REPUBLIC OF THE PHILIPPINES OFFICE OF THE PRESIDENT
METRO MANILA DEVELOPMENT AUTHORITY FLOOD CONTROL & SEWERAGE MANAGEMENT OFFICE
Atty. FRANCIS N. TOLENTINO CHAIRMAN
Metropolitan Manila Development Authority
1
EXISTING DRAINAGE STRUCTURES AND FACILITIES
OPEN WATERWAYS 689.0 km (Rivers,Creeks, Esteros)
DRAINAGE MAIN 59.0 km. (Outfalls and Interceptors)
DRAINAGE LATERALS 897.0 km (Along Major Thoroughfares)
MUNTINLUPA
CITY
2
COASTAL CREEK,
PARAÑAQUE CITY (2014)
MANGAHAN FLOODWAY,
PASIG CITY (2013)
TULLAHAN RIVER,
VALENZUELA CITY (2013)
MARIBLO CREEK,
QUEZON CITY (2014)
STO. NIÑO CREEK, BRGY. 145,
PASAY CITY (2013)
NORTH ANTIPOLO OPEN
CANAL, MANILA CITY (2014)
DEEPENING/DREDGING OF WATERWAYS
BY EQUIPMENT BY LABOR INTENSIVE
3
SAN FRANCISCO DRAINAGE MAIN SOUTH ANTIPOLO DRAINAGE MAIN
2014
DESILTING OF DRAINAGE MAINS/INTERCEPTORS
EDSA OUTFALL
(2013)
4
DECLOGGING DRAINAGE LATERALS
JOSE ABAD SANTOS AVENUE, TECSON TO
YUSECO STS., TONDO, MANILA
(2014)
BRISBANE ST., VISTA REAL SUBD., BRGY.
BATASAN HILLS, QUEZON CITY
(2013)
BY MANUAL SCAPPER BY DECLOGGING EQUIPMENT
5
INDICATORS
BLITZ 1 August 8, - September
8, 2011
BLITZ 2 February 6- March 30,
2012
BLITZ 3 (May 28- Aug 26,
2013)
BLITZ 4 April 4 – May 28,
2014 As of May 28, 2014
NUMBERS OF ESTEROS COVERED
45 42 42 12
TOTAL LENGTH OF ESTEROS CLEANED
(Linear Meters)
75,000 94,123 65,000 5,115
VOLUME OF GARBAGE COLLECTED
(Cubic meters)
7,383 6,402 4,336 6,468
NO. OF TRUCK TRIPS 1,150 951 632 1,018
ESTERO BLITZ
6
ESTERO BLITZ 4
VIENTE REALES, VALENZUELA CITY’
(APRIL 4-5, 2014)
7
TANIGUE CREEK, CALOOCAN
APRIL 22-23, 2014
LETRE OPEN CANAL, MALABON CITY
APRIL 24-25, 2014
PINAGSABUGAN, MALABON CITY
APRIL 29-30, 2014
ESTERO BLITZ 4
MARIBLO CREEK, QUEZON CITY
MAY 6-7, 2014
8
NEWLY COMPLETED
PUMPING STATIONS
9
CATCHMENT AREA = 95 HAS.
