realtime astm f2897 capable gps gis - esri · realtime astm f2897 capable gps gis author: christine...
Post on 17-Jul-2020
26 Views
Preview:
TRANSCRIPT
WELCOME2019 Esr i GeoConX Conference
Gas – Improving Data Quality
Real-time ASTM f2897 Capable GPS-GIS
Mathew Desbiens
AltaGas Utilities
2019 Esri GeoConX Conference
Atlanta, Georgia
AltaGas Utilities Inc.
➢ Leduc, Alberta
➢ 80,000 customers
➢ 21,000 km/13,050 mi pipe
➢ Rural operator
➢ 262m per customer
ASTM f2897
ASTM F2897 15a:
Tracking and Traceability Encoding System of Natural Gas Distribution Components
(Pipe, Tubing, Fittings, Valves and Appurtenances)
•16 character Base-62 encoding (1-9) (a-z) (A-Z)
PE3rA56nqB6224o0
Manufacturer:
Performance Pipe
Lot Code:
821009
Production Date:
Tue Sep 02 2017
Material:
PE2708
Category Type:
3-way tee
Component Type:
Socket fusion
Component Size:
¾” IPS SDR D 0.090 (2.29)
Reserved
Index
AltaGas Utilities (AUI) MT&T Project
• Objective: Replace existing (AUI) GPS units with RTK, ASTM f2897 capable devices and
systems.
• Timeline: 3 years
• Details: Internal – Utility Network
• Current State:
➢ ArcGIS Enterprise 10.1.1
➢ Trimble GeoXH 6000 units (70%-30%)
• ArcGIS for Windows mobile
➢ Post processing workflow
• Trimble positions
PE Asset Barcodes • PE Fittings
• Performance Pipes
PE Pipe
Polytubes
➢ ESRI UC
➢ Partnership 2016
➢ Sample printers
➢ Production March 2019
Translation Module
➢ API - URL
Translation Module
➢ Geoprocessing tool
Proof of Concept
➢ Populate all asbuilt attributes
➢ UPDM – Utility Network
➢ ArcGIS Collector developed
➢ Hardware Testing (4 options)
➢ Business Case
➢ Quantifiable metrics
➢ Dedicated resource
➢ Eos Arrow Gold GPS
➢ Samsung Active 2 Tables
➢ D750 Socket Mobile
10
Hardware
➢ Can-net RTK Subscription
➢ SBAS satellite RTK corrections
➢ AirCard
Software
➢ EOS Tools Pro
➢ ArcGIS Collector
➢ ArcGIS Online
➢ Portal replication
Rollout
➢ Phased Rollout
• Season appropriate
➢ Training
• District basis
• Online/offline workflow
• Regional GPS champion
Challenges
➢ Multiple barcodes
14
➢ Standard Practices Manual
➢ Workflow development
➢ Workflow enforcement
Challenges
15
Challenges
Benefits
➢ Profiles - photos
➢ Data turnaround time
➢ Asbuilt efficiency
➢ Complete data
➢ Reduced human error
➢ Recall reaction time
➢ Interchangeable hardware
Future Plans
➢ Priority base station
➢ 1cm accuracy 40 km (25mi) radius
➢ 5cm accuracy 68 Km (42mi) radius
top related