Page 1: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

RFP Facilities

Page 2: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Facilities

Page 3: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Facilities

Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the selected facilities step the project listed is based on what Facility Type was selected when you started the RFP Wizard project or whenever you go to edit the project. This selection determines what remover is used in 2.0 Scope portion of RFP.

Page 4: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Additional Requirements

Page 5: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Additional RequirementsInformation from the additional Requirements is from two different templates. The replacers are and found in paragraph 2 of RFP and everything else from the Additional Requirements step are for removers found in chapter 5 General Technical Requirements section of RFP.• Replacers:

– SITE_ACRES_AVAILABLE– GFGI_ITEMS

• Removers:– COMMISSIONING_OPTION_1– COMMISSIONING_OPTION_2– COMMISSIONING_OPTION_3– LEED3 – LEED2_2 – WAIVE for parking underdrain system check box– PARKING_OPTION_1– PARKING_OPTION_2– PARKING_OPTION_3– PARKING_OPTION_4– VEHICLE_OPTION_1– VEHICLE_OPTION_2– VEHICLE_OPTION_3– NON_WATER_URINALS– WATER_URINALS– NON_PREF_URINALS

• Removers (cont.)• UMCS_NO• UMCS_BACNET• BACNET• DIACAP_CERT• DIACAP_PART• DIACAP_PART_CERT• WEBBASED• UMCS_INTEGRATE_NO• UMCS_INTEGRATE• INTEGRATE• LNS• STANDALONE• NONE• LONWORKS• NEW• NEW_LNS_NONLNS• STANDALONE_LON• CONFIG_OCC• OCC_MODE• NEW_NO• NEW_LNS_NONLNS_NO• NEW_LNS

Page 6: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Access Control Point

• Facilities– ACP• Facility Subtype• Additional Requirements (same as generic)

Page 7: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Access Control Point • Access Control Point • (ACP) have multiple subtypes listed below. The only major step change is the step

below ACP which list the facility subtype.

• Facility Removers• Gatehouse ACP_GH ACP_GH_NO• Guard Booths ACP_GB ACP_GB_NO• ID Check Area and Canopy ACP_IDCAC ACP_IDCAC_NO• Overwatch Position ACP_OW ACP_OW_NO• Passenger Vehicle Search Area and Canopy ACP_PVSAC ACP_PVSAC_NO• Pedestrian Guard Booth ACP_PGB ACP_PGB_NO• Search Area Building ACP_SAB ACP_SAB_NO• Truck Search Area and Canopy ACP_TSAC ACP_TSAC_NO• Visitor Control Center ACP_VCC ACP_VCC_NO

Page 8: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Access Control Point (ACP)

Page 9: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Gatehouse

Page 11: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Guard Booths

Page 13: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Overwatch Position

Page 14: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Search Area Building

Page 16: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ID Check Area and Canopy

Page 17: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ID Check Area and Canopy

• Removers:– ACP_IDCAC_NO– ACP_IDCAC

• Replacers:– ACP_IDCAC_DEMAND– ACP_IDCAC_NUM_LANES

Page 18: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Advanced Individual Training Complex (AIT)

• Facilities– AIT• Facility Subtype• Additional Requirements (same as generic)

Page 19: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

AIT

Page 20: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

AIT• This is the same form for all the AITs.• Replacers:

– AIT_HARDWARE_FINISH_CODE– AIT_KEYING_SYSTEM– AIT_KEY_MANUFACTURER

• Removers:– AIT_POV_NO– AIT_POV_YES– AIT_TRASH_DUMP– AIT_RECYC_DUMP– AIT_PT_NO– AIT_PT_YES– AIT_LOCKBOX_NO– AIT_LOCKBOX– SOLARWATER_HEATING_AIT– AIT_SMOKE1– AIT_SMOKE2– AIT_SMOKE3– AIT_SMOKE4– AIT_CW– AIT_SCD– AIT_VM– AIT_AEE– AIT_DUMP

Page 21: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

B/COF

Page 23: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

CCP

Page 25: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

LEB

Page 27: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Army Community Service Center (ACSC)

Page 29: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ACSC Additional Requirements

Page 31: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Army Continuing Education System (ACES)

Page 33: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Army Family Housing

Page 34: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Army Fire Station (AFS)

Page 36: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Automated Combat Pistol/MP Firearms Qualification Course (CPQC/MPFQC)

Page 38: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange Area

Page 39: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange Area• Replacers:

– CPQC_LANES_STD – CPQC_LANES_NONSTD – CPQC_LANES_QTY– CPQC_LANES_WIDTH – CPQC_LANES_PERLANE – CPQC_WALK_GRAVEL– CPQC_WALK_OTHER – CPQC_WALK_SPECIFY – CPQC_MARKERS_LIMIT – CPQC_MARKERS_NIGHT – CPQC_MARKERS_LANE – CPQC_MARKERS_FIRING – CPQC_MARKERS_INTER – CPQC_EMP_BELOW– CPQC_EMP_ABOVE – CPQC_EMP_COMBO – CPQC_EMPMAT_CON – CPQC_EMPMAT_OTHER – CPQC_EMPMAT_SPECIFY – CPQC_POWER_HARD– CPQC_POWER_HARDPLUS– CPQC_POWER_BTRY– CPQC_POWER_OTHER– CPQC_POWER_SPECIFY– CPQC_BARRICADE_CONCRETE– CPQC_BARRICADE_CMU– CPQC_BARRICADE_OTHER– CPQC_BARRICADE_SPECIFY

Page 40: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ROCA

Page 41: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ROC Tower

Page 42: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ROC Tower• Replacers:

– CPQC_TOW_QTY– CPQC_TOW_HEIGHT– CPQC_TOW_OBS– CPQC_TOW_CONS_DISC– CPQC_TOW_CONS_CMU– CPQC_TOW_CONS_METAL– CPQC_TOW_CONS_OTHER– CPQC_TOW_CONS_SPECIFY– CPQC_TOW_BI_EL– CPQC_TOW_BI_DN– CPQC_TOW_BI_LP– CPQC_TOW_BI_C2– CPQC_TOW_BI_PA– CPQC_TOW_BI_TEL– CPQC_TOW_BI_COPFIB– CPQC_TOW_BI_FE– CPQC_TOW_BI_FD– CPQC_TOW_HVAC_POWER– CPQC_TOW_HVAR_BOTH– ZERO_TOW_HVAC_HEAT– CPQC_TOW_HVAC_FREEZE– CPQC_TOW_HVAC_VENT– CPQC_TOW_OTHER

Page 43: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

OSB

Page 44: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

OSB• Operations Storage Building (OSB)

• Replacers:– CPQC_OSB_QTY – CPQC_OSB_CONS_DISC – CPQC_OSB_CONS_METAL – CPQC_OSB_CONS_OTHER – CPQC_OSB_CONS_SPECIFY – CPQC_OSB_BI_EL– CPQC_OSB_BI_DN – CPQC_OSB_BI_LP – CPQC_OSB_BI_INET – CPQC_OSB_BI_TEL – CPQC_OSB_BI_COPFIB – CPQC_OSB_BI_FE– CPQC_OSB_BI_FD – CPQC_OSB_HVAC_POWER– CPQC_OSB_HVAC_BOTH– CPQC_OSB_HVAC_HEAT – CPQC_OSB_HVAC_FREEZE – CPQC_OSB_HVAC_VENT– CPQC_OSB_OTHER

Page 45: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Classroom Facility

Page 46: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Classroom Facility• Replacers:

