1

EXISTING DRAINAGE STRUCTURES AND FACILITIES

OPEN WATERWAYS 689.0 km (Rivers,Creeks, Esteros)

DRAINAGE MAIN 59.0 km. (Outfalls and Interceptors)

DRAINAGE LATERALS 897.0 km (Along Major Thoroughfares)

MUNTINLUPA

CITY

2

COASTAL CREEK,

PARAÑAQUE CITY (2014)

MANGAHAN FLOODWAY,

PASIG CITY (2013)

TULLAHAN RIVER,

VALENZUELA CITY (2013)

MARIBLO CREEK,

QUEZON CITY (2014)

STO. NIÑO CREEK, BRGY. 145,

PASAY CITY (2013)

NORTH ANTIPOLO OPEN

CANAL, MANILA CITY (2014)

DEEPENING/DREDGING OF WATERWAYS

BY EQUIPMENT BY LABOR INTENSIVE

3

SAN FRANCISCO DRAINAGE MAIN SOUTH ANTIPOLO DRAINAGE MAIN

2014

DESILTING OF DRAINAGE MAINS/INTERCEPTORS

EDSA OUTFALL

(2013)

4

DECLOGGING DRAINAGE LATERALS

JOSE ABAD SANTOS AVENUE, TECSON TO

YUSECO STS., TONDO, MANILA

(2014)

BRISBANE ST., VISTA REAL SUBD., BRGY.

BATASAN HILLS, QUEZON CITY

(2013)

BY MANUAL SCAPPER BY DECLOGGING EQUIPMENT

5

INDICATORS

BLITZ 1 August 8, - September

8, 2011

BLITZ 2 February 6- March 30,

2012

BLITZ 3 (May 28- Aug 26,

2013)

BLITZ 4 April 4 – May 28,

2014 As of May 28, 2014

NUMBERS OF ESTEROS COVERED

45 42 42 12

TOTAL LENGTH OF ESTEROS CLEANED

(Linear Meters)

75,000 94,123 65,000 5,115

VOLUME OF GARBAGE COLLECTED

(Cubic meters)

7,383 6,402 4,336 6,468

NO. OF TRUCK TRIPS 1,150 951 632 1,018

ESTERO BLITZ

6

ESTERO BLITZ 4

VIENTE REALES, VALENZUELA CITY’

(APRIL 4-5, 2014)

7

TANIGUE CREEK, CALOOCAN

APRIL 22-23, 2014

LETRE OPEN CANAL, MALABON CITY

APRIL 24-25, 2014

PINAGSABUGAN, MALABON CITY

APRIL 29-30, 2014

ESTERO BLITZ 4

MARIBLO CREEK, QUEZON CITY

MAY 6-7, 2014

8

NEWLY COMPLETED

PUMPING STATIONS

9

CATCHMENT AREA = 95 HAS.

NO. OF PUMPS = 2 pumps

CAP./PUMP = 3 cu.m/sec

TOTAL PUMP CAPACITY = 6.0 cu.m/s

DATE COMPLETED = 2012

ULI-ULI PUMPING STATION

Brgy. San Miguel, Manila City

10

CATCHMENT AREA = 18.72 hectares

NO. OF PUMPS = 2 pumps

CAP./PUMP = 1.0 cu.m/sec

TOTAL PUMP CAPACITY = 2.0 cu.m/s

DATE COMPLETED = 2013

BALONGBATO PUMPING STATION

Brgy. Balong Bato, San Juan City

11

CATCHMENT AREA = 18 hectares

NO. OF PUMPS = 2 pumps

CAP./PUMP = 1.0 cu.m/sec

TOTAL PUMP CAPACITY = 2.0 cu.m/s

DATE COMPLETED = 2014

SALAPAN PUMPING STATION

Brgy. Salapan, San Juan City

12

CATCHMENT AREA = 2.8 hectares

NO. OF PUMPS = 2 pumps

CAP./PUMP = 0.30 cu.m/sec

TOTAL PUMP CAPACITY = 0.60cu.m/s

DATE COMPLETED = 2014

RIVERA PUMPING STATION

Brgy. Rivera, San Juan City

13

SCOPE OF WORKS

INCREASE IN PUMP CAPACITY

REMOVAL AND REPLACEMENT OF OLD / EXISTING PUMPS

CONCRETE WORKS FOR PUMP STATION MODIFICATION

ELECTRICAL AND MECHANICAL WORKS

PROVISION OF PUMPING STATION ACCESSORIES (TRASH SCREEN, HORIZONTAL /INCLINED BELT CONVEYOR, HOPPER, FLAP

VALVE, AND BUTTERFLY VALVE ACTUATOR)

SUPPLY OF GENERATOR SETS

COMPUTERIZATION AND NETWORKING SOFTWARE FOR

MONITORING AND ALARM SYSTEM AND FLOOD SIMULATION

SYSTEM

ON-GOING REHABILITATION OF

PUMPING STATIONS

14

WEST BINONDO

QUIAPO

NORTH AVILES

VALENCIA

SOUTH TRIPA DE GALLINA

LIBERTAD

MAKATI

STA. CLARA

EAST ARROCEROS

PANDACAN

PACO

BALETE

PUMPING

STATIONS

COVERED BY

ON-GOING

REHABILITATION

15

VALENCIA AVILES

DATE CONSTRUCTED = 1975

CATCHMENT AREA = 261 has.

CURRENT PUMP CAPACITY =16.45 cu.m/sec

82.25 drums/sec

DATE CONSTRUCTED = 1975

CATCHMENT AREA = 246 has.

