Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 1 of 16
Enterprise Delivery SystemProgram – Customer Portal
VDSS Master Test(SIT and UAT) Plan
Initial Draft Version 0.1
Project Name: Commonwealth of Virginia Department of SocialServices Enterprise Delivery System Program – Customer Portal
System Test Plan Prepared By: Stephanie Napper
Date ST Plan Prepared: November 10, 2011
Test Scripts Created By: DIS, Security, and Business
System Testing Performed By: Staff of DIS, Security, Business, andLDSS Staff
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 2/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 2 of 16
Table of Contents
1. Introduction ......................................................................................... 4 1.1 Acronyms .......................................................................................................... 4 1.2 Definitions ......................................................................................................... 5 1.3 Purpose............................................................................................................. 5 1.4 Scope ................................................................................................................ 6 1.5 System Testing ................................................................................................. 6 1.6 Assumptions/Dependencies/Pre-Requisites/Risk ........................................... 11
2. Test Approach ................................................................................... 12 2.1 Test Approach ................................................................................................. 12
2.1.1 Requirement Testing................................................................................ 12 2.1.2 Regression Testing .................................................................................. 12 2.1.3 Interface Testing ...................................................................................... 12 2.1.4 Information Security Testing .................................................................... 13
3. System Testing Process .................................................................. 13 3.1 Test Entry/Exit Criteria .................................................................................... 13 3.2 Test Pass/Fail Criteria ..................................................................................... 13 3.3 Test Suspension/Resumption Criteria ............................................................. 14 3.4 Test Deliverables ............................................................................................ 14 3.5 Test Execution ................................................................................................ 14 3.6 Staff Responsibilities ....................................................................................... 10 3.7 Draft Schedule ................................................................................................ 15
4. Defect Tracking and Resolution Process........................................ 14 5. Communication ........................................Error! Bookmark not defined.
5.1 Communication Process ................................................................................. 16 6. Change Management ........................................................................ 16
6.1 Changes to Master Test Plan .......................................................................... 16 7. Plan Approvals .................................................................................. 16
7.1 Changes to Master Test Plan .......................................................................... 16
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 3/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 3 of 16
Revision History
System Test Document: Revision HistoryVersion # Date Description Author
0.1 11/09/2011 Initial Draft Stephanie Napper
Approvals
Department Name and Title Approval Date
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 4/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 4 of 16
1. Introduction
An examination of the Virginia Social Services System (VSSS) business model through business
process re-engineering (BPR) revealed several issues and operational challenges within the stateoffice and 120 local departments.
Minimal customer self-service capabilities, paper and manual based processes, and limitations oninformation sharing among social services activities and partners were identified as operational
challenges requiring a more progressive resolution.
It was determined that these concerns could best be addressed by leveraging of more currenttechnology. These concerns led to the inception of a new business process model; an efficient,
state of the art, enterprise-wide VSSS servicing customers holistically. The Virginia Department
of Social Services (VDSS) has entered into a partnership with Deloitte to create a web-enabled
system that will move VSSS to service integration, improved efficiency, and improved outcomesfor the citizens of Virginia.
1.1 Acronyms
The following acronyms may be found within this document.
Acronym Description
ACH Automated Clearing House
ACS Affiliated Computer Systems, Inc.
ADAPT Application Benefit Delivery Automation Project
BA Business Analyst
BPR Business Process Re-engineering
CP Customer Portal
DIS Division of Information Systems
EAL Enterprise Audit Log
EDSP Enterprise Delivery System Project
GIS Geographic Information System
IVR Interactive Voice Response
LDSS Local Department of Social Services
MMIS Medicaid Management Information System
RQM Rational Quality ManagerSOW Statement of Work
SIT System Integration Testing
SNAP Supplemental Nutritional Assistance Program
SPIDeR Systems Partnering in a Demographic Repository
TANF Temporary Assistance for Needy Families
UAT User Acceptance Testing
UCD Use Case Document
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 5/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 5 of 16
Acronym Description
URD User Requirement Document
VaCMS Virginia Case Management System
VDSS Virginia Department of Social Services
1.2 Definitions
Pre-Condition- The state in which the application must be before the test case is run. This mayinclude pre-building test data prior to running a test.