– CPQC_GIB_QTY – CPQC_GIB_CONS_DISC – CPQC_GIB_CONS_METAL – CPQC_GIB_CONS_OTHER – CPQC_GIB_CONS_SPECIFY – CPQC_GIB_BI_EL– CPQC_GIB_BI_DN – CPQC_GIB_BI_LP – CPQC_GIB_BI_DC– CPQC_GIB_BI_INET – CPQC_GIB_BI_TEL – CPQC_GIB_BI_COPFIB – CPQC_GIB_BI_FE– CPQC_GIB_BI_FD – CPQC_GIB_HVAC_POWER – CPQC_GIB_HVAC_BOTH– CPQC_GIB_HVAC_HEAT – CPQC_GIB_HVAC_FREEZE – CPQC_GIB_HVAC_VENT– CPQC_GIB_OTHER

Page 47: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Covered Mess

Page 49: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building

Page 50: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building• Replacers:

– CPQC_ABB_QTY– CPQC_ABB_CONS_DISC– CPQC_ABB_CONS_CMU– CPQC_ABB_CONS_METAL– CPQC_ABB_CONS_OTHER– CPQC_ABB_CONS_SPECIFY– CPQC_ABB_BI_EL– CPQC_ABB_BI_DN– CPQC_ABB_BI_LP– CPQC_ABB_BI_FE– CPQC_ABB_BI_FD– CPQC_ABB_HVAC_POWER– CPQC_ABB_HVAC_BOTH– CPQC_ABB_HVAC_HEAT– CPQC_ABB_HVAC_FREEZE– CPQC_ABB_HVAC_VENT– CPQC_ABB_OTHER

Page 51: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine

Page 52: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine• Replacers:

– CPQC_LAT_QTY– CPQC_LAT_AV – CPQC_LAT_WLSEP – CPQC_LAT_WLSEW – CPQC_LAT_OTHER – CPQC_LAT_SPECIFY – CPQC_LAT_PORT– CPQC_LAT_PORT_SIZE– CPQC_LAT_CONS_DISC – CPQC_LAT_CONS_CMU – CPQC_LAT_CONS_METAL – CPQC_LAT_CONS_OTHER – CPQC_LAT_CONS_SPECIFY – CPQC_LAT_BI_EL– CPQC_LAT_BI_DN – CPQC_LAT_BI_LP– CPQC_LAT_BI_WS – CPQC_LAT_BI_LF2SRC – CPQC_LAT_BI_WSW– CPQC_LAT_BI_SEW– CPQC_LAT_BI_LF2TI– CPQC_LAT_BI_FE– CPQC_LAT_BI_FD– CPQC_LAT_HVAC_POWER– CPQC_LAT_HVAC_BOTH– CPQC_LAT_HVAC_HEAT– CPQC_LAT_HVAC_FREEZE– CPQC_LAT_HVAC_VENT– CPQC_LAT_OTHER

Page 53: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Bleacher Enclosure

Page 55: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building

Page 56: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building• Replacers:

– CPQC_NSTD_QTY– CPQC_NSTD_NAME– CPQC_NSTD_SIZE– CPQC_NSTD_CONS_DISC– CPQC_NSTD_CONS_CMU– CPQC_NSTD_CONS_METAL– CPQC_NSTD_CONS_OTHER– CPQC_NSTD_CONS_SPECIFY– CPQC_NSTD_BI_EL– CPQC_NSTD_BI_DN– CPQC_NSTD_BI_LP– CPQC_NSTD_BI_PA– CPQC_NSTD_BI_INET– CPQC_NSTD_BI_TEL– CPQC_NSTD_BI_COPFIB– CPQC_NSTD_BI_WS– CPQC_NSTD_BI_LF2SRC– CPQC_NSTD_BI_WSW– CPQC_NSTD_BI_SEW– CPQC_NSTD_BI_LF2TI– CPQC_NSTD_BI_FE– CPQC_NSTD_BI_FD– CPQC_NSTD_HVAC_POWER– CPQC_NSTD_HVAC_BOTH– CPQC_NSTD_HVAC_HEAT– CPQC_NSTD_HVAC_FREEZE– CPQC_NSTD_HVAC_VENT– CPQC_NSTD_OTHER

Page 57: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Automated Record Fire Range (ARF)

Page 59: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange Area

Page 60: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange Area• Replacers:

– ARF_LANES_STD– ARF_LANES_NONSTD – ARF_LANES_QTY– ARF_LANES_WIDTH – ARF_LANES_PERLANE– ARF_FP_FOX – ARF_FP_FOXDROPIN – ARF_FP_FOXWALKIN – ARF_FP_PRONE– ARF_FP_SPECIFY– ARF_FP_NONE – ARF_MARKERS_LIMIT– ARF_MARKERS_NIGHT – ARF_MARKERS_LANE– ARF_MARKERS_FIRING – ARF_MARKERS_INTER – ARF_EMP_BELOW – ARF_EMP_ABOVE – ARF_EMP_COMBO – ARF_EMP_ZERO– ARF_EMP_ZEROSETS– ARF_EMP_NIGHT– ARF_EMP_NIGHT_SPECIFY– ARF_EMPMAT_CON– ARF_EMPMAT_OTHER – ARF_EMPMAT_SPECIFY– ARF_POWER_HARD– ARF_POWER_HARDPLUS – ARF_POWER_BTRY– ARF_POWER_OTHER – ARF_POWER_SPECIFY

Page 61: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ROC Tower

Page 62: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ROC Tower• Replacers:

– ARF_TOW_QTY– ARF_TOW_HEIGHT– ARF_TOW_OBS– ARF_TOW_CONS_DISC– ARF_TOW_CONS_CMU– ARF_TOW_CONS_METAL– ARF_TOW_CONS_OTHER– ARF_TOW_CONS_SPECIFY– ARF_TOW_BI_EL– ARF_TOW_BI_DN– ARF_TOW_BI_LP– ARF_TOW_BI_PA– ARF_TOW_BI_C2– ARF_TOW_BI_TEL– ARF_TOW_BI_COPFIB – ARF_TOW_BI_FE– ARF_TOW_BI_FD– ARF_TOW_HVAC_POWER– ARF_TOW_HVAR_BOTH– ARF_TOW_HVAC_HEAT– ARF_TOW_HVAC_FREEZE– ARF_TOW_HVAC_VENT– ARF_TOW_OTHER

Page 63: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

OSB

Page 64: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

OSB• Operations Storage Building (OSB)

• Replacers:– ARF_OSB_QTY– ARF_OSB_CONS_DISC– ARF_OSB_CONS_METAL– ARF_OSB_CONS_OTHER– ARF_OSB_CONS_SPECIFY– ARF_OSB_BI_EL– ARF_OSB_BI_DN– ARF_OSB_BI_LP– ARF_OSB_BI_INET– ARF_OSB_BI_TEL– ARF_OSB_BI_COPFIB– ARF_OSB_BI_FE– ARF_OSB_BI_FD– ARF_OSB_HVAC_POWER– ARF_OSB_HVAC_BOTH– ARF_OSB_HVAC_HEAT– ARF_OSB_HVAC_FREEZE– ARF_OSB_HVAC_VENT– ARF_OSB_OTHER

Page 65: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Classroom Facility

Page 66: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Classroom Facility• Replacers:

