position: qc mechanical inspector · 2018. 11. 11. · client : (saudi aramco) water treatment...

Post on 31-Jul-2021

17 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CURRICULUM VITAE

Page 1

Position: QC Mechanical Inspector (FINAL APPROVED BY SAUDI ARAMCO) Name : SALAMUDDIN ANSARI Father’s Name : MD JAMIL ANSARI Nationality : INDIAN Date of Birth : 05-03-1979 Religion : ISLAM Email ID / Mob. : ansarisalamuddin53@yahoo.com / +966 0581901613 Iqama # : 2218094007 Languages : Hindi, Urdu, English & Arabic ACADEMIC QUALIFICATION

• ITI in Mechanical Technician from Government ITI Motihari (Recognized NCVT Board India) • Diploma in fire & safety management from (NILEM) Chennai India. • Graduation - B.A. (Hons) from B.R.A. Bihar University Muzaffarpur (INDIA). 1997 - 2000 • Intermediate of Science from B.I.E.C. PATNA. 1995 - 1997 • Matriculation from B.S.E.B. PATNA. 1994

TECHNICAL QUALIFICATION:

• ASNT LEVEL II (MT, PT & UT) Expiry 2021. • Brinell hardness Test Training from Olayan Descon. • MS. Office (Word, Excel, Power point).

PROFESSIONAL EXPERIENCE More than 13 years of experience as Quality Control Mechanical/Piping Inspector in Petrochemical, Oil & Gas fields for the prefabrication, erection and maintenance for Storage Tanks, Vessels, Furnace, Reactor, Heat Exchanger & Piping.

Responsibilities:- PIPING:-

• Checking for consistency with P & I.D, Piping Plan and Isometric Drawing as to size, rating and material.

• Material traceability (Fitting, Pipe & Consumable Material). • Spool marking and welds marking. • Inspection of Piping fabrication and erection according to client’s specification and Code B31.1,

B31.3,B31.8 • Inspection of Pre- and Post-welding. • Control of welding material (Electrode, Filler Wire) backing of Low Hydrogen Electrode. • Execute all NDT (PT, MT) according to client’s specification and Codes. • Preparing of the Test Packages. • Verification of punch list after rectification. • Inspection of Hydro test, Pneumatic test, Flushing/Air blowing and Reinstatement.

CURRICULUM VITAE

Page 2

TANKS:- • Inspection of Tanks fabrication and erection such like as Cone type and Floating Roof Tanks as per

API 620/650. • Foundation and level check, Bottom plate’s laying inspection and material Traceability. • Inspection of Shell plate’s Erection vertical and horizontal joints, nozzles, stairs and platform. • Responsible for the inspection of Pre- and Post-welding. • Preparation of welds maps (Bottom, Shell and Roof). • Vacuum Box Test (VBT) of Bottom welds. • Oil Penetrant Test (OPT) of Bottom to Shell welding. • Pneumatic Leak Test (PLT) of reinforcement pads. • Peaking and banding inspection of Tank welds according to API 620/650. • Plumbness of tanks. • Preparing of Test Reports. • Preparation of final Dossier. • Preparation of punch list. • Verification of punch list after rectification. • Hydro test and Pneumatic test of Roof.

PROFESSIONAL EXPERIENCE

1. Organization : OLAYAN DESCON ENGEERING CO. LTD. Responsibility : Inspection of Fabrication & Site Erection of Tanks (API-650) Duration : 25-7-2016 to Till Date Client : SAIPEM / SAUDI ARAMCO - JIGCC-SRU-IK-EPC-PACKAGE-2 (JIZAN)

Position : QC Mechanical Inspector - FINAL APPROVED BY SAUDI ARAMCO

2. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for Equipments (Heat Exchangers) Duration : 25-3-2016 to 8-4-2016 Client : SAUDI KAYAN - Ethylene T/A - 2016 (SABIC) Position : QC Mechanical Inspector

3. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for Equipments (Heat Exchangers) Duration : 20-1-2016 to 26-3-2016 Client : SADAF – Ethylene Major T/A - 2016 (SABIC) Position : QC Mechanical Inspector

4. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for Tank Bottom Replacement. Duration : 22-6-2015 to 26-12-2015 Client : Replacement of Bottom Plate EG. Tanks – SHARQ (SABIC) Position : QC Mechanical/Piping Inspector - APPROVED BY E&PM SABIC

5. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD.

Responsibility : Inspection for Piping & Pressure Vessel’s. Duration : 03-10-2015 to 26-10-2015 Client : SASREF OPD – 2&3 MAJOR T/A -2015 (SAUDI ARAMCO) Position : QC Mechanical Inspector

CURRICULUM VITAE

Page 3

6. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for piping & furnaces. Duration : 15-5-2015 to 14-6-2015 Client : RAST NURA REFINARY T&I- J 80 AREA (SAUDI ARAMCO) Position : QC Mechanical Inspector

7. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD.

