Project Details: Academic Studio: Boston Architectural College (BAC) Scope: Individual Project by Shihab Naeem Project Objective: Select a building within the greater Boston, MA area (example: Phillips Exeter Public Library by Louis Kahn, Car- penter Center by Le Corbusier) and analyze, document findings and develop a conceptual analysis of building through graphical production. Duration: 8 Weeks Date: 1st 1/2 of Fall 2001 Semester The Allston Public Library adds a synergy to Allston, MA a neighborhood which borders Harvard University Foundation Studio: Building Analysis Selected Building: Allston Public Library, Allston MA Architect: Machado & Silvetti Architects Office Location: Boston, MA Instructor: Gregory Buck, 617 262 5000 3

Upload: shihab-naeem

Post on 21-Mar-2016

226 views

Category:

Documents


0 download

DESCRIPTION

Building Analysis

TRANSCRIPT

Page 1: Allston Public Library

13

Project Details:Academic Studio: Boston Architectural College (BAC)Scope: Individual Project by Shihab NaeemProject Objective: Select a building within the greater Boston, MA area (example: Phillips Exeter Public Library by Louis Kahn, Car-penter Center by Le Corbusier) and analyze, document findings and develop a conceptual analysis of building through graphical production.Duration: 8 WeeksDate: 1st 1/2 of Fall 2001 Semester

The Allston Public Library adds a synergy to Allston, MA a neighborhood which borders Harvard University

Foundation Studio: Building Analysis Selected Building: Allston Public Library, Allston MAArchitect: Machado & Silvetti ArchitectsOffice Location: Boston, MA Instructor: Gregory Buck, 617 262 5000

3

Page 2: Allston Public Library

The�Allston�Public�Library�was�finished�being�built�in�the�summer�of�2001�and�ready�to�delight�people�with

it’s�charm�and�elegance.��The�colors�from�the�materials�conjure�feelings�of�fall�and�the�insidious�warmth�that

comes�with�it.��Slate�is�used�in�two�manners�for�the�building.��It’s�used�as�a�foundation�as�well�as�cladding

on�winged�portion�of�the�building.

The�wing

The�monolith

Design�Studio�B1

Experiential�Building�Analysis�(8�weeks)

The�Allston�Public�Library�by�Machado�Silvetti

Instructor:�Gregory�Buck

14

Introduction

The Allston Public Library by Machado Silvetti Architects introduced itself as a charming and delightful building in the fall of 2001. The colors from the materials conjure feelings of autumn and the vast colors of foliage. Slate is used in 2 manners. The first being a foundation cladding on the far left portion of the wall and veneer cladding on the winged portion on far right area.

The�Allston�Public�Library�was�finished�being�built�in�the�summer�of�2001�and�ready�to�delight�people�with

it’s�charm�and�elegance.��The�colors�from�the�materials�conjure�feelings�of�fall�and�the�insidious�warmth�that

comes�with�it.��Slate�is�used�in�two�manners�for�the�building.��It’s�used�as�a�foundation�as�well�as�cladding

on�winged�portion�of�the�building.

The�wing

The�monolith

Design�Studio�B1

Experiential�Building�Analysis�(8�weeks)

The�Allston�Public�Library�by�Machado�Silvetti

Instructor:�Gregory�Buck

14

4

Page 3: Allston Public Library

Design�Studio�B1

Experiential�Building�Analysis�(8�weeks)

The�Allston�Public�Library�by�Machado�Silvetti

Instructor:�Gregory�BuckSketch Analysis

What made the analysis so challenging was the fact that there was no literature or readily available documentation since the building was so new (it was completed upon the beginning of the studio). I went about the analysis by investigating the several different aspects of building and finding what is compelling and do a series of quick sketch vignettes.

Design�Studio�B1

Experiential�Building�Analysis�(8�weeks)

The�Allston�Public�Library�by�Machado�Silvetti

Instructor:�Gregory�Buck

Conceptual Drawing of the Lighting Scheme at Front Entry

Conceptual Sketch Drawing of the Shelves in the Front Portion

Sketch Vignette of Reading Rooms in Library

The front entry was a double height space that was both dramatic and inviting.

The shelving scheme was interesting in that they wrapped around the struc-tural columns

The most compelling area was the reading rooms because they were between glass courtyards. It was a Miesian expression where exterior blends with the interior and nature floods the library.

5

Page 4: Allston Public Library

Floor Plan of Allston Public Library:

1. Main Library Area2. Reading Rooms3. Courtyard4. Recreational/Function Area

1

22

3 33

4

Sketch Depicting a Paved Walkway which sepa-rates courtyard/reading room spaces with the functional/recreational

The Glassed Courtyards (Green Portion) are a major part of design and the rest of the analysis is dedicated to the production of drawings which articulate this concept.

Sketch Analysis

6

Page 5: Allston Public Library

Final Drawings

After understanding that the glassed courtyards were a compelling feature of library, I began laying out drawings that would support this idea. My concept was aimed at showing that these courtyard create a penetrating sense of nature within a library setting. It represented a Miesian idea where light, greenery permeate creating a serene and appropriateness for a library, a place of reflection, solitude and intellectual inquiry.

Front Elevation

Section 1Sec

tion

2

Section 1

Section 2 Key Plan

7

Page 6: Allston Public Library

Final Drawings

30/60 Degree Axonometric Drawing. The Exploded Courtyards articulate the architectural qualities of this the area by showing how the glazing wraps around the courtyards and how the mullions and muntons are arranged.

8

Page 7: Allston Public Library

Final Drawings

A Perspective Drawing of the interior is shown again to articulate my con-cept of the courtyards flooding nature into library.

Key Plan

9