VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1
BACKGROUND Stormwater
![Page 2: 121107 PUBLIC MEETING1 FINAL website low res · Title: 121107_PUBLIC MEETING1_FINAL_website_low res.pptx Author: Emma West Created Date: 11/14/2012 12:14:19 PM](https://reader035.vdocuments.site/reader035/viewer/2022071015/5fce947e89d7651bbe1b0772/html5/thumbnails/2.jpg)
VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1
Background Review –Stormwater 3 • Development constraints
associated with the tributaries, including the TRCA regulation limits.
• The north parcel top of bank has been staked and resulted in a refinement of the floodlines
• Observations of flooding along Highway 7 towards the western limit of study area