Belfast Hotel Project. 141 Bedrooms 15 VRF 3-Pipe Systems 151 Indoor Units Total Installed Capacity – 398 kW Site time – 16 Weeks. Design Stage. Design Calculations - Cymap Indoor Unit Type System Capacities Pipe runs and piping restrictions. Site Drawings. - PowerPoint PPT Presentation

TRANSCRIPT

Belfast Hotel Project

• 141 Bedrooms

• 15 VRF 3-Pipe Systems

• 151 Indoor Units

• Total Installed Capacity – 398 kW

• Site time – 16 Weeks

Design Stage• Design Calculations - Cymap• Indoor Unit Type• System Capacities• Pipe runs and piping restrictions

Site Drawings

5-Year Peace of Mind Warranty

• Design criteria met with regard to horizontal and vertical pipe runs

• Validated pressure tests and evacuation procedures

• Calculated refrigerant added to system

• Detailed commissioning reports by certified engineer returned to Toshiba

• Maintenance contract in place with an Accredited Installer

• 5-Year parts and labour warranty with manufacturer not contractor

Manufacturers Warranty