Lake NasworthyRedevelopment

InitiativeSeptember 17, 2013

The designs and concepts in this presentation are for illustrative purposes only.

Linking Neighborhoodsand Tourism

PARCPeter A. Ravella Consulting, LLC

• Capturing market

• Resolving complex community interests

• Design for implementation

• Focus on locals as tourists

Our Approach

• Regional Leveraging

• Economic -Development

• Harmony between neighborhoods, recreation and tourism

Lake Nasworthy Opportunity

• Master Plan based on community and market analysis (Comp Plan Amend.)

• Catalytic Projects

• Implementation Strategy

Deliverables

ExtensivePublic Participation

Stakeholder Guidance

Assessment of Context

Comprehensive Understanding

Understanding of Resource Management Issues

• Erosion (dredging and other mitigations)

• Storm water management

• Water level management

Market Analysisfor a Realistic Plan

Market Analysis

• Detailed demographic analysis of city and the region

• Demand projections of activities for these markets

• Understanding of visitor market potential

• Comparisons of other lakes to Nasworthy

• Demand analyses for restaurant, hotel, and special uses

Market Analysis

San Angelo has unique preferences

Assessment of Preferences

Market Opportunities

• Programming of water events (an “event facility”)

• Tourism from other west Texas communities

• Education and family venues

• Quality of life activities for locals

• Increased values for undeveloped nearby parcels

Nasworthy Master Plan

Lake Nasworthy Character Zones

Special Opportunity

Nature/Education

Action Sports

Harbor Village

Existing Neighborhoods

Natural Encounter

Action Sports

Action Sports

Figure 47. Zone 1 Estimated Participation/Attendance PotentialActivity/Year Participation Estimates Visits per Year

Local Market

Market Share

Visitor Market

Market Share

Total Local Market

Visitor Market

Total

Boating 75% 60% 10 52012 2,450 15,218 17,669 24,503 76,092 100,5952017 2,580 16,000 18,580 25,800 80,001 105,801Archery 75% 10%

2012 5,475 5,668 11,143 54,750 28,339 83,0892017 5,766 5,959 11,725 57,660 29,796 87,456Mountain Biking 75%

5%

2012 4,633 2,398 7,031 46,328 11,990 58,3182017 4,880 2,521 7,401 48,795 12,607 61,402Wakeboarding 50% 50%

2012 3,349 26,005 29,354 33,492 130,025 163,5172017 3,527 27,342 30,869 35,274 136,709 171,983Running/Jogging 75%

5%

2012 5,346 2,767 8,113 53,460 13,836 67,2962017 5,630 2,909 8,540 56,303 14,547 70,850Camping 5% 10%

2012 275 4,263 4,538 2,746 21,316 24,0622017 289 4,482 4,772 2,892 22,412 25,304Source: ESRI BIS forecasts for 2012 and 2017, NSGA, SFIA,

Harbor Village

Harbor Village

• Marina• Beach• Restaurants• Hotel• Sailing School• Triathlon Staging • Splash pad• Party Boats

Harbor Village

Figure 49. Zone 2 Estimated Participation/Attendance PotentialActivity/Year Participation Estimates Visits per Year

Local Market

Market Share

Visitor Market

Market Share

Total Local Market

Visitor Market

Total

Swimming 50% 10% 10 52012 2,963 4,601 7,564 29,628 23,004 52,6322017 3,120 4,837 7,958 31,204 24,187 55,391Sailing 75% 50%2012 902 4,668 5,569 9,017 23,338 32,3552017 950 4,908 5,857 9,497 24,538 34,034Boating 75% 60%2012 2,450 15,218 17,669 24,503 76,092 100,5952017 2,580 16,000 18,580 25,800 80,001 105,801Triathlon 75% 10%2012 193 200 393 1,932 1,000 2,9322017 204 210 414 2,035 1,052 3,087

Harbor VillageCatalytic Site

Harbor Village (Mary Lee Park)

Harbor Village

Incorporate Mary E Lee Park and adjacent location to catalyze activity by creating a mix of uses:

• Hotel on the lake - 120 to 150 rooms total• Restaurants - 30,000 SF• Conference center - 30,000 SF• Retail/Entertainment Flex Space - 45,000 SF• Beach structure with concessions - 6,000 SF

Marina Mixed-Use

TxDOT established a new process for local unique conditions

TxDOT Project Development Process Manual [revisions in blue]

Subsection 1000

“For urban projects, particularly capacity improvements, the need for a project may be determined from traffic modeling of future travel demands as well as from the need for a sustainable street and transit network associated with… urban design established in regional plans, comprehensive plans, neighborhood plans, other local plans, special district plans, relevant public-private partnerships or economic development plans.”

