florida department of transportation (fdot) district...
Post on 03-Aug-2018
215 Views
Preview:
TRANSCRIPT
IN PARTNERSHIP WITH:
Brevard County • City of TitusvilleFlorida Department of Environmental Protection
Space Coast Transportation Planning Organization
Florida Department of Transportation (FDOT) District Five
Florida East Central Regional Rail Trail
Financial Project No: 424040-4-52-01
PROJECT DETAILS The Florida Department of Transportation’s Florida East Central Regional Rail Trail from Kingman Road/Smokey Lane to the Volusia County line begins construction January 2016. The multi-use, nearly 12.8-mile trail will be part of the Coast to Coast Connector, with more than 260 miles of paved trails connecting St. Petersburg to Titusville.
United Infrastructures Group, Inc. is the project’s prime contractor overseeing both construction and design. AVCON, Inc. will perform design work with Eisman & Russo, Inc., providing project oversight and inspection services. The project scope includes:
• A trailhead at the Aurantia Road crossing with a paved parking area and an adjacent unpaved parking area for equestrian trailers.
• An 8-foot-wide unpaved equestrian trail parallel to the paved multi-use trail from the Aurantia Road Trailhead to the Volusia County line (approx. 5.4 miles).
• Replacement of numerous dirt road crossings and driveways with concrete crossing surfaces.
• Bicycle and pedestrian designation signing and pavement markings for the multi-use trail, trailhead and all crossings.
Your source for information on state roadway projects in Central Florida is just a “click” away!Visit our website, www.cflroads.com, to view anticipated lane closures and
up-to-date information about this project.
Kingman RdSmokey
Ln
Kennedy Pkw
y N
A Max B
rewer
Mem
orial P
kwy
Maytown Rd
NASA ShuttleLanding Facility
ScottsmoorFlatwoodsSanctuary
NASA LaunchSites
Orlando SanfordInternational Airport
TITUSVILLE
VOLU
SIA
COUN
TY
BREV
ARD
COUN
TY
VOLUSIA COUNT Y
ORANGE COUNT Y
BREVARD COUNTY
ORANGE COUNTY
VOLUSIA COUNTYSEMINOLE COUNTY
Kennedy SpaceCenter
PROJECT AREAFlorida East CentralRegional Rail Trail
EQUESTRIAN TRAIL9546
46
50
50
1
417 434402
415
415
PROJECT AREA
M A P L E G E N D
INTERSTATE / TOLL ROAD
HIGHWAY / U.S. ROUTE
MAIN ROAD
ROAD
COUNTY LINE
Total Cost: $10,721,000Start Date: January 4, 2016Estimated Completion: Late 2017
For more information, contact:Lisa Garramone MarkPublic Information CoordinatorIn-House FDOT Consultant District 5 Brevard Operations321-634-6111Lisa.Mark@dot.state.fl.us
Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact: Jennifer Smith, FDOT Title VI Coordinator at (386) 943-5367. Via email at jennifer.smith2@dot.state.fl.us. If you are hearing or speech impaired, please contact us by using the Florida Relay Service, 1-800-955-8771 (TDD) or 1-800-955-8770 (Voice).
top related