pew company profile-rev.12-2014
Post on 17-Jul-2015
124 Views
Preview:
TRANSCRIPT
Power Engineering World
COMPANY PROFILE
[2014] PEW believes in the significance of client satisfaction, quality-based management and a culture of progressive development
Company Profile
Table of Content
Vision, Mission and Value Statement …………………………………….. Page 2
Company Overview ………………………………………………………….…….. Page 3
PEW Companies ……………………………………………………………………… Page 4
Services & Fields ……………………………………………..……………………… Page 5
Work Capabilities...………………………..……………………………..……….. Page 6
Our Projects ……..…………………………………………………………………….. Page 13
Manpower ……..…………………………………………………………………….. Page 20
Contact us ………………………………………..……………………………………… Page 21
Registrations and Memberships ……………………………………………… Page 22
Partnership & Agreements………………………………..….….……………… Page 23
Certificates………………………..…………………………..………………………… Page 24
Power Engineering World | www.pew-group.com 1
Company Profile
VISION
Pursuit to become a key business as an EPC company can meet our
customers' needs in Iraq and Middle East and North Africa
MISSION
Strive to contribute in creating the future can restore confidence in the
local effort and productivity in addition to achieve the Iraqis aspirations
and to meet their needs
VALUES
• Confidence-building fairly and humility • Ambition to set high standards and contribute to the community
• Accept the challenges of the continuing evolution • Promote a culture of open mentality
• Strive for the development of others and ourselves to realize the full potential
Power Engineering World | www.pew-group.com 2
Company Profile
Company Overview
PEW Group project services span a wide range of commercial and contracting strategies covered
by the sisters companies compromising EPC projects contractor, Front End Engineering Design
(FEED), Automation contractor as well as O&M “Operation & Maintenance” Services vary in scope
and size from basic consulting to complete turnkey responsibility for projects of any size. The
leadership from PEW’s Projects Management Unit (PMU) drives best practices, improvement,
service excellence and consistency around Iraq.
Power Engineering World | www.pew-group.com 3
Company Profile
PEW Companies Power Engineering World for General
Contracts ltd. (Registered in Iraq)
ICS / Independent Consulting Service (Registered in Jordan)
Activities & Services to provide are:
Engineering Procurements Installation & Construction Commissioning & Testing Maintenance Trading, Sales & after Sales services
Activities & Services to provide are:
Front End Engineering and Design (FEED) Consultant Services Feasibility studies Services Basic & Detailed Engineering and Design Projects Monitoring & Managements
Power Engineering World for Trading
and Contracts (Registered in Jordan)
Al-Ashar for civil construction (Registered in Jordan)
Activities & Services to provide are:
Trading, Sales & after Sales services Procurements Logistic & Transportation Project Monitoring & Managements
Activities & Services to provide are:
Civil construction business in general Civil engineering foundations works Infrastructure contracting
Al-Mass for Engineering services. (Registered in Iraq)
Lion of Babylon for Power projects Co.
(Registered in Jordan)
specialized in Non distractive tests performed by a group of experienced Engineers in the QA/ QC Field of work such as(but not limited):
Radiographic Testing Dye penetrant inspection (DPI) Ultrasonic Testing (UT) Hydrostatic Testing
Is a consolidated company that can perform high quality power, oil and electro-mechanical projects covering infra-structure fields, LION OF BABYLON aims to become one of the leading companies in Iraq that can perform EPC contracts in power generation and transmission fields.
Power Engineering World | www.pew-group.com 4
Company Profile
Services & Fields
Services
• Construction, Installation & Commissioning
• Engineering, Design & Consultancy
• Sales, Trading & Procurement
• Operation & Maintenance
Fields
• Power Plants & Generating Sets
• Substations , Transformers & Transmission lines
• Pipeline and Storage Tanks
• Automation Electrical Solution
• Buildings & Infrastructure
• IT Networks & Secure Telecommunication Equipment
Sectors
• Power
• Oil & Gas
• Petrochemical & Refineries
• Water & Waste Water Plant
Power Engineering World | www.pew-group.com 5
Company Profile
Work Capabilities
Engineering & Design
PEW as an EPC contractor has a specialized engineering teams in design and analysis of power
plant facilities. Analysis specialties include thermal hydraulic & process flow analysis, structural
analysis, environmental analysis, computer control and automation, and equipment integration
and qualification analysis. Design specialties include conceptual evaluations, design specifications,
design modification packages, design testing and implementation, design review, and design
quality assurance.
