powerpoint presentation · revision f2897 capacity used . astm f2897 review c2 c1 base 62 = 07t...
TRANSCRIPT
Fall 2017 Tracking & Traceability Workshop
ASTM F2897
Greg Goble, R.W. Lyall
Maggie Emery, NW Natural
• October 17, 2017
What to expect…..
• ASTM
• Intro and basic structure
• How ASTM F2897 fits within ASTM
• ASTM F2897
• Expandability and perceived limitations
• Examples of codes
• ASTM Standards Review and Revision Process
• Voluntary consensus standards developing organization
• Members are volunteers
• Over 12,000 ASTM standards found in the 80 volume
“Annual Book of ASTM Standards”
• Over 150 committees in ASTM
• Membership is $75/year
• Committees of interest to our industry:
• A01 Steel, Stainless Steel, and Related Alloys
• F17 Plastic Piping System
ASTM Committee F17
• Approximately 520 members
• 18 subcommittees
• Meetings in April and November
• Specific Subcommittees:
» F17.10 Fittings
» F17.20 Joining
» F17.60 Gas
Development of ASTM F2897
• Need was identified
• Work item requested and Task Group formed to
create/design standard within Subcommittee F17.60
• Draft standard was balloted to every member of F17.60
• Once approved in F17.60, ballot was sent to the Main
F17 committee
• Initial publication in 2011. Revisions in: 2011, 2011,
2014, 2015.
ASTM F2897 Review
Tracking Tracing
§192.1007 (a)(5) Provide for the capture and retention of data on any new pipeline installed. The data must include, at a minimum, the location where the new pipeline is installed and the material of which it is constructed.
ASTM F2897 Review
ASTM F2897 Review
INDUSTRY STAKEHOLDER STEERING COMMITTEEE
ASTM F2897 Review
ASTM F2897-15 16-Character Code
ASTM F2897 Review
•Where did it go?
•Where is it installed now?
•How many are there like it?
•Who Made it?
Improves Safety by quickly
identifying and removing the risk.
•What is it?
•Where did it come from?
•What is it made of?
•How was it made?
Finding root
cause of
quality
variations
ASTM F2897 Review
Component Manufacturer
Current Number of Manufacturers Registered = 35
Limit to Number of Manufacturers that can Register = 3843
Less than 1% of the F2897 Capacity used
ASTM F2897 Review
Mfg. Lot Code
Manufacturer can use the number any way they choose.
Limited to a 7 digit Positive Integer Less Than or Equal to: 9999999
Allows a Base62 four character code between 0000 & FXsj
ASTM F2897 Review
Mfg. Date
Manufacturer Date Code has a 100 year resolution
Limited to a 3 digit Positive Integer between 001 & 365 correlating to the day of the year and a 2 digit Positive Integer between 00 & 99
Allows a Base62 four character code between 01C & 9wj
ASTM F2897 Review
Component Material
Current Number of Component Materials = 32
Limit to Number of Material that can listed = 62
Less than 52% of the F2897 Capacity used
ASTM F2897 Review
Component Type
Current Number of Component Category or Sub Category Listed = 190
Limit to Number of Component Category or Sub Category Listed = 3843
Less than 5% of the F2897 Capacity used
ASTM F2897 Review
Component Size
Current Number of Sizes listed = 318
Less than 85% of the Current Revision F2897 Capacity used
Limit to Number of Component Sizes Currently is 378 established by a matrix from the equation -
ASTM F2897 Review C2
C1
Base 62 = 068
Base 62 = BgH
ASTM F2897 Review C2
C1
ASTM F2897 Review C2
C1
C
1
End of IPS
ASTM F2897 Review
Component Size – Potential with Revision
Three character Base62 Integer Limit =
Limit to Number of Component Sizes could be 487 established by a matrix from the equation -
Less than 66% of the Potential Revision F2897 Capacity used
ASTM F2897 Review C2
C1
Base 62 = 07T
Base 62 = ZPb
ASTM F2897 Review
A Pointer to Track and Trace and gather information about a Gas Distribution Component
Circling back - ASTM
• ASTM Standards Revision process
• Request Work Item
• Task Group
• Ballot
• Standard required to be
reviewed every 5 years
• To participate – join ASTM
www.astm.org/join
ASTM F2897