Post Condition- The state in which the application must be after the test case is run. If the post
condition is met, the test passes.
Test Case- Specific test record to be utilized in a defined test scenario and script (e.g. specific
case/ component, known input, etc.).
Test Scenario- High-level description of a test to be conducted (e.g. set of conditions, variables,
positive/ negative scenarios, circumstance/ situation within which a case/ component is beingprocessed, etc.).
Test Script- The detailed steps/ instructions provided to the testers on how to operate theapplication and execute a test scenario to ensure it works according to the approved
requirements. It contains a sequence of events and expected results.
Application Requirement- The specific requirements the developers must program in order tomeet the overall requirements of the test scenario.
1.3 PurposeThe purpose of this Master Test Plan document is to define and outline processes, activities,
tools, and responsible parties for the System Integrated Testing (SIT), Security, and UserAcceptance Testing (UAT) of the Enterprise Delivery System Project - Customer Portal (EDSP –
CP).
This form of testing is to validate that Customer Portal, ADAPT and all interfaces meet
documented requirements as stated in the following documents:
Statement of Work (12/10/10)
Business and Requirement Document
Use Case Documents
Development Clarification Meeting Documents
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 6/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 6 of 16
1.4 Scope
The System Integrated Testing (SIT) jointly performed by Deloitte, and the Division of
Information Systems (DIS) will be followed by User Acceptance Testing (UAT) performed by
Security and Business. The test schedule below outlines the two phases:
Release 1
Orientation and Training for UAT (Magic Team) November 8 – 9, 2011
SIT/MIT Developing of Test Scripts (11/18/2011)
SIT Training for testers (regular ongoing meetings)
Test Execution: MIT/SIT (November 21, 2011 – January 27, 2012)
UAT Developing Test Scripts (December 6 – 14, 2011)
UAT Building Cases in ADAPT (December 15, 2011 – January 12, 2012)
UAT Orientation for LDSS Testers (January 18, 2012)
UAT Introduction to Test Scripts and new ADAPT screens (January 19, 2012)
Test Execution : UAT - Business and Security (January 24 – March 1, 2012)
Release 2
Test Execution: SIT ( March 12 – May 4, 2012
Orientation and Introduction to Renew, Changes, and Check My Benefits for Testers(May 2 – 3, 2012)
Test Execution: Business and Security (May 7 – June 7, 2012)
1.5 System TestingThis System Test Plan document covers the methods of testing used to verify that the Enterprise
Delivery System Project – Customer Portal delivered by Deloitte meets the system requirementsoutlined in the Statement of Work, Requirement Documents, Use Case Documents, andDevelopment Clarification minutes.
This document describes the comprehensive approach to system testing, including specific areas
of the system that will be tested, areas that will not be tested, the roles of the individuals involvedin the testing, the documentation involved in testing, and the procedures for reporting and
retesting defects found during this phase of testing.
Testing of the system will be predicated upon the releases for this project.
Release 1: This phase of testing will focus on all aspects SIT, Security, and UAT for the“Screening”, “ Apply for Benefits”, and “ My Work Space” modules of the application for TANF,SNAP, Medical Assistance, and Energy Assistance. Testing for this deployment to include SIT,
Security, and UAT will be conducted from 11/21/11 through 3/1/12.
Release 2: This phase of testing will focus on all aspects; SIT, Security, and UAT for the
“Check My Benefits”, “ Report Changes”, and “ Renew My Benefits” modules of the applicationsfor SNAP, TANF, Medical Assistance, and Energy Assistance.
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 7/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 7 of 16
MIT/SIT
Definition: MIT includes initial testing of the individual components/ modules
and their preliminary integration into the solution’s back-end framework. MIT
will be independent of the front-end solution and will focus on the back-endsolution and related components.
SIT includes initial testing of the individual components/ modules and their
preliminary integration into the solution’s back-end framework. MIT will be
independent of the front-end solution and will focus on the back-end solution and
related components.
SIT takes an optimistic approach to testing, because it expects to have few
problems with the individual components due to Unit Testing and MIT. The
strategy relies heavily on the component developers to perform the isolated unit
testing for their product before being released to MIT and then SIT. The goal of the strategy is to avoid redoing the testing done by the developers and initial MIT
testers and instead determine problems caused by the interaction of thecomponents in the environment.
