All Contracts Contract Number Contract Status Federal Aid Number Contract Primary SR Number Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion Date Prime Bid Amount 003692 Completed I-5-2(161) 005 Trosper Road Interchange Ledcor Industries, Inc. TIM L. AHLES 10/23/1989 07/09/1992 4,797,177.00 003703 Completed IR-IRG-5-3(713) 005 Fife I/C - Signal And Ramp Reconstruction M. A. Segale, Inc. KEVIN DAYTON 11/16/1989 12/12/1991 549,566.92 003778 Completed BRF-101(84) 101 Queets River Bridge 101/204 And Approaches Donald B Murphy Contractors Inc JOHN L. HART 05/09/1990 12/23/1992 7,909,565.44 003782 Completed I-5-2(166) 005 Capitol Lake To Plum Street Lakeside Industries TIM L. AHLES 05/24/1990 06/04/1991 1,979,168.55 003783 Completed STATE 016 19th Street Interchange Tucci & Sons, Inc. KEVIN DAYTON 06/20/1990 04/01/1993 7,198,266.01 003784 Completed F-101(115) 101 G.H. Co. Line To Vic. Clearwater Rd. & Clearwater Northwest Rock, Inc. JOHN L. HART 06/06/1990 09/18/1991 1,397,899.10 003795 Completed STATE 012 Devonshire Road Interchange Scarsella Bros., Inc. JOHN L. HART 06/27/1990 08/23/1991 2,466,688.94 003804 Completed F-101(111) 101 Dungeness River To Still/Blake Road Lakeside Industries JERRY MOORE 06/13/1990 12/05/1990 736,393.93 003815 Completed STATE 102 Wishkah River Bridge 12/12n Submarine Cable Replac Intermountain Electric, Inc. JOHN L. HART 06/27/1990 11/16/1990 102,000.00 003826 Completed ACF-020(61) 020 Weeman Bridge To Winthrop North Central Construction, Inc. STAN MOORE 08/07/1990 09/06/1991 3,859,118.90 003835 Completed STATE 012 Satsop River Bridges 12/51 N & S Wespac Construction, Inc. JOHN L. HART 07/31/1990 10/24/1990 89,624.00 003837 Completed ACI-ACIR-705-3(77 705 Sr 5 To 26th St./Portland Ave. To Sr 167 Erosion C Paul Brothers, Inc. DEAN W. MOBERG 08/13/1990 01/01/1994 1,095,736.00 003842 Completed ACI-ACIR-90-1(363 090 North Mercer Way To East Channel Bridge - Landscap Paul Brothers, Inc. AL DYER 10/03/1990 04/07/1993 647,183.90 003846 Completed ID-IR-90-1(357) 090 Bellevue Access Transit & Hov - Phase 1 General/3a, A Joint Venture RAY ARNOLD 03/04/1991 11/04/1993 16,791,302.90 003848 Completed STATE 012 District 5 Seals & Thin Overlays 1991 Granite Northwest Inc VIRGIL E. SCHMIDT 11/05/1990 10/04/1991 2,025,345.50 003851 Completed ACF-016(7) 016 Purdy Vic. Mp 19 Sb Weigh Station Hilltop Construction Co. R. MITTLESTADT 11/06/1990 09/30/1991 465,602.35 003852 Completed STATE 509 Blair Waterway Bridge No. 509/10 Fender Rehabilita Fletcher General, Inc. KEVIN DAYTON 11/19/1990 02/08/1991 143,256.60 003861 Completed STATE 002 Rocky Reach Dam To Orondo Basin Paving Co. ROBERT STOWE, P.E. 12/21/1990 11/05/1991 1,465,678.80 003865 Completed BRS-SO-50(10) 112 Deep Creek Bridge 112/31 Replacement Quigg Bros., Inc. JERRY MOORE 01/22/1991 06/06/1992 641,775.50 003866 Completed STATE 172 Mcneil Canyon Road To E Road Ne Lloyd Logging, Inc. KIRK D. BERG 01/22/1991 09/13/1991 884,371.35 003868 Completed STATE 002 Deception Creek Bridge 2/125 Gordon Kruse Construction Company ROBERT A. MURRAY 01/17/1991 05/05/1992 660,351.85 003870 Completed IR-5-1(208) 005 E. Fork Lewis River Bridge 5/36e Rail Replacement Wespac Construction, Inc. DUAIN R. MILLER 01/02/1991 04/18/1991 151,979.00 003872 Completed ACBRF-101(78) 101 N. Fork Willapa River Bridge 101/56 Replacement Max J. Kuney Company MICHAEL SALLEY 02/21/1991 12/27/1993 6,687,728.00 003873 Completed F-101(121) 101 Forks Vicinity Weigh Station Bruch & Bruch Construction Inc JERRY MOORE 01/28/1991 09/04/1991 456,128.78 003874 Completed M-7694(001) 904 Marshall Road Intersection Rods Electric, Inc. CHARLES WILKE 01/10/1991 10/23/1991 191,573.25 003875 Completed STATE 028 Lamona To Sr 23 Harrington Inland Asphalt Company CHARLES WILKE 02/20/1991 09/11/1991 1,646,195.30 003876 Completed BHF-101(112) 101 Big Creek Bridge 101/147 Widening Dulin Construction, Inc. JOHN L. HART 02/20/1991 11/15/1991 722,494.90 Dec 25, 2019 1 2:32:02 PM

Upload: others

Post on 04-Sep-2019

21 views

Category:

Documents


0 download

TRANSCRIPT

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

003692 Completed I-5-2(161) 005 Trosper Road Interchange Ledcor Industries, Inc. TIM L. AHLES 10/23/1989 07/09/1992 4,797,177.00

003703 Completed IR-IRG-5-3(713) 005 Fife I/C - Signal And Ramp Reconstruction M. A. Segale, Inc. KEVIN DAYTON 11/16/1989 12/12/1991 549,566.92

003778 Completed BRF-101(84) 101 Queets River Bridge 101/204 And Approaches Donald B Murphy Contractors Inc JOHN L. HART 05/09/1990 12/23/1992 7,909,565.44

003782 Completed I-5-2(166) 005 Capitol Lake To Plum Street Lakeside Industries TIM L. AHLES 05/24/1990 06/04/1991 1,979,168.55

003783 Completed STATE 016 19th Street Interchange Tucci & Sons, Inc. KEVIN DAYTON 06/20/1990 04/01/1993 7,198,266.01

003784 Completed F-101(115) 101 G.H. Co. Line To Vic. Clearwater Rd. & Clearwater Northwest Rock, Inc. JOHN L. HART 06/06/1990 09/18/1991 1,397,899.10

003795 Completed STATE 012 Devonshire Road Interchange Scarsella Bros., Inc. JOHN L. HART 06/27/1990 08/23/1991 2,466,688.94

003804 Completed F-101(111) 101 Dungeness River To Still/Blake Road Lakeside Industries JERRY MOORE 06/13/1990 12/05/1990 736,393.93

003815 Completed STATE 102 Wishkah River Bridge 12/12n Submarine Cable Replac Intermountain Electric, Inc. JOHN L. HART 06/27/1990 11/16/1990 102,000.00

003826 Completed ACF-020(61) 020 Weeman Bridge To Winthrop North Central Construction, Inc. STAN MOORE 08/07/1990 09/06/1991 3,859,118.90

003835 Completed STATE 012 Satsop River Bridges 12/51 N & S Wespac Construction, Inc. JOHN L. HART 07/31/1990 10/24/1990 89,624.00

003837 Completed ACI-ACIR-705-3(77 705 Sr 5 To 26th St./Portland Ave. To Sr 167 Erosion C Paul Brothers, Inc. DEAN W. MOBERG 08/13/1990 01/01/1994 1,095,736.00

003842 Completed ACI-ACIR-90-1(363 090 North Mercer Way To East Channel Bridge - Landscap Paul Brothers, Inc. AL DYER 10/03/1990 04/07/1993 647,183.90

003846 Completed ID-IR-90-1(357) 090 Bellevue Access Transit & Hov - Phase 1 General/3a, A Joint Venture RAY ARNOLD 03/04/1991 11/04/1993 16,791,302.90

003848 Completed STATE 012 District 5 Seals & Thin Overlays 1991 Granite Northwest Inc VIRGIL E. SCHMIDT 11/05/1990 10/04/1991 2,025,345.50

003851 Completed ACF-016(7) 016 Purdy Vic. Mp 19 Sb Weigh Station Hilltop Construction Co. R. MITTLESTADT 11/06/1990 09/30/1991 465,602.35

003852 Completed STATE 509 Blair Waterway Bridge No. 509/10 Fender Rehabilita Fletcher General, Inc. KEVIN DAYTON 11/19/1990 02/08/1991 143,256.60

003861 Completed STATE 002 Rocky Reach Dam To Orondo Basin Paving Co. ROBERT STOWE, P.E. 12/21/1990 11/05/1991 1,465,678.80

003865 Completed BRS-SO-50(10) 112 Deep Creek Bridge 112/31 Replacement Quigg Bros., Inc. JERRY MOORE 01/22/1991 06/06/1992 641,775.50

003866 Completed STATE 172 Mcneil Canyon Road To E Road Ne Lloyd Logging, Inc. KIRK D. BERG 01/22/1991 09/13/1991 884,371.35

003868 Completed STATE 002 Deception Creek Bridge 2/125 Gordon Kruse Construction Company ROBERT A. MURRAY 01/17/1991 05/05/1992 660,351.85

003870 Completed IR-5-1(208) 005 E. Fork Lewis River Bridge 5/36e Rail Replacement Wespac Construction, Inc. DUAIN R. MILLER 01/02/1991 04/18/1991 151,979.00

003872 Completed ACBRF-101(78) 101 N. Fork Willapa River Bridge 101/56 Replacement Max J. Kuney Company MICHAEL SALLEY 02/21/1991 12/27/1993 6,687,728.00

003873 Completed F-101(121) 101 Forks Vicinity Weigh Station Bruch & Bruch Construction Inc JERRY MOORE 01/28/1991 09/04/1991 456,128.78

003874 Completed M-7694(001) 904 Marshall Road Intersection Rods Electric, Inc. CHARLES WILKE 01/10/1991 10/23/1991 191,573.25

003875 Completed STATE 028 Lamona To Sr 23 Harrington Inland Asphalt Company CHARLES WILKE 02/20/1991 09/11/1991 1,646,195.30

003876 Completed BHF-101(112) 101 Big Creek Bridge 101/147 Widening Dulin Construction, Inc. JOHN L. HART 02/20/1991 11/15/1991 722,494.90

Dec 25, 2019 1 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

003879 Completed F-290(11) 290 Argonne Road To Harvard Road Acme Materials & Construction Co LEONARD CASH 02/05/1991 12/10/1991 1,202,228.60

003880 Completed ACIR-90-1(354) 090 Franklin Falls Bridge 90/97.8 Painting Coastal Coatings, Inc. ROGER L. ARMS 06/27/1991 08/13/1991 83,552.00

003881 Completed F-097(37) 097 Scotty Creek Vicinity To Brender Park Columbia Asphalt & Gravel, Inc. KIRK D. BERG 02/05/1991 09/20/1991 961,801.30

003883 Completed STATE 507 Lewis County Line To Vicinity Tenino Scl Lakeside Industries ROGER E. HORTON 02/15/1991 12/16/1991 1,636,851.78

003884 Completed F-221(6) 221 Lenzie Rd. To Sellards Rd. Granite Northwest Inc R.F. GIFFORD 02/01/1991 11/15/1991 757,459.00

003886 Completed STATE 302 North Purdy - Park & Ride Lot Tucci & Sons, Inc. LINEA LAIRD 02/27/1991 03/16/1993 374,195.75

003887 Completed IR-82-2(106) 082 Valley Mall Blvd. To Yakima River Yakima River Granite Northwest Inc ROGER L. ARMS 03/12/1991 02/21/1992 1,186,671.25

003888 Completed STATE 515 Sr 515, Se 220th Place To 196th St. Northwest Cascade, Inc. GARY LIFFICK 04/09/1991 10/29/1993 4,094,511.99

003889 Completed STATE 014 Goodnoe Hills Road To Wood Creek Bridge Granite Northwest Inc DUAIN R. MILLER 03/07/1991 07/02/1991 553,507.00

003890 Completed STATE 027 Pullman E. Uab To Idaho State Line Poe Asphalt Paving, Inc. G. E. GIBSON 03/04/1991 07/02/1991 655,565.80

003891 Completed F-009(19) 009 Np Ry Bridge 9/128 Replace Rail Petersen Brothers, Inc. STEVE MILLER 02/27/1991 04/02/1991 73,557.45

003892 Completed F-104(11) 104 Quilcene-Center Road To South Point Road Vicinity Ace Paving Co., Inc. JERRY MOORE 03/08/1991 11/20/1991 1,193,937.05

003893 Completed F-520(9) 520 Sr 405 To N.E. 124th St. Stage Paving Lakeside Industries STEVE MILLER 03/05/1991 08/23/1991 492,492.78

003894 Completed STATE 530 Bridges 530/124, 126 And 138 Deck Overlays Eagle Crest Construction Co STEVE MILLER 03/25/1991 07/25/1991 343,794.20

003895 Completed IR-5-4(209) 005 Vic. Sr 532 Vic. Starbird Rd. Trico Contracting, Inc. STEVE MILLER 03/07/1991 08/09/1991 785,348.35

003896 Completed STATE 020 Anacopper Rd. To Sunset Ave. (Spur) Resurfacing Lakeside Industries JOHN HAYES 02/27/1991 06/24/1991 229,614.50

003897 Completed STATE 203 1991 Thin Overlays (South) Watson Asphalt Paving Company, STEVE MILLER 03/04/1991 09/18/1991 573,029.92

003898 Completed STATE 538 Jct. Sr 9 Vic. Intersection Improvements Klb Construction, Inc. JOHN HAYES 03/12/1991 09/10/1991 276,094.55

003899 Completed STATE 542 1991 Thin Overlays (North) Granite Construction Company JOHN HAYES 03/22/1991 08/26/1992 1,122,895.80

003901 Completed IR-5-2(168) 005 Airdustrial I/C To Trosper Rd. Stage 4 - Noise Wal Ram Inc., Contractors TIM L. AHLES 04/04/1991 09/05/1991 292,665.10

003902 Completed IR-5-5(189) 005 Nulle Rd. To Samish Hwy. Resurface Sb Lanes Granite Construction Company KEN JOHNSON 03/15/1991 08/05/1991 574,065.25

003903 Completed STATE 516 160th Ave. Se To Se Wax Road Widening R.W. Scott Construction Co. GARY LIFFICK 04/09/1991 05/15/1992 2,118,071.30

003904 Completed IR-5-3(652) 005 Pierce Co. Line To Vic. Sr 18 I/C Nb Lanes Pccp Re Tucci & Sons, Inc. TOM BAKER 04/08/1991 09/12/1991 1,628,929.00

003905 Completed F-018(18) 018 Auburn-Black Diamond Rd. Interchange Progressive Contractors, Inc. JAY LAVASSAR 04/19/1991 06/11/1992 923,987.50

003907 Completed F-028(14) 028 Vulcan To Grant Co. Line Northwest Paving & Construction Co. ROBERT STOWE, P.E. 04/04/1991 10/17/1991 560,841.80

003908 Completed IR-5(206) 005 Vic. Todd Rd. To Vic. Kalama Lakeside Industries DUAIN R. MILLER 03/26/1991 08/06/1991 1,061,743.70

003909 Completed IR-5(211) 005 Rutting Repair Wildish Construction Company DOUG FICCO 04/04/1991 07/17/1991 606,927.10

Dec 25, 2019 2 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

003910 Completed F-097(53) 097 West Wapato Road I/S Granite Northwest Inc R.F. GIFFORD 03/29/1991 11/21/1991 348,769.75

003913 Completed F-101(117) 101 Sr 101, 22nd St. To Little Hoquiam River Bridge & Lakeside Industries JOHN L. HART 04/16/1991 09/11/1992 1,146,885.85

003914 Completed IR-5-3(759) 005 Weigh Station To Dearborn - Stage 3 Ramp O'Lay & S Gary Merlino Construction Co., Inc. KIM HENRY 04/16/1991 12/10/1991 644,852.35

003915 Completed STATE 160 Baby Doll Road/Uab Cornell Road Vicinity Rinker Materials West, Llc Dba R. MITTLESTADT 05/01/1991 03/20/1992 979,001.84

003916 Completed STATE 303 Port Washington Narrows Bridge 303/12 - Stage 2 Progressive Contractors, Inc. R. MITTLESTADT 05/01/1991 09/11/1991 567,681.50

003917 Completed STATE 018 Peasley Canyon O'Xing 18/5 To Railroad O'Xing 18/8 M. A. Segale, Inc. JIM VORASS 05/06/1991 11/06/1991 926,814.00

003918 Completed IR-5-3(743) 005 Sr 5, Ne 103rd Reversible Ramp Replace Gates Signal Electric, Inc. TOM BAKER 04/19/1991 04/25/1994 238,476.90

003919 Completed IR-90-4(94) 090 Rr O'Xing 90/232 To Adams Co. Line M. A. Segale, Inc. ROBERT A. MURRAY 05/13/1991 12/06/1991 4,159,401.71

003920 Completed STATE 515 Junction Benson Road Signal Rebuild Signal Electric, Inc. ROBERT GINTER, P.E. 04/19/1991 09/03/1991 73,761.55

003922 Completed RS-S050(11) 112 Crescent Beach Rd. To Sr 101 And Dan Kelly Rd. I/S Lakeside Industries JERRY MOORE 04/24/1991 10/28/1991 967,464.90

003923 Completed HES-5651(3) 507 Couplet Signals Signal Electric, Inc. TROY D. CREWS 04/16/1991 01/24/1992 153,038.00

003924 Completed STATE 509 39th Ave. Sw Vic. Slide Repair Robison Construction, Inc. JIM VORASS 05/13/1991 09/06/1991 279,907.00

003925 Completed STATE 004 Naselle Vicinity Thin Overlay Lakeside Industries MICHAEL SALLEY 05/01/1991 08/20/1991 1,349,202.75

003926 Completed STATE 012 1989-91 District Wide Safety Companion Petersen Brothers, Inc. ROGER L. ARMS 04/24/1991 06/19/1991 268,737.85

003927 Completed F-012(75) 012 Sr 12, Sr 730 To Vancycle Canyon Granite Northwest Inc VIRGIL E. SCHMIDT 05/16/1991 11/04/1991 714,236.95

003929 Completed ER-900297000 004 Landslide - Vicinity Mp 24.5 Kiewit Infrastructure West Co. MICHAEL SALLEY 05/13/1991 08/01/1992 5,891,245.00

003930 Completed IR-90-6(170) 090 Geiger I/C To Division St. I/C Shamrock Paving, Inc. CHARLES WILKE 05/24/1991 09/13/1991 1,062,633.00

003931 Completed F-097(55),M-6404(1) 097 Sr 22 To W. Wapato Road Granite Northwest Inc R.F. GIFFORD 05/24/1991 11/17/1992 1,456,988.70

003932 Completed IR-405-3(740) 405 Main & Ne 8th St.-Undercrossing Bridges 405/42 & 4 David A. Mowat Company JOE SCANLON 05/13/1991 09/30/1991 441,061.20

003933 Completed IR-5-1(207) 005 Edge Drain Retrofit Kiewit Infrastructure West Co. DUAIN R. MILLER 05/13/1991 07/17/1991 363,688.65

003934 Completed IR-5-2(165) 005 Sr 5, Sr 508 To West St. U'Xing Lakeside Industries TROY D. CREWS 05/13/1991 10/21/1991 510,664.25

003935 Completed F-FG-164(6) 164 Sr 164, Jct 244th Ave Se Signal & Channelization Signal Electric, Inc. TOM BAKER 05/13/1991 01/16/1992 214,951.07

003936 Completed WA90X054,072,112 Kingston Ferry Terminal - New Terminal & Overhead Fletcher General, Inc. RON PAANANEN 08/12/1991 02/09/1993 3,277,376.50

003939 Completed I-IR-5-2(169) 005 Sr 5, Airdustrial I/C To Capitol Lake Lakeside Industries TIM L. AHLES 06/06/1991 02/11/1993 5,967,546.69

003940 Completed RS-S381(11) 027 Pullman To Fallon - Stage 2 Poe Asphalt Paving, Inc. G. E. GIBSON 05/24/1991 03/16/1992 753,854.00

003941 Completed IR-90-1(356) 090 Sr 90, Sr 18 Overcrossing 90/78n Deck Overlay Eagle Crest Construction Co JOE SCANLON 06/05/1991 03/30/1992 207,296.50

003942 Completed F-FG-520(7) 520 Sr 520, 148th Ave Ne Interchange-Signals Totem Electric Of Tacoma, Inc. MARLIN LENSSEN 06/05/1991 11/30/1993 142,242.00

Dec 25, 2019 3 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

003944 Completed F-012(76) 012 Wcl Pomeroy To Mayview Rd. Central Washington Asphalt, Inc. ROGER L. ARMS 05/30/1991 11/18/1991 926,086.10

003945 Completed ID-I-90-1(301) 090 Lacey V. Murrow Bridge Pontoon Disposal Kiewit Infrastructure West Co. CATHY ARNOLD 05/20/1991 09/30/1991 1,132,702.00

003946 Completed F-706(3) 706 Jct Sr 7 To Nisqually Ave. Tucci & Sons, Inc. DAVE HILDERBRANT 06/11/1991 04/01/1992 1,779,550.43

003947 Completed F-012(71) 012 Jct Sr 8 To Mox Chehalis Creek Bridge Tom Martin Construction, Inc. DAVE HILDERBRANT 06/06/1991 11/26/1991 1,430,957.65

003948 Completed RS-S32L(5) 027 Freeman To 32nd Avenue Inland Asphalt Company G. E. GIBSON 06/14/1991 05/08/1992 1,368,926.65

003949 Completed I-IR-90-1(366) 090 East Channel Boatlaunch Landscape Golf Landscaping, Inc. AL DYER 06/19/1991 12/01/1994 181,424.55

003950 Completed IR-5-3(739) 005 Sr 5, Dearborn To King Co. Line Stage 3 Ramp Resur Lakeside Industries MARLIN LENSSEN 07/15/1991 06/18/1992 1,381,243.03

003951 Completed STATE 012 Sylvia Creek Bridge 12/31 N & S Deck Overlay Progressive Contractors, Inc. JOHN L. HART 06/21/1991 09/18/1991 615,812.00

003952 Completed IR-90-3(50) 090 South Ellensburg Interchange Columbia Asphalt & Gravel, Inc. ROGER L. ARMS 07/11/1991 10/29/1991 172,185.00

003953 Completed STATE 520 Br 520/1, 3, 6, 8, 16, And 513/10 O'Lay & Br 520/8 Progressive Contractors, Inc. BOB HAUKAP 07/26/1991 10/08/1992 2,175,496.35

003956 Completed IR-5-1(209)(210) 005 Bridge Deck Resurfacing Hamilton Construction Co DOUG FICCO 07/15/1991 11/26/1991 670,721.79

003957 Completed IR-90-2(165) 090 South Cle Elum Road Bridge 90/136s Eagle Crest Construction Co ROGER L. ARMS 06/19/1991 07/01/1992 465,317.00

003958 Completed IR-90-6(171) 090 Pines Road I/C To Seaton Acme Materials & Construction Co RALPH W. ROBERTSON 07/15/1991 11/13/1992 2,789,269.31

003959 Completed STATE 099 Duwamish River Br. 99/530 Replace Submarine Cable Intermountain Electric, Inc. GARY LIFFICK 06/11/1991 08/28/1992 73,430.00

003960 Completed STATE 161 176th Street East To 160th Street East Tucci & Sons, Inc. KEVIN DAYTON 07/11/1991 04/30/1992 586,774.08

003961 Completed IR-5-3(761) 005 S. King Co. Bridge Decks 5/515, 5/521 N-W, 99/500, Eagle Crest Construction Co KIM HENRY 07/11/1991 10/10/1992 692,104.70

003962 Completed IR-5-3(745) 005 Exp. James-Cherry St. O'Xing 5/545r & Exp. N. 42nd Progressive Contractors, Inc. TOM BAKER 07/15/1991 05/03/1992 750,235.75

003963 Completed BSH-RS-S293(7)(5) 009 Sr 9, Bridge Decks 9/211, 215, 216, 217 David A. Mowat Company KEN JOHNSON 07/11/1991 10/23/1991 950,350.50

003964 Completed F-FG-020(56) 020 Sr 20, Whitney-Laconner Road Signal Totem Electric Of Tacoma, Inc. KEN JOHNSON 07/11/1991 03/09/1992 310,931.65

003965 Completed STATE 141 Bst And Realignment Granite Northwest Inc DUAIN R. MILLER 07/23/1991 07/31/1992 897,116.00

003966 Completed F-007(11) 007 Sr 702 To Vic. 296th St. E. Woodworth & Company, Inc. JIM VORASS 06/27/1991 08/17/1992 972,725.63

003967 Completed F-020(63) 020 Sr 20, Granite Creek To E. Of Mazama Rinker Materials West, Llc Dba KIRK D. BERG 07/18/1991 06/29/1993 3,792,608.50

003969 Completed F-167(20) 167 S. 212th I/C - Stage 3. Max J. Kuney Company JAY LAVASSAR 06/27/1991 03/03/1992 633,042.75

003970 Completed F-900(5) 900 Jct 164th Ave. S.E. Channelization Rivera & Green, Inc. JAY LAVASSAR 06/27/1991 10/29/1991 439,223.72

003972 Completed IR-IRG-5-3(750) 005 Sr 5, S. 320th Interchange Sb Ramp And Signal Totem Electric Of Tacoma, Inc. JIM VORASS 07/18/1991 03/25/1992 279,177.85

003973 Completed IR-F-9999(58)(6) 005 Sign And Sign Clip Replacement Coral Construction Company MARLIN LENSSEN 07/11/1991 09/30/1991 157,334.00

003974 Completed BHF-167(21) 167 Sr 167, Puyallup River Bridge 167/20e Progressive Contractors, Inc. KEVIN DAYTON 07/22/1991 02/06/1992 401,969.00

Dec 25, 2019 4 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

003975 Completed F-BRF-097(54)48) 097 Sr 97, Vic. Br. 97/102 To M.P. 38.1 North Central Construction, Inc. R.F. GIFFORD 07/18/1991 05/17/1993 2,383,536.25

003980 Completed STATE 162 Sr 162, Sr 410 To Puyallup River Bridge Max J. Kuney Company JIM VORASS 09/11/1991 03/02/1993 2,039,931.35

003982 Completed F-510960 510 Sr 510, Vic. Yelm Rd. To Yelm Nwcl & Yelm Rd. I/S Tucci & Sons, Inc. MIKE HORTON 08/15/1991 11/24/1992 1,083,381.50

003983 Completed IR-5-3(762) 005 Interstate Bridge Decks Eagle Crest Construction Co KEVIN DAYTON 08/12/1991 03/19/1992 1,041,068.00

003985 Completed ER-9011(2) 090 3rd Lake Washington Bridge Anchor Cable Replacemen Fletcher General, Inc. CATHY ARNOLD 08/06/1991 11/14/1991 341,033.00

003986 Completed ER-80-5(143) 504 Marratta Creek To Coldwater Lake Kiewit Infrastructure West Co. DOUG FICCO 08/05/1991 05/21/1993 6,699,891.25

003988 Completed F-FG-018(5) 018 Sr 181 Interchange - Signals Signal Electric, Inc. JIM VORASS 08/06/1991 10/16/1992 302,822.89

003989 Completed I-90-1(323) 090 Dayton Traffic System Management Center Constructi Buchanan General Contracting Co. INGO GOLLER 08/29/1991 04/12/1993 394,700.00

003990 Completed IR-90-1(359) 090 Richards Road To Issaquah Signal Electric, Inc. INGO GOLLER 08/20/1991 04/12/1993 2,484,423.45

003991 Completed F-002(91) 002 Sunnyslope Vicinity Morrill Asphalt Paving Co., Inc. ROBERT A. MURRAY 08/20/1991 10/14/1992 2,539,809.10

003992 Completed STATE 003 Sr 304 Interchange - Stage 2 Ace Paving Co., Inc. R. MITTLESTADT 08/29/1991 10/12/1992 499,691.94

003993 Completed F-028(15) 017 Blue Lake Rest Area And Quincy Valley Rest Area E. P. Johnson Construction, Inc. ROBERT A. MURRAY 08/15/1991 05/27/1992 475,276.21

003994 Completed I-IR-90-1(367) 090 Sr 5 I/C And Seattle Access Erosion Control & Land Ohno Construction Company RON ERICKSON 08/12/1991 12/28/1995 804,716.15