NO. OF PUMPS = 2 pumps
CAP./PUMP = 3 cu.m/sec
TOTAL PUMP CAPACITY = 6.0 cu.m/s
DATE COMPLETED = 2012
ULI-ULI PUMPING STATION
Brgy. San Miguel, Manila City
10
CATCHMENT AREA = 18.72 hectares
NO. OF PUMPS = 2 pumps
CAP./PUMP = 1.0 cu.m/sec
TOTAL PUMP CAPACITY = 2.0 cu.m/s
DATE COMPLETED = 2013
BALONGBATO PUMPING STATION
Brgy. Balong Bato, San Juan City
11
CATCHMENT AREA = 18 hectares
NO. OF PUMPS = 2 pumps
CAP./PUMP = 1.0 cu.m/sec
TOTAL PUMP CAPACITY = 2.0 cu.m/s
DATE COMPLETED = 2014
SALAPAN PUMPING STATION
Brgy. Salapan, San Juan City
12
CATCHMENT AREA = 2.8 hectares
NO. OF PUMPS = 2 pumps
CAP./PUMP = 0.30 cu.m/sec
TOTAL PUMP CAPACITY = 0.60cu.m/s
DATE COMPLETED = 2014
RIVERA PUMPING STATION
Brgy. Rivera, San Juan City
13
SCOPE OF WORKS
INCREASE IN PUMP CAPACITY
REMOVAL AND REPLACEMENT OF OLD / EXISTING PUMPS
CONCRETE WORKS FOR PUMP STATION MODIFICATION
ELECTRICAL AND MECHANICAL WORKS
PROVISION OF PUMPING STATION ACCESSORIES (TRASH SCREEN, HORIZONTAL /INCLINED BELT CONVEYOR, HOPPER, FLAP
VALVE, AND BUTTERFLY VALVE ACTUATOR)
SUPPLY OF GENERATOR SETS
COMPUTERIZATION AND NETWORKING SOFTWARE FOR
MONITORING AND ALARM SYSTEM AND FLOOD SIMULATION
SYSTEM
ON-GOING REHABILITATION OF
PUMPING STATIONS
14
WEST BINONDO
QUIAPO
NORTH AVILES
VALENCIA
SOUTH TRIPA DE GALLINA
LIBERTAD
MAKATI
STA. CLARA
EAST ARROCEROS
PANDACAN
PACO
BALETE
PUMPING
STATIONS
COVERED BY
ON-GOING
REHABILITATION
15
VALENCIA AVILES
DATE CONSTRUCTED = 1975
CATCHMENT AREA = 261 has.
CURRENT PUMP CAPACITY =16.45 cu.m/sec
82.25 drums/sec
DATE CONSTRUCTED = 1975
CATCHMENT AREA = 246 has.
CURRENT PUMP CAPACITY = 11.85 cu.m/sec
59.25 drums/sec
NORTH SECTOR
16
DATE CONSTRUCTED = 1979
CATCHMENT AREA = 779 has.
CURRENT PUMP CAPACITY = 42 cu.m/sec
(210 drums/sec)
DATE CONSTRUCTED = 1979
CATCHMENT AREA = 779 has.
CURRENT PUMP CAPACITY = 48 cu.m/sec
240 drums /sec
SOUTH SECTOR
LIBERTAD TRIPA DE GALLINA
17
DATE CONSTRUCTED = 1981
CATCHMENT AREA = 151 has.
CURRENT PUMP CAPACITY = 7 cu.m/sec
(35 drums/sec)
SOUTH SECTOR
MAKATI STA. CLARA
DATE CONSTRUCTED = 1976
CATCHMENT AREA = 133 has.
CURRENT PUMP CAPACITY = 5.3 cu.m/sec
(26.50 drums/sec)
18
DATE CONSTRUCTED = 1976
CATCHMENT AREA = 182 has.
CURRENT PUMP CAPACITY = 7.59cu.m/sec
(37.95 drums/sec)
EAST SECTOR
PACO
DATE CONSTRUCTED = 1975
CATCHMENT AREA = 180 has.
CURRENT PUMP CAPACITY = 4.40cu.m/sec
(22 drums/sec)
PANDACAN
19
DATE CONSTRUCTED = 1977
CATCHMENT AREA = 6.0 has.
CURRENT PUMP CAPACITY = 2.06cu.m/sec
(10 drums/sec)
EAST SECTOR
AROCEROS
DATE CONSTRUCTED = 1977
CATCHMENT AREA = 52 has.