– ARF_GIB_QTY– ARF_GIB_CONS_DISC– ARF_GIB_CONS_CMU– ARF_GIB_CONS_METAL– ARF_GIB_CONS_OTHER– ARF_GIB_CONS_SPECIFY– ARF_GIB_BI_EL– ARF_GIB_BI_DN– ARF_GIB_BI_LP– ARF_GIB_BI_DC– ARF_GIB_BI_INET– ARF_GIB_BI_TEL– ARF_GIB_BI_COPFIB– ARF_GIB_BI_FE– ARF_GIB_BI_FD– ARF_GIB_HVAC_POWER– ARF_GIB_HVAC_BOTH– ARF_GIB_HVAC_HEAT– ARF_GIB_HVAC_FREEZE– ARF_GIB_HVAC_VENT– ARF_GIB_OTHER

Page 67: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Covered Mess

Page 69: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building

Page 70: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building• Replacers:

– ARF_ABB_QTY– ARF_ABB_CONS_DISC– ARF_ABB_CONS_CMU– ARF_ABB_CONS_METAL– ARF_ABB_CONS_OTHER– ARF_ABB_CONS_SPECIFY– ARF_ABB_BI_EL– ARF_ABB_BI_DN– ARF_ABB_BI_LP– ARF_ABB_BI_FE– ARF_ABB_BI_FD– ARF_ABB_HVAC_POWER– ARF_ABB_HVAC_BOTH– ARF_ABB_HVAC_HEAT– ARF_ABB_HVAC_FREEZE– ARF_ABB_HVAC_VENT– ARF_ABB_OTHER

Page 71: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine

Page 72: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine• Replacers:

– ARF_LAT_QTY – ARF_LAT_AV– ARF_LAT_WLSEP– ARF_LAT_WLSEW– ARF_LAT_OTHER– ARF_LAT_SPECIFY– ARF_LAT_PORT– ARF_LAT_PORT_SIZE– ARF_LAT_CONS_DISC– ARF_LAT_CONS_CMU– ARF_LAT_CONS_METAL– ARF_LAT_CONS_OTHER– ARF_LAT_CONS_SPECIFY– ARF_LAT_BI_EL– ARF_LAT_BI_DN– ARF_LAT_BI_LP– ARF_LAT_BI_WS– ARF_LAT_BI_LF2SRC– ARF_LAT_BI_WSW– ARF_LAT_BI_SEW– ARF_LAT_BI_LF2TI– ARF_LAT_BI_FE– ARF_LAT_BI_FD– ARF_LAT_HVAC_POWER– ARF_LAT_HVAC_BOTH– ARF_LAT_HVAC_HEAT– ARF_LAT_HVAC_FREEZE– ARF_LAT_HVAC_VENT– ARF_LAT_OTHER

Page 73: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Bleacher Enclosure

Page 75: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building

Page 76: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building• Replacers:

– ARF_NSTD_QTY– ARF_NSTD_NAME– ARF_NSTD_SIZE– ARF_NSTD_CONS_DISC– ARF_NSTD_CONS_CMU– ARF_NSTD_CONS_METAL– ARF_NSTD_CONS_OTHER– ARF_NSTD_CONS_SPECIFY– ARF_NSTD_BI_EL– ARF_NSTD_BI_DN– ARF_NSTD_BI_LP– ARF_NSTD_BI_PA– ARF_NSTD_BI_INET– ARF_NSTD_BI_TEL– ARF_NSTD_BI_COPFIB– ARF_NSTD_BI_WS– ARF_NSTD_BI_LF2SRC– ARF_NSTD_BI_WSW– ARF_NSTD_BI_SEW– ARF_NSTD_BI_LF2TI– ARF_NSTD_BI_FE– ARF_NSTD_BI_FD– ARF_NSTD_HVAC_POWER– ARF_NSTD_HVAC_BOTH– ARF_NSTD_HVAC_HEAT– ARF_NSTD_HVAC_FREEZE– ARF_NSTD_HVAC_VENT– ARF_NSTD_OTHER

Page 77: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Basic 10M-25M Firing Range (ZERO)

• Facilities– ZERO – Basic 10M-25M Firing Range• Downrange Area• ROCA

– ROC Tower– Covered Mess– Ammunition Breakdown Building– Latrine– Bleacher Enclosure– Non-Standard Building

• Additional Requirements

Page 78: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Zero – Basic 10M-25M Firing Range

Page 80: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange Area

Page 81: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange AreaReplacers:

• ZERO_LANES_STD– ZERO_LANES_NONSTD– ZERO_LANES_QTY– ZERO_LANES_WIDTH– ZERO_FP_FOX– ZERO_FP_FOXDROPIN– ZERO_FP_FOXWALKIN– ZERO_FP_PRONE– ZERO_FP_NONE– ZERO_FP_AREA– ZERO_MARKERS_LIMIT– ZERO_MARKERS_NIGHT – ZERO_MARKERS_LANE– ZERO_MARKERS_FIRING– ZERO_TAR_10– ZERO_TAR_25– ZERO_TAR_AUTO– ZERO_EMPMAT_WOOD– ZERO_EMPMAT_OTHER– ZERO_EMPMAT_SPECIFY– ZERO_POWER_NONE

Page 82: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ROCA

Page 83: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ROC Tower

Page 84: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ROC Tower• Replacers:

– ZERO_TOW_QTY– ZERO_TOW_HEIGHT– ZERO_TOW_OBS– ZERO_TOW_CONS_DISC– ZERO_TOW_CONS_CMU– ZERO_TOW_CONS_METAL– ZERO_TOW_CONS_OTHER– ZERO_TOW_CONS_SPECIFY– ZERO_TOW_BI_EL– ZERO_TOW_BI_DN– ZERO_TOW_BI_LP– ZERO_TOW_BI_PA– ZERO_TOW_BI_TEL– ZERO_TOW_BI_COPFIB– ZERO_TOW_BI_FE– ZERO_TOW_BI_FD– ZERO_TOW_HVAC_POWER– ZERO_TOW_HVAR_BOTH– ZERO_TOW_HVAC_HEAT– ZERO_TOW_HVAC_FREEZE– ZERO_TOW_HVAC_VENT– ZERO_TOW_OTHER

Page 85: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Covered Mess

Page 87: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building

Page 88: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building• Replacers:

– ZERO_ABB_QTY– ZERO_ABB_CONS_DISC– ZERO_ABB_CONS_CMU– ZERO_ABB_CONS_METAL– ZERO_ABB_CONS_OTHER– ZERO_ABB_CONS_SPECIFY– ZERO_ABB_BI_EL– ZERO_ABB_BI_DN– ZERO_ABB_BI_LP– ZERO_ABB_BI_FE– ZERO_ABB_BI_FD– ZERO_ABB_HVAC_POWER– ZERO_ABB_HVAC_BOTH– ZERO_ABB_HVAC_HEAT– ZERO_ABB_HVAC_FREEZE– ZERO_ABB_HVAC_VENT– ZERO_ABB_OTHER

Page 89: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine

Page 90: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine• Replacers:

– ZERO_LAT_QTY– ZERO_LAT_AV– ZERO_LAT_WLSEP– ZERO_LAT_WLSEW– ZERO_LAT_OTHER– ZERO_LAT_SPECIFY– ZERO_LAT_PORT– ZERO_LAT_PORT_SIZE– ZERO_LAT_CONS_DISC– ZERO_LAT_CONS_CMU– ZERO_LAT_CONS_METAL– ZERO_LAT_CONS_OTHER– ZERO_LAT_CONS_SPECIFY– ZERO_LAT_BI_EL– ZERO_LAT_BI_DN– ZERO_LAT_BI_LP– ZERO_LAT_BI_WS– ZERO_LAT_BI_LF2SRC– ZERO_LAT_BI_WSW– ZERO_LAT_BI_SEW– ZERO_LAT_BI_LF2TI– ZERO_LAT_BI_FE– ZERO_LAT_BI_FD– ZERO_LAT_HVAC_POWER– ZERO_LAT_HVAC_BOTH– ZERO_LAT_HVAC_HEAT– ZERO_LAT_HVAC_FREEZE– ZERO_LAT_HVAC_VENT– ZERO_LAT_OTHER– ZERO_LAT_SPECIFY