003995 Completed BRF-002(89) 002 Snohomish Rv To Cavalero Cnr. Replace Eastbound Br Guy F. Atkinson Construction Corp. STEVE MILLER 12/02/1991 01/05/1995 18,699,999.71

003996 Completed F-012(77) 012 Sr 12, Lake Creek Road To Sr 123 Lakeside Industries DUAIN R. MILLER 08/23/1991 06/19/1992 1,224,989.12

003997 Completed I-IR-5-2(163) 005 Sr 5, Little St. To Uprr O'Xing 5/323 Landscaping Paul Brothers, Inc. TIM L. AHLES 09/04/1991 10/31/1996 1,842,588.50

003998 Completed F-9999(8) 004 District Wide Non-Interstate Safety Work. Petersen Brothers, Inc. DUAIN R. MILLER 08/15/1991 03/11/1992 590,015.55

003999 Completed STATE 124 Winnett Canyon Bridge 124/12 Columbia Asphalt & Gravel, Inc. VIRGIL E. SCHMIDT 08/21/1991 11/06/1991 173,313.91

004000 Completed F-FG-099(26) 099 Junction Lincoln Way - Signal Signal Electric, Inc. STEVE MILLER 08/20/1991 03/30/1992 357,563.80

004001 Completed BRF-101(102) 101 N. Nemah River Bridge 101/35 All State Construction Inc Of Orego MICHAEL SALLEY 10/24/1991 05/18/1993 2,258,090.00

004002 Completed I-IR-90-1(369) 090 E. Portal To N. Mercer Way Eb - Landscape Teufel Nursery Of Washington, Inc. AL DYER 10/07/1991 11/28/1995 889,792.15

004003 Completed F-FG-018(17) 018 Se 312th Way To Se 240th Scarsella Bros., Inc. JAY LAVASSAR 09/16/1991 10/06/1992 1,163,258.65

004004 Completed BROS-2036(008)(01 Ankeny & Buckley Bridges Ksc, Inc. VIRGIL E. SCHMIDT 10/07/1991 07/31/1992 916,789.57

004005 Completed F-017(21) 017 Adams County Line To Lind Coulee North Central Construction, Inc. PAUL J. MAHRE 09/03/1991 10/09/1992 746,704.00

004006 Completed STATE Mukilteo Toll Plaza Improvement Klb Construction, Inc. RON PAANANEN 09/19/1991 02/11/1993 432,832.20

004007 Completed IR-5-3(781) 005 Downtown Seattle I-5 Corridor Signing Coral Construction Company TOM BAKER 09/30/1991 06/03/1993 687,967.00

004008 Completed F-104(15) 104 Port Gamble Road To Bond Road Vicinity Ace Paving Co., Inc. R. MITTLESTADT 09/17/1991 10/14/1992 904,645.85

Dec 25, 2019 5 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004009 Completed I-IR-90-1(370) 005 Dayton Ave. N. Communications Extension Fiber Con, A J.V. INGO GOLLER 11/21/1991 07/17/1995 3,300,000.00

004010 Completed I-IR-405-3(751) 405 Tukwila To Sr 167 Erosion Control Lakeside Landscaping, Inc. JOE SCANLON 11/07/1991 11/18/1994 443,614.34

004013 Completed I-IR-90-1(371) 090 Sr 90, 60th Ave Se To 76th Ave Se Landscaping Paul Brothers, Inc. KIM HENRY 11/21/1991 07/24/1997 2,746,219.00

004014 Completed IR-90-1(325) 090 Sr202 To Snoqualmie River Br. M. A. Segale, Inc. TOM BAKER 11/12/1991 11/11/1992 1,155,775.28

004015 Completed BRF-011(2) 011 Half Bridge 11/101 Replacement Donald B Murphy Contractors Inc KEN JOHNSON 11/21/1991 08/24/1992 1,069,582.06

004016 Completed ER-9011(1) 090 Lacey V. Murrow Bridge Replacement General/Rainier, A Joint Venture TOM MADDEN 01/29/1992 10/18/1993 73,708,825.40

004017 Completed F-9999(5) 003 Hood Canal/Tacoma Narrows Varriable Message Signs Signal Electric, Inc. LINEA LAIRD 11/07/1991 03/22/1993 723,420.00

004018 Completed IR-90-5(85) 090 Salnave Road Vic. To Four Lakes Acme Materials & Construction Co G. E. GIBSON 11/07/1991 11/05/1992 1,677,376.00

004020 Completed IR-5-2(154) 005 Maytown Rest Area To Mp 96.2 Scarsella Bros., Inc. TIM L. AHLES 11/18/1991 11/05/1992 2,133,127.95

004021 Completed IR-90-2(163) 090 Highline Canal (N) And Squaw Creek (N&S) Bridges O Progressive Contractors, Inc. ROGER L. ARMS 12/02/1991 10/20/1992 796,123.05

004022 Completed IR-90(95) 090 Adams Road To Mae Valley Progressive Contractors, Inc. KIRK D. BERG 12/27/1991 02/17/1994 2,574,682.65

004024 Completed F-395(31)DE0200(8 395 Sr 395, Eltopia To Mesa Steelman-Duff, Inc. VIRGIL E. SCHMIDT 12/02/1991 05/26/1993 4,360,998.10

004025 Completed FLH-F-410(30) 410 Sr 410, Mp 84.50 To Bumping Lake Road Kiewit Infrastructure West Co. R.F. GIFFORD 12/27/1991 05/04/1993 3,287,701.00

004026 Completed I-IR-5-2(164) 005 Airdustrial To Little Street Landscaping And Erosi Fuji Industries, Inc. TIM L. AHLES 11/21/1991 03/09/1995 910,985.00

004027 Completed IR-90-6(167) 090 Spokane W. Uab To Spokane Viaduct - Stage 1 Progressive Contractors, Inc. LEONARD CASH 01/22/1992 11/25/1992 884,146.00

004028 Completed F-978(2) 097 Dot Stockpile To 3.3 Miles S/Entiat River Bridge Basin Paving Co. PAUL J. MAHRE 12/18/1991 10/01/1992 1,365,901.70

004030 Completed F-101(108) 101 Sr 101, County Road Vic. To Elwha River Bridge Lakeside Industries JERRY MOORE 01/02/1992 11/06/1992 1,979,228.15

004031 Completed STATE 302 Sr 302, Elgin Clifton Rd To Sr 16 U'Xing Rinker Materials West, Llc Dba KEVIN DAYTON 02/04/1992 02/08/1993 1,045,198.03

004032 Completed STATE 410 Angeline Road Overcrossing Bridge No. 410/42s Progressive Contractors, Inc. JIM VORASS 01/07/1992 07/15/1992 331,087.00

004033 Completed STATE 538 Urban Ave To Skagit Valley College Trico Contracting, Inc. JOHN HAYES 01/07/1992 04/28/1993 1,393,339.42

004035 Completed IR-5-5(190) 005 Joe Leary Slough Br. To Vic. Nulle Road I/C -Nb Granite Construction Company KEN JOHNSON 02/25/1992 04/09/1993 5,311,464.70

004036 Completed IR-5-2(170) 005 Sr 5, Lewis County Line To Sr 12 Lakeside Industries TIM L. AHLES 02/11/1992 03/25/1994 1,648,044.25

004037 Completed IR-5-2(171) 005 Median Crossover Protection Scarsella Bros., Inc. TROY D. CREWS 02/19/1992 02/04/1993 3,037,921.65

004039 Completed I-IR-405-3(771) 405 N.E. 8th St. I/C To Northup I/C Hov Kiewit Construction Company JAY LAVASSAR 05/11/1992 08/15/1994 27,797,730.45

004040 Completed IR-5-4(207) 005 Stillaguamish Br. 5/670w And Portage Cr. Br. 5/663 Eagle Crest Construction Co MARLIN LENSSEN 03/09/1992 05/20/1992 687,908.70

004041 Completed RS-S293(6) 009 Sr 9, Big Lake Crossing Scoccolo Construction, Inc. MARLIN LENSSEN 02/25/1992 02/16/1994 618,394.15

004042 Completed STATE 012 District 5 Seals And Thin Overlays 1992 Granite Northwest Inc R.F. GIFFORD 03/03/1992 08/28/1992 1,229,724.08

Dec 25, 2019 6 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004043 Completed F-FG-202(17) 202 Jct. N.E. 145th St./148th Ave. N.E. Shoreline Construction Company MARLIN LENSSEN 02/25/1992 03/04/1994 415,941.49

004044 Completed STATE 169 Sr 169, Sr 18 To 196th Ave Se Lakeside Industries JIM VORASS 02/19/1992 06/14/1993 701,412.30

004045 Completed ER-80-5(147) 504 Green River Vicinity To Maratta Creek Vicinity Kiewit Infrastructure West Co. DOUG FICCO 03/18/1992 06/30/1993 4,498,055.46

004047 Completed I-IR-5-3(756) 005 Sr 5, Ne 107th & N. 85th St. Hov Bypasses Lakeside Industries TOM BAKER 03/31/1992 12/01/1993 526,011.03

004048 Completed F-525(12) 525 Smugglers Cove Road To Vicinity Admirals Drive Krieg Construction, Inc. MARLIN LENSSEN 03/25/1992 09/24/1992 396,633.10

004050 Completed I-IR-90-1(375) 090 23rd Ave. S. To Yakima Ave. S. Landscape Paul Brothers, Inc. RON ERICKSON 05/15/1992 06/30/1997 2,116,478.10

004051 Completed STATE 097 Sr 97/220 Paving Granite Northwest Inc R.F. GIFFORD 03/03/1992 02/03/1993 496,612.05

004052 Completed I-IR-405-3(763) 405 S. Renton To Sunset Blvd. Hov Lanes Guy F. Atkinson Construction Corp. JOE SCANLON 04/29/1992 07/01/1996 34,250,527.21

004053 Completed STATE 433 Lewis & Clark Bridge 433/1 Fender Modification Advanced American Diving MICHAEL SALLEY 03/31/1992 04/27/1993 212,646.00

004054 Completed STATE 016 Tacoma Narrows Bridge 16/110 Modify Pier Protectio Fletcher General, Inc. KEVIN DAYTON 04/03/1992 09/15/1992 646,287.00

004056 Completed STATE 025 Columbia River Bridge 25/L30 Painting We Painters, Inc. CHARLES WILKE 04/02/1992 06/02/1992 165,593.00

004057 Completed STATE 167 Bridges 167/127 E & W & 509/126 Painting B-G Paint Company, Inc. TOM BAKER 04/21/1992 06/30/1992 74,888.00

004058 Completed F-395(32) 395 Hillsboro St. To E. Elm Road - Sb Acme Materials & Construction Co VIRGIL E. SCHMIDT 04/15/1992 02/03/1993 1,116,746.10

004059 Completed F-525(9) 525 Cameron Rd. To Sr 20 Stage 2 Northwest Construction, Inc. MARLIN LENSSEN 05/29/1992 11/16/1994 1,830,992.81

004063 Completed F-002(93) 002 Creston To Two Miles East Of Telford Rest Area West Company, Inc. T. J. TREPANIER 05/07/1992 05/19/1994 2,334,471.15

004064 Completed IR-5-5(191) 005 Sr 5, Sr 534 Vic To Joe Leary Slough Bridge Lakeside Industries KEN JOHNSON 04/30/1992 02/15/1994 4,646,383.20

004065 Completed BRF-002(83) 002 Wenatchee River Br. 2/219 All State Construction Inc Of Orego PAUL J. MAHRE 05/20/1992 04/14/1995 3,030,056.30

004066 Completed STATE 003 Sr3/305 Interchange Scarsella Bros., Inc. LINEA LAIRD 05/20/1992 04/10/1995 4,183,766.65

004067 Completed NHF-167(23) 167 Sr 167, S. 277th St. To Green River - Nb Lakeside Industries INGO GOLLER 04/03/1992 09/29/1992 265,785.67

004068 Completed IR-5-4(200) 005 Sr 5, Smokey Point Rest Areas Rehabilitation & Rv Tri-State Construction Inc STEVE MILLER 04/29/1992 02/07/1994 2,003,960.40

004069 Completed IR-5-5(188) 005 Sr 5, Whatcom County Bridge Decks - Stage 2 Progressive Contractors, Inc. KEN JOHNSON 05/29/1992 04/22/1993 1,393,538.90

004070 Completed I-90-1(377) 090 Sr 90, Sr 5 To Lake Wash. City St. Reconstruction Lakeside Industries RON ERICKSON 05/15/1992 10/05/1993 630,111.75

004071 Completed STATE 530 Sr 530, Sr 5 To Vic. 14th Dr. Nw Rinker Materials West, Llc Dba ALETA BORSCHOWA 05/20/1992 07/27/1992 323,753.55

004072 Completed NHF-0002(087) 002 Sr 2, 3/4 Mi E Woods Cr Br To Sultan Weigh Station Lakeside Industries MARLIN LENSSEN 05/11/1992 06/30/1993 1,350,490.40

004073 Completed STPF-0020(65) 020 Weeman Bridge To Winthrop- Revegetation Nelson Landscape Service, Inc. STAN MOORE 05/18/1992 10/05/1993 207,661.00

004074 Completed I-IR-90-1(376) 090 76th Ave Se To Luther Burbank Lid Landscape Fuji Industries, Inc. RAY ARNOLD 05/20/1992 09/07/1995 1,357,270.65

004075 Completed NH-NHG-0395(33) 395 Little Pend Oreille River Bridge To Colville Inland Asphalt Company L. CASH_/ K. OLSON 05/20/1992 03/02/1995 2,888,025.00

Dec 25, 2019 7 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004076 Completed I-IR-405-3(786) 405 Coal Creek I/C To Ne 8th St. I/C Ledcor Industries, Inc. KIM HENRY 06/11/1992 03/15/1995 12,073,758.97

004077 Completed STATE 515 Sr 515, Se 235th To Se 220th Tri-State Construction Inc GARY LIFFICK 05/29/1992 01/17/1994 3,235,271.84

004078 Completed NH-NHG-0020(060) 020 Sr 20, Commercial Ave 36th St. To Swinomish Slough Lakeside Industries KEN JOHNSON 06/05/1992 10/29/1993 2,262,255.89

004079 Completed NH-F-NHG-0104(014 104 Sr 104, Ferry Landing/Railroad Ave. To Paradise La Rinker Materials West, Llc Dba TOM BAKER 05/20/1992 10/27/1992 443,884.60

004080 Completed NH-0522(006) 522 Snohomish/King Co. Line To Cathcart Rd. Watson Asphalt Paving Company, MARLIN LENSSEN 05/20/1992 11/18/1992 1,323,810.43

004084 Completed IR-5-4(206) 005 Sr 5, Everett Vic. Ramps Rinker Materials West, Llc Dba STEVE MILLER 06/22/1992 03/02/1993 1,095,834.61

004085 Completed STATE 224 Sr 224, West Richland To Sr 240 Kiewit Infrastructure West Co. VIRGIL E. SCHMIDT 06/22/1992 03/25/1994 6,579,443.30

004086 Completed NH-F-NHG-012(72) 012 Sr 12, Beach Road To Crumb Road Lakeside Industries TROY D. CREWS 07/08/1992 12/22/1993 2,779,320.39

004087 Completed STPF-STPFG-0020(0 020 Mp 125.21 To Cabinet Creek Rock Fall Mitigation One Way Construction, Inc. MARLIN LENSSEN 05/29/1992 12/11/1992 547,280.30

004088 Completed I-90-1(365) 090 S Bellevue Park And Ride Lot 2nd Stage Paving Rivera & Green, Inc. RON ERICKSON 07/16/1992 08/12/1993 201,867.30

004089 Completed I-IR-90-1(323) Dayton Ave. Bldg. Sprinkler/Alarm Mark Construction, Inc. CRAIG J. STONE 06/22/1992 11/18/1993 228,498.00

004091 Completed I-5-2(172),LOCAL 005 Plum St. To Henderson Blvd. Connection Tucci & Sons, Inc. TIM L. AHLES 07/16/1992 08/08/1994 1,324,434.75

004092 Completed STATE 012 Clarkston Vicinity Planing & Paving Poe Asphalt Paving, Inc. ROGER L. ARMS 06/22/1992 03/04/1993 1,356,886.40

004093 Completed BRM-7075(1) 140 Washougal River Bridge 140/4 Structures, Inc. DUAIN R. MILLER 06/15/1992 07/14/1993 1,800,761.58

004094 Completed BHM-6589(4) 303 Manette Bridge 303/4 Stage 1 Pier 5 Rehabilitation Madden Construction, Inc. R. MITTLESTADT 06/11/1992 10/08/1992 472,030.00

004095 Completed NH-NHG-0002(094) 002 Sr 2, Rocklyn Rd. To Jct. Sr 28 Poe Asphalt Paving, Inc. RALPH W. ROBERTSON 06/22/1992 10/29/1992 655,585.86

004096 Completed I-IR-90-1(378) 090 Sr 90, E. Mercer Island I/C Medians Landscape Ohno Construction Company RAY ARNOLD 06/11/1992 03/26/1996 468,514.00

004097 Completed IR-90-2(166) 090 Sr 90, Yakima River Bridge 90/140s Deck Overlay Eagle Crest Construction Co ROGER L. ARMS 06/22/1992 11/24/1992 364,016.35

004098 Completed NH-NHG-101(123) 101 Sr 101, Sr 3 Off Ramp To Weaver Creek Bridge Ace Paving Co., Inc. DAVE ERICKSON 06/29/1992 04/28/1994 1,655,022.65

004099 Completed NFG-NH-F-0518(003 518 So. 154th St. To Sr 5 Sb On-Ramp & Sr 5 Mp 149.22 Rivera & Green, Inc. TOM BAKER 06/29/1992 08/05/1993 1,097,249.34

004101 Completed STPF-STPFG-0028(0 028 Sr 28, Martin Road To Sr 17 Basin Paving Co. PAUL J. MAHRE 07/10/1992 02/08/1993 1,385,307.80

004102 Completed IR-082-2(105) 082 Sr 82, Beech Street To Valley Mall Blvd. Granite Northwest Inc ROGER L. ARMS 06/26/1992 07/02/1993 2,345,600.45

004103 Completed IR-405-3(787) 908 Sr 908, 114th Ave. Ne To Sr 901 Watson Asphalt Paving Company, TOM BAKER 06/22/1992 12/16/1992 587,027.07

004105 Completed IR-005-1(213) 005 Sr 5, Vic. Sr 503 To Vic. Rr O'Xing Kiewit Infrastructure West Co. DUAIN R. MILLER 06/22/1992 10/09/1992 1,245,058.45

004106 Completed STATE 014 Sr 14, Smith Cripe Road Vic. Dirt And Aggregate Interchange, Inc DUAIN R. MILLER 07/16/1992 12/04/1992 729,767.49

004107 Completed IR-90-2(167) 090 Sr 90, Kachess River To Yakima River Highway Services, Inc. ROGER L. ARMS 07/08/1992 11/19/1992 1,192,853.40

004108 Completed IR-5-4(211) 005 Sr 5, 116th St. Ne I/C & 172nd St. Ne I/C Lakeside Industries STEVE MILLER 07/16/1992 02/18/1994 469,267.24

Dec 25, 2019 8 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004109 Completed 00000 018 Sr 18, Se 312th St. To Sr 90 Widen & Safety Max J. Kuney Company RON ERICKSON 07/16/1992 06/24/1994 4,547,136.27

004110 Completed NH-NHG-0520(11) 520 Sr 520, Ne 24th Street To Sr 901 Lakeside Industries RON ERICKSON 07/16/1992 06/24/1993 1,160,141.61

004113 Completed NH-NHG-0008(002) 008 Mp 11.54 To Vic. Summit Lake Road Scarsella Bros., Inc. MIKE HORTON 07/10/1992 08/23/1994 2,286,972.95

004114 Completed STATE 005 Sr 5, 236th St. Sw To 44th Ave W Hov And Resurface Ledcor Industries, Inc. AL DYER 08/13/1992 11/30/1994 5,321,687.75

004115 Completed STPF-STPFG-S38(01 027 Sr 27, Palouse To Garfield Frank Gurney, Inc. CHARLES WILKE 08/05/1992 11/23/1992 241,570.30

004116 Completed NH-0195(021) 195 Sr 195, Colfax To Watt Steelman-Duff, Inc. G. E. GIBSON 07/27/1992 10/22/1993 1,497,722.85

004117 Completed IR-9999(065) 082 I-82/I-182 Pccp Repair Acme Materials & Construction Co ROGER L. ARMS 08/03/1992 11/08/1992 342,823.92

004118 Completed NH-NHG-0509(005) 509 Sr 509, Nb Off Ramp To Cloverdale Totem Electric Of Tacoma, Inc. TOM BAKER 08/18/1992 06/17/1993 255,172.06

004122 Completed STATE 005 Sr 5, Spokane Street I/C Bridges Seismic Retrofit David A. Mowat Company CATHY ARNOLD 08/07/1992 07/23/1993 909,564.00

004123 Completed IM-IMG-090-2(169) 090 Sr 90, Asahel Curtis I/C To Kachess River Apply-A-Line, Inc. ROGER L. ARMS 07/27/1992 08/05/1993 246,715.00

004124 Completed STPF-STPFG-0202(0 202 Sr 202, 292nd Ave. Se Vic. Tri-State Construction Inc RON ERICKSON 10/16/1992 01/26/1995 394,909.25

004125 Completed ACDPS-0027(001) 395 Sr 395, Mesa To Connell Scarsella Bros., Inc. VIRGIL E. SCHMIDT 09/23/1992 07/01/1994 4,028,412.05

004126 Completed STATE 167 Milwaukee Ave. Overcrossing Progressive Contractors, Inc. KEVIN DAYTON 09/04/1992 09/21/1993 1,472,783.59

004127 Completed STPF-STPFG-0503(0 503 Sr 503, Sr 502 Vic. To Rock Creek Road Vic. Granite Northwest Inc DUAIN R. MILLER 08/13/1992 05/14/1993 1,396,473.75

004129 Completed STATE Kingston Ferry Terminal Overhead Loading System Pamco Industrial Contractors, Inc. RON PAANANEN 10/08/1992 10/04/1994 2,629,167.00

004130 Completed NH-NHG-0012(079) 012 Davis Lake Road To Rainy Creek Bridge Vicinity Lakeside Industries TROY D. CREWS 09/04/1992 07/29/1994 1,888,145.15

004131 Completed STATE 012 Sr 12, Jct. Sr 123 Eb Climbing Lane Klb Construction, Inc. TROY D. CREWS 09/21/1992 03/14/1994 1,287,398.50

004132 Completed STATE 097 Sr 97, Sr 14 Vic. To Stringstreet Road West Wood Corporation MICHAEL SALLEY 10/08/1992 11/02/1993 969,518.60

004133 Completed I-IR-005-3(789) 005 Lake City Way To Ne 175th Sc & Di And Noise Wall Tri-State Construction Inc TOM BAKER 10/02/1992 10/10/1995 1,788,145.35

004134 Completed STATE 522 Ne 147th St. To Swamp Creek Bridge Watson Asphalt Paving Company, CATHY ARNOLD 09/10/1992 09/14/1993 978,701.16

004135 Completed IR-IRG-005-3(660) 005 Sr 5, Mp 152.27 Vic. South 188th Street I/C Signal Totem Electric Of Tacoma, Inc. INGO GOLLER 09/21/1992 11/09/1994 413,759.05

004136 Completed IM-IMG-005-4(212) 005 4th St./Sr 528 Interchange Signal Electric, Inc. STEVE MILLER 09/14/1992 08/18/1993 487,273.80

004137 Completed IR-090-6(176) 090 1992 Dist.6 Bridge Deck Repair N.A. Degerstrom, Inc. CHARLES WILKE 08/31/1992 12/22/1993 820,512.50

004139 Completed IM-005-3(790) 005 Interstate Sign Illumination Signal Electric, Inc. INGO GOLLER 09/14/1992 01/09/1995 614,340.75

004140 Completed I-IR-090-1(306) 090 Third Lake Washington Bridge Maintenance Facility Fletcher General, Inc. INGO GOLLER 09/23/1992 10/30/1996 1,251,513.50

004141 Completed STATE 195 Sr 195, Colfax Main Street Et Al Poe Asphalt Paving, Inc. G. E. GIBSON 09/14/1992 06/30/1993 905,976.20

004142 Completed I-IM-090-1(380) 090 S. Bellevue Transit Access Phase 1 - Landscape Teufel Nursery Of Washington, Inc. RAY ARNOLD 09/23/1992 06/12/1996 284,679.00

Dec 25, 2019 9 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004143 Completed NH-NHG-0016(8) 016 Sr 16, Mullenix Rd. I/C Robison Construction, Inc. LINEA LAIRD 10/09/1992 02/02/1995 3,952,919.00

004144 Completed STATE 097 Bear Mountain Road To South Shore Drive Goodfellow Bros Inc STAN MOORE 10/06/1992 10/05/1993 1,155,681.00

004145 Completed STATE 101 Sr 101 N. Shelton I/C Scarsella Bros., Inc. DAVE ERICKSON 10/23/1992 08/23/1994 2,017,801.35

004146 Completed STATE 005 Downtown Seattle Bridges Seismic Retrofit David A. Mowat Company CATHY ARNOLD 10/06/1992 05/26/1994 597,384.00

004147 Completed I-IM-090-1(381) 090 Sr 90, Dean St. To 23rd Ave. S. Erosion Control An Teufel Nursery Of Washington, Inc. RON ERICKSON 10/12/1992 05/30/1997 747,315.00

004148 Completed NH-0195(022) 195 Cornwall Road To Sr 90 Interchange Stage 1 Inland Asphalt Company CHARLES WILKE 12/01/1992 09/01/1993 1,202,999.00

004149 Completed STATE 009 Sr 204 To Lundeen Parkway Waterworks, Inc. ALETA BORSCHOWA 12/04/1992 04/05/1994 1,926,676.15

004151 Completed STATE 005 South King County Bridges Seismic Retrofit Eagle Crest Construction Co GARY LIFFICK 11/06/1992 05/06/1993 329,916.00

004152 Completed STATE 005 District Wide Signal Revision Totem Electric Of Tacoma, Inc. INGO GOLLER 11/06/1992 06/16/1993 100,411.00

004153 Completed I-090-1(382) 090 Sr 90, Wall 18 And Trail R.W. Scott Construction Co. CATHY ARNOLD 12/04/1992 06/08/1994 1,082,379.00

004154 Completed STATE 410 Sr 410, 184th Ave. E. To 214th Ave. E. Robison Construction, Inc. MIKE MORISHIGE 12/04/1992 03/20/1995 4,148,924.95

004155 Completed I-IM-005-3(792) 005 Sr 5, Roanoke St. To 236th Sw & Sc & Di & 50th N. Rivera & Green, Inc. TOM BAKER 01/12/1993 11/22/1994 2,039,692.95

004156 Completed IM-082-1(074) 082 Sr 82, Interchange Ramp Paving Granite Northwest Inc ROGER L. ARMS 11/19/1992 10/13/1993 615,667.00

004157 Completed IM-090-5(-86) 090 Sr 90, Tokio To Lincoln County Line Acme Materials & Construction Co G. E. GIBSON 11/19/1992 09/27/1993 1,915,506.60

004158 Completed IM-090-5(087) 090 Sr 90, Adams County Line To Spokane County Line Inland Asphalt Company GORDON OLSON 11/12/1992 12/03/1993 5,390,404.20

004159 Completed NH-0097(057) 097 Sr 97, End Truck Lane To Bonanza Campground North Central Construction, Inc. PAUL J. MAHRE 12/21/1992 10/25/1993 2,359,790.50

004161 Completed I-IM-405-3(791) 405 Sr 405, Northup To Bothell Hov And Sc & Di Stage 1 Max J. Kuney Company RON ERICKSON 04/23/1993 05/14/1997 24,556,077.99

004162 Completed STATE 005 Sr 5, Et Al, Bridges 5/650w, 522/138, 530/290, 532 Construction & Rigging, Inc. ALETA BORSCHOWA 12/01/1992 10/07/1993 369,295.00

004163 Completed IM-090-2(170) 090 Sr 90, Fr 3 Frontage Road - West West Company Construction Inc ROGER L. ARMS 12/11/1992 11/15/1993 995,049.95

004164 Completed NH-0395(034) 395 Sr 395, Jct. Sr 231 To Mp 207.81 Inland Asphalt Company KEN OLSON 01/06/1993 05/25/1994 1,838,779.50

004165 Completed IM-082-3(052) 082 Sr 82, Coffin Road I/C Vicinity Granite Northwest Inc VIRGIL E. SCHMIDT 01/06/1993 10/09/1993 191,120.95

004166 Completed NH-0520(012) 520 Sr 520, Sr 5 To 80th Ave. Ne Emergency Telephones Totem Electric Of Tacoma, Inc. CATHY ARNOLD 01/25/1993 04/05/1995 1,124,293.77