PEW has a group of creative and experienced engineers who can provide timely and
acknowledgeable professional services. PEW engineers & technicians develop tremendous
experiences with industrial projects designs in Power, Oil, and Gas sectors in Iraq, providing all
design and analysis of industrial foundations, process, and non-process buildings, HVAC & Fire-
Fighting:
• Heavy duty machine foundations/rotary machines (Gas Turbine foundations) providing static and dynamic analysis.
• Foundations of all electrical equipment (main transformers, cable ducts, cable trenches, substations equipment foundation, gantries, etc.
• Huge tanks foundations for Fuel Storage Tanks (Crude Oil Storage Tanks, Light Distillate Oil Storage Tanks) and Water Storage Tanks (Raw Water, Demineralized, and Firefighting Storage Tanks).
• For the process buildings (control, high voltage, auxiliary boiler, water treatment, etc.)
• Non process buildings such as (administration, canteen, bachelor, etc.)
• Designs of Steel Structures for stores, shades, pipe rack, etc.
• All other plant skids foundations.
Power Engineering World | www.pew-group.com 6
Company Profile
Mechanical Engineering Experiences
PEW as a leading company in Electrical Power Generation and Transmission has a wide experience
and professional staff to perform the erection, repairing, rehabilitation & operating of steam and
gas power plants, and carrying out the general maintenance with the capability of studying the
problems that it is exposed to and find the suitable solutions that secures its return to work with
high efficiency. PEW in capable of studying problems “trouble shooting” that it is exposed to it and
find the suitable solutions that secure its return to work with high efficiency.
Furthermore, PEW is specialized in construction work to cover the installation of the GTG as well
as the mechanical balance of plant for Gas, Steam, and Hydro-Power projects.
Welding Experiences
In addition to the above mentioned capabilities, PEW has developed an excellent experience in
Welding, through a world class, skills, and specialized Engineers & Technical Staff in Welding. PEW
has shown a tremendous progress & successful steps in this field in pipe line or in storage tanks
welding.
RUMAILA Gas Turbines Power Plant Project
Location: Basra, IRAQ
Design & Engineering, Procurement, Installation, Testing & Commissioning of (5 x 292 MW-SGT 5-PAC 4000F Siemens)
Capacity: 1460 MW
Duration: 23 Months
Featured Ongoing Project
Power Engineering World | www.pew-group.com 7
Company Profile
Chemical Engineering Experiences
PEW has developed and excellent skills in projects require Chemical and Process Engineering
experiences, such as Chemical Washing for all capacities of Steam Boilers in addition to
Construction, Rehabilitation, and Supervision of Water and Waste Water Treatment Units of a
wide range of capacities.
Electrical Engineering Experiences
PEW Engineering and Technical staff have the experiences and skills to perform all type of
construction work to cover the Electrical Balance of Gas, Steam and Hydro-Power Plants, in
addition to the erection of substations equipment’s and repairing its components. Erection of high
voltage towers, cables and re-constructing the electrical network related to them up to 400 KV
substations. Also, PEW is able to erect and repair all the appliances and the electrical engines.
Moreover, performing all tests and commissioning of all types of protection and relays, switch
yards, cables, transformers and generators.
