ERTMS DEPLOYMENT IN SPAINERTMS DEPLOYMENT IN SPAIN
ERTMS CCRCC 2015T i M t S t i t B i C
ERTMS CCRCC 2015T i M t S t i t B i CTurning a Mature System into a Business CaseTurning a Mature System into a Business Case
Lille, 22nd‐23rd September 2015Lille, 22nd‐23rd September 2015
1
INDEX
1. SPANISH INFRASTRUCTURE ERTMS DEPLOYMENT
2 ERTMS ON BOARD EQUIPMENT CURRENT SITUATION2. ERTMS ON BOARD EQUIPMENT. CURRENT SITUATION
3. MIGRATION
3.1 VERSION COMPATIBILITY3.2 MIGRATION REQUIREMENTS3.3 MIGRATION STRATEGY3.4 BUDGET AND PROGRESS3.5 SPANISH VIEW FOR B2 SPECS. MIGRATION SUMMARY
4 SPANISH APPROACH TO BASELINE 3 – CONCLUSION4. SPANISH APPROACH TO BASELINE 3 CONCLUSION
2
2. ERTMS ON BOARD EQUIPMENTCurrent situation
362 vehicles running in commercial operation• 2.2.2 + CR*: Upgrading is needed• 2.3.0.d – CR: Some CR are disabled in order to be
compatible with 2.2.2 lines
Onboard systems currently in service:
* CR Ch R t
42001 2019
* CR: Change Request
3.MIGRATION. 3.1 Version Compatibility
In 2008, European Commission adopts 2.3.0.d version as standard
SRS 2.3.0d
2.3.0d version is not compatible with previous versionsSub‐108 v1.2.0Update Annex A
2.3.0d
Reference laboratory (CEDEX) have been used for testingReference laboratory (CEDEX) have been used for testingcompatibility level between different SRS versions in order tomanage the migration process
In order to guarantee interoperability between track and trainsIn order to guarantee interoperability between track and trainsand to avoid captive trains, it is neccesary to define a complexmigration plan that requires coordination between RU (RENFE)and IM (ADIF) with Ministerio de Fomento leadershipand IM (ADIF), with Ministerio de Fomento leadership
5
3. MIGRATION. 3.3 Migration Strategy
L1 2 3 0d
Level 1 / 2 KEYSL1 backup system availability
L1 compatibility between 2.2.2 train & 2.3.0d track
BarcelonaLleida
L1 + L2 v2.3.0.d L1 + L2
2.3.0.d
L1 2.3.0d-L1/2 2.2.2+L1/2 2.2.2+ Current
Guadalajara
Tarragona
Valladolid
Segovia
Zaragoza
Madrid
L1 + L2 v2.3.0.d
L1 2.3.0d-L1/2 2.2.2+
Level 1 / 2
Madrid
1. Infrastructure L1 migration to v2.3.0.d. (2014-2015)Infrastructure Engineering rules compatible with
L1 2.3.0d + Eng. Rules
L2 2.2.2+
Level 1
1
Córdoba
ast uctu e g ee g u es co pat b e tv2.2.2+ in trains.
2. Train migration to 2.3.0.d. (2015-2019)
Trains run in L1 v2.3.0.d-CR & v2.2.2+ and in L2 v2.2.2+ 2.2.2.+ 2.3.0d
L1 2.3.0d + Eng. Rules 2
Málaga
Infrastructure L2 unsubscribe (v2.2.2+).Trains run in L1 v2.3.0.d & v2.2.2+
3 Infrastructure L2 migration to 2 3 0 d (2016)
L1 + L2 v2.3.0.d
2.3.0d
Level 1 / 2
7
3. Infrastructure L2 migration to 2.3.0.d. (2016)2.3.0d
L1 2.3.0d + Eng. Rules
L2 2.3.0d3
3. MIGRATION. 3.5 Spanish view for B2 specs. Summary
2.3.0d is a reference version and it works properly2.3.0d is a reference version and it works properly
We cannot afford a change of specifications that would imply
Backwards compatibility must be guaranteed
the upgrading of lines and current fleet
Backwards compatibility must be guaranteed
Otherwise we should stop ERTMS deployment This is notOtherwise, we should stop ERTMS deployment. This is notpossible because systems are in service
A commitment for 2.3.0d products maintenance must beguaranteed
9
4. SPANISH APPROACH TO B3 ‐ CONCLUSION
InfrastructureADIF d i i O l 2 3 0 d i ill b i t ll d th t kADIF decision: Only 2.3.0.d version will be installed across the network
• B3 infrastructure deployment is not an option to be considered and it is not scheduled
• Next steps: End migration process and mantain consistency and homogenity in the network
OnboardAll future versions of onboard equipment must be compatible with lines version 2.3.0d
The compatibility analysis (BCA report) and the impact should be performed before each new release of the specifications
• B3 products aren’t mature and fully tested and we need to keep our trains moving on ourinfrastructure.
• Next steps: 2.3.0.d lines already in service and, right now, we need onboard equipmentcompatible with 2 3 0 d lines in service as soon as possible Only 2 3 0d trains is the optioncompatible with 2.3.0.d lines in service as soon as possible. Only 2.3.0d trains is the option.
IM & RU investments must be guaranteed