004170 Completed STATE Winslow Ferry Terminal Standard Toll Booth Replace Caicos Corporation GEORGE SAUER 01/05/1993 09/21/1993 124,500.00

004171 Completed BHM-2879(001) 090 Sr 90, Maple Street Bridge Deck Replacement David A. Mowat Company T. J. TREPANIER 01/13/1993 10/29/1993 2,814,439.00

004172 Completed IM-182-3(053) 012 Sr 12, Et Al, Navigation Lights Rehabilitation Intermountain Electric, Inc. R.F. GIFFORD 02/08/1993 10/26/1993 233,982.00

004174 Completed STATE Anacortes Ferry Terminal Secondary Power Connectio Intermountain Electric, Inc. RICK BRATER 01/12/1993 03/10/1994 130,000.00

004175 Completed BR-0011(002) 011 Sr 11, Half Bridge 11/101 Replacement 0.187 Mile Sheldrup Construction, Inc. KEN JOHNSON 03/12/1993 04/01/1994 1,080,842.20

Dec 25, 2019 10 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004176 Completed STATE 097 Sr 97a, Knapps Hill Tunnel Repair Stage 2 One Way Construction, Inc. STAN MOORE 02/08/1993 05/05/1993 367,387.65

004177 Completed ID-I-IR-090-1(357) 090 Sr 90, Bellevue Access Transit & Hov - Phase 2 Max J. Kuney Company RAY ARNOLD 03/03/1993 07/09/1996 18,112,685.21

004178 Completed 516 Sr 516, 132nd Ave Se To 160th Ave Se Volker Stevin Pacific Inc. GARY LIFFICK 03/17/1993 03/24/1995 5,423,414.40

004179 Completed STPF-STPFG-0009(0 009 Sr 9, Jct 84th St Ne/Getchell Rd Signal And Channe Granite Construction Company MARLIN LENSSEN 03/08/1993 11/30/1993 220,951.50

004180 Completed STATE 004 Sr 4, Cooper Pt Vic. & Bunker Hill Vic. Truck Clim Elting Incorporated MICHAEL SALLEY 03/15/1993 11/17/1995 2,007,181.20

004181 Completed IM-090-4(096) 090 Sr 90, Dodson Rd To Rr O'Xing 90/232 Acme Materials & Construction Co STAN MOORE 04/07/1993 03/15/1995 2,796,478.85

004182 Completed STATE 509 Sr 509, District Boundary To King/Pierce County Li Woodworth & Company, Inc. GARY LIFFICK 02/18/1993 08/25/1993 192,663.00

004183 Completed STATE 539 Sr 539, Tenmile To Birch Bay-Lynden Rd. Resurface Rinker Materials West, Llc Dba JOHN HAYES 03/15/1993 12/09/1993 936,570.23

004186 Completed STATE 010 Sr 10, Sr 970 To Sr 97 - Guardrail Mt Mckinley Fence Co Inc ROGER L. ARMS 03/15/1993 01/24/1994 416,269.76

004187 Completed NH-0012(081) 012 Sr 12, E. C/L Naches To Pp&L Spillway Granite Northwest Inc R.F. GIFFORD 03/08/1993 02/02/1994 479,486.00

004188 Completed IM-090-1(383) 090 Sr 90, High Point Road O'Xing - 90/74s Deck Overla Eagle Crest Construction Co KIM HENRY 02/24/1993 02/28/1994 178,406.00

004189 Completed STATE 240 Sr 240, Mp 26 Vic. To Stevens Dr. Vic. West Company Construction Inc VIRGIL E. SCHMIDT 03/15/1993 01/20/1994 296,437.50

004190 Completed STPF-5191(002) 821 Sr 821, Roza Dam To Wymer Tommer Construction Co., Inc. R.F. GIFFORD 03/15/1993 12/08/1993 385,314.20

004191 Completed IM-005-3(795) 005 Sr 5, Northgate Way To Ne 175th Bridge Deck Resurf David A. Mowat Company TOM BAKER 04/09/1993 09/13/1995 448,428.40

004192 Completed BHF-9999(025) 020 Sr 20/97, Bridges 20/645, 20/648, 97/533& Pateros Eagle Crest Construction Co ROBERT A. MURRAY 03/16/1993 01/19/1994 542,212.30

004193 Completed STATE 090 Sr 90, Winchester Rest Areas Update Rv Dump Aztech Electric Inc PAUL J. MAHRE 03/15/1993 01/04/1994 72,336.50

004194 Completed STATE 101 Sr 101, Dry Creek Bridge To Jefferson County Line Rinker Materials West, Llc Dba JOHN L. HART 04/15/1993 01/03/1995 1,946,738.00

004195 Completed STATE 104 Sr 104, Sr 524/Main St., Dayton St. & 95th Place W Totem Electric Of Tacoma, Inc. TIM SMITH 03/16/1993 05/03/1994 240,607.00

004196 Completed STATE 520 Sr 520, 124th Ave Ne To W. Lake Sammamish Parkway Totem Electric Of Tacoma, Inc. KIM HENRY 04/09/1993 08/28/1995 1,994,157.75

004197 Completed STATE 021 Bnrr O'Xing And Sandhill Coulee Bridge Overlay Eagle Crest Construction Co RALPH W. ROBERTSON 03/25/1993 01/10/1994 125,045.00

004198 Completed STATE 026 Sr 26, Sr 90 To Royal City And Grant County Line T Basin Paving Co. KIRK D. BERG 05/05/1993 06/09/1995 2,397,165.61

004200 Completed IM-005-3(798) 005 Sr 5, Pierce County Line To Tukwila Hov-Stage 2a S David A. Mowat Company INGO GOLLER 05/24/1993 04/15/1999 2,583,641.39

004201 Completed ER-800-5(163) 504 Sr 504, Coldwater Lake To Johnston Ridge Morrison Knudsen Corporation AMY E. REVIS 05/05/1993 08/24/1999 23,113,735.99

004202 Completed BRF-0002(096) 002 Sr 2, Snohomish River To Cavalero Corner Replace E Fletcher General, Inc. STEVE MILLER 06/16/1993 09/04/1998 9,595,980.86

004203 Completed STPF-0410(034) 410 284th Avenue S.E. To White River Mill Watson Asphalt Paving Company, TOM BAKER 03/17/1993 04/19/1994 304,937.38

004204 Completed STATE 530 Vicinity Arnot Road Retaining Wall One Way Construction, Inc. ALETA BORSCHOWA 03/25/1993 02/04/1994 86,840.20

004205 Completed IM-0005-3(796) 005 Sr 5, Overhead Sign And Sign Structure Repair David A. Mowat Company TOM BAKER 05/26/1993 03/13/1996 425,346.00

Dec 25, 2019 11 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004206 Completed STATE 097 Sr 97a, Chelan Vicinity Basin Paving Co. PAUL J. MAHRE 04/28/1993 10/04/1993 283,785.00

004207 Completed NH-0395(037) 395 Sr 395, Colville To Columbia River Bridge Poe Asphalt Paving, Inc. CHARLES WILKE 04/28/1993 02/03/1994 1,770,077.10

004208 Completed BRS-S212(007) 508 Sr 508, Tilton River Bridge 508/30 Weaver Construction Co. TROY D. CREWS 05/17/1993 05/11/1995 1,655,171.50

004209 Completed STPF-0532(004) 532 Sr 532, Smith Road Vic. To Bnrr 532/6 Trico Contracting, Inc. KEN JOHNSON 04/29/1993 02/20/1996 1,010,144.20

004210 Completed STPF-0020(070) 020 Sr 20, Alder Creek To Rockport Vicinity Climbing L Lakeside Industries KEN JOHNSON 04/29/1993 04/13/1994 1,628,028.50

004211 Completed STATE 097 Sr 97, Box Canyon Road Vic. Climbing Lane Granite Northwest Inc MICHAEL SALLEY 04/28/1993 02/07/1996 1,463,096.30

004212 Completed IM-005-3(799) 005 Sr 5, Interstate Bridge Decks David A. Mowat Company DEAN W. MOBERG 05/25/1993 05/09/1996 1,419,958.45

004213 Completed STATE 542 Sr 542, Vicinity Noon Rd. To Bridge 542/9 Granite Construction Company JOHN HAYES 05/07/1993 02/28/1994 667,009.10

004214 Completed STPF-S310(002) 092 Sr 92, Jct. 131st Ave. Ne Channelization Granite Construction Company MARLIN LENSSEN 05/20/1993 02/07/1994 302,238.00

004215 Completed STATE 101 Sr 101, Vic. Sr 107 To Cosmopolis Scl/Uab Scarsella Bros., Inc. JOHN L. HART 06/01/1993 04/18/1994 1,017,721.09

004216 Completed STPF-0169(010) 169 Sr 169, Maplewood Ave. Se To Sr 405 Lakeside Industries CATHY ARNOLD 05/11/1993 05/10/1994 338,609.59

004217 Completed STATE 004 Sr 4, Skamokawa To Sr 407 Lakeside Industries MICHAEL SALLEY 04/19/1993 01/04/1994 678,498.80

004218 Completed NH-0097(059) 097 Sr 97, Swauk Creek Structures 97/271 Et Al Volker Stevin Pacific Inc. KIRK D. BERG 05/20/1993 10/09/1996 1,720,339.30

004219 Completed STATE 405 Sr 405 Ne 80th St. Undercrossing 405/51 - Painting Long Painting Company RON ERICKSON 05/20/1993 10/22/1993 69,691.80

004222 Completed STATE 005 Sr 5, Stillguamish River Bridges 5/670 E & W Paint Dunkin & Bush, Inc. ALETA BORSCHOWA 07/20/1993 01/20/1994 356,082.50

004223 Completed STATE 012 Sr 12, Salkum Vicinity Climbing Lanes Klb Construction, Inc. TROY D. CREWS 06/28/1993 02/28/1996 1,315,355.80

004224 Completed STATE 012 Sr 12 Snake River Bridge 12/512s Floorbeam Crack R Donald B Murphy Contractors Inc VIRGIL E. SCHMIDT 05/20/1993 09/13/1993 80,302.27

004225 Completed STPF-0017(023) 017 Sr 17, Vicinity Scenic Viewpoint To Sr 2 Basin Paving Co. ROBERT A. MURRAY 05/20/1993 06/20/1994 644,435.25

004227 Completed STATE 203 Sr 203, Skykomish River Bridge 203/106 Deck Overla Adhesive Systems Inc ALETA BORSCHOWA 05/05/1993 02/22/1994 232,625.25

004228 Completed NH-NHG-0104(016) 104 Sr 104, Bond Road To Kingston Ferry Terminal Ace Paving Co., Inc. LINEA LAIRD 06/11/1993 10/21/1996 1,579,335.74

004229 Completed BRF-0505)005) 505 Sr 505, Cowlitz River Bridge 505/110 Fletcher General, Inc. D. FICCO / A. REVIS 06/02/1993 06/23/1997 4,065,667.00

004230 Completed STATE 507 Sr 507, Couplet Signals - Stage 2 Signal Electric, Inc. TROY D. CREWS 05/14/1993 06/27/1994 167,650.70

004231 Completed NH-0522(007) 522 Sr 522, 164th St Se Vicinity To Sr 2/Monroe Granite Construction Company AL DYER 05/20/1993 09/28/1994 537,134.70

004232 Completed NH-0525(013) 525 Sr 525, Ash Way To Sr 99 & Ferry Terminal To 4th S Rinker Materials West, Llc Dba AL DYER 05/20/1993 12/12/1994 1,015,245.19

004234 Completed NH-0012(083) 012 Sr 12 Turnouts, Sr 410 Turnouts And Oak Creek Brid Granite Northwest Inc R.F. GIFFORD 05/14/1993 06/27/1994 851,459.65

004235 Completed IM-090-2(171) 090 Easton Hill To Yakima River Concrete Textures, Inc. ROGER L. ARMS 07/08/1993 02/13/1995 4,392,434.20

004236 Completed STATE 101 Sr 101, Vic. Cosmopolis Scl/Uab To 22nd St. Lakeside Industries JOHN L. HART 05/25/1993 03/18/1994 1,844,840.90

Dec 25, 2019 12 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004237 Completed STATE 395 Sr 395, Hastings Road To Mp 172 Stage 1 Sletten Construction Company G. E. GIBSON 07/02/1993 01/02/1997 10,731,700.50

004238 Completed STATE 527 Sr 527, 208th St. Se To 164th St. Se Guy F. Atkinson Construction Corp. AL DYER 06/28/1993 09/25/1997 9,442,601.90

004239 Completed IM-005-3(800) 005 Sr 5, Sb To Sr 520 Eb Ramp Tunnel David A. Mowat Company TOM BAKER 07/19/1993 03/15/1995 192,735.50

004242 Completed IM-005-1(218) 005 Sr 5, Et Al, District 4 Bridge Deck Rehabilitation Progressive Contractors, Inc. DOUG FICCO 06/02/1993 08/24/1994 649,937.50

004243 Completed IM-090-1(386) 090 Sr 90, Richards Road To Issaquah Creek Bridge Lakeside Industries KIM HENRY 07/12/1993 08/23/1996 3,424,275.00

004244 Completed NH-0097(060) 097 Sr 97, Brender Park To Sr 2 Morrill Asphalt Paving Co., Inc. PAUL J. MAHRE 06/16/1993 05/12/1995 1,269,507.70

004245 Completed NH-NHG-0900(006) 900 Sr 900, Jct. 68th Ave. S./Monster Road Active Construction, Inc. TOM BAKER 06/02/1993 04/12/1995 605,405.59

004247 Completed IM-005-3(801) 005 Sr 5, Vic. Northgate Way To Ne 145th St. Signing A Totem Electric Of Tacoma, Inc. TOM BAKER 05/24/1993 01/04/1996 154,185.50

004248 Completed ACI-090-1(384) 090 Sr 90, Phase 3 Traffic Switch Fletcher General, Inc. RON ERICKSON 06/18/1993 11/02/1995 3,453,326.00

004249 Completed IM-090-2(172) 090 Sr 90, West Ellensburg I/C To Ryegrass Rest Area Granite Construction Company R.F. GIFFORD 06/14/1993 11/28/1994 2,596,550.15

004250 Completed IM-005-3(802) 005 Sr 5, Nisqually River To Gravelly Lake I/C Woodworth & Company, Inc. MIKE MORISHIGE 07/19/1993 07/11/1995 3,930,823.60

004251 Completed NH-0012(080) 012 Sr 12, Vic. Rainey Creek Bridge To Cispus Road Lakeside Industries TROY D. CREWS 06/11/1993 07/23/1996 2,339,552.00

004252 Completed IM-9999(069) 082 Sr 82 Et Al, District Wide Interstate Sign Illumin Aztech Electric Inc R.F. GIFFORD 06/18/1993 09/16/1994 258,119.86

004253 Completed STATE 221 Sr 221, Prosser Hill Truck Climbing Lane Steelman-Duff, Inc. R.F. GIFFORD 06/14/1993 03/08/1994 742,453.85

004254 Completed IM-090-4(099) 090 Sr 90/21, Grant County Line To Vicinity Sr 21 M. A. Segale, Inc. KIRK D. BERG 06/16/1993 11/01/1994 3,850,535.20

004256 Completed IM-005-3(805) 005 Sr 5, Beacon-Holgate U'Xing Bridge Deck Overlay Eagle Crest Construction Co TOM BAKER 06/18/1993 04/14/1994 198,794.50

004257 Completed IM-005-3(803) 005 Sr 5, Weigh Station To Dearborn Stage 4 Lakeside Industries TOM BAKER 07/06/1993 06/23/1995 641,068.16

004258 Completed STPF-STPFG-0009(0 009 Sr 9, Jct. 172nd St Ne Signal And Channelization Hilltop Construction Co. MARLIN LENSSEN 06/18/1993 11/16/1994 404,966.87

004259 Completed BRF-0014(015) 014 Sr 14, Little White Salmon River Bridge 14/126 Kiewit Infrastructure West Co. MICHAEL SALLEY 07/20/1993 09/30/1997 3,951,830.70

004260 Completed STATE 101 Sr 101, Big Quilcene River To Vicinity Mill Road Ace Paving Co., Inc. JERRY MOORE 07/29/1993 04/08/1994 961,928.30

004261 Completed STATE 405 Sr 405, Bothell Ii Park And Ride Lot Pacific Road & Bridge Co. KIM HENRY 06/18/1993 06/13/1997 1,518,342.64

004262 Completed IM-005-4(216) 005 Sr 5, 164th St. Sw To To Lowell Road Lakeside Industries MARLIN LENSSEN 07/19/1993 10/18/1996 4,980,797.33

004263 Completed IM-005-4(214) 005 Sr 5, Smokey Point To Stillaguamish River Bridge Rinker Materials West, Llc Dba KEN JOHNSON 07/16/1993 01/09/1995 1,993,864.50

004264 Completed STATE 009 Sr 9/542, Bridge Deck Restoration Progressive Contractors, Inc. KEN JOHNSON 06/18/1993 10/20/1994 771,162.75

004265 Completed NH-0012(084) 012 Sr 12, Vic. Sr 395 I/C Farm Tank Road Granite Northwest Inc VIRGIL E. SCHMIDT 07/06/1993 12/08/1994 588,518.00

004266 Completed NH-0012(082) 012 Sr 12, Nine Mile Canyon To Wallula Road Intersecti Granite Northwest Inc VIRGIL E. SCHMIDT 07/19/1993 07/29/1996 2,065,489.00

004267 Completed STPF-0024(015) 024 Sr 24, Experimental Station To Taylor Ranch Granite Northwest Inc R.F. GIFFORD 06/16/1993 05/06/1994 723,349.70

Dec 25, 2019 13 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004268 Completed ACDPS-0027(001) 395 Sr 395, Sr 26 To Lind Scarsella Bros., Inc. T. J. TREPANIER 07/22/1993 04/18/1996 14,423,531.05

004269 Completed STPF-405-3(804) 405 Sr 405, Sr 181/Green River I/C Progressive Contractors, Inc. TOM BAKER 07/06/1993 06/05/2001 7,373,878.90

004270 Completed ACI-090-1(388) 090 Sr 90, Lacey V. Murrow Bridge Paint Approach Spans C.D.S. Painting & Coatings, Inc. TOM MADDEN 06/24/1993 03/22/1994 1,423,031.00

004271 Completed IM-090-2(173) 090 Sr 90, Cle Elum Vic. Bridge Deck Repair Progressive Contractors, Inc. ROGER L. ARMS 06/30/1993 09/19/1994 745,015.20

004272 Completed BR-NH-0101(126)(1 101 Sr 101, Black Lake Blvd. I/C & Black Lake Blvd. To Kiewit Infrastructure West Co. TIM L. AHLES 08/11/1993 02/17/1999 16,693,476.94

004273 Completed IM-005-4(215) 529 Sr 529, Marine View Drive To Ebey Slough Progressive Contractors, Inc. MARLIN LENSSEN 08/16/1993 07/13/1998 5,886,590.43

004275 Completed STATE 005 Sr 5, Sr 512 Interchange Interim Hov Improvement Tucci & Sons, Inc. MIKE MORISHIGE 08/03/1993 03/09/1995 1,142,358.32

004276 Completed STATE 003 Sr 3, Luoto Road I/C To Sr 305 I/C Scarsella Bros., Inc. LINEA LAIRD 07/20/1993 02/05/1996 6,150,388.23

004277 Completed IM-090-5(088) 090 Sr 90, Lincoln Co. Line To Vicinity Salnave Road Inland Asphalt Company GORDON OLSON 07/07/1993 11/02/1995 3,838,487.00

004278 Completed STPF-205-1(189) 205 Sr 205, St. John Noise Wall F.E. Ward, Inc. MIKE L. NIEMI 06/28/1993 09/14/1995 1,358,768.20

004279 Completed STATE 395 Sr 395, Columbia River Bridge To Court Street I/C Acme Materials & Construction Co VIRGIL E. SCHMIDT 07/16/1993 05/05/1994 316,084.70

004281 Completed IM-005-1(210) 005 Sr 5, Sr 432 I/C & Headquarters Road Ramp Paver Lakeside Industries DOUG FICCO 07/19/1993 03/21/1995 468,928.60

004282 Completed ACI-090-1(387) 090 Sr 90, S. Judkins St. Erosion Control & Landscape Ohno Construction Company CATHY ARNOLD 06/30/1993 04/17/1998 647,023.50

004283 Completed NH-0395(038) 395 Addy To Arden West Wood Corporation KEN OLSON 07/20/1993 10/25/1995 3,074,382.00

004284 Completed STPF-405-3(808) 405 Sr 405 Coal Creek Interchange Ledcor Industries, Inc. KIM HENRY 08/10/1993 04/29/1996 409,172.65

004285 Completed NH-0500(003) 500 Sr 500, Andresen Road Interchange Wildish Standard Paving Co MIKE L. NIEMI 08/10/1993 06/30/1998 8,133,606.80

004286 Completed F-0530(011) 530 Sr 530, Cicero Vic. To Oso Vic. Granite Construction Company STEVE MILLER 09/01/1993 04/30/1997 2,387,879.56

004289 Completed IM-9999(157) 005 Sr 5 Et Al, Interstate Sign Illumination Mill Plain Electric, Inc. MIKE L. NIEMI 07/16/1993 11/08/1994 103,303.00

004290 Completed BROS-2036(013) Walla Walla County Peppers Bridge A & R Construction, Inc. VIRGIL E. SCHMIDT 07/19/1993 06/05/1995 560,665.54

004291 Completed STPS-0017(024) 017 Sr 17, Mp 12.80 To Basin City Road Granite Northwest Inc VIRGIL E. SCHMIDT 07/12/1993 08/18/1994 484,065.47

004292 Completed STATE 167 Sr 167, 84th Ave. S. To S. Grady Way Hov & Sc & Di Mowat Construction Company INGO GOLLER 09/01/1993 06/12/2000 14,645,364.35

004293 Completed ACI-405-3(807) 520 Sr 520, Evergreen Point Bridge To 124th Ave. Ne Sc D.W. Close Company, Inc. KIM HENRY 09/09/1993 05/03/1996 2,417,759.79

004294 Completed STPF-0542(010) 542 Sr 542, Bridge 542/11 - Nugents To Marshall Hill R Granite Construction Company KEN JOHNSON 07/12/1993 02/24/1994 796,634.00

004295 Completed BRS-S370(003) 544 Sr 544, Nooksack River Bridges 544/9 & 10 Construction & Rigging, Inc. KEN JOHNSON 08/24/1993 01/17/1996 3,795,205.05

004297 Completed STATE 012 Sr 12, Snake River Bridge 12/915 Electrical Rehabi Rods Electric, Inc. VIRGIL E. SCHMIDT 07/29/1993 08/02/1995 381,246.00

004298 Completed STATE 169 Sr 169, 196th Ave Se/ Jones Road To Maplewood Kiewit Infrastructure West Co. CATHY ARNOLD 09/17/1993 12/15/1997 11,888,508.64

004299 Completed STATE 002 N. Spokane/Division Street Stage 1 Inland Asphalt Company HAROLD WHITE 09/01/1993 01/19/1996 3,688,246.06

Dec 25, 2019 14 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004301 Completed STPFG-9999(145) 004 Sr 4, Non-Interstate Safety Coral Construction Company MIKE L. NIEMI 07/29/1993 09/20/1995 707,270.00

004302 Completed STATE 012 Sr 12, Sr 101 To Fleet Street Lakeside Industries JOHN L. HART 08/16/1993 04/25/1995 1,149,190.00

004303 Completed STATE 024 Sr 24, Columbia River Bridge 24/105 Painting Oliver B. Cannon & Sons, Inc. ROGER L. ARMS 08/10/1993 02/04/1994 198,955.00

004304 Completed IM-090-1(390) 090 Sr 90, Interstate Guide Signs Sharp-Line Industries, Inc. KIRK D. BERG 07/19/1993 04/15/1994 134,450.00

004305 Completed STATE 101 Sr 101, Sr 8 O'Xing To Sr 3 Off Ramp Rinker Materials West, Llc Dba DAVE ERICKSON 08/10/1993 11/29/1995 2,581,949.20

004308 Completed STATE 020 Sr 20, Jacobs Road To Libbey Road Lakeside Industries JOHN HAYES 08/03/1993 02/15/1994 545,097.60

004309 Completed STATE 005 Sr 5 Et Al, Pierce County Bridges Seismic Retrofit Fletcher General, Inc. KEVIN DAYTON 08/24/1993 10/23/1995 415,514.00

004310 Completed ACI-STPF-090-1(389) 090 Sr 90, Phase 2 Electrical And Irrigation Control S D.W. Close Company, Inc. CATHY ARNOLD 10/12/1993 08/06/1997 3,373,261.00

004311 Completed NH-0504(004) 504 Sr 504, Tower Road To Seaquest State Park Granite Construction Company DOUG FICCO 09/02/1993 09/21/1999 4,190,909.90

004313 Completed STATE 011 Sr 11, Vic. Oyster Creek Slide Correction Pacific Road & Bridge Co. JOHN HAYES 09/01/1993 02/18/1994 155,256.24

004314 Completed ACI-090-1(393) 090 Sr 90, Changeable Message Signs - Stage 1 Signal Electric, Inc. ROGER L. ARMS 09/14/1993 12/02/1994 124,394.00

004315 Completed STPF-0003(015) 003 Sr 3, Allyn Vicinity Curves Ace Paving Co., Inc. LINEA LAIRD 09/14/1993 09/29/1995 1,181,818.08

004316 Completed IM-005-3(812) 005 Sr 5, Interstate Sign Illunination Totem Electric Of Tacoma, Inc. DAVE ERICKSON 08/26/1993 02/08/1996 393,359.00

004317 Completed STPF-0124(005) 012 Sr 12, & 124, Lower Waitsburg Road To Touchet Rive Steelman-Duff, Inc. VIRGIL E. SCHMIDT 08/16/1993 01/26/1996 1,553,937.20

004318 Completed NHG-0101(12) 101 Sr 101, Fort Columbia Tunnel Illumination Campbell Electric Co., Inc. MICHAEL SALLEY 09/09/1993 02/17/1995 264,408.60

004319 Completed STATE 509 Sr 509, S. 218th St. To Des Moines Way S. Sheldrup Construction, Inc. GARY LIFFICK 09/09/1993 06/27/1995 1,115,829.30

004321 Completed STATE 002 Sr 2, Snohomish River Bridge 2/5n Painting Long Painting Company MARLIN LENSSEN 09/09/1993 01/27/1995 206,009.40

004322 Completed ACI-090-1(391) 090 Sr 90, Seattle Misc. City Street Repair D. A. Zuluaga Construction, Inc. CATHY ARNOLD 09/14/1993 02/13/1995 930,735.10

004323 Completed NH-005-1(221) 005 Sr 5, Ne 134th St. U'Xing And Park And Ride Kiewit Infrastructure West Co. MIKE L. NIEMI 10/20/1993 01/05/1998 4,254,350.22

004324 Completed STPF-090-4(100) 090 Sr 90, Sr 17 Interchange North Central Construction, Inc. KIRK D. BERG 10/04/1993 07/14/1995 961,105.90

004325 Completed ACI-090-1(392) 090 Sr 90, Seattle Added Access Mowat Construction Company RAY ARNOLD 10/12/1993 09/16/1998 3,560,557.10

004326 Completed ACDPI-0067(001) 005 Sr 5, Ne 195th To 164th Sw Stage 2 Max J. Kuney Company AL DYER 12/09/1993 09/01/1998 29,872,179.45

004327 Completed IM-005-4(218) 005 Sr 5, Smokey Point Rest Area Rehabilitation - Stag Ohno Construction Company STEVE MILLER 09/28/1993 11/12/1996 677,011.36

004329 Completed NH-005-1(224) 005 Sr 5, Ne 78th Street To Salmon Creek Mowat Construction Company MIKE L. NIEMI 12/14/1993 12/21/1999 14,850,204.70

004330 Completed STPFG-0024(017) 024 Jct. Sr 24/243 Vernita Vicinity Steelman-Duff, Inc. PAUL J. MAHRE 11/23/1993 06/01/1995 765,519.60

004332 Completed IMG-005-3(814) 005 Sr 5, Ravenna Blvd. To N. 85th Safety Improvements David A. Mowat Company TOM BAKER 11/12/1993 03/15/1995 297,132.00

004333 Completed NH-005-4(220) 005 Sr 5, Everett Park & Ride Lot - Stage 1 Tri-State Construction Inc STEVE MILLER 12/28/1993 03/04/1999 1,378,562.70

Dec 25, 2019 15 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004334 Completed ACI-090-1(396) 090 Sr 90, Mercer Island City Streets - Resurface Watson Asphalt Paving Company, RAY ARNOLD 11/01/1993 02/16/1995 523,366.30