TAZA Gas Turbines Power Plant Project
Location: Kirkuk, IRAQ
Design & Engineering, Procurement, Installation, Testing & Commissioning of (1 x 292 MW-SGT 5-PAC 4000F Siemens)
Capacity: 292 MW
Duration: 17 Months
Featured Ongoing Project
Power Engineering World | www.pew-group.com 8
Company Profile
Automation, Control, Instrumentation & Telecommunications
PEW has wide experience in the design, installation, and maintenance of PLC, RTU, DAS, DCS,
SCADA, and PABX Systems. The excellent experience of PEW in installation and maintenance is
being reinforced by design activities in these fields with a growing design team and joint-ventures
with experienced companies worldwide. Furthermore, Hard working to demonstrate the
recognized role in developing Iraq’s’ Information and Communication Technology infrastructures.
Power Engineering World | www.pew-group.com 9
Company Profile
Civil Engineering Experiences
PEW Civil Engineers have tremendous field and academic experiences to perform all Civil
Engineering and Construction of Power Plants, such as machines foundations, industrial buildings,
switchyard foundations, cable trenches, steel structures, concrete water tanks, sheds, and
administration and support buildings. All civil designs for PEW projects are now done in house.
Tanks & Structure Experiences
We are company committed to satisfy our clients & also focusing on long term relationship. PEW is
a dynamic, rapidly growing company striving to dedicate its efforts to design innovation &
functional integrity for storage tanks. PEW involves the formation of a team responsible for
working with customers to identify needs, analyze and create strategies and solutions, and
provide resources for implementation.
ALQUDUS-3 Gas Turbines Power Plant Project
Location: Baghdad, IRAQ
Design & Engineering, Procurement, Installation, Testing & Commissioning of 4 Units GE Frame 9E 125 MW, each with all the Auxiliaries & BOP
Capacity: 500 MW
Duration: 18 Months
Completed Project
Power Engineering World | www.pew-group.com 10
Company Profile
Engineering & In-house Design
PEW established an independent design department that can perform in-house design, design
review, technical evaluation of proposals, engineering, site supervision and complete technical
support during construction. Design capabilities include architectural, geotechnical, civil,
structural, mechanical (HVAC, piping, pumps, steel tanks, mechanical systems), electrical (high
voltage and small power), firefighting and fire alarm, control and instrumentation, and special
systems (SCADA, CCTV).
PEW design/engineering team was established to perform services for PEW projects but due its
technical capacity, currently design/engineering services are being provided to other clients as
well. PEW has established professional relationships with many highly qualified international
design firms specialized in power projects for their technical support and design input depending
on size of project and required delivery time.
Power Engineering World | www.pew-group.com 11
Company Profile
Renewable Energy (Solar & Wind Energy)
With rising fuel costs, climate change concerns, and a growing demand for electricity, renewable
energy resources such as solar power are becoming an increasingly valuable part of the world's
energy mix.
PEW is adapting a very ambitious plan through collaboration and joint-ventures with well-known
pioneer and experienced international companies to take the lead in transferring the renewable
energy technologies, especially, Solar Energy and Wind Energy to Iraq
Building on a strong power generation heritage spanning more than a century, PEW's partner’s
solar products and systems have proven performance and reliability. Utilizing partners industry
expertise and leadership in energy technologies
Smart grid technologies built by PEW`s partners help utilities improve power reliability through
smart devices and applications that adapt in real time. Utilities are able to monitor performance
and identify outages, restore power, and precisely dispatch crews. They’re even able to identify
anomalies that could lead to potential problems. The result: increased “uptime” and happier
customers. (GE Energy)
Power Engineering World | www.pew-group.com 12
Company Profile
Our Projects
On Going Extension & Brand New Projects
Gas Turbine Power Plants
Location Client Main Contractor Project Starting
Date Duration Plant Capacity
Basra MOE
HEC - Hyundai Engineering
Company & PEW
RUMAILA Gas Turbines Power Plant Project Design & Engineering, Procurement, Installation, Testing & Commissioning of (5 x 292 MW-SGT 5-PAC 4000F Siemens)
Feb. 2012
23 months
1460 MW
Kirkuk MOE
HEC - Hyundai Engineering
Company & PEW
TAZA Gas Turbines Power Plant Project Design & Engineering, Procurement, Installation, Testing & Commissioning of (1 x 292 MW-SGT 5-PAC 4000F Siemens)
Dec. 2011
17 Months
292 MW
Basrah
Basrah Gas Company/ Shell
ABB Process Automation Division Italy
Khor Al Zubair (KAZ) Power Plant Project Electromechanical Construction Work, Testing, Precomissioning and Assistat Commisioning for two Units GE Frame 5 (2X25 MW).