Responsibility : Inspection for Piping & Equipments (Pressure Vessels) Duration : 7-4-2015 to 14-5-2015 Client : SASREF VBU & TGU T/A -2015 (SAUDI ARAMCO) Position : QC Mechanical Inspector

8. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for Reactors Screen Alternation Duration : 20-1-2015 to 10-2-2015 Client : NATPET T/A – 2015 YAMBU Position : QC Mechanical Inspector

9. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for Piping & Equipments. Duration : 10-12-2014 to 30-12-2014 Client : MA’ADEN PHOSPHATE COMPANY T/R SAP TRAIN “C” Position : QC Mechanical Inspector

10. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for Fabrication & Site Erection of Tanks. Duration : 15-06-2014 to 5-12-2014 Client : SADARA CHEMICAL III PROJECT JUBAIL (KSA) Position : QC Mechanical Inspector (Final Approved by SADARA)

11. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for Furnaces Tube Alternation & Repair work Duration : 11-04-2014 to 29 - 05 - 2014 Client : SAUDI ARAMCO RIYADH REFINARY MAJOR T/A APRIL- 2014 Position : QC Mechanical Inspector

12. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for piping prefabrication & Erection Duration : 01-12-2013 to 10 -04- 2014 Client : TGU PROJECT ALBAYRONI (SABIC) JUBAIL KSA Position : QC Piping Inspector - APPROVED BY ALBAYRONI

13. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for piping & Equipments. Duration : 29-10-2013 to 30 -11- 2013 Client : SRU-1 SHUTDOWN SASREF- 2013 (SAUDI ARAMCO) Position : QC Mechanical Inspector

CURRICULUM VITAE

Page 4

14. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD.

Responsibility : Inspection for piping prefabrication & Erection Duration : 01-07-2013 to 03-10-2013 Client : NIGC PTC PIPE LINE (SABIC) Position : QC Piping Inspector

15. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for piping prefabrication & Erecton Duration : 20-05-2013 to 25-06-2013 Client : REPLACEMENT OF CAUSTIC HEADER SADAF – T/A Position : QC Piping Inspector

16. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD.

Responsibility : Inspection for piping & Equipments Repair work Duration : 10-03-2013 to 15-05-2013 Client : SAMREF MAJOR T/A – 2013 (YAMBU-SAUDI ARAMCO) Position : QC Mechanical Inspector

17. Organization : OLAYAN DESCON INDUSTRIAL CO. LTD. Responsibility : Inspection for piping Repair work Duration : 06-11-12 to 20-11-12 Client : SASREF- SRU- 3 T/A -2012 (SAUDI ARAMCO) Position : QC Mechanical Inspector

18. Organization : OLAYAN DESCON ENGEERING CO. LTD. Responsibility : Inspection for Tank Pre-fabrication and Erection Duration : 26-09-10 to 20-12-11 Client : Karan gas field /Saudi Aramco Position : Asst. QC Mechanical Inspector

19. Organization : OLAYAN DESCON ENGEERING CO. LTD. Responsibility : Inspection for Tanks fabrication and site Erection Duration : 21-01-09 to 15-09-10 Client : Saudi Kayan Petrochemical Complex (SABIC) Position : QC Mechanical Inspector

20. Organization : OLAYAN DESCON ENGEERING CO. LTD. Responsibility : Inspection for Tanks fabrication and site Erection Duration : March 2008 to July 2008 Client : (Saudi Aramco) Water treatment Plant Koraya KSA. Position : QC Mechanical Inspector

21. Organization : OLAYAN DESCON ENGEERING CO. LTD.

Responsibility : NDE Coordinator for Tanks - API 650 Duration : April 2007 to December 2007. Client : Sharq Third Expansion Project (Samsung / SABIC) Position : NDE Coordinator

CURRICULUM VITAE

Page 5

22. Organization : OLAYAN DESCON ENGEERING CO. LTD.

Responsibility : Inspection for Tanks fabrication and site Erection Duration : May 2006 to march 2007. Client : Snam Progeti / CCC. (KPF – SAUDI ARAMCO) Position : Asst. QC Inspector

23. Organization : OLAYAN DESCON ENGEERING CO. LTD. Responsibility : Inspection for Tanks fabrication and site Erection Duration : December 2005 to May 2006. Client : Saudi Aramco (waste water treatment Project Rastanura) Position : Asst. QC Inspector

24. Organization : OLAYAN DESCON ENGEERING CO. LTD. Responsibility : Inspection for Tanks fabrication and site Erection Duration : July 2005 to December 2005. Client : S.N.C. Lavalin (Gulf Farabi Project) Position : Asst. QC Inspector

FAMILIARITY WITH CODES & STANDARDS:-

• API-650, API-620. • ASME Sec V • ASME Sec II • ASME Sec. B31.1, B31.3, B31.8 • AWS D1.1 • SAUDI ARAMCO ENGINEERING STANDARD (SAES), SAIC, SATIP & SATR • SABIC ENGINEERING STANDARD

top related