004335 Completed ACDPS-0027(001) 395 Sr 395, Connell To Vicinty Sr 26 Steelman-Duff, Inc. T. J. TREPANIER 11/23/1993 07/31/1996 7,154,098.86

004336 Completed ACI-IM-405-3(815) 405 Sr 405, Northup To Bothell Hov And Sc & Di - Stage Max J. Kuney Company RON ERICKSON 01/25/1994 12/30/1997 4,108,134.70

004337 Completed STATE 101 Sr 101, Mp 78 Vicinity Slide Northwest Rock, Inc. JOHN L. HART 12/14/1993 11/16/1995 1,555,154.25

004340 Completed IM-090-2(175) 090 Sr 90, Top Of Easton Hill To Silver Creek Progressive Contractors, Inc. ROGER L. ARMS 12/08/1993 02/16/1995 1,905,201.30

004341 Completed STPF-090-2(174) 090 Sr 90, Easton To Ellensburg Safety Columbia Asphalt & Gravel, Inc. ROGER L. ARMS 12/09/1993 01/02/1996 3,392,601.31

004343 Completed IM-005-3(811) 005 Sr 5, Pierce County Line To Tukwila Hov-Stage 2b Mowat Construction Company INGO GOLLER 01/07/1994 08/17/2000 5,307,319.08

004344 Completed BR-0520(013) 520 Sr 520, Evergreen Point Bridge 520/8 Rehabilitatio Guy F. Atkinson Construction Corp. JAY LAVASSAR 01/05/1994 07/09/1996 15,975,775.00

004345 Completed 101 Sr 101 Sr 103, Ilwaco Long Beach Paver Midmountain Contractors, Inc. GLENN SCHNEIDER 02/03/1994 06/09/1997 4,144,834.00

004346 Completed IM-082-1(076) 082 Sr 82, 12, Naches River Bridge To Beech Street Granite Northwest Inc R.F. GIFFORD 12/28/1993 02/06/1996 3,124,940.70

004347 Completed BH-005-3(817) 005 Sr 5, S. King County Bridges Seismic Retrofit Donald B Murphy Contractors Inc TOM BAKER 12/28/1993 01/05/1995 319,565.00

004348 Completed NH-0002(103) 002 Sr 2, Rayrock Springs To Skinney Creek Central Washington Asphalt, Inc. PAUL J. MAHRE 12/28/1993 01/29/1996 2,554,435.80

004349 Completed NH-0012(086) 012 Sr 12, Aberdeen Bluffs To Vic. Sargent Blvd. - Sta Stimpel-Wiebelhaus Associates JOHN L. HART 12/27/1993 02/03/1995 2,809,419.00

004350 Completed STPF-090(178) 090 Sr 90, Spokane West Uab To Spokane Viaduct Stage 2 Kiewit Infrastructure West Co. KEN OLSON 01/25/1994 03/11/1997 14,952,733.10

004351 Completed STATE 097 Sr 97,Bridges 97/271 & 272 Replacement Jij Corporation KIRK D. BERG 01/11/1994 09/15/1995 691,740.39

004353 Completed STATE 010 Sr 10, Fill Slope Protection Coral Construction Company ROGER L. ARMS 12/28/1993 02/01/1995 172,764.00

004354 Completed STATE 018 Sr 18, Auburn-Black Diamond Rd To Se 312th Robison Construction, Inc. RON PAANANEN 04/13/1994 05/21/1999 12,086,995.57

004355 Completed ACI-ACSTPF-090-1( 090 Sr 90, E. Portal Mt. Baker Ridge Tunnel S. Landsca Ohno Construction Company RON ERICKSON 12/28/1993 02/23/1998 256,752.85

004356 Completed ACBH-005-3(818) 005 Sr 5, & 90, South Seattle Bridges Seismic Retrofit Harcon Incorporated CATHY ARNOLD 01/11/1994 03/16/1995 759,546.00

004357 Completed ACI-ACSTPF-090-1( 090 Sr 90, Lake Washington To W. Mercer Way Landscape Ohno Construction Company RAY ARNOLD 02/16/1994 11/06/1998 240,803.90

004358 Completed ACI-ACIM-005-3(816) 005 Albro Place To Ship Canal Bridge Ramp Metering And Guy F. Atkinson Construction Corp. TOM BAKER 03/24/1994 07/09/1997 5,277,944.00

004359 Completed NH-BR-0097(061) 097 Vicinity Bridge 97/106 To Dry Creek Bridge Scoccolo Construction, Inc. VIRGIL E. SCHMIDT 03/10/1994 08/12/1996 3,946,723.00

004361 Completed ACI-ACSTPF-090-1(399 090 Sr 90, Sturgus Ave. S. Landscaping Buckley Nursery Company, Inc. RAY ARNOLD 02/03/1994 01/05/1999 415,610.00

004362 Completed NH-005-2(174) 005 Sr 5, 93rd Ave Sw I/C To Airdustrial I/C Lakeside Industries TIM L. AHLES 03/15/1994 03/19/1997 2,899,806.71

004363 Completed STATE 007 Sr 7, Morton To Nisqually River Bridge Granite Construction Company TROY D. CREWS 03/03/1994 03/28/1995 1,695,751.80

004364 Completed NHG-0104(018) 104 Sr 104, Sr 99 To 19th Ave Ne Signal System Interco Underground Distribution Lighting AL DYER 02/16/1994 06/15/1995 155,443.00

004365 Completed STATE 970 Sr 970 & 903, Sr 970 To National Forest Boundry Columbia Asphalt & Gravel, Inc. ROGER L. ARMS 03/04/1994 02/22/1995 1,135,970.25

Dec 25, 2019 16 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004367 Completed STPF-0282(002) 282 Sr 282, Sr 28/Ephrata To Sr 17 Basin Paving Co. PAUL J. MAHRE 03/03/1994 05/16/1995 601,834.00

004368 Completed RRP-3569(002) 397 Sr 397, Columbia River Bridge To Oregon Street Granite Northwest Inc VIRGIL E. SCHMIDT 03/15/1994 06/26/1995 299,807.25

004369 Completed NH-0509(006) 509 Sr 509, S. 136th St. To Myers Way Watson Asphalt Paving Company, TOM BAKER 03/21/1994 07/29/1996 2,088,826.77

004370 Completed STATE 002 Sr 2, Bnrr O'Xing 2/105 Skykomish Spur Lakeside Industries MARLIN LENSSEN 03/10/1994 02/02/1995 513,949.05

004371 Completed STPF-005-1(220) 005 Sr 5, Mp 44 Weigh Station Lakeside Industries D. FICCO / A. REVIS 03/29/1994 04/25/1995 319,425.85

004372 Completed STPUL-0526(004) 005 Sr 5, Eb Sr 526 To Nb Sr 5 Ramp Addition Fletcher General, Inc. MARLIN LENSSEN 04/06/1994 06/27/1996 10,683,378.38

004373 Completed STPFG-0104(017) 104 Sr 104 At Jct Sr 3 Signal Totem Electric Of Tacoma, Inc. JERRY MOORE 03/15/1994 06/28/1995 141,830.00

004375 Completed BH-9999(187) 002 Sr 2/153, Bridges Seismic Retrofit Tommer Construction Co., Inc. KIRK D. BERG 04/20/1994 06/23/1995 217,692.00

004376 Completed STATE 017 Sr 17, Adams County Line To Mp 12.70 Inland Asphalt Company VIRGIL E. SCHMIDT 03/29/1994 03/31/1995 1,188,888.00

004378 Completed STPF-0202(026) 202 Sr 202, Beta Street To Bridge 202/65 Resurface And Tri-State Construction Inc RON ERICKSON 06/10/1994 02/03/1998 1,057,723.50

004379 Completed STATE 908 Sr 908/202, Sr 908 To Sr 520 Watson Asphalt Paving Company, KIM HENRY 04/07/1994 03/20/1995 307,768.65

004380 Completed STATE District Wide Seal And Crush 1994 Morrill Asphalt Paving Co., Inc. PAUL J. MAHRE 04/22/1994 01/10/1995 1,243,373.05

004381 Completed STATE 014 Sr 14/142, Goldendale Vicinity Paver Kiewit Infrastructure West Co. MICHAEL SALLEY 05/03/1994 03/11/1996 1,072,777.20

004383 Completed STATE 009 Sr 9, Soper Hill Road To 60th St. Ne And Rehab. Of Rinker Materials West, Llc Dba MARLIN LENSSEN 04/13/1994 02/28/1995 307,684.91

004384 Completed STATE 009 Sr 9, 268th To Pilchuck Creek Bridge Overlay Rinker Materials West, Llc Dba KEN JOHNSON 04/13/1994 07/28/1994 203,247.56

004385 Completed STATE 008 Sr8, Elma Rest Area Rv Dump Westmark Excavating Inc JOHN L. HART 04/05/1994 07/05/1994 68,720.00

004386 Completed STATE 109 Sr 109, Vic. Broadway St. To Humptulips River Lakeside Industries JOHN L. HART 04/21/1994 01/06/1995 1,696,595.30

004387 Completed STPF-0101(134) 101 Sr 101, Vic. Sr 109 West For Hoquiam River Lakeside Industries JOHN L. HART 04/12/1994 03/07/1995 914,024.00

004388 Completed STATE 002 Sr 2, Sr 28 To Rocky Reach Dam North Central Construction, Inc. STAN MOORE 04/22/1994 04/06/1995 2,081,652.07

004389 Completed STATE 141 Sr 141, Quarry Site Z-59 Reclamation James Dean Construction, Inc. MICHAEL SALLEY 03/23/1994 02/14/1996 63,600.00

004390 Completed STATE 020 Sr 20, Sr 525 To Jacobs Road Lakeside Industries KEN JOHNSON 04/07/1994 10/19/1994 422,502.10

004391 Completed STATE 020 Sr 20, Deception Pass Park S. Boundary To Gibralte Rinker Materials West, Llc Dba KEN JOHNSON 04/15/1994 03/23/1995 507,401.70

004392 Completed IM-082-1(078) 082 Sr 82, I-90 I/C To Sr 821 I/C Granite Northwest Inc R.F. GIFFORD 04/20/1994 04/27/1995 1,235,217.15

004393 Completed STATE 202 Sr 202, 154th Place To 145th St. Watson Asphalt Paving Company, KIM HENRY 04/26/1994 01/09/1996 224,472.50

004394 Completed STATE 525 Sr 525, Galbreath Rd. To Campbell Rd. Lakeside Industries MARLIN LENSSEN 04/07/1994 09/21/1995 375,842.80

004395 Completed STATE 009 Sr 9, Skagit River Bridge To Sr 20 Csr Associated KEN JOHNSON 04/15/1994 02/16/1996 163,481.05

004396 Completed IM-005-3(819) 005 Sr 5, Puyallup River Bridge To King County Line Tucci & Sons, Inc. DEAN W. MOBERG 05/11/1994 09/06/1995 3,999,030.19

Dec 25, 2019 17 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004397 Completed STATE 012 Sr 12, Vic. Mox Chehalis Creek To Gibson Creek Lakeside Industries TIM L. AHLES 04/21/1994 09/29/1995 517,501.25

004399 Completed NH-0101(135) 101 Sr 101, Sr 8 I/C To Black Lake I/C - Eb Lakeside Industries TIM L. AHLES 04/12/1994 12/22/1995 637,584.55

004400 Completed STATE 410 Sr 410, White River Mill To To National Forest Bou Watson Asphalt Paving Company, GARY LIFFICK 05/02/1994 08/28/1995 1,269,633.33

004402 Completed STATE 823 Sr 823, Selah To Resthaven Frank Gurney, Inc. R.F. GIFFORD 04/26/1994 10/10/1994 163,900.79

004406 Completed NH-0002(101) 002 Sr 2, Vic 387th Ave Se Culvert Replacement Thomco Construction Inc. AL DYER 05/26/1994 01/30/1995 63,170.00

004408 Completed STATE 020 Sr 20, Rocky Creek To Cascade Road Rinker Materials West, Llc Dba KEN JOHNSON 05/23/1994 12/07/1994 306,532.10

004409 Completed ILCS-705-3(003) 509 Sr 509, Portland Ave. Vic. To Milwaukee Way - Stru Walter & Sci Construction (Usa) Inc RON LANDON 07/13/1994 09/29/1999 20,851,370.00

004410 Completed NH-0097(O62) 097 Sr 97, Oroville Scl To International Boundary Morrill Asphalt Paving Co., Inc. STAN MOORE 05/25/1994 04/25/1995 1,330,995.27

004411 Completed NHG-0002(167) 002 Sr 2, Vic. No Name Creek Bridge Safety One Way Construction, Inc. AL DYER 05/17/1994 04/24/1996 559,626.55

004414 Completed CM-0509(007) 509 Sr 509, Milwaukee Way To Taylor Way Scarsella Bros., Inc. RON LANDON 08/22/1994 07/11/2000 7,792,507.13

004415 Completed STATE 005 Sr 5, National Avenue U'Xing Bridge No. 5/227 - Re Rognlin'S, Inc. TROY D. CREWS 06/09/1994 03/14/1995 93,341.00

004417 Completed IM-005-2(177) 005 Sr 5, Salzer Creek To Thurston Co. Line Lakeside Industries TROY D. CREWS 06/17/1994 05/14/1996 1,427,323.84

004419 Completed NH-0195(023) 195 Sr 195, Cornwall Road To Sr 90 I/C Stage 2 Inland Asphalt Company CHARLES WILKE 06/02/1994 02/02/1995 1,327,707.00

004420 Completed NH-405-3(824) 405 Sr 405, Ne 8th To Northup I/C Noise Wall Kiewit Construction Company JAY LAVASSAR 06/17/1994 12/15/1995 1,171,528.20

004421 Completed NH-0051(229) 005 Sr 5, Visitor Information Center All Concrete Specialties Inc MIKE L. NIEMI 05/19/1994 03/07/1995 74,381.50

004422 Completed STATE 162 Sr 162, Military Road Channelization Channelizatio Lakeside Industries MIKE MORISHIGE 06/09/1994 06/07/1995 265,747.00

004423 Completed STATE 021 Sr 21, Et Al, 1994 District 6 Chip Seal-South Granite Northwest Inc CHARLES WILKE 05/19/1994 02/02/1995 1,523,999.60

004424 Completed ER-9011(500) 112 Sr 112, Jim Creek Slide Repair Bruch & Bruch Construction Inc JERRY MOORE 05/06/1994 11/03/1994 423,050.50

004426 Completed STATE 002 Sr 2, Sultan Ecl To Deception Creek - Stage 2 Apply-A-Line, Inc. KIM HENRY 05/16/1994 11/18/1994 93,701.36

004428 Completed BR-0002(168) 002 Sr 2, Snohomish River To Cavalero Corner Replace E Fletcher General, Inc. S. MILLER/LENSSEN 06/29/1994 07/02/2002 12,276,032.25

004429 Completed NJ-0002(172) 002 Sr 2, 2 Miles E. Of Telford R/A To Rocklyn Road Inland Asphalt Company KEN OLSON 06/06/1994 01/19/1995 771,245.00

004431 Completed STPF-0202(023) 202 Sr 202, Jct. North Bend Way Signal Rebuild Moose City Service Electric RON ERICKSON 05/25/1994 04/07/1995 90,203.00

004432 Completed STATE 270 Sr 270, Spring St. To Johnson Rd. Weaver Construction Co. HAROLD WHITE 07/13/1994 08/08/1997 4,979,877.06

004433 Completed NH-0395(042) 395 Sr 395, W. Kennewick Ave. To I-82 Acme Materials & Construction Co VIRGIL E. SCHMIDT 06/17/1994 06/05/1996 1,189,178.34

004434 Completed STPF-0542(011) 542 Sr 542, Mp 43 Slide Repair Half Bridge One Way Construction, Inc. KEN JOHNSON 06/28/1994 01/03/1995 244,276.80

004435 Completed IM-090-4(097) 090 Sr 90, Burke Jct. To Dodson Road M. A. Segale, Inc. STAN MOORE 06/02/1994 05/08/1996 4,427,047.56

004436 Completed STATE 097 Sr 173 To Okanogan River Bridge To Columbia River Basin Paving Co. PAUL J. MAHRE 06/17/1994 07/07/1995 909,851.90

Dec 25, 2019 18 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004437 Completed STATE 112 Sr 112, Hoko Ozette Road To Clallam Bay Lakeside Industries JERRY MOORE 05/31/1994 03/16/1995 766,866.41

004440 Completed IM-005-1233) 005 Sr 5, Interstate Rutting & Bridge Approach Repair Lakeside Industries TROY D. CREWS 06/28/1994 10/19/1995 1,511,374.47

004441 Completed NHG-0012(088) 012 Sr 12, South Naches Road Intersection Totem Electric Of Tacoma, Inc. R.F. GIFFORD 05/31/1994 10/31/1995 110,702.80

004442 Completed STATE 004 Sr 4, Wahkiakum County Line To Cameron Creek Road Knife River Corporation-Northwest MICHAEL SALLEY 06/28/1994 05/24/1995 390,503.90

004443 Completed ACI-405-(821) 405 Sr 405, Factoria To Northup Sc & Di Totem Electric Of Tacoma, Inc. KIM HENRY 07/13/1994 02/05/1997 2,908,018.53

004444 Completed STATE 520 Sr 520, W. Lake Sammamish Parkway To Sr 202 Mowat Construction Company JAY LAVASSAR 07/27/1994 02/26/1999 15,684,653.45

004445 Completed NH-0012(087) 012 Sr 12, Vic. Turner Road To Messner Road Granite Northwest Inc VIRGIL E. SCHMIDT 06/20/1994 01/25/1996 642,108.00

004446 Completed STPF-0003(021) 003 Sr 3, Newberry Hill Rd. To Vic. Waaga Way Ace Paving Co., Inc. LINEA LAIRD 06/03/1994 09/05/1995 698,477.85

004447 Completed NHG-0099(033) 099 Sr 99, 70th Ave. E. I/S Signal Totem Electric Of Tacoma, Inc. MIKE MORISHIGE 05/26/1994 10/23/1995 112,040.00

004450 Completed STATE 020 Sr 20, Twin Lakes I/S Morrill Asphalt Paving Co., Inc. PAUL MAHRE/ A. EMTER 06/07/1994 05/02/1995 94,445.07

004452 Completed NH-0002(171) 002 Sr 2, Sr 211 To Idaho State Line Acme Materials & Construction Co CHARLES WILKE 07/07/1994 12/10/1996 3,474,638.84

004454 Completed STATE 125 Sr 125, Sr 12 To Military Road Granite Northwest Inc VIRGIL E. SCHMIDT 06/17/1994 04/23/1996 641,613.10

004455 Completed STATE 512 Sr 512, 15th St Sw To Sr 161 U-Xing Truck Climbing R.W. Scott Construction Co. MIKE MORISHIGE 07/05/1994 02/15/1996 1,234,749.66

004456 Completed STATE Kearney Street Improvements Blaine Street To Jeffe Lakeside Industries JERRY MOORE 06/16/1994 06/21/1995 266,804.34

004458 Completed IM-005-3(820) 005 Sr 5, Nb & Sb Sea-Tac Weigh Station Improvements Signal Electric, Inc. TOM BAKER 06/17/1994 07/21/1995 186,327.20

004459 Completed STATE 509 Sr 509/99, Duwamish River/1st Ave S Parallel Sb Br Guy F. Atkinson Construction Corp. MESSAY SHIFERAW 10/07/1994 03/20/2003 50,536,088.05

004460 Completed STATE 005 Sr 5, Woodland Park And Pool Lot Ostrander Rock & Construction AMY E. REVIS 06/28/1994 03/22/1995 96,123.00

004461 Completed STATE 014 Sr 14, 164th Ave I/C Kiewit Infrastructure West Co. AMY E. REVIS 07/25/1994 01/04/2000 9,498,414.02

004462 Completed NH-0395(043) 395 Sr 395, Loon Lake To Sr 231 Acme Materials & Construction Co GORDON OLSON 07/07/1994 02/01/1996 1,625,943.30

004463 Completed STATE 020 District 6 1994 Chip Seal/North Morrill Asphalt Paving Co., Inc. CHARLES WILKE 06/27/1994 01/18/1995 1,354,407.81

004467 Completed STPF-0020(072) 020 Sr 20, Bacon Creek Road To Goodell Creek Rinker Materials West, Llc Dba KEN JOHNSON 07/13/1994 05/22/1995 1,310,129.63

004468 Completed NH-0002(175) 002 Sr 2, Sr 21 To Mp 224 Inland Asphalt Company KEN OLSON 07/07/1994 07/25/1995 479,996.30

004469 Completed IM-090-3(051) 090 Sr 90, Ryegrass To Vantage Phase 1 Granite Northwest Inc R.F. GIFFORD 07/07/1994 12/09/1994 249,748.00

004470 Completed ACDPS-0027(001) 395 Sr 395, Sr 26 Interchange Scarsella Bros., Inc. T. J. TREPANIER 07/25/1994 03/27/1997 2,737,794.81

004471 Completed STATE 028 Sr 28 & 153, Bridges 28/124 And 153/6 Deck Repair N.A. Degerstrom, Inc. KIRK D. BERG 07/01/1994 01/19/1995 228,859.15

004473 Completed STATE 012 Sr 12, Ski Area To Indian Creek Granite Northwest Inc TROY D. CREWS 07/25/1994 06/13/1997 1,675,891.80

004474 Completed STATE 002 Sr 2 & 153, Riprap Protection Bridges 2/224 Et Al North Central Construction, Inc. KIRK D. BERG 07/12/1994 12/19/1994 80,078.50

Dec 25, 2019 19 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004475 Completed STATE 531 Sr 531, Forty Five Road To Sr 9 Lakeside Industries MARLIN LENSSEN 07/25/1994 04/17/1995 649,326.89

004476 Completed NHG-0014(022) 014 Sr 14, 15th Street Signal Mill Plain Electric, Inc. MICHAEL SALLEY 07/19/1994 11/15/1995 229,350.00

004477 Completed STPH-000S(049) City Of Milton, Intersection Of Milton Way And Por Totem Electric Of Tacoma, Inc. DAVE ERICKSON 07/07/1994 12/28/1995 124,452.80

004478 Completed IM-005-5(195) 005 Sr 5, Mp 248 Median Slide One Way Construction, Inc. KEN JOHNSON 07/25/1994 10/21/1994 69,540.20

004481 Completed IM-005-4(222) 005 Sr 5, Marysville Vic. Nb Bridge Decks Mowat Construction Company MARLIN LENSSEN 08/09/1994 04/04/1997 1,963,573.00

004482 Completed STATE 532 Sr 532, E. Camano Dr. To Smith Rd. And Deck Repair Pacific Road & Bridge Co. KEN JOHNSON 08/31/1994 04/23/1996 1,879,919.48

004483 Completed STATE 503 Sr 503, 144th St. To Battle Ground Waterworks, Inc. AMY E. REVIS 08/22/1994 09/23/1998 10,603,353.34

004484 Completed NH-082-2(107) 082 Sr 82, District 5 Rumble Strips Surface Prep Technologies Inc R.F. GIFFORD 08/04/1994 02/24/1995 249,832.00

004485 Completed STPE-1255(5) 002 Sr 2, City Of Sultan Pedestrian & Bike Path Signal Electric, Inc. KIM HENRY 10/07/1994 01/04/1996 59,640.10

004486 Completed STATE 027 Sr 27, Sprague Ave. And Pines Road Intersection Inland-Central, A Joint Venture CHARLES WILKE 08/12/1994 03/13/1995 416,786.40

004487 Completed ACI-NH-090-1(402) 090 Sr 90, Rainier Ave S. Erosion Control And Landscap Northwestern Landscape Co. CATHY ARNOLD 09/08/1994 08/17/2000 248,814.82

004489 Completed ACDPS-BR-0027(001 395 Sr 395, Lind To Ritzville Scarsella Bros., Inc. T. J. TREPANIER 09/23/1994 07/01/1997 18,613,675.46

004490 Completed BHM-6587(009) 303 Sr 303, Port Washington Narrows Br. 202/12 Seismic Concrete Barrier, Inc. CRAIG MCDANIEL 10/31/1996 04/09/1997 776,081.00

004491 Completed STPRF-0160(006) 160 Sr 160, Southworth Park And Ride Lot Ace Paving Co., Inc. CRAIG MCDANIEL 08/25/1994 01/24/1996 212,594.40

004492 Completed STATE 405 Sr 405, Bothell Ii Park And Ride Lot-Completion Granite Construction Company KIM HENRY 08/12/1994 10/10/1995 69,495.00

004493 Completed STATE 002 Sr 2, Snohomish River Bridge 2/5s Electrical Rehab D.W. Close Company, Inc. STEVE MILLER 09/02/1994 01/19/1996 258,320.00

004495 Completed IM-005-1(232) 005 Sr 5, Sr 205 To North Fork Lewis River Pccp Rehabi Kiewit Infrastructure West Co. AMY E. REVIS 09/08/1994 06/25/1999 4,703,252.16

004496 Completed STATE 002 Sr 2, Hawthorne Rd. To Day-Mt. Spokane Rd. Acme Materials & Construction Co GORDON OLSON 09/13/1994 06/25/1996 1,152,345.75

004498 Completed ACNH-0012(086) 012 Sr 12, Aberdeen Bluffs To Vic. Sargent Blvd. Stage Rognlin'S, Inc. JOHN L. HART 09/02/1994 01/22/1996 2,441,886.90

004500 Completed STATE 092 Sr 92, 84th Street To Granite Falls Northwest Construction, Inc. MARLIN LENSSEN 09/23/1994 04/26/1999 2,587,048.35

004501 Completed STATE 500 Sr 500, Andresen Road To Sr 503 Granite Northwest Inc MIKE L. NIEMI 09/01/1994 10/14/1997 2,966,592.25

004502 Completed STATE 500 Sr 500, Signal Modification Mill Plain Electric, Inc. MIKE L. NIEMI 08/25/1994 01/31/1996 119,989.85

004506 Completed STATE 395 Sr 395, 7th Ave. To Buena Vista Rd. Hap Taylor And Sons, Inc. Dba GORDON OLSON 09/09/1994 03/24/1995 251,466.85

004507 Completed ACI-ID-705-3(802) 509 Sr 509, Dock Street To E. D Street Max J. Kuney Company RON LANDON 10/20/1994 04/06/1999 16,446,410.40

004508 Completed STATE 090 Sr 90, S. Fork Road I/C Reforestation Terra Dynamics Inc KIM HENRY 09/12/1994 11/05/1997 83,687.00

004509 Completed STATE 547 Sr 547, Vic. Mp 7.3 Wall Replacement One Way Construction, Inc. KEN JOHNSON 09/20/1994 06/05/1995 279,974.25

004510 Completed STPFG-0101(136) 101 Sr 101, Lincoln To 8th Signals Totem Electric Of Tacoma, Inc. JOHN L. HART 08/30/1994 05/20/1996 372,382.00

Dec 25, 2019 20 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004511 Completed STATE 016 Sr 16, Mullenix Park And Ride Lot Stage 1 Ace Paving Co., Inc. CRAIG MCDANIEL 09/12/1994 04/29/1996 235,544.01

004512 Completed 005 Sr 5, Star Lake Park & Ride Lot Northwestern Landscape Co. GARY LIFFICK 10/06/1994 06/18/1999 79,989.82

004516 Completed STATE 542 Sr 542, Squalicum Creek Box Culvert Hlnr Services KEN JOHNSON 10/10/1994 01/05/1995 24,144.14

004517 Completed IM-090-6(181) 090 Sr 90, Sr 290 To Havana Street Highway Services, Inc. CHARLES WILKE 09/26/1994 11/27/1995 1,903,209.20

004518 Completed ACI-ID-7053(802) 509 Sr 509, East D St. To Portland Ave. - Grading Ames Construction, Inc. RON LANDON 11/10/1994 07/25/1997 2,754,772.06

004520 Completed ACI-ID-705-3(802) 509 Sr 509, Rr Yard To Portland Ave. Max J. Kuney Company RON LANDON 10/10/1994 04/27/1999 12,051,698.85

004521 Completed STATE Friday Harbor Ferry Terminal Wingwall Replacement Manson Construction Co. RICK BRATER 09/09/1994 12/27/1995 1,557,900.00

004522 Completed STATE 101 Sr 101, Dosewallips Road Channelization Lakeside Industries DAVE ERICKSON 09/19/1994 07/06/1995 69,981.11

004523 Completed STATE 405 Bothell Ii Park And Ride Lot Signal And Right Turn D.W. Close Company, Inc. KIM HENRY 09/20/1994 09/28/1995 113,779.00

004528 Completed I-ID-090-1(401) 090 Sr 90, Changeable Message Signing - Stage 2 Totem Electric Of Tacoma, Inc. ROGER L. ARMS 01/31/1995 08/27/1997 1,766,750.90