CURRENT PUMP CAPACITY = 3.30cu.m/sec
(16.50 drums/sec)
BALETE
20
FLOOD CONTROL BAYANIHAN ZONE ALLIANCES
ZONE 10 Parañaque City
21
Flood Control Bayanihan Zone Alliance 22
LINIS PALENGKE PROJECT
23
DAGONOY PUBLIC MARKET
OCTOBER 8, 2013
24
MURPHY, QUEZON CITY PUBLIC MARKET
OCTOBER 13, 2014
25
PARANAQUE PUBLIC MARKET
OCTOBER 25, 2014
26
MUNTINLUPA PUBLIC MARKET
JANUARY 17, 2014
27
PASAY PUBLIC MARKET
JANUARY 24, 2014
28
MANDALUYONG PUBLIC MARKET
FEBRUARY 17, 2014
29
POLO PUBLIC MARKET
FEBRUARY 21, 2014
30
PASIG CITY MEGA MARKET
MARCH 28, 2014
31
1ST BATCH
2ND BATCH
3RD BATCH
LEGEND :
NEWLY INSTALLED ADDITIONAL WATERLEVEL ALONG
RIVERWAYS AND 2 RAIN GAUGE SENSORS
32
38 -WATERLEVEL SENSORS
2- RAIN GAUGE SENSORS
MAINTENANCE WORK
TECHNICAL TRAINING/TROUBLE
SHOOTING
33
CURRENT STATUS :
PROVISION OF THE DETAILED PLANS,
SPECIFICATION AND DESIGN ANALYSIS
FOR PROPOSED REVISION OF DESIGN
OF PNR SUPPORT
RELOCATION OF FIRST PHILIPPINE
INDUSTRIAL CORPORATION (FPIC) OIL
PIPELINE
ON-GOING CONSTRUCTION OF 2.5m X 2.5m DOUBLE
BARREL BOX CULVERT
34 ALONG MOJICA –DON BOSCO, MAKATI CITY
DEEPENING / DREDGING WORKS ALONG MARIKINA RIVER
DEEPENING/DREDGING AT THE MOUTH OF MARIKINA RIVER NEAR ROSARIO
WEIR FLOODGATES
LENGTH = 585 LINEAR METER
35
DEEPENING / DREDGING WORKS ALONG MARIKINA RIVER
DEEPENING / DREDGING AT LOWER MARIKINA RIVER
LENGTH = 1,100 L.M.
36
NO. LOCATION DESCRIPTION
1. HAGONOY PUMPING STATION UPGRADING OF PUMPING STATIONS (INSTALLATION OF ADDITIONAL PUMPS)
2 TAGUIG PUMPING STATION UPGRADING OF PUMPING STATIONS (INSTALLATION OF ADDITIONAL PUMPS)
3 LUNETA PUMPING STATION UPGRADING OF PUMPING STATION INCLUDING DRAINAGE IMPROVEMENT ALONG P. BURGOS,
KATIGBAK DRIVE AND LAGUSNILAD
4. JONES PUMPING STATION UPGRADING OF PUMPING STATION
5. CENTRAL POST OFFICE UPGRADING OF PUMPING STATION
6 REHABILITATION OF NAVIGATIONAL LOCK GATES AT
NAPINDAN HYDRAULIC CONTROL STRUCTURE
REPAIR/REHABILITATION OF THE STRUCTURE INCLUDING MECHANICAL AND ELECTRICAL
WORKS
FLOOD CONTROL PROJECTS FUNDED BY DPWH
FOR IMPLEMENTATION CY-2014
37
METRO MANILA DISASTER RISK REDUCTION
MANAGEMENT COUNCIL (MMDRRMC)
MMDRRMC MEETING WITH
CONCERNED GOVERNMENT
AGENCIES AND LGU DRRMO
DURING
TYPHOON“YOLANDA”
NOVEMBER 7, 2013
38
39
SPECIAL MMDRRMC MEETING WITH 17
METRO MANILA MAYORS
CENTURY PARK HOTEL, MANILA CITY
NOVEMBER 13, 2013
40