June 2013 6 Months 50 MW
Engineering Project
Location Client Main Contractor Project Starting
Date Duration Plant Capacity
Basrah MOE JV ELC-PEW
Consulting & Professional Services for Al-Hartha Thermal Power Plant 2008 800 MW
Taji Hilla
Karbala MOE JV
ELC-PEW
MOE Owner Engineer For 3 Fast Track Projects Preparation of EPC Documents for BOP 4 x 40 MW GE Frame 6E GT Power Plant 2 x 125 MW GE Frame 9E GT Power Plant 2 x 125 MW GE Frame 9E GT Power Plant
2008 160 MW 250 MW 250 MW
Power Engineering World | www.pew-group.com 13
Company Profile
Baghdad MOE HEC
Al-Qudus/3 Gas Power Plant Project 4 Units F9E GE, EPC Contractor, for the design of Arch., civil, F.F., F.A, HVAC and small Power and lighting for Buildings, Procurement F.F. equipment, HVAC Equipment and Ducts, Control and Power Cables, Lighting Fixtures and Electrical Panels, Construction al Activities from Civil Work, Electromechanical work t the commissioning and start up.
2011 18 Months
500 MW
Basra MOE
HEC - Hyundai Engineering
Company & PEW
RUMAILA Gas Turbines Power Plant Project (5 x 292 MW-SGT 5-PAC 4000F Siemens) EPC Contractor, for the design of Arch., civil, F.F., F.A, HVAC and small Power and lighting for Buildings, Procurement F.F. equipment, HVAC Equipment and Ducts, Control and Power Cables, Lighting Fixtures and Electrical Panels, Construction al Activities from Civil Work, Electromechanical work the commissioning and start up.
Feb. 2012
23 months
1460 MW
Kirkuk MOE
HEC - Hyundai Engineering
Company & PEW
TAZA Gas Turbines Power Plant Project (1 x 292 MW-SGT 5-PAC 4000F Siemens) EPC Contractor, for the design of Arch., civil, F.F., F.A, HVAC and small Power and lighting for Buildings, Procurement F.F. equipment, HVAC Equipment and Ducts, Control and Power Cables, Lighting Fixtures and Electrical Panels, Construction al Activities from Civil Work, Electromechanical work the commissioning and start up.
Dec. 2011
17 Months
292 MW
Naynava MOE CALIK Evaporation Pond for Naynava Power Plant May 2013 4 Months
Karbala MOE Calik Evaporation Pond For Al-Khayrat Power Plant May 2013 4 Months
Power Engineering World | www.pew-group.com 14
Company Profile
Completed Extension & Brand New Projects
Gas Turbine Power Plants
Location Client Main Contractor Project Starting
Date Duration Plant Capacity
Baghdad MOE
HEC - Hyundai Engineering
Company & PEW
Al-Qudus Gas Power Plant Project Design & Engineering, Procurement, Installation, Testing & Commissioning of 4 Units GE Frame 9E 125 MW, each with all the Auxiliaries & BOP
April 2011
18 months
500 MW
Baghdad MOE JV Vitzrosys-PEW
Al-Rasheed Gas Power Plant Project Installation Testing & Commissioning of 2 Units Siemens SGT-800 47 MW each with all the Auxiliaries & BOP
2009 16 Months 94 MW
Al-Najaf MOE Int.Free Co. (IFC)
Al-Najaf Gas Power Plant Project Installation Testing & Commissioning of 2 Units GE Frame 9E 125 MW each with all the Auxiliaries & BOP
2007 18 Months 250 MW
Baghdad MOE JV Uruk–Baghdad
Al-Qudus Expansion Project Adding 2 Units GE Frame 9E 125 MW each. PEW Performed all the Construction works of 400 KV switchyard , Power Transformers, Gen CB’s, Bus Duct, SWG’s, Control Container, Protection & Metering, Unit Control & DC System , and laying & Termination of 400 KV XLPE , MV , LV Cables.