004529 Completed ID-NH-IR-090-1(402) 090 Sr 90, Corridor Completion Landscape Ohno Construction Company RAY ARNOLD 10/24/1994 02/15/2000 904,820.30

004530 Completed STATE 017 Sr 17, Grape Dr. Signal Totem Electric Of Tacoma, Inc. KIRK D. BERG 10/21/1994 08/08/1995 190,239.88

004532 Completed ID-705-3(802)UNIT 509 Sr 509, Pacific Ave. To Dock Street Progressive Contractors, Inc. CRAIG MCDANIEL 11/17/1994 03/10/1998 12,137,413.62

004533 Completed STPFG-0512(008) 512 Sr 512, Eb Off Ramps At Portland Ave. I/C Totem Electric Of Tacoma, Inc. MIKE MORISHIGE 10/31/1994 01/30/1997 271,408.05

004534 Completed STATE 097 Sr 97, Toppenish Creek Br. Granite Northwest Inc R.F. GIFFORD 10/05/1994 01/31/1995 49,642.00

004535 Completed STPFG-STPE-0014(0 014 Sr 14, Tunnel Warning System D.W. Close Company, Inc. MICHAEL SALLEY 12/07/1994 10/05/1995 99,725.00

004536 Completed ACI-ACIM-005-3(82 005 Sr 5, Tukwila To Lucile St. - Stage 1 Hov And Sc&D Guy F. Atkinson Construction Corp. TOM BAKER 11/03/1994 05/31/2000 13,836,844.14

004537 Completed STATE Tahlequah Ferry Terminal Building Demolition Rjc Inc. RICK BRATER 01/31/1995 07/18/1995 31,096.00

004538 Completed M-6605(001) 160 Sr 160, Jackson Ave. Se Intersection Signalization Moose City Service Electric CRAIG MCDANIEL 11/15/1994 10/23/1995 116,082.00

004539 Completed ID-I-005-3(776) 005 Sr 5, Northgate I/C Revision Mowat Construction Company TOM BAKER 12/06/1994 09/02/1998 4,332,049.30

004540 Completed CM-0000(173) 005 Sr 5, Eb Sr 526 To Sb Sr 5 Hov Bypass Klb Construction, Inc. MARLIN LENSSEN 11/29/1994 03/31/1997 1,564,623.55

004541 Completed ACSTPF9501(001) Edmond Ferry Terminal Replace Docking Facility Manson Construction Co. RICK BRATER 12/02/1994 11/28/1995 5,932,633.00

004542 Completed STATE 005 Sr5 Portage Creek Br To Sr 548 Guide Sign Replacem Waterworks, Inc. KEN JOHNSON 12/23/1994 05/16/1995 337,760.00

004543 Completed STPF-005-3(821)U2 005 Sr 5, Tukwila To Lucile St. Hov & Sc & Di - Stage Mowat Construction Company RAY ARNOLD 01/18/1995 07/06/2000 20,752,941.92

004544 Completed STATE 512 94th Ave. East I/C Tri-State Construction Inc MIKE MORISHIGE 01/10/1995 06/23/1997 4,014,638.10

004545 Completed F-090-4(101) 090 I-90 Frontage Road Repair North Central Construction, Inc. KIRK D. BERG 12/06/1994 11/21/1995 371,681.20

004547 Completed STATE 099 Sr 99, Aurora Ave. Bridge 99/560 Repair Mkb Constructors RAY ARNOLD 01/05/1995 09/23/1996 2,811,132.92

Dec 25, 2019 21 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004548 Completed STPXS130(009) 170 Sr 170, Warden Railroad Crossings Aztech Electric Inc KIRK D. BERG 12/30/1994 11/06/1995 388,348.00

004549 Completed STATE 005 Sr 5 Et Al, Region Wide Seismic And Rocker Bearing Mowat Construction Company GLENN SCHNEIDER 12/06/1994 04/03/1997 607,530.00

004551 Completed STPF-0002(102) 002 City Of Leavenworth Sr 2 Intermodel Project Trico Contracting, Inc. PAUL J. MAHRE 02/02/1995 10/01/1997 1,618,491.10

004552 Completed NH-NHG-0099(036) 099 Sr 99, Sr 518 Eb On Ramp Signalization Signal Electric, Inc. INGO GOLLER 11/16/1994 06/03/1998 112,405.50

004553 Completed STPF-STPFG-0202(025) 202 Sr 202, Jct. Sr 203 Signalization Moose City Service Electric RON ERICKSON 12/20/1994 04/08/1996 118,831.60

004554 Completed IM-005-3(826) 005 Sr 5, Interstate Ramps Lloyd Enterprises, Inc. MIKE MORISHIGE 01/17/1995 12/24/1997 1,610,982.50

004555 Completed STATE 021 Sr 21, Republic North North Central Construction, Inc. KIRK D. BERG 12/19/1994 07/03/1996 1,335,782.24

004557 Completed NH-0522(0522) 522 Sr 522, Jct. 80th Ave. Ne Signal Rebuild Totem Electric Of Tacoma, Inc. TOM BAKER 12/15/1994 05/24/1996 158,159.40

004558 Completed BH-0002(181) 002 Sr 2, Snohomish River Br. 2/5n To Sr 204 Seismic R Diamaco Inc. STEVE MILLER 01/05/1995 01/22/1996 1,192,841.00

004559 Completed BH-0053(828) 005 Sr 5, Ship Canal Bridge 5/570 E & W Seismic Retrof Diamaco Inc. CATHY ARNOLD 01/05/1995 06/25/1997 1,426,050.60

004560 Completed NH-090-6(182) 090 Sr 90, Interstate Permanent Signs D.W. Close Company, Inc. CHARLES WILKE 12/22/1994 12/02/1996 489,488.00

004561 Completed ACDPS-0027(001) 395 Sr 395, Sr 260 Interchange Steelman-Duff, Inc. VIRGIL E. SCHMIDT 01/04/1995 04/27/1999 2,688,045.60

004562 Completed NHG-0516(013) 516 Sr 516, Jct. 116th Ave. Se Signal D.W. Close Company, Inc. AMIR RASAIE 12/15/1994 02/12/1997 135,460.80

004563 Completed STPF-0532(006) 532 Jct. Union St./88th Ave. Nw Signalization Aztech Electric Inc KEN JOHNSON 01/06/1995 02/21/1996 330,592.27

004564 Completed STATE 002 Sr 2/395, Houston Ave To Hawthorne Rd & North Divi Inland Asphalt Company GORDON OLSON 12/28/1994 02/17/1996 1,786,315.40

004566 Completed STATE 101 Sr 101, Mp 188 To Mill Creek Bridge Lakeside Industries JERRY MOORE 01/23/1995 01/22/1996 647,398.14

004567 Completed STATE 018 Sr 18, Issaquah-Hobart Rd. I/C And Raging River Br Scarsella Bros., Inc. AMIR RASAIE 03/13/1995 04/11/2000 17,516,198.29

004568 Completed BH-005-4(221) 005 Sr 5, Everett Vic. Bridges Seismic Retrofit Abhe & Svoboda, Inc. AL DYER 03/03/1995 06/16/1997 814,024.00

004571 Completed STPU-0053(823) 005 Sr 5, Tacoma Vicinity Tsm - Stage 2 Coral Construction Company MIKE MORISHIGE 03/06/1995 02/18/1997 345,646.00

004573 Completed STATE 522 Sr 522/527, Signal Systems Interconnect Service Electric Co., Inc. STEVE MILLER 01/09/1995 09/21/1995 66,250.00

004574 Completed STPF-STPFG-0525(015) 525 Sr 525, Cultus Bay Road/ Langley Road Totem Electric Of Tacoma, Inc. MARLIN LENSSEN 01/12/1995 12/04/1995 209,947.00

004575 Completed STATE 165 Sr 165, Carbon River Bridge 165/10 F.E. Ward, Inc. MIKE MORISHIGE 02/13/1995 06/11/1996 528,888.00

004576 Completed ACNH-0003(024) 003 Sr 3, Agate Wye Rd. To Mp 18 Ace Paving Co., Inc. CRAIG MCDANIEL 01/23/1995 06/03/1996 1,287,635.55

004577 Completed STATE 101 Sr 101, Steamboat Island Road Intersection Scarsella Bros., Inc. DAVE ERICKSON 02/21/1995 06/24/1997 2,842,045.20

004578 Completed STATE 017 Sr 17 Et Al, North Central Region Seal & Crush - 1 Granite Northwest Inc STAN MOORE 02/10/1995 12/28/1995 1,497,282.50

004579 Completed STPF-STPFG-0020(074) 020 Sr 20, Jct. Ault Field Rd. Signal And Channelizati Lakeside Industries KEN JOHNSON 02/03/1995 05/09/1996 262,511.55

004581 Completed STPRF-A093(001) 028 City Of Rock Island Sr 28 To Garden Ave. Basin Paving Co. PAUL J. MAHRE 02/10/1995 08/18/1995 322,509.50

Dec 25, 2019 22 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004582 Completed STATE Southworth Ferry Terminal Access & 2nd Toll Booth Drury Construction Co., Inc. RICK BRATER 04/04/1995 04/26/1996 323,384.90

004583 Completed STATE 005 Sr 5, 90 & 99, Region Wide Loop Replacement Totem Electric Of Tacoma, Inc. STEVE MILLER 02/07/1995 01/25/1996 95,147.00

004584 Completed NH-082-3(055) 082 Sr 82, Yakima Gateway Stage 1a Max J. Kuney Company R.F. GIFFORD 03/07/1995 12/05/1997 6,188,339.05

004585 Completed STPF-0097(065) 097 Sr 97, Twin W Orchards To Columbia River Bridge Basin Paving Co. STAN MOORE 03/09/1995 03/13/1996 2,009,321.37

004586 Completed STATE 305 Sr 305, North Of Winslow Stage 1 Glacier Construction & Equipment CRAIG MCDANIEL 03/13/1995 09/12/1996 464,083.50

004588 Completed NH-0012(090) 012 Sr 12, Mcnary Pool To Wallula Depot Road Acme Materials & Construction Co VIRGIL E. SCHMIDT 03/13/1995 12/13/1995 835,794.45

004589 Completed STATE 513 Sr 513, Montlake Bridge 513/12 Centerlock Buffers Fletcher General, Inc. TOM BAKER 03/03/1995 11/18/1996 727,937.00

004590 Completed STATE 011 Sr 11, Slide Repair At Mp 13.4 - Stage 1 One Way Construction, Inc. KEN JOHNSON 01/18/1995 04/27/1995 130,590.00

004591 Completed STATE 223 Sr 223/97, Sr 22 To Indian Church Rd & Sr 22 To Ro Granite Northwest Inc R.F. GIFFORD 03/03/1995 03/05/1996 507,896.00

004592 Completed NH-F-0900(004) 900 Sr 900, Jct. Se May Valley Road Channelization Santana Trucking And Excavation Inc INGO GOLLER 04/05/1995 06/22/1999 2,070,480.33

004594 Completed NH-097(064) 097 Sr 97, Jct Sr 970 To Tronsen Cr. Campground Vic. Granite Construction Company PAUL J. MAHRE 04/12/1995 10/30/1996 3,277,821.35

004595 Completed NH-0020(081) 020 Sr 20, Best Road To Sr 536 Resurface And Safety Rinker Materials West, Llc Dba KEN JOHNSON 02/27/1995 01/03/1996 304,816.00

004596 Completed STATE 005 Sr 5 & Sr 90 Rumble Strips P.R. Systems, Inc. STEVE MILLER 04/07/1995 03/12/1996 240,323.50

004597 Completed 099 Sr 99, S. 208th To S. 200th Resurfacing Watson Asphalt Paving Company, TOM BAKER 03/20/1995 02/23/1996 345,122.20

004598 Completed STATE 520 Sr 520, Montlake I/C Vic. Variable Message Sign Aztech Electric Inc TOM BAKER 05/09/1995 03/02/1998 377,278.00

004599 Completed STATE 020 Sr 20, I-5 Nb Ramps To Sterling Road Lakeside Industries KEN JOHNSON 03/24/1995 06/21/1996 1,024,920.27

004601 Completed ACDPS-0027(001) 395 Sr 395/90, Lind To Ritzville Stage 2 Scarsella Bros., Inc. T. J. TREPANIER 04/24/1995 12/05/1997 9,442,217.64

004603 Completed STATE 011 Sr 11, Vicinity Half Bridge 11/11 - Stage 2 One Way Construction, Inc. KEN JOHNSON 01/25/1995 03/08/1995 49,000.00

004605 Completed STATE 012 Sr 12 Et Al, South Central Region Seals - 1995 Morrill Asphalt Paving Co., Inc. R.F. GIFFORD 03/13/1995 05/06/1996 1,632,276.60

004606 Completed 291 Sr 291, Curve Realignment Vic. 22.3 Ibex Construction, Inc. CHARLES WILKE 03/30/1995 02/12/1996 353,332.00

004607 Completed NH-4053(827) 405 Sr 405, Coal Creek Pkwy To Ne 8th Roadside Restora Dennis R. Craig Construction, Inc. KIM HENRY 05/23/1995 02/03/2000 382,120.70

004609 Completed STATE 405 Sr 405, Ne 160th I/C Bridge Widening Kiewit Construction Company RON ERICKSON 08/25/1995 05/11/1998 2,915,749.49

004610 Completed STPF-STPFG-0410(0 410 Sr 410, Jct. 284th Ave Se Signalization D.W. Close Company, Inc. TOM BAKER 04/14/1995 03/05/1997 160,589.00

004613 Completed STATE 104 Sr 104, Hood Canal Br. 104/5 Grid Deck Replacement Donald B Murphy Contractors Inc JERRY MOORE 04/04/1995 06/11/1996 2,464,592.00

004614 Completed STPUL-9927(031) 016 Sr 16, Olympic Interchange Mowat Construction Company CRAIG MCDANIEL 05/17/1995 09/14/1998 3,318,174.00

004615 Completed IM-005-4(226) 005 Sr 5, Sr 529 To Smokey Point I/C Vic. Paving Stage Rinker Materials West, Llc Dba MARLIN LENSSEN 04/17/1995 09/16/1996 2,033,453.73

004616 Completed IM-005-5(198) 005 Sr 5, Joe Leary Slough Bridge To Nulle Road - Sb P Granite Construction Company KEN JOHNSON 04/24/1995 04/02/1998 5,296,087.75

Dec 25, 2019 23 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004617 Completed IM-005-3(831) 018 Sr 18, Sr 99 To Peasley Canyon O'Xing Resurface Watson Asphalt Paving Company, JOE SCANLON 04/19/1995 11/05/1998 2,508,198.90

004618 Completed NH-0097(063) 097 Sr 97, Klickitat County Line To Vic. Bridge 97/106 Scoccolo Construction, Inc. ROGER L. ARMS 04/18/1995 05/08/1996 3,489,468.05

004619 Completed STATE 510 Sr 510, Yelm City Limits To Sr 507 Lakeside Industries DAVE ERICKSON 04/26/1995 01/25/1996 317,891.50

004620 Completed NH-0002(182) 002 Sr 2, Index-Galena Rd Vic Embankment Repair Scoccolo Construction, Inc. STEVE MILLER 04/14/1995 12/22/1997 558,643.39

004621 Completed IM-IM-0053(821)U3 005 Sr 5, Tukwila To Lucile St. - Stage 3 Hov And Sc&D Guy F. Atkinson Construction Corp. CATHY ARNOLD 06/21/1995 08/23/2000 25,455,888.94

004622 Completed STATE 6 Sr 105/6, Pacific County Chip Seal Lakeside Industries TROY D. CREWS 04/20/1995 03/12/1996 2,149,439.98

004623 Completed NHG-9999(211) 002 Sr 2, Et Al, North Central Region Wide Illuminatio Aztech Electric Inc STAN MOORE 04/12/1995 12/12/1995 147,792.00

004624 Completed STPF-0014(024) 014 Sr 14, Tunnel No. 5 - Wire Mesh J & S Construction, Inc. DIMITRIOS SHAIDAEE 04/14/1995 11/29/1995 225,037.00

004625 Completed NH-0395(045) 395 Chewelah City Limits To Iron Mountain Road Ibex Construction, Inc. GORDON OLSON 05/10/1995 12/09/1997 1,498,788.75

004627 Completed NH-0970(004) 970 Sr 903 I/S To Teanaway River Granite Construction Company ROGER L. ARMS 04/18/1995 01/25/1996 683,427.55

004628 Completed STATE 028 Sr 28, Ephrata Signal Interconnect Aztech Electric Inc PAUL J. MAHRE 04/12/1995 09/06/1995 42,742.00

004632 Completed BH-090-2(178) 010 Sr 10, Seismic Retrofit Concrete Barrier, Inc. ROGER L. ARMS 05/03/1995 08/26/1996 229,514.00

004633 Completed STATE 012 Sr 12, Cispus Road To Surrey Creek Bridge Vic. Lakeside Industries TROY D. CREWS 04/28/1995 03/13/1996 744,200.25

004634 Completed STATE 027 Sr 27, Sr 195 To Pullman Klb Construction, Inc. KEN OLSON 05/08/1995 03/25/1996 1,108,713.30

004635 Completed IM-090-2(176) 090 Sr 90, Bridge Deck Concrete Barrier, Inc. ROGER L. ARMS 04/28/1995 12/01/1997 1,289,448.75

004636 Completed STATE 097 Sr 97, Mcdonald Rd. To W. Wapato Rd. Fencing Guyline Construction, Inc. R.F. GIFFORD 04/20/1995 01/10/1996 141,707.60

004637 Completed STPF-0124(013) 124 Sr 124, Pettyjohn Road To Sr 125 Steelman-Duff, Inc. VIRGIL E. SCHMIDT 06/05/1995 04/11/1997 1,873,494.15

004638 Completed STATE 503 Sr 503, Baker Road To Englert Road Granite Northwest Inc MIKE L. NIEMI 04/26/1995 01/18/1996 595,925.56

004639 Completed STATE 005 Sr 5, 13th St. U'Xing Br. 5/220 - Repair Mowat Construction Company TROY D. CREWS 04/28/1995 06/26/1996 113,972.00

004640 Completed STATE 161 Sr 161, Graham Hill Truck Climbing Lanes Northwest Cascade, Inc. MIKE MORISHIGE 05/23/1995 01/09/1998 1,066,180.85

004641 Completed STATE 012 Sr 12, Solki Road To Alder Grove Lakeside Industries JOHN L. HART 05/16/1995 03/29/1996 2,895,864.80

004642 Completed STATE 547 Sr 547, Vic. Bishop Road Resurfacing Granite Construction Company KEN JOHNSON 04/20/1995 09/08/1995 50,759.50

004643 Completed STATE 536 Sr 536, Jct. Avon-Allen Road Rinker Materials West, Llc Dba KEN JOHNSON 05/09/1995 12/16/1996 320,100.21

004644 Completed STATE 011 Sr 11, Bow Hill Road To Colony Road Vic. Lakeside Industries KEN JOHNSON 04/12/1995 07/10/1995 46,261.50

004645 Completed STATE 014 Sr 14, Clark County Line To Cape Horn Granite Northwest Inc GLENN SCHNEIDER 05/15/1995 03/20/1996 516,363.45

004646 Completed 025 Spokane River Bridge 25/6 Painting Abhe & Svoboda, Inc. KEN OLSON 06/05/1995 10/15/1996 543,310.00

004647 Completed 007 Sr 7, Sr 507 To Sr 512 - Stage 1 Woodworth & Company, Inc. TIM L. AHLES 05/23/1995 05/01/1997 2,218,715.20

Dec 25, 2019 24 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004649 Completed STATE 009 Sr 9, Whatcom/Skagit County Line To Sumas Chandler Construction, Inc. KEN JOHNSON 04/28/1995 06/19/1995 39,501.00

004651 Completed STATE 009 Sr 9 Et Al, Northwest Region Guardrail Upgrade Petersen Brothers, Inc. STEVE MILLER 04/28/1995 09/06/1995 79,733.20

004652 Completed NH-0018(022) 018 Sr 18, Sr 164 To Auburn- Black Diamond Road Robison Construction, Inc. AMIR RASAIE 05/09/1995 04/02/1996 214,649.40

004653 Completed BH-3429(002) 397 Sr 397, Yew St. To Columbia River Br. & Rr Br. O'X Granite Northwest Inc VIRGIL E. SCHMIDT 05/26/1995 01/31/1997 2,002,381.25

004654 Completed BR-0503(011) 503 Sr 503, Rock Creek Bridge 503/109 F.E. Ward, Inc. AMY E. REVIS 05/11/1995 05/11/1999 3,474,776.60

004655 Completed IM-STPF-005-4(225 005 Sr 5, Sr 529 To Smokey Pt. I/C - Stage 1 And 88th Tri-State Construction Inc RON ERICKSON 06/30/1995 02/27/1998 10,529,293.79

004656 Completed STPF-005-5(201) 005 Sr 5/542, Sunset Drive I/C Mkb Constructors KEN JOHNSON 07/07/1995 12/29/1999 5,062,794.55

004657 Completed STATE 411 Sr 411, Lexington Vic. To Sandy Bend Rd. Vic. Lakeside Industries GLENN SCHNEIDER 05/10/1995 02/26/1996 444,966.60

004658 Completed STATE 303 Sr 303, Manette Br. 303/4 Interim Repair Caicos Corporation CRAIG MCDANIEL 05/25/1995 11/18/1996 1,195,221.00

004661 Completed IM-005-3(835) 005 Sr 5, S. 320th To E-N Ramp Military Rd. Bridge Dec Concrete Barrier, Inc. INGO GOLLER 06/08/1995 03/16/1999 744,754.35

004662 Completed STATE 014 Sr 14, Sr 5 To Blandford Drive Kiewit Infrastructure West Co. AMY E. REVIS 06/15/1995 07/11/2000 8,848,754.90

004664 Completed STATE 169 Sr 169, Vicinity Se 416th Street Shoulder Restorat Lakeside Industries CATHY ARNOLD 05/17/1995 06/20/1996 42,678.00

004665 Completed BH-0101(133) 101 Sr 101, Chehalis River Bridge 101/115 Painting Root Paint & Glass Co. Inc. JOHN L. HART 05/26/1995 10/16/1995 1,121,951.00

004666 Completed BR0IM-005-3(799) 005 Sr 5, Tacoma/Fife Vic. Bridge Deck O'Lays Seismic Mowat Construction Company MIKE MORISHIGE 06/01/1995 08/03/1998 2,355,400.40

004669 Completed NH-STPF-9999(213) 002 Sr 2/97 & 97a Vicinity Euclid Avenue Basin Paving Co. PAUL J. MAHRE 06/01/1995 08/26/1996 1,524,866.04

004670 Completed STATE 002 Sr 2, Bridges 2/115a And 2/116 - Painting Coatings Unlimited, Inc. MARLIN LENSSEN 06/16/1995 09/14/1998 290,909.00

004671 Completed STPR-T142(001)(002) City Of Elma - Main St. Ceccanti, Inc. DAVE ERICKSON 06/22/1995 08/06/1996 737,347.05

004672 Completed STATE 020 Sr 20, Challenger Road To Concrete Wcl Klb Construction, Inc. KEN JOHNSON 06/05/1995 03/19/1996 2,192,560.80

004673 Completed STPF-0097(066) 097 Sr 97, West Wapato Road To Lateral A Road - Sb Granite Northwest Inc R.F. GIFFORD 05/19/1995 03/05/1996 671,220.20

004674 Completed STATE 097 Okanogan Channelization And Site Preparation Morrill Asphalt Paving Co., Inc. KIRK D. BERG 05/16/1995 03/12/1996 554,054.85

004675 Completed NH-0526(005) 526 Sr 526, Evergreen Way Interchange Granite Construction Company MARLIN LENSSEN 06/01/1995 11/14/1996 345,848.02

004676 Completed STATE 008 Sr 8, Sr 12 To Mp 11.54 Stage 1 And Heise Road Int Granite Construction Company DAVE ERICKSON 06/12/1995 08/19/1996 3,631,509.30

004677 Completed BH-0395(040) 260 Sr 260/395, Esquatel Coulee 260/6 & Court St U'Xin Concrete Barrier, Inc. VIRGIL E. SCHMIDT 06/05/1995 07/22/1997 302,178.25

004678 Completed IM-0055(194) 005 Sr 5, Bow Hill Weigh Station-Bypass Ramp Rinker Materials West, Llc Dba KEN JOHNSON 06/02/1995 02/05/1996 165,315.00

004679 Completed STATE 405 Sr 405, Sr 5 O'Xing Bridge 405/112 East & West Coatings Unlimited, Inc. STEVE MILLER 07/10/1995 02/23/1996 421,508.00

004681 Completed STATE 002 Sr 2, Espanola Road To Fairchild Afb Inland Asphalt Company KEN OLSON 05/23/1995 09/19/1995 738,838.00

004682 Completed STATE 543 Sr 543, H St. To Border Crossing Truck Holding Lan Rinker Materials West, Llc Dba KEN JOHNSON 06/05/1995 03/05/1996 128,370.20

Dec 25, 2019 25 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004684 Completed DYSYR 004 Sr 4, Stella Vicinity Rockfall Protection One Way Construction, Inc. GLENN SCHNEIDER 06/05/1995 03/11/1996 579,126.00

004685 Completed ID-090-1(402) 090 Sr 90, S. Bellevue Transit Access - Phase 2 Landsc Paul Brothers, Inc. RAY ARNOLD 06/12/1995 01/29/2001 352,243.50

004686 Completed IM-090-6(184) 904 Sr 90, Bridge Deck Repair 904/1 & 902/10 N.A. Degerstrom, Inc. KEN OLSON 06/08/1995 03/18/1996 598,515.00

004687 Completed NH-0097-(067) 097 Sr 97, Centerville Rd. To Goldendale Granite Northwest Inc GLENN SCHNEIDER 06/26/1995 06/25/1996 1,125,283.40

004688 Completed STATE 006 Sr 6, Adna School Left Turn Channelization Lakeside Industries TROY D. CREWS 05/22/1995 03/13/1996 82,757.00

004689 Completed NH-0014(026) 014 Sr 14, Ellsworth And Camas I/C Ramps Granite Northwest Inc MIKE L. NIEMI 06/06/1995 01/18/1996 406,564.40

004690 Completed STPX-0109(007) 109 Sr 109, Jct. Sr 101 To Vic. Broadway St. Rognlin'S, Inc. JOHN L. HART 06/29/1995 01/02/1997 2,374,171.20

004692 Completed STATE 012 Sr 12/410 To West C/L Naches Columbia Asphalt & Gravel, Inc. R.F. GIFFORD 06/26/1995 03/07/1996 688,578.70

004693 Completed IM-090-2(179) 090 Sr 90, West Easton I/C Ramp Paving Columbia Asphalt & Gravel, Inc. ROGER L. ARMS 06/26/1995 03/07/1996 256,687.00

004694 Completed STPF-S327(003) 291 Sr 291, Lowell Road To Nine Mile Steelman-Duff, Inc. CHARLES WILKE 06/19/1995 10/08/1997 1,499,470.35

004695 Completed BH-0395(046) 395 Sr 395, Columbia River Bridge 395/40 Painting Bridges R Us Painting Co Inc VIRGIL E. SCHMIDT 06/30/1995 05/23/1996 1,880,163.50

004696 Completed BH-0530(019) 530 Sr 530, Sauk River, Hilt Creek, Skagit River Bridg One Way Construction, Inc. MARLIN LENSSEN 06/05/1995 08/06/1996 712,995.25

004697 Completed STATE Talequah Ferry Terminal Park And Ride Lot Harlow Construction Co. RICK BRATER 08/09/1995 03/14/1997 299,546.40

004698 Completed STATE 009 Sr 9, Old Np Rr Overcrossing 9/128 Bridge Deck Res Concrete Barrier, Inc. MARLIN LENSSEN 08/02/1995 03/27/1997 259,663.00

004700 Completed STATE 009 Sr 9, S. Skagit Highway Vic. Rinker Materials West, Llc Dba KEN JOHNSON 06/28/1995 04/30/1996 710,186.25

004701 Completed BH-0520(020) 520 Sr 520, Evergreen Point Bridge Guide Rollers - Pro Everett Shipyard, Inc. JAY LAVASSAR 06/19/1995 01/13/1997 552,601.00

004702 Completed STATE 432 Sr 432, Jct. Sr 433 To 3rd Ave. Bridge Lakeside Industries GLENN SCHNEIDER 06/21/1995 02/26/1996 715,680.90

004703 Completed STATE 548 Fingalson Creek Culvert Replacement Henifin & Associates, Inc. KEN JOHNSON 07/03/1995 08/11/1995 116,042.00

004704 Completed STATE 272 Sr 272, Clear Creek Bridge 272/3.25 Replacement West Company, Inc. CHARLES WILKE 06/30/1995 02/28/1996 249,121.86