SIT includes system to system and interface to interface testing. It includes thetesting of the integration of the front-end solution with the back-end solution. To
be more efficient and accurate, user-like workloads (e.g. for customers, for
workers) will be defined for creating realistic scenarios in exercising the
environment. This allows for confirmation that the integrated environment willwork as expected for the target customers/ workers.
Participants:
IT Test ManagerMary Disse
IT Requirements Manager
Iesha Tiller4 Business Analysts
Jan Ellison
Fernando MillerWillie McWhite
John Vaughan
Method: MIT/ SIT will conduct requirements-based testing focusing on thefollowing test scenarios and their associated requirements:
Security (e.g. including authentication, authorization, associations, EAL andSAMS Reports)
Apply For Assistance through Customer Portal (CP) Interface
o Including Reapply for assistance through CP
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 8/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 8 of 16
Renew My Benefits through CP Interface
o Including Add person or program with renewal of benefits through CP
Report My Changes through CP Interface, including:
o Address change
o Add a person
o Remove a persono Add a program
o Begin/end pregnancy or disability
Check My Benefits through CP Interface (including Application Statuschecks)
File Clearance through My Workspace (MWS) and ADAPT
FIPS Verification through MWS (using GIS)
Reference Table Validations (ADAPT and CP)
Changes to ADAPT required to accommodate the above scenarios (e.g.including errors, screen help, alerts, inboxes, summary screens, reports, etc.).
Test scenario documents, requirements traceability matrices, screen mockups, designdocuments, and help files in the form of the CP/ADAPT VDSS Back-End Design
Document and supplemental documents/ data matrices will be provided to testers. The
Test Scripts which include steps the testers will follow to test the scenarios and theirrequirements will be developed by and provided to all testers.
Security
Definition: testing encompasses the back end of this project as it relates to both
citizens and staff of local departments of social services entering and accessing
secure information, to include creating accounts, strong passwords, resettingpasswords and access to information is provided as associated with client IDs..
Separate tests will be conducted on the SAMS CP functions with existing Security
Staff. An established SAMS regression test process will be utilize as part of these
tests. Separate test account for each worker role in CP will be tested. COV
Auditors will assist in conducting tests on the CP.
Participants
Test Manager
Matt Teasdale
Existing Security Staff 10 COV Auditors
Method: Security will conduct requirements-based testing.
Each tester will enter data and log the inputs as they make them for comparisons
with the audit logs.Testers will purposely attempt to enter values that should be rejected.
Testers will process file clearance actions to see how they are logged in EAL.
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 9/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 9 of 16
Testers will add, update and delete accounts to see how the system responds and
updates to EAL.Testers will create a CP account and test the password reset options.
Separate tests will be conducted on the SAMS CP functions with existing Security
Staff.
UAT
Definition: Business UAT as are all components of testing has a primary
expectation to test with the goal of releasing to the users; both the citizens of the
Commonwealth and DSS staff an efficient new technology that will enhance theway we do business the first time out of the gate. To that extent UAT focuses on
the testing of business rules for SNAP, TANF, Medical Assistance, and Energy
Assistance utilized in the EDSP – CP and the ADAPT System to ensure that
programming of rules and logic result in accurate outcomes in line with the
Requirements Document.
UAT includes testing of navigational tools, password generation, access to clientinformation, system and screen flow, the accuracy of the passing of information
from the Customer Portal to ADAPT to include the filing of an application
utilizing the Spanish language, and the generation of reports in My Work Space.
UAT includes ease of use testing through the partnering with The Virginia
Department for the Blind and Vision Impaired.
Participants:
Co-Test ManagersStephanie Napper
Delores Veal3 Subjects Matter Experts (Regional Consultants who have been with the
project from the first JAD session)
Sherry Sinkler-CrawleyNan Foster
Cathy Trimble
2 Testers from local departments of social ServicesGail Kelley – Norfolk Department of Human Resources
Julie Chalupsky - Norfolk Department of Human Resources
Possible Testers from VDSS Business Operations Unit
Method: UAT will conduct requirements-based testing conducted in a test lab.