Page 91: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Bleacher Enclosure

Page 93: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building

Page 94: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building• Replacers:

– ZERO_NSTD_QTY– ZERO_NSTD_NAME– ZERO_NSTD_SIZE– ZERO_NSTD_CONS_DISC– ZERO_NSTD_CONS_CMU– ZERO_NSTD_CONS_METAL– ZERO_NSTD_CONS_OTHER– ZERO_NSTD_CONS_SPECIFY– ZERO_NSTD_BI_EL– ZERO_NSTD_BI_DN– ZERO_NSTD_BI_LP– ZERO_NSTD_BI_PA– ZERO_NSTD_BI_INET– ZERO_NSTD_BI_TEL– ZERO_NSTD_BI_COPFIB– ZERO_NSTD_BI_WS– ZERO_NSTD_BI_LF2SRC– ZERO_NSTD_BI_WSW– ZERO_NSTD_BI_SEW– ZERO_NSTD_BI_LF2TI– ZERO_NSTD_BI_FE– ZERO_NSTD_BI_FD– ZERO_NSTD_HVAC_POWER– ZERO_NSTD_HVAC_BOTH– ZERO_NSTD_HVAC_HEAT– ZERO_NSTD_HVAC_FREEZE– ZERO_NSTD_HVAC_VENT– ZERO_NSTD_OTHER

Page 95: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Basic Training and One Station Unit Training Complex (BTOSUT)

Page 96: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Basic Training and One Station Unit Training Complex (BTOSUT)

• Here is a list of the Basic Training (BT) and One Station Unit Training (OSUT) Complex removers based on the facility selection. All the BTOSUT have the sub step titled BTOSUT underneath Facilities in the RFP Wizard hierarchy.

• Facility (with Removers underneath)– Barracks/Company Operations Facility

• BTCOF• BTCOF_NO

– Battalion Headquarters Facility• BTBN• BTBN_NO

– Central Cooling Plant• BTCCP• BTCCP_NO

– Dining Facility• BTDF• BTDF_NO

– Lawn Equipment Building• BTLEB• BTLEB_NO

Page 97: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

BTOSUT

Page 98: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

BTOSUT• Replacers:

– BTOSUT_KEYING– BTOSUT_LOCKBOX_DESCRIPTION

• Removers:– BTOSUT_LOCKBOX– BTOSUT_LOCKBOX_NO– BTOSUT_CW– BTOSUT_SCD– BTOSUT_VM– BTOSUT_AEE– BTOSUT_DUMP– BTOSUT_POV_NO– BTOSUT_POV_YES– BTOSUT_TRASH_DUMP– BTOSUT_RECYC_DUMP– BTOSUT_PT_NO– BTOSUT_PT_YES

Page 99: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

B/COF

Page 101: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

CCP

Page 103: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

LEB

Page 105: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Battalion Headquarters

• Facilities– Battalion– Bde/Bn Additional Reqs– Additional Requirements

Page 106: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Battalion

Page 108: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Bde/Bn Additional Reqs

Page 109: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Bde/Bn Additional Reqs• This slide is the same for three facility types (Battalion Headquarters, Brigade

Headquarters, and Brigade and Battalion Headquarters). The only difference is the top portion there is a check box to consolidate into one facility and the maximum gross area input area is grayed out except when the facility type is the Brigade and Battalion Headquarters. This is also when the “Consolidate” remover is used.

• Replacers:– BDEBN_MAX_AREA

• Removers:– CONSOLIDATE– CONSOLIDATE_NO– HQ_POV_OTHER– HQ_POV_GOV

Page 110: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Battlefield Weather Support Facility (BWF)

Page 112: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Brigade and Battalion Headquarters

• Facilities– Battalion– Bde/Bn Additional Reqs– Brigade– Additional Requirements

• This is a combination of the Brigade step and the Battalion step . One difference is the step Bde/Bn Additional Reqs shows the consolidated button as active and checked. It is grayed out when the facility type is Battalion Headquarters or Brigade Headquarters.

Page 113: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Brigade

Page 115: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Brigade Headquarters

• When Brigade Headquarters facility is selected it has the same steps as the Brigade and Battalion Headquarters facility except without the Battalion step and the consolidate portion in the Bde/Bn Additional Reqs is grayed out.

• Facilities– Bde/Bn Additional Reqs– Brigade– Additional Requirements

Page 116: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Chapel Facility

Page 118: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Chaplain Family LifeCenter (CFLC)

• CFLC has is same as standard version with only the Additional Requirements step.

• Facilities– Additional Requirements

• Removers:– CFLC

Page 119: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Child Development Center

Page 121: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Classroom XX1

Page 123: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Command and Control Facility

• Facilities– C2F• Spatial• Equipment

– Additional Requirements

Page 124: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

C2F

Page 125: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

C2F• Replacers:– C2F_MAX_AREA– C2F_OTHER_TYPE– C2F_OTHER_OP_LONG– C2F_OTHER_OP_SHORT – C2F_STRUCTURAL– C2F_PLANNING_ROOMS– C2F_NUMBER_HMMWV– C2F_NUMBER_SHELTER– C2F_NUMBER_HMMWV_TRAILERS – C2F_GOV– C2F_GO – C2F_VIP– C2F_MALE_PERCENT– C2F_FEMALE_PERCENT

• Removers:– C2F– C2F_DIV– C2F_CORPS– C2F_NUMA– C2F_DRU– C2F_DRU_OTHER– C2F_DRU_OTHER_NOT– C2F_ASCC (group based on drop down list of type of command)– C2F_ACOM– C2F_OTHER– C2F_OCONUS_THREE– C2F_OCONUS_FOUR– C2F_ANTENNA– C2F_ANTENNA_NOT– C2F_HELI– C2F_HELI_NOT– C2F_CLASS– C2F_CLASS_NOT– C2F_DEPLOYED – C2F_DEPLOYED_NOT

• Removers: (additional)– C2F_SCIF (portion based on select which additional spaces are required for the

facility”)– C2F_SCIF_NOT– C2F_STO– C2F_DT_CBT– C2F_DT_CBT_NOT– C2F_LAYOUT_INCLUDED– C2F_FIGURE1 (portion based on drop down list of “select how the preferred

locations and distribution of these spaces will be depicted”)– C2F_DESIGN_CHARRETTE– C2F_OPEN_STORAGE– C2F_ELECTRONIC– C2F_NOHEAT– C2F_FOREIGN_NAT– C2F_FOREIGN_NAT_NOT– C2F_INSTALLATION_NOT– C2F_INSTALLATION – C2F_AVCOMBINED– C2F_AVCOMBINED_NOT– C2F_SITE_PLAN– C2F_FIRE_GOV– C2F_FIRE_CONTR– C2F_DRAWINGS– C2F_SPACE_PROGRAM– C2F_VEND_LOBBY– C2F_VEND_BREAK– C2F_VEND_DRAWINGS– C2F_OTHER_OPERATIONAL– C2F_AUTHORIZED_NOT– C2F_AUTHORIZED– C2F_AVCAB– C2F_AVCONTROL– C2F_LOAD– C2F_NOC– C2F_NOC_NOT

