florida department of transportation (fdot) district...

1

Click here to load reader

Upload: duongque

Post on 03-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Florida Department of Transportation (FDOT) District …spacecoasttpo.com/wp-content/uploads/2016/08/FECRRT-Flyer-update… · Florida Department of Environmental Protection ... VOLUSIA

IN PARTNERSHIP WITH:

Brevard County • City of TitusvilleFlorida Department of Environmental Protection

Space Coast Transportation Planning Organization

Florida Department of Transportation (FDOT) District Five

Florida East Central Regional Rail Trail

Financial Project No: 424040-4-52-01

PROJECT DETAILS The Florida Department of Transportation’s Florida East Central Regional Rail Trail from Kingman Road/Smokey Lane to the Volusia County line begins construction January 2016. The multi-use, nearly 12.8-mile trail will be part of the Coast to Coast Connector, with more than 260 miles of paved trails connecting St. Petersburg to Titusville.

United Infrastructures Group, Inc. is the project’s prime contractor overseeing both construction and design. AVCON, Inc. will perform design work with Eisman & Russo, Inc., providing project oversight and inspection services. The project scope includes:

• A trailhead at the Aurantia Road crossing with a paved parking area and an adjacent unpaved parking area for equestrian trailers.

• An 8-foot-wide unpaved equestrian trail parallel to the paved multi-use trail from the Aurantia Road Trailhead to the Volusia County line (approx. 5.4 miles).

• Replacement of numerous dirt road crossings and driveways with concrete crossing surfaces.

• Bicycle and pedestrian designation signing and pavement markings for the multi-use trail, trailhead and all crossings.

Your source for information on state roadway projects in Central Florida is just a “click” away!Visit our website, www.cflroads.com, to view anticipated lane closures and

up-to-date information about this project.

Kingman RdSmokey

Ln

Kennedy Pkw

y N

A Max B

rewer

Mem

orial P

kwy

Maytown Rd

NASA ShuttleLanding Facility

ScottsmoorFlatwoodsSanctuary

NASA LaunchSites

Orlando SanfordInternational Airport

TITUSVILLE

VOLU

SIA

COUN

TY

BREV

ARD

COUN

TY

VOLUSIA COUNT Y

ORANGE COUNT Y

BREVARD COUNTY

ORANGE COUNTY

VOLUSIA COUNTYSEMINOLE COUNTY

Kennedy SpaceCenter

PROJECT AREAFlorida East CentralRegional Rail Trail

EQUESTRIAN TRAIL9546

46

50

50

1

417 434402

415

415

PROJECT AREA

M A P L E G E N D

INTERSTATE / TOLL ROAD

HIGHWAY / U.S. ROUTE

MAIN ROAD

ROAD

COUNTY LINE

Total Cost: $10,721,000Start Date: January 4, 2016Estimated Completion: Late 2017

For more information, contact:Lisa Garramone MarkPublic Information CoordinatorIn-House FDOT Consultant District 5 Brevard [email protected]

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact: Jennifer Smith, FDOT Title VI Coordinator at (386) 943-5367. Via email at [email protected]. If you are hearing or speech impaired, please contact us by using the Florida Relay Service, 1-800-955-8771 (TDD) or 1-800-955-8770 (Voice).