CURRENT PUMP CAPACITY = 11.85 cu.m/sec

59.25 drums/sec

NORTH SECTOR

16

DATE CONSTRUCTED = 1979

CATCHMENT AREA = 779 has.

CURRENT PUMP CAPACITY = 42 cu.m/sec

(210 drums/sec)

DATE CONSTRUCTED = 1979

CATCHMENT AREA = 779 has.

CURRENT PUMP CAPACITY = 48 cu.m/sec

240 drums /sec

SOUTH SECTOR

LIBERTAD TRIPA DE GALLINA

17

DATE CONSTRUCTED = 1981

CATCHMENT AREA = 151 has.

CURRENT PUMP CAPACITY = 7 cu.m/sec

(35 drums/sec)

SOUTH SECTOR

MAKATI STA. CLARA

DATE CONSTRUCTED = 1976

CATCHMENT AREA = 133 has.

CURRENT PUMP CAPACITY = 5.3 cu.m/sec

(26.50 drums/sec)

18

DATE CONSTRUCTED = 1976

CATCHMENT AREA = 182 has.

CURRENT PUMP CAPACITY = 7.59cu.m/sec

(37.95 drums/sec)

EAST SECTOR

PACO

DATE CONSTRUCTED = 1975

CATCHMENT AREA = 180 has.

CURRENT PUMP CAPACITY = 4.40cu.m/sec

(22 drums/sec)

PANDACAN

19

DATE CONSTRUCTED = 1977

CATCHMENT AREA = 6.0 has.

CURRENT PUMP CAPACITY = 2.06cu.m/sec

(10 drums/sec)

EAST SECTOR

AROCEROS

DATE CONSTRUCTED = 1977

CATCHMENT AREA = 52 has.

CURRENT PUMP CAPACITY = 3.30cu.m/sec

(16.50 drums/sec)

BALETE

20

FLOOD CONTROL BAYANIHAN ZONE ALLIANCES

ZONE 10 Parañaque City

21

Flood Control Bayanihan Zone Alliance 22

LINIS PALENGKE PROJECT

23

DAGONOY PUBLIC MARKET

OCTOBER 8, 2013

24

MURPHY, QUEZON CITY PUBLIC MARKET

OCTOBER 13, 2014

25

PARANAQUE PUBLIC MARKET

OCTOBER 25, 2014

26

MUNTINLUPA PUBLIC MARKET

JANUARY 17, 2014

27

PASAY PUBLIC MARKET

JANUARY 24, 2014

28

MANDALUYONG PUBLIC MARKET

FEBRUARY 17, 2014

29

POLO PUBLIC MARKET

FEBRUARY 21, 2014

30

PASIG CITY MEGA MARKET

MARCH 28, 2014

31

1ST BATCH

2ND BATCH

3RD BATCH

LEGEND :

NEWLY INSTALLED ADDITIONAL WATERLEVEL ALONG

RIVERWAYS AND 2 RAIN GAUGE SENSORS

32

38 -WATERLEVEL SENSORS

2- RAIN GAUGE SENSORS

MAINTENANCE WORK

TECHNICAL TRAINING/TROUBLE

SHOOTING

33

CURRENT STATUS :

PROVISION OF THE DETAILED PLANS,

SPECIFICATION AND DESIGN ANALYSIS

FOR PROPOSED REVISION OF DESIGN

OF PNR SUPPORT

RELOCATION OF FIRST PHILIPPINE

INDUSTRIAL CORPORATION (FPIC) OIL

PIPELINE

ON-GOING CONSTRUCTION OF 2.5m X 2.5m DOUBLE

BARREL BOX CULVERT

34 ALONG MOJICA –DON BOSCO, MAKATI CITY

DEEPENING / DREDGING WORKS ALONG MARIKINA RIVER

DEEPENING/DREDGING AT THE MOUTH OF MARIKINA RIVER NEAR ROSARIO

WEIR FLOODGATES

LENGTH = 585 LINEAR METER

35

DEEPENING / DREDGING WORKS ALONG MARIKINA RIVER

DEEPENING / DREDGING AT LOWER MARIKINA RIVER

LENGTH = 1,100 L.M.

36

NO. LOCATION DESCRIPTION

1. HAGONOY PUMPING STATION UPGRADING OF PUMPING STATIONS (INSTALLATION OF ADDITIONAL PUMPS)

2 TAGUIG PUMPING STATION UPGRADING OF PUMPING STATIONS (INSTALLATION OF ADDITIONAL PUMPS)

3 LUNETA PUMPING STATION UPGRADING OF PUMPING STATION INCLUDING DRAINAGE IMPROVEMENT ALONG P. BURGOS,

KATIGBAK DRIVE AND LAGUSNILAD

4. JONES PUMPING STATION UPGRADING OF PUMPING STATION

5. CENTRAL POST OFFICE UPGRADING OF PUMPING STATION

6 REHABILITATION OF NAVIGATIONAL LOCK GATES AT

NAPINDAN HYDRAULIC CONTROL STRUCTURE

REPAIR/REHABILITATION OF THE STRUCTURE INCLUDING MECHANICAL AND ELECTRICAL

WORKS

FLOOD CONTROL PROJECTS FUNDED BY DPWH

FOR IMPLEMENTATION CY-2014

37

METRO MANILA DISASTER RISK REDUCTION

MANAGEMENT COUNCIL (MMDRRMC)

MMDRRMC MEETING WITH

CONCERNED GOVERNMENT

AGENCIES AND LGU DRRMO

DURING

TYPHOON“YOLANDA”

NOVEMBER 7, 2013

38

39

SPECIAL MMDRRMC MEETING WITH 17

METRO MANILA MAYORS

CENTURY PARK HOTEL, MANILA CITY

NOVEMBER 13, 2013