All testers will test from this lab. The lab environment will provide computers for
each tester. Orientation will be held for all testers to provide guidance for testerswho will develop test cases and test scripts. An additional orientation will be held
for all testers who will perform system testing. Testers developing scenarios and
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 10/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 10 of 16
scripts will be provided access to Use Case Documents, hard copy of the VDSS
Back End Design Document, and the Requirement Document.
Testing of the Customer Portal; Screening, Apply for Benefits, My Work Space,
Filing Renewals, Reporting Changes, and Check My Benefits will include:
Accuracy of information on screens
Input of information
Expected results vs. Actual results
Testing of Requirements
Test to ensure they cannot get off the screen without a strong password
Test to ensure that only the identified individual(s) can access caseinformation
Testing of the ADAPT System to ensure information pushed from the Customer
Portal to ADAPT is correctly populated in the appropriate subsystems and that no
facet of eligibility determination and benefit calculation is automatically ran.
LDSS testers will have primary role in ensuring that screens other thanidentified screens have not changed.
LDSS tester will have primary role in ensuring that the system functionsthe way it did prior to the new application other than identified changes.
Testers will add program to both pending applications and ongoingcases.
Testers will add/delete a person to both pending applications andongoing cases.
1.6 Staff Responsibilities
VDSS/DIS/Security/Business staff will be responsible for creating the System Test Planand creating and maintaining System Test Case Scripts using the documents noted in
above sections. The assigned staff will be responsible for securing test documents and
securing production data used for testing.
Test Managers are responsible for the overall environment, operations, and process of
the unit’s system testing. Test managers will review and key defects into ClearQuest.
Test Managers will monitor the lifecycle of defects.
Testers are responsible for accurate and precise testing of test scripts and regression
testing as needed. Testers are also responsible for reporting defects to Test Managers.
Testers will maintain a daily count of test scripts tested to include pass/fail results.
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 11/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 11 of 16
1.7 Assumptions/Dependencies/Pre-Requisites/RiskAssumptions
The following assumptions have been made for this plan:
Deloitte, DIS, Security, and Business will commit adequate resources to support
the testing effort as listed in the project schedule. All components of testing (Deloitte, SIT, Security, and Business)
All testing will be manually performed.
Testers, Test Managers, and Project Co-Leads will be made aware of all defects,new and outstanding.
Review of defects will be review by Test Managers to ensure the defect is valid,supporting documentation is provided to explain defect, and that an identical defect
has not been previously submitted.
Defects will be corrected in a timely manner to ensure the success of the projectschedule.
Regional and LDSS personnel participating in testing understand 100% of their
effort is required.
Deloitte, MIT/SIT, Security and UAT agree upon the severity definition for defectsidentified during testing.
Deloitte, MIT/SIT, Security and UAT will have access to defects created inClearQuest.
All defects will be entered in ClearQuest daily by 3:00 p.m.
Defects with a critical or high severity level will also be called in to the identifiedperson for Deloitte and DIS.
Dependencies and pre-requisites
The following dependencies and prerequisites exist:
Defects found during SIT have been resolved before UAT can begin.
All testing resources (computers, requirements, SOW) must be in place.
All test environments (ADAPT, SPIDeR, MMIS, VaCMS, Energy AssistanceAutomated Program, LDSS interface, etc) must be properly established
Test environment matches “real world”
Testers are experts in their own area
Testers from LDSS are knowledgeable of all benefit programs
All defects found during testing have been resolved to an agreed upon acceptablelevel.
Risks
The following risk may exist:
Resources not being available when needed to test
Users and/or developers trying to make changes to previously approved requirements
Findings on pre-existing production issues and requests for resolutions (potentialscope creep).
Non-CP related legacy system or interface changes impacting this project.
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 12/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 12 of 16
2. Test Approach
2.1 Test Approach
System testing will be performed manually for SIT, Security, and UAT.
Test scripts will be executed using valid and invalid data to verify the expected results occur.
Each test script or test case will be created, tested, and documented as pass or fail. Test scriptsmay be combined into one document or maintained as individual documents with the goal of
entering all test scenarios and scripts in Quality Manager. The IT, Security, and Business Test
Managers should be abreast of all test scenarios and scripts.