Page 126: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Spatial

Page 128: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Equipment

Page 129: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Equipment• Replacers:

– C2F_CONFERENCEROOM_ADD– C2F_MULTIPURPOSEROOM_ADD– C2F_WARROOM_ADD– C2F_OC_ADD– C2F_NOC_ADD – C2F_BRIEFINGROOM_ADD – C2F_SCIF_ADD– C2F_AVCOMBINED_ADD– C2F_AVCOMBINED_NOT_ADD

• Removers:– C2F_CONFSCREEN– C2F_CONFVCR– C2F_CONFDVD– C2F_CONFCONTROL– C2F_CONFPODIUM– C2F_CONFSMARTWHITE– C2F_CONFPA– C2F_CONFADJLIGHT– C2F_CONFVTC– C2F_CONFWHITE– C2F_CONFSHADES– C2F_MULTIWHITE– C2F_WARSCREEN– C2F_WARVCR– C2F_WARDVD– C2F_WARCONTROL– C2F_WARPODIUM– C2F_WARSMARTWHITE– C2F_WARPA– C2F_WARADJLIGHT– C2F_WARVTC– C2F_WARNETWORK– C2F_WARWHITE– C2F_WARSHADES– C2F_OCVIDEO– C2F_OCSCREEN– C2F_OCVCR– C2F_OCDVD– C2F_OCCONTROL– C2F_OCPODIUM– C2F_OCSMARTWHITE

• Removers: (cont.)– C2F_OCPA– C2F_OCADJLIGHT– C2F_OCVTC– C2F_OCNETWORK– C2F_OCWHITE– C2F_OCSHADES– C2F_NOCCAB– C2F_NOCPROJ– C2F_BRIEFSCREEN– C2F_BRIEFVCR– C2F_BRIEFDVD– C2F_BRIEFCONTROL– C2F_BRIEFPODIUM– C2F_BRIEFSMARTWHITE– C2F_BRIEFPA– C2F_BRIEFADJLIGHT– C2F_BRIEFVTC– C2F_BRIEFWHITE– C2F_BRIEFSHADE– C2F_SCIFSCREEN– C2F_SCIFVCR– C2F_SCIFDVD– C2F_SCIFCONTROL– C2F_SCIFPODIUM– C2F_SCIFSMARTWHITE– C2F_SCIFPA– C2F_SCIFADJLIGHT– C2F_SCIFVTC– C2F_SCIFWHITE– C2F_SCIFSHADES– C2F_STO_SHREDDER– C2F_STO_COMMS– C2F_STO_WORKSTATION– C2F_STO_VTCOIP– C2F_STO_VOIP– C2F_STO_SCANNER– C2F_STO_PRINTER– C2F_STOVTC_WORKSTATION– C2F_STOVTC_VOIP– C2F_STOVTC_DISPLAY– C2F_AVCAB– C2F_AVCONTROL

Page 130: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Company Operations Facility (COF)

Page 131: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Company Operations Facility (COF)• Replacers:

– COF_SHOWER_ACCESS– COF_TOTAL_COMPANIES– COF_BATTALION_NAME– COF_COMPANY_LETTER– COF_NUMBER_COMPANY_PERSONNEL– COF_COMPANY_PERSONNEL_RATIO– COF_BATTALION_ADMIN_AREA– COF_BATTALION_READINESS_AREA– COF_BATTALION_HARDSTAND_AREA– COF_DESIGN_CONCEPT– COF_REPEAT– COF_TAS_REQUIRED– COF_BATTALION_NAME_WITH_TAS

• Removers:– COF_POV_OTHER– COF_POV_GOV– COF_REPEAT– COF_REPEAT_CO– COF_TAS– COF_AC– COF_AC_NO

Page 132: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Criminal Investigation Division Command (CIDC)

Page 134: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Department of Emergency Services (formerly CFSS)

• Facilities– DES(CFSS)– Additional Requirement

• Additional Requirement

Page 135: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

DES(CFSS)

Page 137: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Additional Requirements (DES/CFSS)

Page 139: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Dining Facility

Page 141: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Enlisted Unaccompanied Personnel Housing

• Facilities– UEPH• Additional Requirements

– Additional Requirements

Page 142: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

UEPH

Page 144: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Additional Requirements (UEPH)

Page 145: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Additional Requirements (UEPH)• Replacers:

– UEPH_KEYING_SYSTEM– UEPH_KEY_MANUFACTURER– UEPH_KEYCARD_DESCRIPTION– UEPH_LOCKBOX_DESCRIPTION

• Removers:– UEPH_LAUNDRY_DWELL– UEPH_LAUNDRY_CENTRAL– UEPH_OPERABLE– UEPH_SEALED– UEPH_ENTRYDOORS_HM– UEPH_ENTRYDOORS_HM_NOT– UEPH_ENTRYDOORS_WD– UEPH_ENTRYDOORS_WD_NOT– UEPH_KEY_NO– UEPH_KEY_YES– UEPH_KNOX_NO– UEPH_KNOX– UEPH_MAIL_EXT– UEPH_MAIL_KIOSK– UEPH_MAIL_EXT_NOT– UEPH_MAIL_LOB– UEPH_MAIL_LOB_NOT– UEPH_MASS_YES– UEPH_MASS_NO– UEPH_DUCTLESS

• Removers (cont.)– UEPH_DUCTLESS_NOT– UEPH_DUCTED– UEPH_DUCTED_NOT– UEPH_ZONE1B– UEPH_ZONE1A– UEPH_ZONE2B– UEPH_ZONE2A– UEPH_ZONE3B– UEPH_ZONE3A– UEPH_ZONE4B– UEPH_ZONE4A– UEPH_ZONE5B– UEPH_ZONE5A– UEPH_ZONE6B– UEPH_ZONE6A– UEPH_ZONE7A– UEPH_ZONE8A– UEPH_SMOKE1– UEPH_SMOKE2– UEPH_SMOKE3– UEPH_SMOKE4– UEPH_RANGE– UEPH_TWOBURNER– UEPH_FOURBURNER– UEPH_DISPOSER

Page 146: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

General Instruction Building (GIB)

Page 148: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Live Fire Exercise Shoothouse• Facilities

– LFSH • Downrange Area • ROCA

– AAR– OSB– Ammunition Breakdown Building– Latrine– Non-Standard Building

– Additional Requirements

• Note: The Live Fire Exercise Shoothouse steps are similar to the ZERO steps because it has ROCA steps. They have different replacers due to the naming convention but the ROCA steps are similar except LFSH has AAR step and the OSB step whereas the ZERO ROCA steps do not. The OSB step is also found in the (CPQC/MPFQC) facility ROCA steps. Since all the ROCA steps are the same I only included the steps LFSH, downrange area and AAR . The replacers for the ROCA steps are in the following slides.