004705 Completed STPR-0101(130) 101 Sr 101, Mill Creek Bridge To County Road Lakeside Industries JERRY MOORE 07/17/1995 03/06/1997 1,344,449.95

004706 Completed IM-005-2(179) 005 Sr 5, Martin Way O'Xing Vic. Mounts Road - Nb Diamond Surface, Inc. TIM L. AHLES 07/24/1995 10/21/1996 1,595,103.17

004707 Completed STATE 522 Sr 9 I/C To Sr 2 I/C Interim Safety Improvements Mark Rite Lines Of Mt Inc STEVE MILLER 07/28/1995 04/24/1996 248,522.05

004708 Completed STPF-5924(002) City Of East Wenatchee 8th/9th St. Connection Stag Goodfellow Bros Inc STAN MOORE 06/28/1995 09/24/1996 496,125.00

004709 Completed ER-9502(003) 112 Sr 112 Mp 32 Vic. Jim Creek Bank Protection Delhur Industries Inc JERRY MOORE 05/15/1995 08/10/1995 46,425.00

004710 Completed BHM-2715(004) 529 Sr 529, Union Slough Bridges 529 E&W Column Repair Concrete Barrier, Inc. MARLIN LENSSEN 07/27/1995 05/16/1997 509,757.00

004711 Completed STPF-0023(004) 023 Sr 23/27, Bridge Rail Update 23/14 & Bridge Replac West Company, Inc. CHARLES WILKE 07/27/1995 11/26/1997 312,528.50

004712 Completed STATE 401 Sr 401, Megler Rest Area To Naselle Lakeside Industries TROY D. CREWS 07/24/1995 05/15/1996 2,140,519.80

Dec 25, 2019 26 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004713 Completed BHM-1006(003) 509 Sr 509, F.B. Hoit & Younglove Creek Bridges Deck R Donald B Murphy Contractors Inc TOM BAKER 07/28/1995 12/19/1997 1,764,741.09

004714 Completed STATE 002 Sr 2, Airway Heights Curb And Sidewalk Shamrock Paving, Inc. HAROLD WHITE 08/14/1995 03/05/1997 2,029,814.30

004716 Completed IM-IMG-005-3(836) 005 Sr 5, Swift Ave. S. And Graham St. Signals Mt Electric, Inc. TOM BAKER 08/09/1995 09/23/1996 356,126.82

004718 Completed STATE 002 Sr 2, N. Spokane/Division St. Stage 2 Acme Materials & Construction Co HAROLD WHITE 08/04/1995 02/02/1998 2,673,639.32

004721 Completed ER-9503(001) 101 Sr 101, Mp 317.0 Slide Repair Active Construction, Inc. CRAIG MCDANIEL 06/21/1995 02/08/1996 389,405.50

004722 Completed ER-9502(006) 101 Sr 101, Mp 314.0 Slide Repair Westmark Excavating Inc DAVE ERICKSON 07/27/1995 01/26/1996 44,539.00

004723 Completed STATE 002 Sunnyslope Interchange Stage 2 Goodfellow Bros Inc PAUL J. MAHRE 08/10/1995 02/20/1998 4,044,528.00

004724 Completed STATE 530 Sr 530, Montague Creek Bridge To Hazel Vic - Stage Klb Construction, Inc. S MILLER / M LENSSEN 08/04/1995 12/28/2001 2,540,633.98

004726 Completed STATE 090 Sr 90, Pines Rd. To Idaho State Line Acme Materials & Construction Co KEN OLSON 08/01/1995 03/18/1996 1,053,971.20

004727 Completed STATE 014 Old Hatchery Road To Bergen Road Kiewit Infrastructure West Co. GLENN SCHNEIDER 10/04/1995 03/03/1998 2,159,079.00

004729 Completed STATE 141 Sr 141, Carr Road To Trout Lake Vicinity Granite Northwest Inc MIKE L. NIEMI 08/09/1995 03/25/1998 1,239,445.00

004730 Completed STATE 503 Sr 503, Yale Bridge Deck Replacement 503/26 503/26 Selby Bridge Company Inc MIKE L. NIEMI 07/28/1995 07/26/1996 555,180.00

004731 Completed ER-9502(015) 101 Sr 101 Mp 323.8 Vic. Slide Repair Dulin Construction, Inc. DAVE ERICKSON 07/20/1995 04/16/1996 218,647.50

004732 Completed STPF-E-0014(020-023) 014 Sr 14, Nelson Creek Rd I/S And Franz Lake Turnout J. L. Storedahl And Sons GLENN SCHNEIDER 07/31/1995 05/08/1997 494,957.70

004733 Completed STATE 169 Sr 169, Se Wax Road And Sr 18/Se 232nd Street Totem Electric Of Tacoma, Inc. RON PAANANEN 08/04/1995 12/16/1996 284,462.70

004734 Completed NHS-0002(183) 002 Sr 2, National Forest Boundary To Tunnel 2/108 Vic One Way Construction, Inc. STEVE MILLER 07/27/1995 04/18/1996 405,879.00

004735 Completed STATE 101 Sr 101, Andrews Creek Revision Seton Construction, Inc. JERRY MOORE 08/23/1995 01/17/1996 419,023.50

004736 Completed STATE 002 Sr 2, Tumwater Canyon Slope Stabilization Coral Construction Company STAN MOORE 08/10/1995 05/15/1996 318,114.00

004737 Completed ACBR-0012(091) 012 Sr 12, Bridge Replacement 12/285, 12/286, 12/287 Mowat Construction Company RON POLLOCK 09/11/1995 04/20/1999 5,206,471.30

004738 Completed STATE 970 Sr 970, Teanaway River Erosion Stabilization Morgan & Son Earthmoving ROGER L. ARMS 08/10/1995 12/11/1995 112,321.00

004739 Completed STPF-S161(001) 019 Sr 19, Vic. Oak Bay Road To Vic. Embody Road Lakeside Industries JERRY MOORE 08/24/1995 02/13/1997 469,790.00

004740 Completed IM-090-2(180) 090 Sr 90, Yakima River To W. Ellensburg Interchange - Columbia Asphalt & Gravel, Inc. ROGER L. ARMS 08/04/1995 01/02/1996 201,536.60

004741 Completed STATE 004 Sr 4, Coal Creek Road Signal Totem Electric Of Tacoma, Inc. GLENN SCHNEIDER 08/14/1995 06/04/1997 162,123.40

004742 Completed STATE 012 Sr 12/14, Lyle And Rimrock Tunnels Goodfellow Bros Inc GLENN SCHNEIDER 08/02/1995 06/03/1996 312,682.00

004744 Completed BRF-0530(014 530 Sr 530, S. Fork Stillaguamish River Bridge Mike M. Johnson, Inc. S MILLER / M LENSSEN 08/08/1995 03/21/1996 75,195.31

004745 Completed STATE 004 Sr 4 Et Al, Non-Interstate Safety 1995 Dirt And Aggregate Interchange, Inc MIKE L. NIEMI 08/29/1995 02/19/1997 1,034,510.70

004747 Completed ID-705-3802)U-1 509 Sr 509, Pacific Ave. To Dock St. Max J. Kuney Company CRAIG MCDANIEL 09/13/1995 06/07/1999 11,880,246.00

Dec 25, 2019 27 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004748 Completed STATE 516 Sr 516, Vic. Lake Meridian Slide Repair R.W. Scott Construction Co. GARY LIFFICK 09/13/1995 04/23/1997 191,179.30

004749 Completed ER-9502(013) 101 Sr 101, Mp 340.0 Purdy Creek Bridge Hurlen Construction Company CRAIG MCDANIEL 09/07/1995 06/03/1996 66,015.00

004750 Completed ACNH-0101(139) 101 Sr 101, Leland Creek Vic. Grade Revision Seton Construction, Inc. JERRY MOORE 08/31/1995 01/17/1996 226,241.50

004752 Completed STATE 090 Sr 90 Snow Fence Chandler Construction, Inc. CHARLES WILKE 09/06/1995 11/08/1995 57,181.00

004753 Completed DEMO-1995(001) 395 Sr 395, North Corridor Safety Improvements Inland Asphalt Company GORDON OLSON 09/07/1995 03/18/1997 960,005.10

004754 Completed STATE 005 Sr 5 Et Al, Structural Tile Cleaning Environmental Services, Inc. PHIL GEORGE 09/29/1995 09/29/1995 167,408.48

004756 Completed ID-IM-4053(744) 405 Tukwila To Factoria Sc&Di - Stage 1 Tri-State Construction Inc KIM HENRY 11/08/1995 12/07/1999 34,415,811.54

004757 Completed STPH-5238(004 County Road, Martin Way/ Nisqually Cut-Off I/S Totem Electric Of Tacoma, Inc. TIM L. AHLES 09/18/1995 05/01/1997 145,707.10

004758 Completed IM-0055200 005 Sr 5, Bow Hill Rest Areas (Northbound & Southbound Mike'S Roofing, Inc. KEN JOHNSON 10/02/1995 05/07/1996 28,000.00

004759 Completed STATE 101 Sr101 Mp 322.4 Vic. Slide Repair Granite Construction Company DAVE ERICKSON 09/26/1995 03/07/1996 170,075.25

004763 Completed STATE Vashon Main Slip Reconstruction Fletcher General, Inc. RICK BRATER 12/27/1995 04/16/1996 835,673.40

004764 Completed AC-STPUS-F-0020(0 020 Sr 20 Spur, R Avenue Signal & Channelization Klb Construction, Inc. KEN JOHNSON 10/16/1995 10/28/1997 845,556.15

004765 Completed ER-9502(024) 100 Sr 100 Slide Dulin Construction, Inc. GLENN SCHNEIDER 09/25/1995 09/03/1996 544,901.00

004766 Completed ER-9411(001) 012 Sr 12, Peters Road Vicinity Slide West Company, Inc. TROY D. CREWS 09/25/1995 09/24/1996 826,037.40

004767 Completed STPUS-0823(056) 082 Sr 82, Yakima Gateway Stage 1b Granite Northwest Inc R.F. GIFFORD 12/04/1995 01/27/1998 2,837,461.05

004768 Completed STATE 018 Sr 18, 304th St. To Covington Way Scarsella Bros., Inc. JOE SCANLON 12/28/1995 02/11/2000 6,189,595.83

004769 Completed ACNH-0002(169) 002 Sr 2, Vic. Sr 522 I/C Safety Improvements Totem Electric Of Tacoma, Inc. STEVE MILLER 11/20/1995 04/24/2000 187,263.05

004770 Completed STPF-9999(227) 005 Sr 5, Et Al, Region Wide Signal Revisions Signal Electric, Inc. JAY LAVASSAR 11/30/1995 02/14/1997 83,764.00

004771 Completed STATE 167 Sr 167, 15th St Nw To 84th Ave S Hov & Sc & Di - S Max J. Kuney Company INGO GOLLER 12/28/1995 06/26/2006 23,339,160.45

004772 Completed STATE 090 Issaquah To North Bend Eb Striping West Line Construction, Inc. KIM HENRY 11/06/1995 09/19/1996 67,207.22

004776 Completed STATE 018 Sr 18, Se 312th Way To Se 304th St. - Stage 2 Icon Materials, Inc. DAVE STANDAHL 02/23/1996 09/08/2000 25,737,305.11

004777 Completed STATE 018 Sr 18, Se 312th Way To Covington Way Wetland Mitig Buckley Nursery Company, Inc. AMIR RASAIE 02/12/1996 05/02/2000 512,089.06

004778 Completed STATE 101 Sr 101, Skokomish River Bridge 101/418 Painting Root Paint & Glass Co. Inc. DAVE ERICKSON 12/18/1995 03/04/1997 161,200.00

004779 Completed IM-NH-405-3(828) 405 Sr 405, S. Renton To Sunset Blvd. Erosion Control Paul Brothers, Inc. KIM HENRY 01/12/1996 01/09/2001 729,787.00

004780 Completed STATE 516 Nwr Video Monitoring System Signal Improvement Pro Signal Electric, Inc. INGO GOLLER 01/02/1996 05/13/1999 81,390.00

004782 Completed NH-0285(001) 285 Sr 285, Wenatchee Ave. Br. 285/15 To Maple St. Vic Morrill Asphalt Paving Co., Inc. KIRK D. BERG 01/03/1996 01/03/1997 1,787,861.10

004783 Completed STATE 020 Sr 20 , Sky Creek Bridge Flood Damage - Emergency Klb Construction, Inc. KEN JOHNSON 11/14/1995 02/05/1996 40,871.00

Dec 25, 2019 28 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004785 Completed NHG-0104(20) 104 Sr 104, Jct. 25th Ave. Ne Signalization Moose City Service Electric RON ERICKSON 02/13/1996 06/19/1997 180,784.64

004786 Completed STATE Seattle 3rd Slip Wingwalls Hurlen Construction Company RICK BRATER 01/23/1996 08/20/1996 1,026,111.00

004787 Completed NH-0099(039) 099 Sr 99, Vicinity S. 144th St. To 140th St. Signal Electric, Inc. TOM BAKER 02/26/1996 07/30/1997 362,767.47

004788 Completed ACNH-0028(018) 028 Sr 28, Vic. Rock Island Grade Road To Vulcan Basin Paving Co. STAN MOORE 01/16/1996 01/21/1998 1,267,248.51

004789 Completed STPF-1009(002) 161 Sr 161, Jovita Blvd To Sr 18 Widen Stage 1 Guy F. Atkinson Construction Corp. TOM BAKER 03/11/1996 01/26/1999 4,990,500.61

004790 Completed NH-0901(411) 090 Sr 90, Day Street Open Space Buckley Nursery Company, Inc. CATHY ARNOLD 02/29/1996 04/30/1999 206,393.51

004792 Completed STATE 090 Sr 90, Lodge Creek Vic. Morgan & Son Earthmoving ROGER L. ARMS 11/29/1995 01/29/1996 75,000.00

004793 Completed STATE 410 Sr 410, Slippery Creek Vic. Klb Construction, Inc. JOE SCANLON 12/15/1995 03/13/1996 409,528.00

004794 Completed STATE 002 Sr 2, Rayrock To Leavenworth Chipman Construction, Inc. STAN MOORE 12/01/1995 03/16/1998 600,000.00

004795 Completed ACIM-090-3(052) 090 Sr 90, Ryegrass To Vantage - Stage 2 Granite Northwest Inc R.F. GIFFORD 01/26/1996 04/23/1997 2,867,796.10

004797 Completed STATE 706 Sr 706, 305th Ave E. To Anderson/Kernhan Rds. Tri-State Construction Inc STEVE ROARK 02/20/1996 07/12/1999 1,453,091.70

004798 Completed STATE 008 Sr 8, Sr 12 To Mp 11.54 Stage 2 Scarsella Bros., Inc. DAVE ERICKSON 02/21/1996 05/12/1998 891,866.91

004799 Completed STATE 020 Sr 20 Et Al, North Central Region Seal And Crush - Granite Northwest Inc STAN MOORE 02/15/1996 11/12/1996 1,360,840.34

004800 Completed ACIM-0906(186) 090 Sr 90, Broadway Ave. To Thierman St. Weaver Construction Co. CHARLES WILKE 03/28/1996 02/07/1997 813,973.00

004801 Completed STATE 020 Sr 20, Sutter Creek Flood Damage Klb Construction, Inc. KEN JOHNSON 12/19/1995 03/05/1996 242,754.60

004802 Completed STATE 542 Sr 542, Shuksan Facility Flood Damage Henifin & Associates, Inc. KEN JOHNSON 12/26/1995 02/16/1996 103,052.40

004803 Completed STATE 090 Sr 90, Vic. Of Lodge Creek Bob Wright Grouting Specialities ROGER L. ARMS 12/07/1995 02/20/1995 25,095.00

004804 Completed STATE 020 Sr 20, Shovel Spur Flood Damage One Way Construction, Inc. KEN JOHNSON 01/03/1996 04/08/1996 161,032.00

004806 Completed ER-080-5(163) 504 Sr 504, Coldwater To Johnston Ridge Scarsella Bros., Inc. AMY E. REVIS 12/11/1995 10/29/1996 100,000.00

004807 Completed STATE 410 Sr 410 Washout Harry Jefferson Excavating ROGER L. ARMS 12/19/1995 04/24/1996 50,000.00

004809 Completed STATE 023 Sr 23, Bridge Replacement 12/116 Mike M. Johnson, Inc. KEN OLSON 03/06/1996 02/03/1997 187,468.89

004810 Completed STATE 009 Sr 522/Sr 9 I/C Modification - Stage 1a Mowat Construction Company DAWN MCINTOSH, P.E. 03/28/1996 10/12/2001 5,489,065.25

004811 Completed STATE 097 Sr 97, Bridge Rail Retrofit Coral Construction Company STAN MOORE 04/17/1996 01/16/1997 193,647.50

004812 Completed STATE 005 Sr 5, Pierce County Line To Tukwila Hov And Climbi Kiewit Infrastructure West Co. STANLEY ENG 05/20/1996 12/12/2005 17,044,423.96

004813 Completed ID-705-3(802) 509 Sr 509, E. "D" Street To Milwaukee Way Paving Tucci & Sons, Inc. MIKE MORISHIGE 03/21/1996 03/09/1999 2,513,712.93

004814 Completed BH-NH-0520(018)(0 520 Sr 520, Evergreen Pt Bridge Rehab Stage 2 And Ever Guy F. Atkinson Construction Corp. JAY LAVASSAR 03/18/1996 07/11/1997 4,077,630.32

004815 Completed STATE 532 Sr 532, 64th Ave. Nw Vic. Sr 5 Csr Associated KEN JOHNSON 03/01/1996 03/06/1997 735,643.76

Dec 25, 2019 29 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004816 Completed STATE Bainbridge Island Earthquate Retainer Hurlen Construction Company RICK BRATER 02/29/1996 10/09/1996 33,305.00

004817 Completed NH-0104(022) 104 Sr 104, 240th St. Sw To 244th St. Sw Csr Associated AL DYER 03/07/1996 09/22/1997 415,767.82

004818 Completed IM-082-1(080) 082 Sr 82, Selah Creek Bridges To Sr 823 Granite Northwest Inc R.F. GIFFORD 03/28/1996 05/15/1997 1,920,627.30

004819 Completed IM-082-2(108) 082 Sr 82/22, Prosser Vicinity - Wb Acme Materials & Construction Co VIRGIL E. SCHMIDT 03/22/1996 12/02/1997 726,783.90

004820 Completed BRF-0530(014) 530 Sr 530, S Fork Stillaguamish River Br 530/120 Repl F.E. Ward, Inc. STEVE MILLER 04/03/1996 12/28/2001 5,212,921.95

004821 Completed STATE 101 Sr 101, Lee'S Creek Primo Construction, Inc. JERRY MOORE 03/21/1996 03/04/1997 209,229.00

004822 Completed NH-0002(196) 002 Sr 2, Proctor Creek To Mp 33 Lakeside Industries KIRK D. BERG 04/03/1996 01/22/1998 510,538.55

004824 Completed STATE 524 Sr 524, 88th Ave W. Vic To 64th Ave W. Vic. Csr Associated AL DYER 05/06/1996 07/23/1997 226,103.55

004825 Completed STATE 104 Sr 104, Bin Wall Failure Repair Ace Paving Co., Inc. CRAIG MCDANIEL 02/21/1996 07/29/1996 105,035.00

004826 Completed NH-0054(229) 005 Sr 5, Sr 96/128th St Sw I/C N.B. Ramp Intersection Granite Construction Company MARLIN LENSSEN 04/17/1996 04/28/1997 97,962.00

004827 Completed NH-0055(197) 005 Sr 5, Bakerview I/C Nb On/Off & Sb Off Ramps Sail Electric, Inc. KEN JOHNSON 04/25/1996 01/22/1997 306,178.95

004830 Completed IM-005-5(193) 005 Sr 5, Nulle Rd To Samish Hwy Northbound Csr Associated KEN JOHNSON 04/03/1996 02/24/1997 791,978.86

004831 Completed STPF-0009(023) 009 Sr 9, 132nd St Ne To 204th St Ne Granite Construction Company MARLIN LENSSEN 04/05/1996 01/11/1999 509,990.90

004832 Completed AC-STPF-0020(076) 020 Sr 20, Thunder Arm To Region Boundary Lakeside Industries KEN JOHNSON 03/21/1996 05/08/1998 3,804,721.13

004833 Completed STATE 203 Sr 203, Jct 202 Vic To Ne 40th Street Vicinity Lakeside Industries RON ERICKSON 03/21/1996 01/24/1997 657,866.35

004834 Completed STPF-9999(239) 516 Sr 516/515, Central Ave To Se 256th And Sr 516 To Lakeside Industries INGO GOLLER 04/11/1996 01/22/1999 671,956.99

004835 Completed STATE 082 Sr 82, Vic Mp 27 Emergency Flood Damage Repair Tra Granite Northwest Inc R.F. GIFFORD 02/13/1996 08/06/1996 300,000.00

004836 Completed STATE 082 Sr 82, Vic Mp 39 Emergency Flood Damage Repair Columbia Asphalt & Gravel, Inc. ROGER L. ARMS 02/23/1996 11/20/1996 250,000.00

004837 Completed STATE 410 Sr 410, Horseshoe Bend Westerly Emergency Flood Da Selland Construction, Inc. R.F. GIFFORD 02/22/1996 08/09/1996 1,440,000.00

004838 Completed STATE 097 Sr 97, Blewett Pass Flood Repair 1996 - Emergency Goodfellow Bros Inc KIRK D. BERG 02/13/1996 07/10/1997 600,000.00

004839 Completed STATE 097 Sr 97, Toppenish Creek Flood Damage - Emergency Columbia Asphalt & Gravel, Inc. ROGER L. ARMS 02/23/1996 07/19/1996 100,000.00

004840 Completed STATE 090 Sr 90 - Vic. Mp 103 Flood Damage Repair Morgan & Son Earthmoving ROGER L. ARMS 03/01/1996 06/24/1996 212,000.00

004841 Completed STATE 090 Sr 90/904, Four Lakes To Geiger Vicinity Inland Asphalt Company KEN OLSON 04/11/1996 11/13/1996 714,892.00

004842 Completed STATE 012 Sr 12, Waitsburg Vic. Et Al Emergency Flood Damage Granite Northwest Inc VIRGIL SCHMIDT 02/27/1996 06/05/1996 100,000.00

004843 Completed IM-0904(102) 090 Sr 90, Dodson Rd To Moses Lake Bridge-Wb Acme Materials & Construction Co KIRK D. BERG 04/19/1996 03/20/1997 2,013,589.06

004844 Completed STPF-0302(003) 302 Sr 302 To Sr 16 (Spur) Ace Paving Co., Inc. CRAIG MCDANIEL 04/01/1996 11/20/1996 272,635.61

004846 Completed STATE Lopez Island Ferry Terminal Maintenance And Repair Hurlen Construction Company RICK BRATER 04/15/1996 07/24/1997 270,196.25

Dec 25, 2019 30 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004847 Completed NJ-0002(198) 002 Sr 2, Sultan Ecl Vic. To Wallace River Bridge Lakeside Industries STEVE MILLER 04/23/1996 02/27/1998 471,055.28

004848 Completed STPF-0240(005) 249 Sr 240, Stevens Drive To Sr 224 Acme Materials & Construction Co VIRGIL E. SCHMIDT 04/29/1996 12/02/1997 1,132,700.65

004849 Completed NH-0520(021)ETAL 520 Sr 520, 104th Ave Ne To West Lake Sammamish Parkwa Max J. Kuney Company JAY LAVASSAR 07/03/1996 10/17/2001 32,079,551.08

004850 Completed BH-2715(006) 528 Sr 528/529, Snohomish River To Sr 528 Bridge Rehab Walter & Sci Construction (Usa) Inc MARLIN LENSSEN 06/19/1996 02/14/2002 6,461,421.12

004851 Completed STATE 530 Sr 530, Hazel Vicinity To Boulder Creek Bridge 530 One Way Construction, Inc. STEVE MILLER 04/24/1996 03/04/1999 1,309,242.65

004852 Completed STATE 101 Sr 101, Sr 112 To Doyle St Lakeside Industries JERRY MOORE 04/22/1996 12/23/1997 1,614,525.77

004854 Completed STPF-0009(026) 009 Sr 9, 223rd Place Se To Sr 96 Watson Asphalt Paving Company, AL DYER 04/19/1996 05/01/1997 1,267,710.05

004855 Completed STATE 124 Sr 124, Sr 125, To Lower Waitsburg Rd Acme Materials & Construction Co VIRGIL E. SCHMIDT 05/03/1996 10/16/1997 1,050,354.97

004856 Completed IM-NHG-0051(234) 005 Sr 5, Sr 504 To Newaukum River Bridge Kiewit Infrastructure West Co. RON J. POLLOCK 05/09/1996 02/02/1999 5,948,999.00

004857 Completed STATE 509 Sr 509, City Waterway Bridge 509/5 Fletcher General, Inc. CRAIG MCDANIEL 04/17/1996 10/07/1996 35,629.00

004858 Completed STATE 433 Sr 433, Lewis & Clark Br 433/1 Emergent Deck Repai Concrete Barrier, Inc. GLENN SCHNEIDER 04/23/1996 06/19/1997 74,157.00

004860 Completed STATE 169 Sr 169, Se 416th St To Se 400th St Vicininty Watson Asphalt Paving Company, CATHY ARNOLD 04/26/1996 04/22/1997 236,666.50

004861 Completed STPF-0096(002) 096 Sr 96, Sr 5 To Sr 527 Csr Associated STEVE MILLER 05/06/1996 06/27/1997 244,417.90

004862 Completed NH-0020(082) 020 Sr 20, 1050th Ave To Bayview Rd Vicinity Wb Weigh Csr Associated KEN JOHNSON 04/29/1996 03/17/1997 785,735.60

004863 Completed STPF-0164(008) 164 Sr 164, Se 408th St To Se 436th St Lakeside Industries TOM BAKER 05/21/1996 08/04/1998 1,395,509.44

004864 Completed STATE 522 Sr 522, 41st St Ne To Kenmore P & R Lot Midmountain Contractors, Inc. TOM BAKER 05/22/1996 05/28/1999 3,463,676.70

004865 Completed NH-NHG-0539(005) 539 Sr 539, Jct Sr 546 Signalization Granite Construction Company KEN JOHNSON 05/14/1996 02/24/2000 517,763.00

004866 Completed STATE 101 Sr 101, Mp 174.50 To Mp 188.0 Lakeside Industries JERRY MOORE 05/03/1996 06/10/1998 2,225,979.99

004868 Completed STPR-0002(193) 002 Sr 2, Orondo Truck Escape Ramp Escape Ramp Selland Construction, Inc. STAN MOORE 04/30/1996 08/21/1996 149,323.00

004869 Completed NH-0020(091) 020 Sr 20, Frosted Rd To Deception Pass Park Csr Associated KEN JOHNSON 05/09/1996 04/14/1998 1,354,347.85

004870 Completed STPF-0900(010) 900 Sr 900, Tibbets Creek Bridge To Sr 90 Watson Asphalt Paving Company, RAY ARNOLD 05/13/1996 05/21/1997 292,144.93

004871 Completed STATE 530 Sr 530, Darrington To Sr 20 Csr Associated MARLIN LENSSEN 05/09/1996 05/01/2000 7,147,899.05

004872 Completed NH-0195(027) 195 Sr 195, Vicininty Babbit Road To Colfax Poe Asphalt Paving, Inc. KEN OLSON 06/07/1996 04/21/1997 1,433,256.18

004873 Completed NH-0002(186) 002 Sr 2, Chumstick Signal Mccandlish Electric Inc KIRK D. BERG 05/20/1996 11/21/1996 149,000.00

004874 Completed NH-0503(12) 503 Sr 503, Sr 500 To 76th St- 65th St Signal Granite Northwest Inc MIKE L. NIEMI 05/09/1996 09/26/1997 249,700.80

004875 Completed WA90-X083 Seattle Ferry Terminal Pedestrian Improvements Hurlen Construction Company RICK BRATER 09/03/1996 03/16/1998 1,185,945.00

004876 Completed NH-0014(024) 014 Sr 14, Blandford Dr To Vancouver City Limits Kiewit Infrastructure West Co. JIM MCCLELLAN 05/17/1996 12/03/1999 1,870,481.75

Dec 25, 2019 31 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004877 Completed STPF-0027(005) 027 Sr 28, Mt. Hope Rd To Freeman Inland Asphalt Company CHARLES WILKE 05/15/1996 04/01/1997 707,000.00

004880 Completed NH-005-3(830) 005 Sr 5, N. 113th St To Roosevelt Way Vic. Noise Barr Max J. Kuney Company TOM BAKER 06/19/1996 09/16/1998 3,093,944.55