Each test case/script will be traced to a Business Requirement. There may be rare situations
where a test can not be located in the Business Requirements because discrepancies may exist.
While the Rational Suite, including Rational RequisitePro, ClearQuest, and Quality Manager, are
the systems of record for the EDSP-CP project a back-up method will be implemented at the
beginning of the process. All requirements are loaded and managed in RequisitePro; all defects
must be logged/ tracked in ClearQuest, and all test items will be included in Quality Manager.This will ensure traceability and consistency throughout the entire project lifecycle.
Test Cases and Test Scripts are to be written and compiled on the agreed upon format forconsistency. Test Cases and Scripts will include a unique numbering identifier, the associated
requirement number(s), and a pithy description of the intent of the scenario and script. Paper
documents will be electronically filed in a determined folder on the R: / drive.
2.1.1 Requirement TestingEach applicable numbered requirement will be traced to a test script/case for traceabilityto validate each function properly works and meets the needs of the user.
2.1.2 Regression TestingMIT/SIT, Security, and UAT will each conduct regression testing. Regression testing
will be performed on defects introduced during system testing only. Regression testing
will also will include testing of existing legacy system functionality to verify that it was
not impacted unexpectantly when other aspects of the system/interface were changed to
meet project requirements.
2.1.3 Interface TestingMIT/SIT will test not only the individual components/requirements, but will also test the
interfaces between the CP and ADAPT/ MMIS/ Energy system/ LDAP/ SPIDeR/ EAL/
GIS, both by module and by end to end process. This includes the CP data, ESB
translations, VDSS Holding Tables, and legacy system databases. This is to ensure thatthe data entered into the CP is accurately transmitted and displayed in ADAPT. Also, it
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 13/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 13 of 16
will test that the data in ADAPT/ MMIS/ Energy system is accurately transmitted and
displayed in the CP during the Renew My Benefits, Report My Changes and Check MyBenefits processes.
2.1.4 Information Security Testing
Information security testing will be performed differently because of its complexity andthe number of roles versus groups versus user types. Testing will consist of validating
system access and allowing of information to clients through the CP.
3. System Testing Process
3.1 Test Entry/Exit Criteria
System Testing will begin after tester training has been completed, test case scripts
documentation have been initiated and approved in draft, and system access and logonhave been obtained for the testers from SBE. All resources must be in place and all test
environments must be properly established and connections available.
System Testing will be considered complete when all planned test scripts have been
executed, all known system testing defects have been documented, tracked, and correcteddefects have been re-tested with no outstanding Critical or High defects or at the end of the
contract period, whichever comes first. A “critical” defect is a defect that prevents further
testing. A “high” defect” is a defect that that does not functions as expected/designed or
causes other functionality to fail to meet requirements. Otherwise, system testing will beconsidered complete on March 2, 2012 for Release 1 and June 8, 2012 for Release 2 per
the current Statement of Work Contract.
3.2 Test Pass/Fail Criteria
The pass/fail criteria for each test case/script is described by its expected results and will
be noted as pass or fail (with a defect number assigned), the test date, and tester name. If the expected results are received, the test will be marked as “pass”, if the expected results
are not received, the test will be marked as “fail”.
Upon defect correction, the test case/script will be retested and again noted as pass or fail
during retest. Each test case/script will continue to be retested until it passes or is deemedacceptable by the EDSP – CP Business Manager.
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 14/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 14 of 16
3.3 Test Suspension/Resumption Criteria
If a problem is found that impedes the continuation of any phase of testing (50% or more
of the test cases can not be completed), System Testing will be suspended until appropriate
corrections are made and testing can resume. If this type of suspension is warranted, the
EDSP – CP Test Manager will immediately be notified.
3.4 Test Deliverables
The following items are work products that will be outputs of the testing process.
System Test Plan
System Test Case Scripts that includes a traceability matrix
3.5 Test Execution
System Testing will be performed in a test environment at VDSS by testers identified byDIS, Security, and Business. A stable URL will be provided by Deloitte. Testers will
have access to the unit Test Manager on a daily basis (in person, phone or email) during
the testing period to discuss issues and questions.