Page 149: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

OSB (LFSH)• Replacers

– LFSH_OSB_QTY– LFSH_OSB_CONS_DISC – LFSH_OSB_CONS_CMU– LFSH_OSB_CONS_METAL – LFSH_OSB_CONS_OTHER – LFSH_OSB_CONS_SPECIFY – LFSH_OSB_BI_EL – LFSH_OSB_BI_DN – LFSH_OSB_BI_LP– LFSH_OSB_BI_INET – LFSH_OSB_BI_TEL– LFSH_OSB_BI_COPFIB – LFSH_OSB_BI_FE – LFSH_OSB_BI_FD– LFSH_OSB_HVAC_POWER – LFSH_OSB_HVAC_BOTH – LFSH_OSB_HVAC_HEAT– LFSH_OSB_HVAC_FREEZE – LFSH_OSB_HVAC_VENT– LFSH_AAR_OTHER

Page 150: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building (LFSH)

• Replacers :– LFSH_ABB_QTY– LFSH_ABB_CONS_DISC – LFSH_ABB_CONS_CMU – LFSH_ABB_CONS_METAL – LFSH_ABB_CONS_OTHER – LFSH_ABB_CONS_SPECIFY – LFSH_ABB_BI_EL– LFSH_ABB_BI_DN – LFSH_ABB_BI_LP – LFSH_ABB_BI_FE – LFSH_ABB_BI_FD – LFSH_ABB_HVAC_POWER – LFSH_ABB_HVAC_BOTH– LFSH_ABB_HVAC_HEAT – LFSH_ABB_HVAC_FREEZE – LFSH_ABB_HVAC_VENT– LFSH_ABB_OTHER

Page 151: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine (LFSH)• Replacers:

– LFSH_LAT_QTY– LFSH_LAT_AV – LFSH_LAT_WLSEP – LFSH_LAT_WLSEW – LFSH_LAT_OTHER – LFSH_LAT_SPECIFY – LFSH_LAT_PORT– LFSH_LAT_PORT_SIZE – LFSH_LAT_CONS_DISC – LFSH_LAT_CONS_CMU – LFSH_LAT_CONS_METAL – LFSH_LAT_CONS_OTHER – LFSH_LAT_CONS_SPECIFY – LFSH_LAT_BI_EL– LFSH_LAT_BI_DN – LFSH_LAT_BI_LP – LFSH_LAT_BI_WS – LFSH_LAT_BI_LF2SRC – LFSH_LAT_BI_WSW– LFSH_LAT_BI_SEW – LFSH_LAT_BI_LF2TI – LFSH_LAT_BI_FE– LFSH_LAT_BI_FD – LFSH_LAT_HVAC_POWER – LFSH_LAT_HVAC_BOTH– LFSH_LAT_HVAC_HEAT – LFSH_LAT_HVAC_FREEZE – LFSH_LAT_HVAC_VENT– LFSH_LAT_OTHER

Page 152: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building (LFSH)

• Replacers:– LFSH_NSTD_QTY– LFSH_NSTD_NAME – LFSH_NSTD_SIZE– LFSH_NSTD_CONS_DISC – LFSH_NSTD_CONS_CMU– LFSH_NSTD_CONS_METAL – LFSH_NSTD_CONS_OTHER – LFSH_NSTD_CONS_SPECIFY – LFSH_NSTD_BI_EL – LFSH_NSTD_BI_DN – LFSH_NSTD_BI_LP – LFSH_NSTD_BI_PA– LFSH_NSTD_BI_INET – LFSH_NSTD_BI_TEL– LFSH_NSTD_BI_COPFIB – LFSH_NSTD_BI_WS– LFSH_NSTD_BI_LF2SRC – LFSH_NSTD_BI_WSW – LFSH_NSTD_BI_SEW – LFSH_NSTD_BI_LF2TI – LFSH_NSTD_BI_FE – LFSH_NSTD_BI_FD– LFSH_NSTD_HVAC_POWER – LFSH_NSTD_HVAC_BOTH – LFSH_NSTD_HVAC_HEAT– LFSH_NSTD_HVAC_FREEZE – LFSH_NSTD_HVAC_VENT – LFSH_NSTD_OTHER

Page 153: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

LFSH

Page 155: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange Area

Page 156: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange Area• Replacers:

– LFSH_CONFIG_STD– LFSH_CONFIG_NONSTD– LFSH_ROOMS– LFSH_HALLWAYS– LFSH_LIGHTNING_PROTECTION– LFSH_WM_SHOCK_ABCON– LFSH_WM_MS– LFSH_WM_SAND– LFSH_CANOPY_STD– LFSH_PARTIAL_WALLS– LFSH_BALLISTIC_CEILING– LFSH_CANOPY_OTHER– LFSH_POWER_HARD– LFSH_POWER_HARDPLUS– LFSH_POWER_BTRY– LFSH_POWER_OTHER– LFSH_POWER_SPECIFY

Page 157: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

AAR

Page 158: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

AAR• Replacers:

– LFSH_AAR_QTY– LFSH_AAR_CONS_DISC– LFSH_AAR_CONS_CMU– LFSH_AAR_CONS_METAL– LFSH_AAR_CONS_OTHER– LFSH_AAR_CONS_SPECIFY– LFSH_AAR_BI_EL– LFSH_AAR_BI_DN– LFSH_AAR_BI_LP– LFSH_AAR_BI_PA– LFSH_AAR_BI_C2– LFSH_AAR_BI_TEL– LFSH_AAR_BI_COPFIB– LFSH_AAR_BI_FE– LFSH_AAR_BI_FD– LFSH_AAR_HVAC_POWER– LFSH_AAR_HVAC_BOTH– LFSH_AAR_HVAC_HEAT– LFSH_AAR_HVAC_FREEZE– LFSH_AAR_HVAC_VENT– LFSH_AAR_OTHER

Page 160: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

AAC HGR

Page 162: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

UAS HGR

Page 164: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Modified Record Fire Range

• Facilities– MRF

• Downrange Area• ROCA

– Range Control Tower – Small Arms– OSB– Classroom Facility– Covered Mess– Ammunition Breakdown Building– Latrine– Bleacher Enclosure – Non-Standard Building

• Note: The Modified Record Fire Range (MRF) steps are similar to the CPQC steps because it has the same ROCA steps. They have different replacers due to the naming convention .

• Since all the steps are the same I only included the steps MRF.

Page 165: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Downrange Area (MRF)• Replacers:

– MRF_LANES_STD– MRF_LANES_NONSTD– MRF_LANES_QTY– MRF_LANES_WIDTH– MRF_LANES_PERLANE – MRF_FP_FOX– MRF_FP_FOXDROPIN– MRF_FP_FOXWALKIN– MRF_FP_PRONE– MRF_FP_SPECIFY– MRF_FP_NONE– MRF_MARKERS_LIMIT– MRF_MARKERS_NIGHT– MRF_MARKERS_LANE– MRF_MARKERS_FIRING– MRF_MARKERS_INTER– MRF_EMP_BELOW– MRF_EMP_ABOVE– MRF_EMP_COMBO– MRF_EMP_ZERO– MRF_EMP_ZEROSETS– MRF_EMP_NIGHT– MRF_EMP_NIGHT_SPECIFY– MRF_EMPMAT_CON– MRF_EMPMAT_OTHER– MRF_EMPMAT_SPECIFY– MRF_POWER_HARD– MRF_POWER_HARDPLUS– MRF_POWER_BTRY– MRF_POWER_OTHER– MRF_POWER_SPECIFY

Page 166: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Range Control Tower - Small Arms (MRF)