2005 18 Months 250 MW
Power Engineering World | www.pew-group.com 15
Company Profile
Substations
Location Client Main Contractor Project Starting
Date Duration Voltage Level
Baghdad MOE Washington International
Inc.
Installation of Agargouf 132 KV Siemens Substation 132/33 KV , 63 MVA
2006 11 Months 132 KV
Diyala & Wassit MOE
Washington International
Inc.
Commissioning of 13 ABB Distribution Substation 33/11 KV
2006 7 Months 33/11 KV
Basrah MOE
MOE Transmission lines Projects Department
Construction of Basrah Center 132 KV Substation Laying & Connection wiring of Control Cables between Transformers & SWG’s
2005 4 Months 132 KV
Baghdad MOE JV Uruk–Baghdad
Al-Qudus-2 Project Construction and installation of 2 Units F9E, 123 Mw, triple Fuel (Gas, LDO, Crude)
2007 2008 400 KV
Al-Najaf MOE Int.Free Co. (IFC)
Al-Najaf Gas Power Plant Project Installation of 2 Units F9E, 123 Mw, triple Fuel (Gas, LDO, HFO)
2008 2009 132 KV
Baghad MOE HEC
Al – Qudus 3 Installation of 2 AIS 400 KV Diameter EX of AIS Diameter 400 KV cable laying and terminations
2011 18 Months 400 KV
Kirkuk MOE HEC
Taza Gas Turbine Installation of extended 400 KV AIS Diameter and installation 400 KV internal transmission line
2011 17 Months 400 KV
Basra MOE HEC
Rumaila Gas Turbine Installation of Siemens 400 & 132 KV GIS S/S 132 KV cable laying and termination
2012 27 Months 1460 KV
Power Engineering World | www.pew-group.com 16
Company Profile
SCADA Systems Projects
Location Client Main Contractor Project Starting
Date Duration
Central of Iraq MOE
Washington International Inc.
New Automated Monitoring & Control System, Central Regional Control Center Installation of PLC’s U Wave RTU’s For 40 Substation 132 KV Installation of the Siemens Dispatch
2005 19 Month
Iraq South Region MOE Washington Int.
Inc. SCADA Systems Commissioning 2007 12 Month
Engineering Projects
Location Client Main Contractor Project Starting
Date Duration
All over Iraq 25
locations MOE
JICA Japan Study
Team
Feasibility Study & Site Survey For Iraqi 132/33/11 KV Substations & Power Plants 2004 1
Month
Iraq South Region MOE
Washington International
Inc. Feasibility Study & Assessment for SCADA Systems 2008 1
Month
Completed Maintenance Projects
Gas Turbine Power Plants
Power Engineering World | www.pew-group.com 17
Company Profile
Location Client Main Contractor Project Starting
Date Duration Plant Capacity
Nassrya MOE Fluor - Amec Rehabilitation of Nassrya Gas Power Station Technical Logistic Support for Turbine Inspection & Repair
2006 9 Months 40 MW
Baiji MOE General Co. For Electricity Projects
Rehabilitation & Fabrication & MIG Welding for Aluminum Bus Bar & Units No. 1 & No. Power Modification
2002 12 Months
Steam Power Plants
Location Client Main Contractor Project Starting
Date Duration Plant Capacity
Baghdad MOE Mohan Export (India)
Supply & Erection of Hydrogen Plant Generation at Baghdad South Power Plant
1998 55MW
Hilla MOE Mohan Export (India)
Supply & Erection of Nitrogen Plant Generation in Mussaib Power Station
1999 55MW
Baghdad MOE
General Co. for Rehabilitation of Power Plants
Rehabilitation of Boilers No. 2 & No. 3 at Baghdad South Power Station 2004 6
Months 110 MW
Basrah MOE Applitic (Italy) HP-LP Rotor of Turbine No. 4 At Al-Martha Power Station 2004 1
Month 200 MW
Power Engineering World | www.pew-group.com 18
Company Profile
Baghdad MOE I.E.S (Russian)
Rehabilitation For Turbines & Boilers for Units No. 1 ,No. 2 & No. 3 at Baghdad South Power Station And Unit No. 3 at Dura Power Station
2004 3 Months 160 MW
Baghdad MOE I.E.S (Russian) 2 Months Guaranty & Maintenance to all Units at Baghdad South Power Station. 2005 2
Months 160 MW
Baghdad MOE PEW Rehabilitation of Boilers No. 5 at Baghdad South Power Station 2005 7
Months 47 MW
Substations
Location Client Main Contractor Project Starting
Date Duration Plant Capacity
Baghdad MOE Washington International Inc.
