121107 public meeting1 final website low res · title: 121107_public meeting1_final_website_low...

Post on 22-Aug-2020

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1

BACKGROUND Stormwater

VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1

Background Review –Stormwater 3 •  Development constraints

associated with the tributaries, including the TRCA regulation limits.

•  The north parcel top of bank has been staked and resulted in a refinement of the floodlines

•  Observations of flooding along Highway 7 towards the western limit of study area

top related