• Replacers:– MRF_TOW_QTY– MRF_TOW_HEIGHT– MRF_TOW_OBS– MRF_TOW_CONS_DISC– MRF_TOW_CONS_CMU– MRF_TOW_CONS_METAL– MRF_TOW_CONS_OTHER– MRF_TOW_CONS_SPECIFY– MRF_TOW_BI_EL– MRF_TOW_BI_DN– MRF_TOW_BI_LP– MRF_TOW_BI_PA– MRF_TOW_BI_C2– MRF_TOW_BI_TEL– MRF_TOW_BI_COPFIB– MRF_TOW_BI_FE– MRF_TOW_BI_FD– MRF_TOW_HVAC_POWER– MRF_TOW_HVAR_BOTH– MRF_TOW_HVAC_HEAT– MRF_TOW_HVAC_FREEZE– MRF_TOW_HVAC_VENT– MRF_TOW_OTHER

Page 167: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Classroom (MRF)

• Replacers:– MRF_GIB_QTY– MRF_GIB_CONS_DISC– MRF_GIB_CONS_CMU– MRF_GIB_CONS_METAL– MRF_GIB_CONS_OTHER– MRF_GIB_CONS_SPECIFY– MRF_GIB_BI_EL– MRF_GIB_BI_DN– MRF_GIB_BI_LP– MRF_GIB_BI_DC– MRF_GIB_BI_INET– MRF_GIB_BI_TEL– MRF_GIB_BI_COPFIB– MRF_GIB_BI_FE– MRF_GIB_BI_FD– MRF_GIB_HVAC_POWER– MRF_GIB_HVAC_BOTH– MRF_GIB_HVAC_HEAT– MRF_GIB_HVAC_FREEZE– MRF_GIB_HVAC_VENT– MRF_GIB_OTHER

Page 169: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building

• Replacers:– MRF_ABB_QTY– MRF_ABB_CONS_DISC– MRF_ABB_CONS_CMU– MRF_ABB_CONS_METAL– MRF_ABB_CONS_OTHER– MRF_ABB_CONS_SPECIFY– MRF_ABB_BI_EL– MRF_ABB_BI_DN– MRF_ABB_BI_LP– MRF_ABB_BI_FE– MRF_ABB_BI_FD– MRF_ABB_HVAC_POWER– MRF_ABB_HVAC_BOTH– MRF_ABB_HVAC_HEAT– MRF_ABB_HVAC_FREEZE– MRF_ABB_HVAC_VENT– MRF_ABB_OTHER

Page 170: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine (MRF)• Replacers:

– MRF_LAT_QTY– MRF_LAT_AV– MRF_LAT_WLSEP– MRF_LAT_WLSEW– MRF_LAT_OTHER– MRF_LAT_SPECIFY– MRF_LAT_PORT– MRF_LAT_PORT_SIZE– MRF_LAT_CONS_DISC– MRF_LAT_CONS_CMU– MRF_LAT_CONS_METAL– MRF_LAT_CONS_OTHER– MRF_LAT_CONS_SPECIFY– MRF_LAT_BI_EL– MRF_LAT_BI_DN– MRF_LAT_BI_LP– MRF_LAT_BI_WS– MRF_LAT_BI_LF2SRC– MRF_LAT_BI_WSW– MRF_LAT_BI_SEW– MRF_LAT_BI_LF2TI– MRF_LAT_BI_FE– MRF_LAT_BI_FD– MRF_LAT_HVAC_POWER– MRF_LAT_HVAC_BOTH– MRF_LAT_HVAC_HEAT– MRF_LAT_HVAC_FREEZE– MRF_LAT_HVAC_VENT– MRF_LAT_OTHER

Page 172: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building(MRF)

• Replacers:– MRF_NSTD_QTY– MRF_NSTD_NAME– MRF_NSTD_SIZE– MRF_NSTD_CONS_DISC– MRF_NSTD_CONS_CMU– MRF_NSTD_CONS_METAL– MRF_NSTD_CONS_OTHER– MRF_NSTD_CONS_SPECIFY– MRF_NSTD_BI_EL– MRF_NSTD_BI_DN– MRF_NSTD_BI_LP– MRF_NSTD_BI_PA– MRF_NSTD_BI_INET– MRF_NSTD_BI_TEL– MRF_NSTD_BI_COPFIB– MRF_NSTD_BI_WS– MRF_NSTD_BI_LF2SRC– MRF_NSTD_BI_WSW– MRF_NSTD_BI_SEW– MRF_NSTD_BI_LF2TI– MRF_NSTD_BI_FE– MRF_NSTD_BI_FD– MRF_NSTD_HVAC_POWER– MRF_NSTD_HVAC_BOTH– MRF_NSTD_HVAC_HEAT– MRF_NSTD_HVAC_FREEZE– MRF_NSTD_HVAC_VENT– MRF_NSTD_OTHER

Page 173: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

MRF

Page 175: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Operational Readiness Training Complex (ORTC)

• Facilities– Additional Requirements– Operational Readiness Training Complex (ORTC) have multiple subtypes listed

below. The only major step change is the step below ORTC which list the facility subtype.

– Note: 2 facility subtypes have additional information ( Barracks and Dining Facility)

• Facility Removers• Barracks ORTCUEPH• Battalion Headquarters Building ORTCBN• Brigade Headquarters Building ORTCBDE• Company Headquarters Building ORTCCOF• Company Shed (Note: Removes as of 4/5/12) ORTCCS• Dining Facility ORTCDF• Officer Quarters ORTCNCO• Vehicle Maintenance ORTCVBW

Page 176: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ORTC Barracks

Page 178: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

ORTC DF

Page 180: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Physical Fitness Facility

Page 181: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Physical Fitness Facility• There are a couple hidden windows

based on what check box you select. For example selecting Gymnasium and or Structured Activity opens up another section that is selectable.

• Replacers:– PFF_TYPE– PFF_CUSTOM– PFF_TOTAL_NET– INDOOR_JOGGING_TRACK_AREA– NATATORIUM_AREA– RAQUET_NUM_COURT– SMALL_GROUP_AREA– SPIN_AREA– CONCESSIONS_AREA– STRUCT_OTHER– STRUCT_OTHER2– STRUCT_OTHER3– STRUCT_OTHER4– ADDITIONAL_MODULE_DETAILS

• Removers:– PFF_NONSTD– NATATORIUM– NATATORIUM_NO– FIT_MOD– EX_MOD– GYM_MOD– GY1– GY2– GY3– GY4– GY5– GY6– GY7– GY8– GY9– GY10– GY11– GY12– GY13– GY14– GY15– GY16– GY17– GY18– STRUCT_MOD

Page 182: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Physical Fitness Facility (cont.)• Removers (cont)

– SA_RC1– SA_RC2– SA_RC3 – SA_RC4 – SA_SGF800– SA_SGF1200 – SA_SGF1600– SA_SGF2000– SA_C01– SA_CO2– SA_ICC600– SA_ICC900 – SA_ICC1200– SA_ICC1500 – SA_CW600– SA_CW1000– SA_CW1400– SA_CW1800 – SA_FT1000

• Removers (cont)– SA_FT1500 – SA_FT2000 – SA_FT2500– SA_SSR150– SA_SSR200– SA_SSR250– PT1– PT2– PT3– PT4– PT5– PO1– PO2– PO3– PO4– PO5– PO6– PO7– PO8– PO9– PO10– NATATORIUM_NO

Page 183: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Religious Education Facility (REF)

Page 185: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Training Support Center

Page 187: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Unique Facility

Page 189: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Urban Assault Course (UAC)• Facilities

– UAC – Urban Assault Course• Downrange Area • ROCA

– OSB– Ammunition Breakdown Building– Latrine– Non-Standard Building

– Additional Requirements• The Urban Assault Course (UAC) is similar to Live Fire Exercise Shoothouse (LFSH)

steps because it has ROCA steps. They have different replacers due to the naming convention but the steps are similar except LFSH facility has the step AAR. Since all the steps are the same I have not additional slides except the UAC slide and Downrange Area (due to different naming convention and inputs).