Workstations will consist of the hardware setup used by VDSS within the department and
access to the test environment will be secure and only accessed by the individuals taskedwith this activity.
Testing will be executed manually by using test case scripts that will be captured in MS
WORD or MS Excel Spreadsheets. Each script will contain the object of the test, the
conditions to perform the test, the expected results, the actual results received, the tester’sname, the date of test, and the execution status of the test (pass/fail). The execution of test
scripts are governed solely by the tester assigned and can be executed in any order deemednecessary by the tester.
The test database will consist of production and test data; therefore, data will be handled
securely:
Production data will not be accessed nor viewed by anyone in Deloitte orVDSS/DIS.
4. Defect Tracking and Resolution Process
Any defects encountered will be reported by the testers at the end of the day, with the exception
of Critical or High defects and entered directly into ClearQuest. Critical and High defects are to
be reported to the Test Manager immediately. Defect tracking and resolution will occur at the
test script level. System testers will execute the test scripts and record within the script the stepat which the script failed. If a script fails, it will be recorded within the defect tracking system
and attachments will be supplied as evidence.
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 15/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 15 of 16
The following table describes the Defect Severity levels:
Severity Level Definition
Critical A defect that prevents further testing of the system,
High A defect that does not function as expected/designed or causes
other functionality to fail to meet requirements.
Medium A defect which does not conform to standards and conventions.
The application or system may function properly, but the actual
test results are not the same as expected results. (Should be
evaluated on a defect by defect basis.)
Low Cosmetic defects which does not affect the functionality of the
application or system.
It is expected that 100% of all defects be resolved.
ClearQuest statuses will be used to track the defect through the testing and retesting processes.
This status will be used to meet project reporting needs.
5. Schedule
5.1 Draft Schedule
The following dates are estimates based on the project plan and deadline date for completion of
system testing.
SIT Release 1 Completed: January 27, 2012
Security and UAT Release 1 Completed: March 2, 2012
SIT Release 2 Completed: May 4, 2012
Security and UAT Release 2 Complete: June 8, 2012
5/11/2018 Edsp Cp Master Test Plan Sit Uat 11092011 - slidepdf.com
http://slidepdf.com/reader/full/edsp-cp-master-test-plan-sit-uat-11092011 16/16
Virginia Department of Social Services Master Test PlanEnterprise Change Management EDSP - CP
v 0.1 – 11/09/2011 Page 16 of 16
5.2 Communication ProcessA weekly communications meeting with Deloitte, DIS, Security and Business will be held
to discuss status of the system testing effort, status of interface and web services, and
outstanding items that affect system testing.
Deloitte should also be available to for additional meetings and phone calls as needed.
Defects identified by a VDSS team member that are determined to be related to Deloitterequirements will be submitted to the team’s Test Manager who will submit the defect tothe Deloitte PM in ClearQuest. The VDSS Tester will notify the appropriate Test
Manager, and the Test Manager will notify the Deloitte PM by email of the entry inClearQuest.
Such defects will be linked/ traced to the Deloitte Requirements as entered in RequisitePro.
The Deloitte PM will then assign the defect to the appropriate Deloitte technical lead forresolution. Upon resolution, the Deloitte PM will re-assign to the IT Test Manager for any
required review or retesting.
Deloitte identified defects that are determined to be related to VDSS requirements will beassigned by the Deloitte team member to the appropriate Test Manager in ClearQuest. The
Deloitte team member will notify the Deloitte PM, and the Deloitte PM will notify the IT
Test Manager by email of the entry in ClearQuest. The IT Test Manager will work withthe Technical Leads to assign the defect to the appropriate DIS team member for
resolution. Upon resolution, the IT Test Manager will re-assign to the Deloitte PM for any
required review or retesting.
6. Change Management
6.1 Changes to Master Test PlanChanges to the Master Test Plan will be made by Stephanie Napper or Delores Veal, Co-TestManagers. Test Managers for SIT and Security should submit requested changes via email.
7. Plan Approvals
7.1 Changes to Master Test PlanThe Master Test Plan and any changes will be approved by the Project Co-Leads.