004881 Completed NH-0051(226) 005 Sr 5, Ridgefield Weigh Station Kiewit Infrastructure West Co. MIKE L. NIEMI 05/21/1996 03/16/1999 1,275,202.12

004882 Completed NH-0026(015) 017 Sr 17, Franklin County Line To Sr 25 & Othello Vic Central Washington Asphalt, Inc. PAUL J. MAHRE 05/29/1996 03/20/1997 1,097,158.80

004883 Completed ER-9601(003) 166 Sr 166, Mp 1.2 Vic. Slide Repair Scarsella Bros., Inc. CRAIG MCDANIEL 04/26/1996 02/20/1997 368,804.25

004884 Completed STATE 405 Sr 405, Coal Creek I/C Sb Off-Ramp Right Turn Lane Tri-State Construction Inc RAY ARNOLD 05/06/1996 04/28/1997 69,696.96

004885 Completed STATE 090 Sr 90, Coal Mine Wall Drainage Laser Underground JAY LAVASSAR 05/22/1996 09/17/1996 48,594.00

004887 Completed STATE 021 Sr 21 Et Al, Eastern Region 1996 Chip Seal North Poe Asphalt Paving, Inc. CHARLES WILKE 06/03/1996 12/17/1997 1,673,819.68

004888 Completed STPF-0024(016) 024 Sr 24, Taylor Ranch To Vic. Sr 241 Granite Northwest Inc R.F. GIFFORD 06/07/1996 09/04/1997 833,177.30

004889 Completed STATE 002 Sr 2, Nason Creek Rest Area Bremmer Construction, Inc. STAN MOORE 06/19/1996 11/25/1996 173,586.00

004890 Completed IM-0051(235) 005 Sr 5, Kalama Vic. To Ostrander Rd. Kiewit Infrastructure West Co. GLENN SCHNEIDER 06/07/1996 12/03/1998 1,645,444.50

004891 Completed STP-PM96(003) 007 Sr 7, 246th St To Mp 43.16 Safety Improvements Woodworth & Company, Inc. DAVE ERICKSON 05/28/1996 12/04/1996 140,889.00

004892 Completed ER-9502(021) 101 Sr 101, Smith Creek Road Vicinity Slide The Nestaval Corporation RON POLLOCK 06/07/1996 05/28/1997 521,873.00

004893 Completed IM-005-3(827) 005 Sr 5, Cherry St To Ne 103rd Reversible Roadway - S D.W. Close Company, Inc. TOM BAKER 07/19/1996 06/05/2001 1,525,855.00

004894 Completed MH-0525(018) 525 Sr 525, Cameron Road To Sr 20 Stage 3a Krieg Construction, Inc. MARLIN LENSSEN 06/25/1996 08/17/2000 618,581.19

004895 Completed STPF-195) 195 Sr 195, Horn School Rest Area Sewage Lagoon Motley-Motley, Inc. KEN OLSON 08/12/1996 04/14/1997 565,877.00

004896 Completed STP-PM96(003) 308 Sr 308, Viking Way To Ne Harvard Ave Vic. Safety Ace Paving Co., Inc. CRAIG MCDANIEL 06/11/1996 03/26/1997 275,664.30

004897 Completed BR-0112(006) 112 Sr 112, Susie Creek Bridge 112/38 Mkb Constructors JERRY MOORE 06/14/1996 10/29/1999 2,094,328.61

004898 Completed NH-0002(199) 002 Sr 2, Mp 224 To Creston Inland Asphalt Company KEN OLSON 06/19/1996 02/06/1997 642,888.00

004899 Completed STPFG-0016(009) 016 Sr 16, Nb Off Ramp At Sedgewick Moose City Service Electric CRAIG MCDANIEL 06/04/1996 06/24/1997 102,187.00

004901 Completed NH-0012(097) 012 Sr 12, Naches Vic. & Pp&L Spillway To Mitchell Roa Granite Northwest Inc R.F. GIFFORD 06/14/1996 03/11/1997 911,396.17

004902 Completed AC-IM-090-1(412) 090 Sr 90, Hyak Vic. To Ellensburg-Phase 1 And Snowshe Acme Materials & Construction Co ROGER L. ARMS 07/02/1996 12/17/1998 8,990,000.00

004903 Completed STPF-405-3(831) 405 Sr 405, Ne 195th St I/C Bridge Widening Mowat Construction Company RON ERICKSON 07/02/1996 04/01/1999 2,516,841.00

004904 Completed NH-0513(001) 513 Sr 513, Sr 520 To Ne 45th St. Granite Construction Company RAY ARNOLD 07/02/1996 04/14/1998 570,874.50

004905 Completed ER-9601(014) 165 Sr 165, Vicinity Mp 1 Ceccanti, Inc. MIKE MORISHIGE 06/07/1996 11/07/1997 166,721.50

004906 Completed STATE Kingston Slip 1 Dolphin Replacement Fletcher General, Inc. RICK BRATER 08/21/1996 01/23/1997 376,860.00

004907 Completed NHG-9999(235) 016 Sr 16 Et Al, Blunt End Terminal Upgrade Petersen Brothers, Inc. JOHN L. HART 06/13/1996 10/30/1996 279,567.72

Dec 25, 2019 32 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004908 Completed STATE 097 Sr 97, Okanogan River Bridge 97/520 A & A Coatings, Inc. STAN MOORE 06/28/1996 12/04/1996 179,616.20

004909 Completed NH-0012(095) 012 Sr 12, Sr 124 To West C/L Walla Walla Granite Northwest Inc VIRGIL E. SCHMIDT 07/03/1996 10/22/1997 1,795,364.20

004910 Completed STATE 023 Sr 23 Et Al, 1996 Eastern Region Chip Seal South Morrill Asphalt Paving Co., Inc. CHARLES WILKE 06/19/1996 07/30/1997 1,237,269.00

004911 Completed STPR-0173(002) 173 Sr 173, Downing Town Site Curve Revision Basin Paving Co. KIRK D. BERG 07/10/1996 03/10/1997 163,806.70

004912 Completed NA-0003(025) 003 Sr 3, Belfair To Vic. Imperial Way And Belfair To Ace Paving Co., Inc. CRAIG MCDANIEL 06/12/1996 06/25/1997 636,145.00

004913 Completed STATE Southworth Ferry Terminal Access Phase 1b Ace Paving Co., Inc. RICK BRATER 06/28/1996 11/12/1998 335,259.30

004914 Completed Vashon Slip 2 Outer Right Dolphin Replacement Fletcher General, Inc. RICK BRATER 06/04/1996 10/03/1996 233,215.00

004915 Completed STATE 395 Hatch Road Vicinity To Mp 172.30 Acme Materials & Construction Co HAROLD WHITE 07/03/1996 03/19/1997 373,690.10

004916 Completed STATE 012 East Lewis St. Interchange Steelman-Duff, Inc. VIRGIL E. SCHMIDT 07/11/1996 07/26/1999 4,028,965.00

004917 Completed ER-9602(001) 012 Naches River Bridge 12/320 Replacement Weaver Construction Co. ROGER L. ARMS 07/03/1996 06/23/1998 2,547,108.60

004918 Completed ER-9602(017) 165 Vic Mp 7.4 To Mp 12.5 Olson Brothers Excavating, Inc. MIKE MORISHIGE 07/03/1996 08/26/1997 820,819.00

004919 Completed STATE 018 Sr 18, Covington Way To 180th Ave Se Mowat Construction Company DAVE STANDAHL 07/24/1996 01/02/2002 12,153,246.55

004920 Completed NH-0101(140) 101 Mp 71.55 To E. 2nd St. & Vic. Johns Rv And Vic. Jo Lakeside Industries JOHN L. HART 07/02/1996 05/01/1997 2,192,950.45

004921 Completed IM-006-3(230) 005 Silver Lake Sb Weigh Station Comm-Exco Construction, Inc. MARLIN LENSSEN 08/07/1996 10/27/1997 110,359.97

004923 Completed STATE 090 Sr 90, Hyak Dormitory Bridge Madden Construction, Inc. ROGER L. ARMS 07/23/1996 04/06/1998 314,553.00

004924 Completed NH-405-3(833) 405 Sr 405, Ne 8th To Northup Erosion Control Terra Dynamics Inc RAY ARNOLD 07/23/1996 11/29/2000 1,100,489.75

004926 Completed STATE 005 Sr 5, Mp 119 Vic. Interim Modifications (Tib Proje Tucci & Sons, Inc. DAVE ERICKSON 07/26/1996 08/11/1998 1,557,934.50

004927 Completed NJ-0008(005) 101 Sr 101, Sr 8 I/C To Black Lake I/C Wb And Mp 18 Vi Lakeside Industries TIM L. AHLES 07/08/1996 03/17/1998 670,164.82

004928 Completed STPF-0014(028) 014 Sr 14, Stevenson Two-Way Couplet Scoccolo Construction, Inc. MIKE L. NIEMI 09/12/1996 05/02/2000 3,500,940.05

004929 Completed STATE 020 Sr 21, Republic North Paving Morrill Asphalt Paving Co., Inc. CHARLES WILKE 06/25/1996 02/06/1997 412,687.75

004930 Completed STPF-0395(045) 395 Sr 395, Wandermere/Hastings Rd Park And Ride Acme Materials & Construction Co GORDON OLSON 07/16/1996 03/03/1998 441,178.15

004932 Completed IM-005-5(199) 005 Sr 5, Bellingham Vic. Bridge Decks Mowat Construction Company KEN JOHNSON 08/08/1996 02/11/1998 840,145.98

004933 Completed NH-0539(006) 539 Sr 539, Sr 5 To Kellogg Road Vicinity Csr Associated MARLIN LENSSEN 08/27/1996 03/15/1999 653,264.00

004934 Completed STP-PM96(003) 524 Sr 524, Main St. To 88th Ave. W. Csr Associated AL DYER 08/13/1996 01/09/1998 328,159.47

004935 Completed NHG-0512(009) 512 Sr 512, Pioneer Way I/C Totem Electric Of Tacoma, Inc. MIKE MORISHIGE 07/22/1996 12/04/1997 191,241.35

004936 Completed NH-0002(201) 002 Sr 2, Rr Overcrossing 2/34 To Stream Bridge 2/107 Lakeside Industries STEVE MILLER 07/29/1996 11/20/1998 935,528.05

004938 Completed STATE 101 Sr 101, Chehalis River Bridge 101/115 Quigg Bros., Inc. JOHN L. HART 08/05/1996 08/26/1997 153,499.00

Dec 25, 2019 33 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004941 Completed ID-I-090-1(400) 090 Sr 90, Third Lake Washington Emergency Piping Syst Mowat Construction Company INGO GOLLER 08/16/1996 06/12/2000 2,439,552.00

004942 Completed STATE Lopez And Southworth Ferry Terminal Generator Inst R E P Electric Inc RICK BRATER 09/10/1996 08/26/1998 481,038.00

004943 Completed BH-0000(255) 021 Sr 21, 174 & 904, 1996 Eastern Region Bridge Deck Concrete Barrier, Inc. KEN OLSON 08/02/1996 06/29/1998 495,578.75

004944 Completed BH-0405-3(832) 405 Sr 405, Woodinville I/C Hov Widening Guy F. Atkinson Construction Corp. RON ERICKSON 10/10/1996 11/12/1999 11,921,554.00

004945 Completed STP-PM96(003) 169 Sr 169, Lawson St. To Ravensdale Rd. Vic. Watson Asphalt Paving Company, TOM BAKER 08/05/1996 10/14/1997 319,932.74

004946 Completed STP-PM96(003) 509 Sr 509, F.B. Hoit Bridge 509/101 To 21st Ave. Sw Tucci & Sons, Inc. TOM BAKER 08/05/1996 03/11/1997 390,508.02

004947 Completed STATE 020 Sr 20, Spruce Canyon Road To Mill Creek Road Deatley Company, Inc. GORDON OLSON 08/22/1996 09/23/1999 4,865,691.15

004950 Completed NH-0525(019) 525 Sr 525, Cameron Road To Sr 20 Stage 3 Klb Construction, Inc. MARLIN LENSSEN 08/16/1996 10/09/2000 2,176,215.02

004953 Completed STATE 409 Sr 409, Julia Butler Hansen Bridge 409/10 - Pier P Advanced American Diving GLENN SCHNEIDER 08/12/1996 01/28/1997 98,001.00

004954 Completed BH-9999(225) 018 Sr 18/410, S. King County Bridges Seismic Retrofit Pct Construction, Inc. CATHY ARNOLD 08/21/1996 05/27/1997 194,575.20

004955 Completed STATE 005 Sr 5, 164th To Sr 526 Hov Lanes Granite Construction Company MARLIN LENSSEN 09/03/1996 08/21/2002 13,297,730.90

004956 Completed ER-9602(054) 012 Sr 12, Spiral Butte Vicinity Slide T L J Construction, Inc. RON POLLOCK 09/05/1996 04/17/1998 249,658.00

004957 Completed ER-9411(001) 012 Peters Slide, Re-Open Sr 12 Granite Construction Company RON POLLOCK 08/19/1996 03/11/1999 3,484,072.20

004958 Completed ER-9602(016) 007 Sr 7, Vic. Mp 31.0 Slide Repair Condon-Johnson & Associates, Inc. MIKE MORISHIGE 09/06/1996 10/02/1997 304,919.00

004959 Completed STATE Seattle Ferry Terminal Gangway Construction Jesse Engineering Co RICK BRATER 09/26/1996 05/01/1997 182,660.00

004960 Completed ER-9502(024) 101 Sr 101/100, Ft. Canby Slide & Ilwaco/Skinville I/S Ostrander Rock & Construction GLENN SCHNEIDER 08/30/1996 01/06/1998 1,217,566.44

004962 Completed ACBRACBH0099(044) 509 Sr 509/99, Duwamish River/First Ave. S. Bridge Rep Guy F. Atkinson Construction Corp. TOM MADDEN 10/18/1996 06/16/2000 27,099,940.00

004963 Completed 005 Sr 5, South Dupont Interchange Robison Construction, Inc. STEVE ROARK 09/19/1996 01/26/1999 12,092,243.10

004964 Completed NH-0002(195) 002 Sr 2, Woods Creek Bridge To Deception Creek Bridge Apply-A-Line, Inc. STEVE MILLER 08/27/1996 05/08/1998 420,720.64

004965 Completed STATE 002 Sr 2, Skykomish River Br. Scour Repair Thomco Construction Inc. RAY ARNOLD 09/03/1996 01/05/1999 289,982.50

004966 Completed ER-9602 241 Sr 241, Sunnyside To Sr 24 Granite Northwest Inc VIRGIL E. SCHMIDT 08/14/1996 06/20/1997 488,251.25

004968 Completed STATE Wsf, Vashon Main Slip Reconstruction Hurlen Construction Company RICK BRATER 10/04/1996 12/29/1998 1,722,390.00

004970 Completed ER-9601(066) 536 Sr 536,Skagit River Br 536/15 Emergency Pier Repai Hurlen Construction Company KEN JOHNSON 09/13/1996 02/24/1997 484,550.00

004974 Completed ER-9601 002 Sr 2, Stevens Pass Ditch Repair Pipkin Inc., Dba Pipkin Constructio PAUL J. MAHRE 09/20/1996 02/24/1998 370,314.00

004975 Completed STATE 542 Sr 542, Vic. Mp 53 Emergency Culvert Replacement Granite Construction Company TOM BAKER 08/28/1996 01/22/1997 113,870.00

004977 Completed STATE Pof Barge Drydocking And Overhaul Everett Shipyard, Inc. RICK BRATER 09/11/1996 05/08/1997 253,709.00

004983 Completed ILCS-7053(005) 509 Sr 509, Blair Bridge Removal A. H. Powers, Inc. RON LANDON 12/05/1996 04/29/1999 3,095,903.00

Dec 25, 2019 34 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

004984 Completed BH-000(621) 005 Sr 5/16, South Puget Sound Seismic Retrofit Diamaco Inc. DAVE ERICKSON 10/22/1996 07/16/1998 487,044.00

004987 Completed STPFG-PM96(003) 017 Sr 17, Stratford Road Undercrossing Traffic Signal Mccandlish Electric Inc PAUL J. MAHRE 10/10/1996 10/24/1997 147,846.90

004988 Completed ER-9601(060) 002 Sr 2, Bridge 2/5s - Pier 2 Scour And Fender Repair A. H. Powers, Inc. RAY ARNOLD 09/30/1996 04/30/1997 66,221.00

004989 Completed NHG-9999(234) 002 Sr 2 Etal, Ncr Guardrail Update Petersen Brothers, Inc. KIRK D. BERG 10/31/1996 11/05/1997 511,816.45

004998 Completed BH-0000(262) 005 Sr 5/520, Seattle Bridges Seismic Retrofit Diamaco Inc. CATHY ARNOLD 10/22/1996 08/26/1998 1,188,973.00

004999 Completed STPE-STPF-005-3(8 005 Sr 5, Melrose Ave. E./Lakeview Blvd. Trail Connect Mowat Construction Company CATHY ARNOLD 01/15/1997 02/02/1999 429,379.50

005000 Completed STATE 002 Sr 2, Anderson Creek Bridge 2/39 Northwest Construction, Inc. RAY ARNOLD 09/20/1996 06/25/1997 35,099.00

005001 Completed STATE Anacortes/Shaw/Orcas Dolphins Hurlen Construction Company RICK BRATER 10/24/1996 06/11/1997 849,000.00

005002 Completed STATE 005 Sr 5, Lake Washington Ship Canal Br 5/570 Painting Abhe & Svoboda, Inc. JULIA MIZUHATA 01/30/1997 06/11/2001 6,323,310.00

005004 Completed ER-9602(-98) 002 Sr 2, S. Fork Skykomish River Bridge 2/40 Klb Construction, Inc. RAY ARNOLD 10/02/1996 05/07/1997 77,049.00

005005 Completed ER-9602(236) 002 Sr 2, S. Fork Skykomish River Bridges 2/116 & 2/11 Northwest Construction, Inc. RAY ARNOLD 09/26/1996 06/23/1997 186,063.00

005007 Completed STATE Bremerton Slip 2 Refurbishment American Construction Co., Inc. RICK BRATER 11/15/1996 06/09/1998 560,633.00

005009 Completed IM-082-1(077) 082 Sr 82, Sr 821 To Selah Creek Bridges Highway Services, Inc. R.F. GIFFORD 12/02/1996 05/18/1998 9,774,140.40

005010 Completed STP-PM96(003) 097 Sr 97, South Wapato Road Instersection Granite Northwest Inc R.F. GIFFORD 11/07/1996 04/21/1998 396,103.20

005011 Completed STATE 002 Sr 2, N. Spokane/Division Street - Stage 3 Acme Materials & Construction Co HAROLD WHITE 11/19/1996 02/10/1999 2,209,474.61

005012 Completed STP-PM96(003) 028 Sr 28, Winchester To Martin Road Basin Paving Co. KIRK D. BERG 11/14/1996 12/30/1997 933,215.15

005013 Completed ER-9602(227) 410 Sr 410, Mp 72.7 Vic. Slide Repair West Company, Inc. R.F. GIFFORD 11/14/1996 01/05/1998 240,645.00

005014 Completed NH-NHG-0002(206) 002 Sr 2, Fairchild Afb To Sr 90 Et Al Inland Asphalt Company KEN OLSON 12/12/1996 02/25/1998 2,323,888.98

005016 Completed STPH-0503(013) 503 Sr 503, Ne 244th Street Signal System Mill Plain Electric, Inc. MIKE L. NIEMI 11/20/1996 12/31/1997 73,624.00

005017 Completed STPF-PM96(003) 027 Sr 27, 32nd Ave. Signal Mp 83.15 Colvico, Inc. CHARLES WILKE 01/21/1997 03/20/1998 117,828.50

005018 Completed NH-0002(203) 002 Sr 2, Chattaroy To Vicinity Four Lanes Central Washington Asphalt, Inc. CHARLES WILKE 12/16/1996 09/01/1998 1,896,149.40

005019 Completed ER-0805(163) 504 Sr 504, Coldwater Box Culverts Mowat Construction Company AMY E. REVIS 11/01/1996 09/14/1999 1,495,234.00

005020 Completed NH-0099(032) 099 Sr 99, Jct. S. 240th St. Signal Rebuild Totem Electric Of Tacoma, Inc. INGO GOLLER 12/09/1996 07/24/1998 430,560.69

005022 Completed NH-9999(226) 281 Sr 281, George To Quincy Basin Paving Co. PAUL J. MAHRE 12/03/1996 08/18/1998 1,138,707.63

005023 Completed STATE Anacortes Wingwall Replacement American Construction Co., Inc. RICK BRATER 12/05/1996 02/23/1998 1,720,697.00

005024 Completed IM-NH-0053(840) 005 Sr 5, Mercer St. To Ne 145th St. Signing, Signal & D.W. Close Company, Inc. INGO GOLLER 12/02/1996 02/23/2000 1,023,219.00

005025 Completed STATE 018 Sr 18, Auburn-Black Diamond Rd To Se 312th Stage 1 Buckley Nursery Company, Inc. STANLEY ENG 01/15/1997 03/13/2003 611,880.95

Dec 25, 2019 35 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005026 Completed STP-PM96(003) 290 Sr 290, Hamilton St. To Mission Ave. Inland Asphalt Company HAROLD WHITE 01/02/1997 12/11/1997 628,532.51

005027 Completed ER-9602(075) 508 Sr 508, Bear Canyon Slide Correction Webfoot Construction, Inc. RON POLLOCK 12/17/1996 04/13/1998 87,571.75

005028 Completed STATE 101 Sr 101, Lincoln St To Golf Course Rd. Lakeside Industries JERRY MOORE 01/02/1997 01/06/1998 606,304.11

005029 Completed STATE 105 Sr 105, North Cove Vic. Erosion Protection Fury Construction Company RON POLLOCK 11/20/1996 06/12/1997 328,320.00

005030 Completed STATE 002 North Central Region Sign Update - 1996 Sharp-Line Industries, Inc. KIRK D. BERG 12/18/1996 02/17/1998 105,059.00

005031 Completed NHG-9999(238) 026 Sr 25 Et Al, Eastern Region Blunt End Terminal Rep Frank Gurney, Inc. CHARLES WILKE 12/20/1996 10/02/1997 292,520.39

005032 Completed NHS-0104(023) 104 Sr 104, Jct. 76th Ave Ne/ Meridian Ave. Signal Electric, Inc. AL DYER 12/09/1996 01/13/1998 59,826.85

005033 Completed STATE 012 Sr 12, Old Naches Highway I/S Mccandlish Electric Inc R.F. GIFFORD 01/28/1997 09/23/1997 250,154.00

005034 Completed NH-0822(110) 082 Sr 82, Valley Mall Blvd. Columbia Asphalt & Gravel, Inc. R.F. GIFFORD 11/15/1996 03/04/1998 408,035.50

005035 Completed BH-9999(231) 012 Sr 12 Et Al, Lewis County Seismic Retrofit Concrete Barrier, Inc. RON POLLOCK 12/17/1996 11/03/1998 323,491.00

005036 Completed STATE 016 Sr 16, Burnham Dr. To Mp 22 Vic. Woodworth & Company, Inc. CRAIG MCDANIEL 12/13/1996 07/09/1998 1,867,458.30

005037 Completed BH-9999(266) 002 Sr 2/153, Seismit Retrofit & Pier Repair Bridge 2/ Tommer Construction Co., Inc. STAN MOORE 01/08/1997 02/12/1998 393,298.55

005038 Completed NH-0002(207) 002 Sr 2, Pine Canyon Slope Stabilization Slope Protec Hi Tech Rockfall Construction, Inc. STAN MOORE 01/16/1997 01/23/1998 224,436.00

005039 Completed STATE Seattle Passenger Only Ferry Terminal 1996 Modifi Hurlen Construction Company RICK BRATER 12/09/1996 03/26/1998 719,230.00

005040 Completed STATE Wsf, Schel-Chelb Estuary Construction Glacier Construction & Equipment RICK BRATER 01/27/1997 02/02/1998 554,328.00

005041 Completed STATE 002 Sr 2, Hay Brook Vic. Mp 37.5 Scoccolo Construction, Inc. STEVE MILLER 11/21/1996 05/15/1997 113,000.00

005042 Completed ER-9602(163) 125 Sr 125, Walla Walla To Sr 124 Granite Northwest Inc VIRGIL E. SCHMIDT 12/16/1996 11/06/1997 127,582.20

005043 Completed STATE 005 Sr 5, 196th St/Sr 524 I/C East Side Modification Granite Construction Company DAWN MCINTOSH, P.E. 02/19/1997 03/08/2002 3,974,084.17

005044 Completed NHG9999(236) 004 Sr 4 Et Al, Guardrail Terminal/ Attenuator Upgrade Petersen Brothers, Inc. MIKE L. NIEMI 01/13/1997 01/29/1998 427,808.90

005045 Completed STP-PM96(003) 019 Sr 19-Jct Sr 104 To Oak Bay Rd/Vic Embody Rd To Sr Ace Paving Co., Inc. CRAIG MCDANIEL 01/02/1997 11/19/1998 1,936,602.28

005047 Completed NHG-9999(237) 012 Sr 12 Et Al, South Central Region Blunt End Termin Frank Gurney, Inc. CHARLES WILKE 12/20/1996 10/02/1997 364,150.22

005048 Completed STATE 012 Sr 12, East Aberdeen Slope Correction Brumfield Construction, Inc. JOHN L. HART 12/30/1996 11/06/1997 173,003.00

005049 Completed ER-9602(237) 161 Sr 161, Vic. Mp 30 Slide Klb Construction, Inc. MIKE MORISHIGE 01/02/1997 01/16/1998 90,137.00

005050 Completed STATE 002 Sr 2, Profitt'S Point To Deception Creek Bridge Klb Construction, Inc. STAN MOORE 01/10/1997 05/23/2000 7,740,459.19

005051 Completed NH-0904(103) 090 Sr 90, Moses Lake Bridge To Sr 17 Vic. Overcrossin Central Washington Asphalt, Inc. KIRK D. BERG 01/14/1997 04/09/1998 1,882,822.14

005052 Completed NH-0104(024) 104 Sr 104, Paradise Lane Vic. To 238th Sw Csr Associated AL DYER 02/04/1997 05/18/1998 344,299.85

005053 Completed NH-009(072) 097 Sr 97, Cordell Siding To Oroville Scl Morrill Asphalt Paving Co., Inc. PAUL J. MAHRE 01/28/1997 11/06/1997 514,846.36

Dec 25, 2019 36 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005054 Completed STATE 405 Sr 405, Bothell To Swamp Cr I/C Hov Lanes - Stage Tri-State Construction Inc DAWN MCINTOSH, P.E. 03/05/1997 04/15/2002 18,937,187.24

005055 Completed STATE 161 Sr 167/161 To Vic. Of 43rd St. Ct. E. Tucci & Sons, Inc. MIKE MORISHIGE 01/24/1997 01/30/1998 443,601.50

005056 Completed STATE 021 Sr 21, North Of Republic West Company, Inc. CHARLES WILKE 02/04/1997 03/03/1998 1,466,727.10

005057 Completed NH-0028(019) 028 Sr 28, Grant Rd. Vic. To Rock Island Grade Rd. Morrill Asphalt Paving Co., Inc. KIRK D. BERG 01/29/1997 03/10/1998 1,251,074.68

005058 Completed IM-182-3(050) 182 Sr 182/395, Vic. 20th Ave. I/C To Sr 395 I/C And H Granite Northwest Inc VIRGIL E. SCHMIDT 02/26/1997 10/19/1998 2,760,578.86

005059 Completed NH-0522(022) 522 Sr 522, Sr 527 To King/Snohomish County Line Watson Asphalt Paving Company, PATRICK MCCORMICK 01/22/1997 12/18/2000 1,162,196.21

005061 Completed STATE Bainbridge Island Ferry Terminal Emergency Generat Intermountain Electric, Inc. RICK BRATER 02/06/1997 04/24/1998 1,377,220.00

005062 Completed NH-0433(005) 433 Sr 433, Lewis & Clark Bridge 433/1 Interim Deck Re Mowat Construction Company GLENN SCHNEIDER 02/04/1997 01/27/1999 899,985.76

005063 Completed STATE 024 Sr 24 Et Al, North Central Region Seal - 1997 Granite Northwest Inc PAUL J. MAHRE 03/12/1997 12/04/1997 936,757.75

005065 Completed STP-PM96(003) 009 Sr 9, Jct. Sr 96 Lowell-Larimer Road Signal Rehab. Moose City Service Electric AL DYER 02/05/1997 04/27/1998 172,618.45

005067 Completed STP-PM96(003) 162 Sr 162, Old Pioneer Way E To Vic. Orville Rd. E. Woodworth & Company, Inc. MIKE MORISHIGE 01/24/1997 01/07/1998 458,731.00