• Removers– UAC

Page 190: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

OSB - (UAC)• Replacers

– UAC_OSB_QTY– UAC_OSB_CONS_DISC – UAC_OSB_CONS_CMU– UAC_OSB_CONS_METAL – UAC_OSB_CONS_OTHER – UAC_OSB_CONS_SPECIFY – UAC_OSB_BI_EL – UAC_OSB_BI_DN – UAC_OSB_BI_LP – UAC_OSB_BI_PA – UAC_OSB_BI_TEL– UAC_OSB_BI_COPFIB – UAC_OSB_BI_FE – UAC_OSB_BI_FD– UAC_OSB_HVAC_POWER – UAC_OSB_HVAC_BOTH – UAC_OSB_HVAC_HEAT– UAC_OSB_HVAC_FREEZE – UAC_OSB_HVAC_VENT – UAC_OSB_OTHER

Page 191: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Ammunition Breakdown Building - (UAC)

• Replacers:– UAC_ABB_QTY– UAC_ABB_CONS_DISC – UAC_ABB_CONS_CMU– UAC_ABB_CONS_METAL – UAC_ABB_CONS_OTHER – UAC_ABB_CONS_SPECIFY – UAC_ABB_BI_EL – UAC_ABB_BI_DN – UAC_ABB_BI_LP – UAC_ABB_BI_FE – UAC_ABB_BI_FD– UAC_ABB_HVAC_POWER – UAC_ABB_HVAC_BOTH – UAC_ABB_HVAC_HEAT– UAC_ABB_HVAC_FREEZE – UAC_ABB_HVAC_VENT – UAC_ABB_OTHER

Page 192: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Latrine - (UAC)• Replacers:

– UAC_LAT_QTY – UAC_LAT_AV – UAC_LAT_WLSEP – UAC_LAT_WLSEW – UAC_LAT_OTHER – UAC_LAT_SPECIFY – UAC_LAT_PORT– UAC_LAT_PORT_SIZE – UAC_LAT_CONS_DISC – UAC_LAT_CONS_CMU– UAC_LAT_CONS_METAL – UAC_LAT_CONS_OTHER – UAC_LAT_CONS_SPECIFY – UAC_LAT_BI_EL – UAC_LAT_BI_DN – UAC_LAT_BI_LP – UAC_LAT_BI_WS– UAC_LAT_BI_LF2SRC – UAC_LAT_BI_WSW – UAC_LAT_BI_SEW – UAC_LAT_BI_LF2TI – UAC_LAT_BI_FE – UAC_LAT_BI_FD– UAC_LAT_HVAC_POWER– UAC_LAT_HVAC_BOTH – UAC_LAT_HVAC_HEAT– UAC_LAT_HVAC_FREEZE – UAC_LAT_HVAC_VENT – UAC_LAT_OTHER

Page 193: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Non-Standard Building – (UAC)• Replacers:

– UAC_NSTD_QTY– UAC_NSTD_NAME – UAC_NSTD_SIZE – UAC_NSTD_CONS_DISC – UAC_NSTD_CONS_CMU – UAC_NSTD_CONS_METAL– UAC_NSTD_CONS_OTHER– UAC_NSTD_CONS_SPECIFY– UAC_NSTD_BI_EL – UAC_NSTD_BI_DN– UAC_NSTD_BI_LP– UAC_NSTD_BI_PA – UAC_NSTD_BI_INET– UAC_NSTD_BI_TEL– UAC_NSTD_BI_COPFIB– UAC_NSTD_BI_WS– UAC_NSTD_BI_LF2SRC– UAC_NSTD_BI_WSW– UAC_NSTD_BI_SEW– UAC_NSTD_BI_LF2TI– UAC_NSTD_BI_FE– UAC_NSTD_BI_FD– UAC_NSTD_HVAC_POWER– UAC_NSTD_HVAC_BOTH– UAC_NSTD_HVAC_HEAT– UAC_NSTD_HVAC_FREEZE– UAC_NSTD_HVAC_VENT– UAC_NSTD_OTHER

Page 194: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

UAC - Urban Assault Course

Page 196: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

UAC - Downrange Area

Page 197: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

UAC - Downrange Area

• Replacers:– UAC_STATION1 – UAC_STATION2 – UAC_STATION3 – UAC_STATION4 – UAC_STATION5– UAC_MARKERS_LIMIT – UAC_MARKERS_NIGHT – UAC_EMPMAT_CON– UAC_EMPMAT_OTHER– UAC_EMPMAT_SPECIFY – UAC_POWER_HARD– UAC_POWER_HARDPLUS – UAC_POWER_BTRY– UAC_POWER_OTHER – UAC_POWER_SPECIFY

Page 198: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Vehicle Maintenance Shop

• Facilities– TEMF– Additional Requirements

Page 199: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

TEMF

Page 200: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

TEMF• Removers

– TEMF– TEMF_REPEAT– TEMF_POV_OTHER– TEMF_POV_GOV– TEMF_POL_NO– TEMF_POL– TEMF_STORAGE_NO– TEMF_STORAGE– TEMF_SECURE_STORAGE_NO– TEMF_SECURE_STORAGE– TEMF_UAV_NO– TEMF_UAV– TEMF_STORM_CONTR– TEMF_STORM_OTHER

• Replacers– BATTALIONS_TOTAL– TEMF_BATTALION_NAME– TEMF_SIZE– TEMF_CRANE_SIZE– TEMF_ACCOMODATE_ORG_VEHICLES– TEMF_HARDSTAND_SY– TEMF_ORG_STORAGE_SF– TEMF_POL_BLDG_SF– TEMF_HAZ_WASTE_BLDG_SF– TEMF_DISTRIBUTION_STORAGE_REQUIRED– TEMF_UAV_STORAGE_REQUIRED– TEMF_POL_PARKING_REQUIRED– TEMF_REPEAT– TEMF_MAX_GROSS_SF

Page 201: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Warriors in Transition Complex

• Types– Barracks– Central Plant– Dining Facility– Soldier and Family Assistance Center– Unit Administration Services

• Removers:– WT Warriors in Transition Complex– WTB WTB_NO Barracks – WTCP WTCP_NO Central Plant– WTDF WTDF_NO Dining Facility– WTSFAC WTSFAC_NO Soldier and Family Assistance Center– WTUAS WTUAS_NO Unit Administration Services– WTBN WTBN_NO Battalion Headquarters (not in Facility choices under WT)– WTCO WTCO_NO Company Headquarter (not in Facility choices under WT)

Page 202: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

WT

Page 204: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

WT Barracks

Page 205: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

WT Barracks• Replacers:

– WT_NUMBER_OF_2BED_2BATH– WT_NUMBER_OF_2BED_1BATH– WT_ACCESS_MANUFACTURER– WTB_NUMBER– WTB_MAX_GROSS

• Removers:– WTB_CEILING_FAN– WTB_DIAPER1– WTB_SINGLE_MANUFACTURER– WTB_EXISTING_ACCESS– WTB_MAIL_EXT– WTB_MAIL_KIOSK– WTB_MAIL_EXT_NO– WTB_MAIL_LOB– WTB_MAIL_LOB_NO

Page 206: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

WT SFAC

Page 208: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

WT UAS

Page 210: RFP Facilities. Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the

Youth Center (YC)