DESCRIPTION

Electrical rooms provide safe and secure spaces for the operation and maintenance of electrical equipment. While electrical equipment types and ratings can have significant impacts on electrical room requirements, distributing the electrical power to the rest of the building via wiring, busways, and raceways can also affect electrical room design. Switchboards, switchgear, transformers, generators, and UPSs require space for installation, maintenance, heat dissipation, and possible future expansion. And the wiring, busways, and raceways that distribute the electrical power must be accounted for—now, and in the future. Documentation and monitoring of electrical system’s equipment and how it connects to the rest of the facility must be accurately maintained. The design of electrical rooms requires an integrated approach among disciplines. Architects and structural, mechanical, and fire protection engineers should work as a team in designing these rooms. NFPA 70: National Electrical Code (NEC) is the main source for electrical room requirements, but other codes, good practices, and recommendations should be considered. The result will be a room that is safe and secure, and provides for the functional operation and maintenance of the specific electrical equipment located within.

TRANSCRIPT

Electrical Systems: Designing electrical rooms

Join the discussion about this Webcast on Twitter at #CSEelectricalroom

Sponsored by:

Brian Martin, PE, Portland Electrical Department ManagerCH2M HillPortland, Ore.

Brian Rener, PE, LEED AP, AssociateSmithgroupJJR,Chicago, Ill.

Moderator: Jack Smith, Consulting-Specifying Engineer and Pure Power, CFE Media, LLC

Presenters:

Electrical Systems: Designing electrical rooms

Brian Martin, PE, Portland Electrical Department Manager

CH2M HillPortland, Ore.

Brian Rener, PE, LEED AP, AssociateSmithgroupJJR ,

Chicago, Ill.

Presentation scope

• NFPA 70 (NEC) 2014• International Building Code (IBC)• 800 A and Above • Primary services• No hazardous locations• Good engineering practices

Electrical room design

• Needs a coordinated team:• Electricals• Architects• Structural• Mechanicals• Fire protection

Room types

• Primary service rooms• Electrical rooms• UPS or battery rooms• Generator rooms• Computer rooms• Utility vaults

Design issues

• Working vs. dedicated spaces• Dedicated spaces and foreign systems• Fire protection• Fire ratings• Ventilation• Structural• Building occupancy• Lighting

Working vs. dedicated spaces

• Different spaces– Worker vs. equipment

Working vs. dedicated spaces

• Different spaces– Worker vs. equipment

Working space• Applies to:

– “Equipment operating at 600 V, nominal, or less, to ground and likely to require examination, adjustment, servicing, or maintenance while energized.” NEC Article 110.26(A)

• Switchboards• Switchgear (Added in 2014)• Motor control centers• Panelboards• Disconnect switches• Circuit breakers• Controllers• Controls for HVAC equipment• Transformers sometimes fall into this category

Working space: table

Working space: elevations

Nonelectrical parts

“Where rear access is required to work on nonelectrical parts on the back of enclosed equipment, a minimum horizontal working space of 30 in. shall be provided.” NEC Article 110.26(A)(1)a

Dedicated spaces• Applies to:

• “All switchboards, switchgear, panelboards, and motor control centers shall be located in dedicated spaces and protected from damage.” NEC Article 110.26(E)

• Switchboards• Switchgear (Added in 2014)• Panelboards• Motor control centers

Dedicated spaces and foreign systems

• Can you have foreign systems (mechanical ducts and/or plumbing) in your electrical room? – Yes and no

• Understand dedicated space

Foreign systems (MP)

• NEC: above, if protected

• What about sprinklers?• NEC: okay in dedicated space

2014 NEC change• Outdoor spaces

– New requirement now calls for the same basic dedicated equipment or electrical space for outdoor installations that has been in effect for indoor installations

– This space above and below the electrical equipment should be dedicated

Primary equipment

• Switchboard vs. switchgear• Switchboards: UL 891

– Front access – Rear access– Primarily fixed mounted

Primary equipment

• Switchboard Vs Switchgear• Switchgear - ANSI C37

– Rear Access– Primarily Drawout Construction

Access

• 1200 amps & 6 feet in width– Two doors on opposite ends– Doors 6’ 1/2’’ x 24”– One door if working clearance

doubled– Doors Swing Out

• 800 A (New to NEC 2014)– Listed Panic Hardware on Doors

Access: plan examples

Beyond NEC: working space and access

• Doors: at least 36 in. wide or double 36 in., 9 ft. high• Access to drawout devices• Would you want to work in only 3½ ft?• Breaker truck access• NFPA 70E: Standard for Electrical Safety in the Workplac

e - arc flash zones

• Arc flash gear, venting• Height above switchboards • Space planning: work with your architect

Fire protection

• Sprinklers– NFPA 13: yes, or 2 hr rating– Some cities: preaction

• Fire detection– Smoke detectors in electrical rooms– Recommend heat and flame detection in generator

rooms

Fire ratings

• Do electrical rooms need to be fire rated?– NEC

• Not if sprinklered– What about dry type transformers?

• 112.5 kVA, 155 C or higher insulation

• Emergency systems (NEC Article 700)– NEC high rise or high occupancy

• Approved fire suppression• 2-hr systems

Fire ratings

• NFPA 110– EPS installed in a separate room for Level 1 systems– Room must have a 2-hr rating

• Know your local codes– Example: City of Chicago

• Generator room rating: 3 hr• Fuel storage: 550-gal limit• Not located more 2 floors up or down from grade.

• Insurance carrier requirements

Ventilation

• Required?• General rating of equipment: 104 F• Recommend: 86 F• Electrical rooms

– Without transformer: 1 cfm/sq. ft. – With transformer: 1.0% to 2.0% of kVA (3 cfm/kVA)

• Generator rooms– Cooling vs. combustion air– After engine shuts down– Remote radiator – 2,500 Btu/hr/kVA

Ventilation

• Battery/UPS rooms– Keep temperature around 77 F– What about hydrogen?

• Flooded (vented) batteries• Valve regulated, sealed• Conflicting codes: NEC, UFC, IFC

– Safe rules• 1 cfm/sq. ft. • Fan failure relay

Structural

• Often overlooked– Switchboards and switchgear – Generators– Vibration isolation– Computer rooms– Raised floors– Miscellaneous

• Pads • Penetrations• Fire sealing• Path of delivery

Lighting

• Recommended lighting levels– IES and NFPA 70E: 30 foot-candles

• Emergency lighting– 1 foot-candle is not enough

• Switching– Must include nonautomatic means

Miscellaneous room issues

• EMI• Noise

Brian Martin, PE, Portland Electrical Department ManagerCH2M HillPortland, Ore.

Brian Rener, PE, LEED AP, AssociateSmithgroupJJR,Chicago, Ill.

Moderator: Jack Smith, Consulting-Specifying Engineer and Pure Power, CFE Media, LLC

Presenters:

Electrical Systems: Designing electrical rooms

Join the discussion about this Webcast on Twitter at #CSEelectricalroom

Sponsored by:

top related