Rehabilitation of Baghdad West Substation 400 KV Replacing one bay of the 400 KV S/S
2006 13 Months 400 KV
Diyala MOE Washington International Inc.
Rehabilitation of Baghdad East Substation 400 KV Replacing one bay of the 400 KV S/S
2006 13 Months 400KV
Power Engineering World | www.pew-group.com 19
Company Profile
Water Treatment Plants
Location Client Main Contractor Project Starting
Date Duration Plant Capacity
Baghdad BWA UNDP
Al-Karama Water Treatment Plant Rehabilitation of Plant, Upgrading tanks, Pumping Systems, Chlorination & Electrical And Increasing the Plant Capacity 10%.
2008 18 Months
227,300 M3/Day
Power Engineering World | www.pew-group.com 20
Company Profile
Manpower
Overall manpower on sites Around 1360 Persons
26%
10%64%
Permanet Staff ( Mid 2013 )
Engineers
Administratives
Labors & Technicians
Power Engineering World | www.pew-group.com 21
Company Profile
Contact PEW
Baghdad Office (Headquarter) Hay Al-Wehda, Mahalla 906, St. 44, House 7 Baghdad-Iraq.
P. O. Box 2562, Al-Jadria, Baghdad–Iraq Mob: +964 7803 263 430
Amman Office (Regional & Active HQ) Al-Waha Circle Building 164 – 5th floor Amman-Jordan Tel: +962 (6) 5534 833 Fax: +962 (6) 5534 843 Mob: +962 799 080 316 P. O. Box 4845, Amman 11953, Jordan
Basra Office (South Branch) Basra - Manaoe Basra - Hay Al-Cahera Mob: +964 7806 845 088 Mob: +964 7709 070 258
Najaf office (Local Office) Najaf-Hay Al-Ishtiraki Tel: +964 (33) 362896 Mob: +964 7807296939
Power Engineering World | www.pew-group.com 22
Company Profile
Registration & Memberships
• Ministry of trade-commercial registration no.10833
• Iraqi Engineering Union-Consultant Engineer- Regis: No.17767/1978
• Iraqi Contractors Union, Regis. No. 28549
• Baghdad Chamber of Commerce, Regis. No. 45-18-A
• The Hashemite kingdom of Jordan-ministry of industry and trade Reg. N0.1037 at 5/9/2006
• Iraqi Businessmen Association Regis. No. 530
• Iraqi Tax Authority Registration no. : 11974
• Tax Identity Number “TIN” in Iraq : 900224273
Power Engineering World | www.pew-group.com 23
Company Profile
Partnership & Agreements
• General Electric Company “GE Energy” Low AC & Mid. AC Motors; “Distributor & Re-seller
Agreement No. MEIR-PO12-681”
• General Electric Company “GE Measurment & Control”.Bently Nevada; “Distributor & Re-seller Agreement ”
• General Electric Company “GE Power & Water”.GE Chemical; “Distributor & Re-seller Agreement ”
Power Engineering World | www.pew-group.com 24
Company Profile
Certificates
• ISO 9001:2008
• ISO 14001:2004 (in process & expected in Mid 2014)
• OHSAS 18001:2007 (in process & expected in Mid 2014)
Power Engineering World | www.pew-group.com 25