Subsection 1330The Institute of Transportation Engineers (ITE) and the Congress for the New Urbanism (CNU) have developed a proposed recommended practice …. Those resources and the other resource materials listed below shall provide guidance for the CSS process.

Accommodation Goals and ApproachUsing ITE’s Designing Walkable Urban Thoroughfares

• Traffic Operations

• Transit• Pedestrians• Bicycles• Cars• Parking• Landscaping• ADA• Development• Context zoning

ITE Context Zones

Concept agreed to per MOU

Harbor VillageNeighborhood Preservation

Hotel Opportunity

Nature/Education

Nature/Education

• Nature Center (relocated)

Potential partnership with larger Texas Zoo

• Family Entertainment Center (FEC)

Only if risk remains on private sector

Nature Center Concept

Special Opportunity Zone

Special Opportunity

• Walk/Jogging/Bike Trail

• Windsurfing

• Zip line (connection to Gun Club Hill)

• Hotel (potential Interpretive Ctr.)

• Residential Development

• Commercial/Retail Development

Special Opportunity

Figure 52. Zone 4 Estimated Participation/Attendance PotentialActivity/Year Participation Estimates Visits per Year

Local Market

Market Share

Visitor Market

Market Share

Total Local Market

Visitor Market

Total

Bicycle Riding 65% 5% 10 52012 3,852 2,300 6,152 38,516 11,502 50,0182017 4,057 2,419 6,475 40,565 12,094 52,659Exercise Walking 65% 3%

2012 4,075 1,460 5,535 40,749 7,301 48,0502017 4,292 1,535 5,827 42,917 7,677 50,593Running/Jogging 75% 5%

2012 5,346 2,767 8,113 53,460 13,836 67,2962017 5,630 2,909 8,540 56,303 14,547 70,850

Power PlantCatalytic Site

Activation of a previously dormant parcel by taking advantage of the canal and location on the Lake:

Power Plant Catalytic Site

• Hotel on the Channel• Neighborhood retail and commercial• Mixed Residential Types• Potential Heritage Interpretive Center

Power Plant Catalytic Site

Interpretive Center with Hotel

Natural Encounter Zone

Natural Encounter Zone

• Birding Center

• Fishing

• Canoe/Kayak

Natural Encounter Zone

Figure 54. Zone 5 Estimated Participation/Attendance PotentialActivity/Year Participation Estimates Visits per Year

Local Market

Market Share

Visitor Market

Market Share

Total Local Market

Visitor Market

Total

Bird Watching 50% 10% 10 52012 1,803 2,801 4,604 18,034 14,003 32,0372017 1,899 2,945 4,844 18,994 14,723 33,716Fishing 50% 25%

2012 2,319 9,002 11,320 23,185 45,009 68,1942017 2,442 9,465 11,907 24,420 47,323 71,743Kayaking 50% 25%

2012 2,748 10,669 13,417 27,481 53,344 80,8242017 2,894 11,217 14,112 28,943 56,086 85,029

Birding CenterCatalytic Site

Birding Center

Implementation Strategy

Integrated Trail Plan

Gun Club Hill

• Per the City Engineer, a trail could be facilitated via construction of an additional 5 to 8 foot wide improved pedestrian way adjacent to the roadway (20 feet width)

High Impact, Low Cost Investments

Low Impact Trailhead (parking, bathrooms)

• Potential Partnership Structures

• Special Districts

• Catalytic Projects

• Zoning Regulatory Approach

• Innovative erosion control

• Knickerbocker

Implementation Strategy

Next Steps

• Adoption of proposed Comprehensive Plan Amendment

• Catalytic Sites

• Detailed Zoning Strategies

A game-changing initiative

PARCPeter A. Ravella Consulting, LLC