Client:

Dauntsey’s School

Market Sector:

Education

Programme:

52 Weeks

Value:

Circa £59,000

The Project:

A new maths and geography block arranged over 2 levels with 16 classrooms, three staff offices and circulation spaces.

The project consists of a building with:

The Challenge:

˶ Designing and Installing a heating and ventilation system that has a low energy use as the site’s main heating fuel is LPG.

˶ Heating plant,

˶ Intelligent automatic windows

˶ Electricity, gas and water utility monitoring

Dauntsey’s School Olive BuildingWest Lavington, Devizes

Controlco Ltd Unit 5b,Littlecombe Business Park,Lister Road, Dursley,Gloucestershire,GL11 4BA

Tel: +44 (0) 1453 543311

Email: info@controlco.co.uk

www.controlco.co.uk

The Solution:

˶ Priva Blue ID BMS System

˶ Integration of the BMS with the Window Master system to enable full automatic control.

˶ Integration of intelligent room sensor/controllers to monitor and control classroom temperature and CO2 levels by opening high level windows

˶ Room controllers were installed with a traffic light LED system to notify the teachers when the low level windows will need to be manually opened for full effect of the natural ventilation.

˶ History monitoring of room temperatures and CO2 levels by the client to verify energy efficient operation.

˶ Remote interrogation of BMS control system to enable the site facilities & maintenance department staff the ability to monitor and adjust class room comfort conditions.

The Benefits:

˶ Provision of a future proof open BMS system.

˶ Low ongoing operating costs.

˶ Reduced ongoing maintenance labour costs.