEMF_REPEAT– TEMF_POV_OTHER– TEMF_POV_GOV– TEMF_POL_NO– TEMF_POL– TEMF_STORAGE_NO– TEMF_STORAGE– TEMF_SECURE_STORAGE_NO– TEMF_SECURE_STORAGE– TEMF_UAV_NO– TEMF_UAV– TEMF_STORM_CONTR– TEMF_STORM_OTHER

• Replacers– BATTALIONS_TOTAL– TEMF_BATTALION_NAME– TEMF_SIZE– TEMF_CRANE_SIZE– TEMF_ACCOMODATE_ORG_VEHICLES– TEMF_HARDSTAND_SY– TEMF_ORG_STORAGE_SF– TEMF_POL_BLDG_SF– TEMF_HAZ_WASTE_BLDG_SF– TEMF_DISTRIBUTION_STORAGE_REQUIRED– TEMF_UAV_STORAGE_REQUIRED– TEMF_POL_PARKING_REQUIRED– TEMF_REPEAT– TEMF_MAX_GROSS_SF

Warriors in Transition Complex

• Types– Barracks– Central Plant– Dining Facility– Soldier and Family Assistance Center– Unit Administration Services

• Removers:– WT Warriors in Transition Complex– WTB WTB_NO Barracks – WTCP WTCP_NO Central Plant– WTDF WTDF_NO Dining Facility– WTSFAC WTSFAC_NO Soldier and Family Assistance Center– WTUAS WTUAS_NO Unit Administration Services– WTBN WTBN_NO Battalion Headquarters (not in Facility choices under WT)– WTCO WTCO_NO Company Headquarter (not in Facility choices under WT)

WT

WT Barracks

WT Barracks• Replacers:

– WT_NUMBER_OF_2BED_2BATH– WT_NUMBER_OF_2BED_1BATH– WT_ACCESS_MANUFACTURER– WTB_NUMBER– WTB_MAX_GROSS

• Removers:– WTB_CEILING_FAN– WTB_DIAPER1– WTB_SINGLE_MANUFACTURER– WTB_EXISTING_ACCESS– WTB_MAIL_EXT– WTB_MAIL_KIOSK– WTB_MAIL_EXT_NO– WTB_MAIL_LOB– WTB_MAIL_LOB_NO

WT SFAC

WT UAS

Youth Center (YC)

top related