005068 Completed STATE 172 Sr 172, Jct. Sr 2 To Co Rd 10 Nw Selland Construction, Inc. STAN MOORE 02/25/1997 11/18/1998 952,522.30

005071 Completed BH-9999(230) 090 Sr 90 Et Al, Bellevue Vic. Bridges - Seismic Retro Diamaco Inc. RAY ARNOLD 02/05/1997 09/15/1998 285,367.00

005072 Completed BH-0000(248) 101 Sr 101 Et Al, Region Wide Seismic Retrofit Mowat Construction Company TIM L. AHLES 03/04/1997 09/09/1999 814,692.00

005073 Completed NH-0002(209) 002 Sr 2, Peshastin Signal Mccandlish Electric Inc STAN MOORE 02/26/1997 02/25/1998 149,000.00

005074 Completed STATE 395 Sr 395, Stevens Co. Line To Loon Lake Acme Materials & Construction Co GORDON OLSON 03/03/1997 06/18/1998 2,162,829.80

005075 Completed STPF-S329(002) 206 Sr 206, Sr 2 To Bruce Road - Phase 1 Inland Asphalt Company T. J. TREPANIER 02/20/1997 03/30/1999 1,272,442.00

005076 Completed STATE 129 Sr 129, Oregon State Line To Grande Ronde River Steelman-Duff, Inc. VIRGIL E. SCHMIDT 01/10/1997 04/28/1998 150,000.00

005077 Completed NH-0012(094) 012 Sr 12, Elma Gate Road To 183rd Ave Sw Lakeside Industries TIM L. AHLES 03/03/1997 04/30/1999 569,528.87

005078 Completed ER-9502(025) 006 Sr 6, Pluvius Vicinity Settlement Granite Construction Company RON J. POLLOCK 03/06/1997 04/22/1998 632,732.50

005079 Completed STATE 020 Sr 20, Deception Pass 20/204 & Canoe Pass 20/207 B Dunkin & Bush, Inc. MARLIN LENSSEN 03/14/1997 01/25/1999 1,489,841.00

005081 Completed NH-0053(847) 005 I-5 Cctv System - Stage 3 Elcon Corporation MIKE MORISHIGE 03/07/1997 02/04/2003 872,152.00

005082 Completed NH-STPF-9999(226) 026 Sr 26 Et Al, Ncr Channelization - 1997 Basin Paving Co. PAUL J. MAHRE 03/19/1997 08/27/1998 657,966.70

005083 Completed LOCAL 090 Sr 90, Edgewick Road To Hyak Vicinity Apply-A-Line, Inc. ROGER L. ARMS 03/07/1997 02/02/1998 605,127.09

005084 Completed STATE 014 Sr 14, Prindle Rd To Smith-Cripe Rd Lakeside Industries AMY E. REVIS 03/03/1997 12/01/1998 268,656.50

005085 Completed NH-0525(017) 525 Campbell Road To Midvale Road Lakeside Industries MARLIN LENSSEN 03/27/1997 08/03/1998 279,074.87

005086 Completed BH-9999(228) 002 Sr 2, South Snohomish County Bridges Seismic Retro Mowat Construction Company RAY ARNOLD 04/14/1997 04/03/2000 1,009,184.00

Dec 25, 2019 37 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005087 Completed STP-PM97(003) 014 Sr 14, Mp 175 To Sr 82 Granite Northwest Inc VIRGIL E. SCHMIDT 03/20/1997 04/01/1998 918,377.00

005088 Completed STPF-0509(010) 509 Sr 509, Des Moines Way S. To S. 136th St. Bridge Watson Asphalt Paving Company, TOM BAKER 03/19/1997 06/08/1998 1,164,150.16

005089 Completed NH-0520(023) 520 Sr 520, Sr 5 To Evergreen Pt. Bridge Signing And L Signal Electric, Inc. JAY LAVASSAR 03/07/1997 05/27/1999 298,000.00

005090 Completed STP-PM96(003) 155 Sr 155, Disautel Pass Vicinity Scarsella Bros., Inc. KIRK D. BERG 05/01/1997 09/18/2000 3,263,265.63

005091 Completed STP-PM96(003) 530 Sr 530, Sr 5 To Dike Road Vicinity Csr Associated MARLIN LENSSEN 04/08/1997 03/01/1999 498,518.96

005092 Completed IM-IMG-0051(236) 005 Sr 5, Newaukum River To Thurston County Line Thurs Lakeside Industries AMY E. REVIS 03/26/1997 01/06/1999 779,700.62

005093 Completed STP-PM97(003) 202 Sr 202, Vic. Se 8th St. To Vic. 292nd Ave. Se Klb Construction, Inc. RON ERICKSON 04/14/1997 11/14/2000 1,903,867.07

005094 Completed STP-PM97(003) 516 Sr 516, Se Wax Rd. To Sr 169 Resurfacing Watson Asphalt Paving Company, TOM BAKER 03/19/1997 11/22/1999 889,077.83

005096 Completed STP-PM97(003) 020 Sr 20, Safety Improvements Goodfellow Bros Inc PAUL J. MAHRE 04/17/1997 04/22/1998 342,021.00

005097 Completed NH-0003(027) 003 Sr 3, Clear Creek Road To Sr 308 Lakeside Industries CRAIG MCDANIEL 04/07/1997 04/27/1998 1,753,697.90

005098 Completed STATE Lopez Island Ferry Terminal Emergency Slope Protec Klb Construction, Inc. RICK BRATER 03/10/1997 12/30/1997 66,388.06

005099 Completed STATE 101 Sr 101, Bear Creek Bridge To Vic. Fairholm Campgro Lakeside Industries JERRY MOORE 04/10/1997 07/01/1998 2,336,538.25

005101 Completed NH-0053(846) 005 Sr 5, King St. Br. 5/543 & Pine St. Br. 5/551 Brid Pct Construction, Inc. GOLLER 05/14/1997 02/23/1999 493,368.91

005102 Completed STATE 542 Sr 542, Wales Corner To Hatchery Rd. Vic. & Coal C Granite Construction Company KEN JOHNSON 04/03/1997 06/21/2000 844,195.85

005103 Completed STATE 005 Sr 5, Convention Center/Freeway Park Lighting Reha D.W. Close Company, Inc. INGO GOLLER 05/08/1997 07/05/2000 1,698,750.00

005104 Completed STP-PM97(003) 410 Sr 410, Vic. 143rd Ave. To Vic. 181st Ave. E. King Tucci & Sons, Inc. MIKE MORISHIGE 04/03/1997 02/01/1999 2,393,213.11

005105 Completed STP-PM(003) 507 Sr 507, Railroad Bridge To Vic. Idaho Street Lakeside Industries TIM L. AHLES 04/14/1997 04/30/1999 468,211.71

005106 Completed NH-0003(028) 003 Sr 3, Rr U'Xing To Vic. Sherman Heights Rd. Ace Paving Co., Inc. CRAIG MCDANIEL 04/08/1997 02/08/1999 1,006,895.96

005107 Completed NH-0303(004) 303 Sr 303, Jct. Sr. 304 To Vic. Riddell Rd. Vic. Ridd Ace Paving Co., Inc. CRAIG MCDANIEL 04/09/1997 02/08/1999 1,000,188.00

005109 Completed STP-PM97(003) 529 Sr 529, Marine View Dr./Broadway I/C Csr Associated MARLIN LENSSEN 04/08/1997 01/29/1999 124,529.20

005110 Completed STATE 012 Sr 5, Mill Creek Vicinity Rip Rap Braden & Nelson, Inc. VIRGIL E. SCHMIDT 02/19/1997 09/08/1997 100,000.00

005113 Completed IM-0053(845) 005 Sr 5, Tacoma Mall Vic. Ramps Tucci & Sons, Inc. RON LANDON 04/03/1997 01/07/1999 966,190.80

005115 Completed IM-005-4(231) 005 Sr 5, Everett Vic. Bridge Deck Resurfacing - Stage Mowat Construction Company STEVE MILLER 04/14/1997 01/25/2001 2,912,985.78

005116 Completed NH-0020(094) 020 Sr 20 Spur, Commercial Ave. To Anacortes Ferry Ter Lakeside Industries KEN JOHNSON 04/08/1997 04/19/1999 899,012.20

005117 Completed STP-PM96(003) 169 Sr 169, Jct. Cedar Grove Road Signal Rehab. Signal Electric, Inc. AMIR RASAIE 03/28/1997 04/07/2000 106,650.63

005119 Completed STATE 097 Satus Creek Vicinity Rip Rap Delbert Wheeler Construction Co. ROGER L. ARMS 03/21/1997 08/05/1997 200,000.00

005121 Completed NH-0395(049) 395 Sr 395, Hamilton Road To Stevens Co. Line Acme Materials & Construction Co HAROLD WHITE 05/19/1997 06/15/1998 1,381,575.10

Dec 25, 2019 38 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005122 Completed IM-0052(181 005 Sr 5, Martin Way O/C To Vic. Mounts Rd. Sb Walter & Sci Construction Ltd STEVE ROARK 04/21/1997 05/19/1999 2,236,338.38

005124 Completed NH-0017(028) 017 Sr 17, Sr 395 To Basin City Road Acme Materials & Construction Co VIRGIL E. SCHMIDT 04/18/1997 07/17/1998 734,900.01

005125 Completed IM-0822(109) 082 Sr 82 Et Al, Kiona Vicinity To Mp 100.84 Granite Northwest Inc VIRGIL E. SCHMIDT 04/18/1997 05/22/1998 1,314,832.97

005126 Completed IM-0902(177) 090 Sr 90/97, Yakima River To West Ellensburg I/C Phas Columbia Asphalt & Gravel, Inc. R.F. GIFFORD 04/14/1997 03/23/1998 1,648,052.40

005127 Completed STP-PM97(003) 202 Sr 202, Jct. 244th Ave. Ne Scarsella Bros., Inc. RON ERICKSON 04/14/1997 12/12/1997 386,642.35

005128 Completed NH-0518(004) 518 Sr 518, Sr 509 To 51st Ave S. Vic. Lakeside Industries TOM BAKER 05/23/1997 10/13/1999 2,909,249.60

005129 Completed DPR-0078(001) 014 Sr 14, White Salmon River Bridge To Hood River Bri Kiewit Infrastructure West Co. JIM MCCLELLAN 05/20/1997 08/30/1999 2,800,778.80

005130 Completed STATE 012 Sr 12, Cortwright Creek To Wildcat Creek Columbia Asphalt & Gravel, Inc. RON POLLOCK 04/24/1997 12/10/1998 2,348,795.54

005132 Completed STPF-STPUL-0291(0 291 Sr 291, Division St. To Lowell Ave. Acme Materials & Construction Co HAROLD WHITE 04/30/1997 04/29/1999 2,785,226.53

005133 Completed STATE 005 Sr 5 Et Al, Region Wide Loop Replacement Totem Electric Of Tacoma, Inc. JAY LAVASSAR 04/17/1997 05/04/1998 255,229.00

005134 Completed STATE 520 Sr 520, Evergreen Pt. Bridge Anchor Cable Replacem Global Diving & Salvage, Inc. RAY ARNOLD 06/03/1997 01/12/2001 254,223.00

005135 Completed STATE 520 Sr 520, 84th Ave Ne Pedestrian Enhancements Pedest Madden Construction, Inc. JAY LAVASSAR 04/22/1997 03/09/1998 57,731.80

005136 Completed BH-NHS-0012(096)( 012 Sr 12/128, Br. 012/810 Alpowa To Clarkston, 13th A Poe Asphalt Paving, Inc. VIRGIL E. SCHMIDT 05/05/1997 07/14/1998 1,508,768.81

005137 Completed STATE 082 Sr 82/823, Sr 82 To Selah Kiewit Infrastructure West Co. ROGER L. ARMS 05/20/1997 02/23/2001 23,936,226.10

005138 Completed STATE 507 Sr 507, Signal Upgrade And Interconnect Colvico, Inc. RON POLLOCK 04/17/1997 05/13/1998 155,993.00

005139 Completed STATE 002 Sr 2, King C/L To Rayrock Csr Associated STAN MOORE 05/13/1997 03/23/1998 2,569,592.63

005140 Completed STATE 012 Sr 12, Scr Seals 1997 Granite Northwest Inc R.F. GIFFORD 05/20/1997 03/23/1998 2,353,480.30

005141 Completed STATE 124 Sr 124, Mp 17.61 To Railroad Bridge 124/8 Granite Northwest Inc VIRGIL E. SCHMIDT 05/08/1997 06/19/1998 438,590.71

005142 Completed NH-0240(006) 240 Sr 240, Airport Rd. To Duportail Rd. & Sr 224 To S Acme Materials & Construction Co VIRGIL E. SCHMIDT 05/02/1997 01/25/1999 1,193,162.43

005143 Completed STATE 014 Sr 14, Wood Creek To Benton County Line Granite Northwest Inc GLENN SCHNEIDER 05/05/1997 08/24/1998 1,085,361.00

005144 Completed NH-0195(029) 195 Sr 195, Bridge 195/34 To Bridge 195/38 Acme Materials & Construction Co CHARLES WILKE 06/03/1997 09/29/1998 3,696,951.34

005145 Completed ER9602(001) 508 Sr 508 Et At, Sw Region Bridge Painter - 1997 Interstate Coatings, Inc. RON POLLOCK 04/17/1997 07/08/1999 193,051.00

005147 Completed STATE 005 Sr 5, Interstate Bridge To 39th Street Lakeside Industries JIM MCCLELLAN 04/24/1997 02/25/1999 1,319,343.97

005148 Completed IM-2051(277) 205 Sr 205, Sr 14 To 9th Ave. Wildish Standard Paving Co AMY E. REVIS 04/24/1997 09/09/1998 745,687.00

005149 Completed STP-PM97(003) 105 Sr 105, Edward P. Smith Dr. To Sr 101 Lakeside Industries JOHN L. HART 04/24/1997 11/07/1997 969,846.00

005150 Completed STATE 101 Sr 101, Lewis Rd. To Mp 260.06 Lakeside Industries JERRY MOORE 05/01/1997 04/23/1998 740,830.85

005152 Completed BH-0101(155) 101 Sr 101, Sol Duc River Bridges Root Paint & Glass Co. Inc. JERRY MOORE 04/29/1997 01/13/1998 477,650.00

Dec 25, 2019 39 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005153 Completed STP-PM97(003) 026 Sr 26, Dusty To Union Flat Creek Poe Asphalt Paving, Inc. KEN OLSON 05/05/1997 01/04/1999 1,063,461.05

005154 Completed IM-005(240) 005 Sr 5, N. Kelso To Ostrander - Nb Lakeside Industries AMY E. REVIS 05/01/1997 01/19/1999 693,359.50

005155 Completed STATE 012 Sr 12, Gershick Rd To Corn Creek Br Lakeside Industries RON POLLOCK 05/07/1997 05/10/1999 951,866.55

005156 Completed NH-0097(074) 097 Sr 97, State Frontage Rd To Yakima County Line Granite Northwest Inc GLENN SCHNEIDER 05/20/1997 03/10/1999 2,767,027.25

005157 Completed NH-0002(210) 002 Sr 2/9, Old Sr 2 To 3/4 Mi. E. Br. 2/22 & Old Sr 2 Lakeside Industries STEVE MILLER 05/08/1997 05/19/2000 2,669,152.76

005158 Completed BH-9999(229) 005 Sr 5 Et Al, Sr 5, 9, 11, 532, 539, And Sr 542 Seis Pct Construction, Inc. KEN JOHNSON 05/14/1997 04/16/1998 716,642.92

005159 Completed NH-IM-0054(228) 005 Sr 5, Stillaguamish River Br. To Joe Leary Slough Csr Associated STEVE MILLER 05/15/1997 08/08/2000 3,819,536.74

005160 Completed STATE 125 Sr 125, Oregon State Line To Military Rd Granite Northwest Inc VIRGIL E. SCHMIDT 05/14/1997 09/25/2002 1,424,037.01

005161 Completed STP-PM97(003) 507 Sr 507, Jct. Sr 702 Vicinity Granite Construction Company T.L.AHLES/N.CAMPBELL 04/29/1997 05/12/1999 546,081.68

005162 Completed NH-0167(025) 167 Sr 167, Sr 5 To Puyallup Woodworth & Company, Inc. RON LANDON 05/14/1997 05/11/1999 1,829,765.00

005163 Completed STATE 097 Sr 97a, Euclid Avenue Drainage Goodfellow Bros Inc PAUL J. MAHRE 05/06/1997 10/27/1997 162,757.00

005165 Completed STP-PM97(003) 900 Sr 900, Kirkland Ave. Ne Vic. To Duvall Ave. Ne Lakeside Industries TOM BAKER 08/11/1997 12/29/1998 312,643.90

005166 Completed STATE 020 Sr 20, Mill Road To Tiger Junction Deatley Company, Inc. GORDON OLSON 05/30/1997 01/10/2000 6,124,150.70

005167 Completed DEMO-1995(001) 395 Sr 395, N. Corridor Safety Improvements - Paving West Company, Inc. GORDON OLSON 05/08/1997 11/02/1998 432,898.25

005168 Completed IM-0903(053) 082 Sr 90, Sr 82 To Boylston Rd Vic. - Phase 1 Granite Northwest Inc R.F. GIFFORD 05/14/1997 03/11/1998 979,968.20

005169 Completed STP-PM97(003) 164 Sr 164, Dogwood St. Se To Sr 410 Watson Asphalt Paving Company, STANLEY ENG 05/15/1997 11/29/1999 1,429,647.83

005170 Completed STPPM(003)ER9602( 203 Sr 203, Ne 40th St. Vic. To Overflow Slough Br. Pacific Road & Bridge Co. RON ERICKSON 05/15/1997 02/02/2000 2,823,603.85

005171 Completed STATE 410 Sr 410, Bumping River Rd To Little Naches River Rd Granite Northwest Inc R.F. GIFFORD 05/14/1997 02/03/1998 337,828.00

005172 Completed AWPM-1995(010) 900 Sr 900, 148th Ave Se To Vic 171st Pl Se Longline T West Line Construction, Inc. JACOBSON-BAKER 05/07/1997 08/08/1997 45,060.00

005173 Completed AWPM-1995(010) 900 Sr 900, Vic. Se May Valley Road To Vic. Mp 20 Long West Line Construction, Inc. JACOBSON-BAKER 05/07/1997 08/07/1997 43,072.00

005176 Completed NHF-0020(088) 020 Sr 20, Bridge Guardrail Replacement Petersen Brothers, Inc. KEN JOHNSON 05/15/1997 07/23/1997 143,154.30

005177 Completed STP-PM97(003) 117 Tumwater Truck Route Lakeside Industries JERRY MOORE 05/13/1998 02/17/1998 448,024.65

005178 Completed STATE 548 Sr 548, Vic. Drayton Harbor Road Granite Construction Company KEN JOHNSON 05/19/1997 01/27/1998 45,815.20

005179 Completed STP-PM97(003) 020 Sr 20 Et Al, Eastern Region Guardrail Update Guard Petersen Brothers, Inc. KEN OLSON 05/19/1997 01/15/1998 225,204.20

005180 Completed STATE 090 Sr 90, Sprague Ave I/C Phase 1 West Company, Inc. T. J. TREPANIER 05/23/1997 01/15/1999 987,852.70

005181 Completed STATE 547 Sr 547, Vic. Reese Hill Road Granite Construction Company KEN JOHNSON 05/19/1997 01/27/1998 46,655.20

005182 Completed BH-0020(089) 020 Sr 20, Swinomish Slough Bridge 20/211s Seismic Ret C.A. Carey Corporation KEN JOHNSON 05/21/1997 05/08/1998 234,769.00

Dec 25, 2019 40 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005184 Completed STATE 101 Sr 101, Greenhead Slough To Wildlife Boat Launch W Lakeside Industries GLENN SCHNEIDER 05/21/1997 05/05/1998 722,025.40

005185 Completed STATE 025 Sr 25, Slide Emergency Scarsella Bros., Inc. GORDON OLSON 04/04/1997 06/16/1998 429,422.50

005186 Completed NH-0195(028) 195 Sr 195, Idaho State Line To Colton Quad-Cities Construction, Inc. KEN OLSON 05/30/1997 12/18/1998 1,940,027.50

005187 Completed STATE 020 1997 Eastern Region Chip Seal Poe Asphalt Paving, Inc. CHARLES WILKE 05/19/1997 10/14/1998 1,948,863.89

005188 Completed STATE 021 Sr 21, Scatter Creek Bridge Scour Repair Scour Rep West Company, Inc. CHARLES WILKE 05/14/1997 01/08/1998 144,556.50

005189 Completed STP-PM97(003) 097 Sr 97, Lateral A Intersecion Goodfellow Bros Inc R.F. GIFFORD 06/05/1997 05/13/1998 1,121,627.00

005190 Completed IM-005-2(178) 005 Sr 5, Sr 12 To Maytown Rd. O'Xing Maytown Rd. O'Xi Lakeside Industries TIM L. AHLES 06/04/1997 05/12/1999 1,692,496.27

005191 Completed STP-PM97(003) 532 Sr 532, Stanwood Wcl To Jct. Old Sr 530 Csr Associated STEVE MILLER 05/21/1997 03/08/2000 877,492.65

005192 Completed STPF-NH-0099(040) 099 Sr 99, Mp 0 To King County Line Tucci & Sons, Inc. MIKE MORISHIGE 05/23/1997 09/15/1999 872,538.60

005193 Completed IM-0055(202) 005 Sr 5, N. Lake Samish Rd. To 36th St. U'Xing 5/807 Csr Associated KEN JOHNSON 06/05/1997 07/06/2000 7,637,774.96

005194 Completed IM-0055(206) 005 Sr 5, Nooksack River To Blaine Bridges Csr Associated KEN JOHNSON 06/11/1997 12/12/2000 8,717,983.53

005195 Completed STPE-EN95(019) 108 Sr 108, Jct. Sr 8 To Jct. 101 And Kamilche Transit Granite Construction Company JOHN L. HART 07/01/1997 04/06/1999 2,146,712.05

005196 Completed NH-BH-0101(147) 101 Sr 101 & Sr 8, Thurston County Bridge Preservation Concrete Barrier, Inc. TIM L. AHLES 06/03/1997 05/04/1999 714,123.50

005197 Completed NH-0002(187) 002 Sr 2, Monitor To Sunny Slope Morrill Asphalt Paving Co., Inc. PAUL J. MAHRE 06/13/1997 01/04/1999 1,559,610.30

005200 Completed IM-9999(232) 005 Sr 5 & Sr 90 Vic Bridges Seismic Retrofit Mowat Construction Company CATHY ARNOLD 06/17/1997 01/10/2000 1,799,660.00

005201 Completed NH-0520(024) 520 Sr 520, Evergreen Point Bridge Pontoon Bolted Join Mowat Construction Company RAY ARNOLD 06/13/1997 07/20/1999 2,740,260.00

005202 Completed ER-9602(194) 101 Sr 101, Mp 29 Vicinity Ostrander Rock & Construction GLENN SCHNEIDER 06/03/1997 03/20/1998 227,630.00

005203 Completed NH-0109(009) 109 Sr 109, Conner Creek To Moclips Lakeside Industries JOHN L. HART 06/19/1997 02/28/1998 2,026,657.45

005207 Completed IM-0051(241) 005 Sr 5, Ne 78th St To Dike Rd Granite Northwest Inc JIM MCCLELLAN 07/07/1997 04/29/1999 2,450,036.60

005208 Completed STATE 005 Sr 5, Pilchuck Creek To Dawson Road Resurfacing Csr Associated STEVE MILLER 06/18/1997 03/20/1998 111,212.50

005209 Completed STP-PM97(003) 515 Sr 515, Se 192nd St To Se 176th St Totem Electric Of Tacoma, Inc. INGO GOLLER 06/10/1997 02/18/1999 271,171.50

005210 Completed STATE 500 Sr 500, Ne 121st To Ward Road Granite Northwest Inc AMY E. REVIS 06/10/1997 05/11/1999 753,078.86

005211 Completed STPUL-9701(007) 104 Ferry Variable Message Signing Totem Electric Of Tacoma, Inc. CRAIG MCDANIEL 10/08/1997 10/25/1999 845,690.10

005212 Completed STATE 536 Sr 536/544/548, Skagit & Whatcom County Pavers Granite Construction Company KEN JOHNSON 06/24/1997 03/31/1998 235,330.00

005214 Completed STATE 285 Sr 285, Columbia River Bridges 285/10 & 285/15 Concrete Barrier, Inc. KIRK D. BERG 06/26/1997 05/11/2000 1,214,569.00

005215 Completed NH-STPH-0525(020) 525 Sr 525, Maxwelton Rd I/S Signalization Signalizati Moose City Service Electric MARLIN LENSSEN 06/24/1997 04/16/1998 210,879.65

005216 Completed AWPM-1995(010) 900 Sr 900, Vic Mp 20 To Newport Way Longline Thermopl Apply-A-Line, Inc. TOM BAKER 05/13/1997 08/06/1997 40,202.00

Dec 25, 2019 41 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005218 Completed STP-PM(003) 524 Sr 524, Sr 527 Vic. To Sr 522 & Jct. York Rd. Granite Construction Company AL DYER 07/28/1997 09/03/1999 1,198,077.00

005219 Completed STATE 018 Sr 18, Se 304th St. To Covington Way Roadside Reve Buckley Nursery Company, Inc. AMIR RASAIE 07/10/1997 05/02/2000 397,365.59

005220 Completed NH-0101(156) 101 Sr 101, Sund Creek Br. To Mp 337 Vic. Ace Paving Co., Inc. JOHN L. HART 07/11/1997 03/16/1999 1,504,280.34

005221 Completed STATE 020 Sr 20/153, Methow Valley Bridges Chipman Construction, Inc. STAN MOORE 07/22/1997 10/02/1998 270,328.89

005222 Completed WA-03-099 Bremerton Overhead Loading System Hurlen Construction Company TOM CASTOR 11/18/1997 03/29/2000 5,661,385.00

005223 Completed STATE 020 Sr 20 Spur Mp 54.1 Landslide Strider Construction Co., Inc. KEN JOHNSON 05/21/1997 01/28/1998 267,669.00

005224 Completed NH-0525(002) 525 Sr 525, Cameron Rd. To Sr 20 Stage 3b Klb Construction, Inc. MARLIN LENSSEN 07/01/1997 02/11/2000 255,044.10

005225 Completed STATE 520 Sr 520, Bellewood Farms Noise Wall Granite Construction Company RAY ARNOLD 07/21/1997 01/26/2000 1,178,000.80

005226 Completed NH-009(070) 097 Sr 97, King Creek Rd. To End Truck Climbing Lane Pipkin Inc., Dba Pipkin Constructio PAUL J. MAHRE 07/01/1997 02/24/1998 512,685.20

005227 Completed NH-0905(091) 090 Sr 90, Sprague Lake Rest Areas Levernier Construction, Inc. T. J. TREPANIER 07/15/1997 01/28/2000 1,125,000.00

005228 Completed STATE 002 Sr 2, Tumwater Canyon Slopes - 1997 Hi Tech Rockfall Construction, Inc. STAN MOORE 07/29/1997 04/15/1998 745,186.00

005229 Completed ER-9701(088) 009 Sr 9, Vic. Lake Mcmurray Slide Repair Slide Repair Pacific Road & Bridge Co. KEN JOHNSON 06/09/1997 12/11/1997 239,767.50

005230 Completed NH-0906(187) 090 Sr 90, Pines Rd. I/C Safety Modifications Colvico, Inc. CHARLES WILKE 07/15/1997 01/11/1999 370,891.00

005231 Completed STATE 548 Sr 548, Drayton Harbor Rd To Blaine Granite Construction Company MARCO FOSTER 07/31/1997 05/23/2000 308,643.36

005232 Completed STATE 305 Sr 305, Sr 3 To Bond Road Scarsella Bros., Inc. CRAIG MCDANIEL 07/25/1997 11/03/1999 2,338,907.40

005233 Completed STATE 020 Sr 20, Okanogan County Line To Republic To Republi Morrill Asphalt Paving Co., Inc. LARRY L. EIK 07/15/1997 03/19/1998 667,008.55

005235 Completed STATE Mukilteo New Agents Office & Terminal Bldg. Remode Synergy Construction, Inc. BRIAN HOLLING 08/08/1997 01/27/1999 667,119.31

005236 Completed ER-9701(055) 101 Sr 101, Vic. Hoh River Erosion Dulin Construction, Inc. JOHN L. HART 07/22/1997 11/14/1997 262,736.00

005237 Completed STP-PM97(003) 542 Sr 542, Sr 9 To Marshall Hill Rd Vic Coral Construction Company KEN JOHNSON 07/31/1997 05/20/1998 126,954.00

005238 Completed STP-PM97(003) 542 Sr 542, Britton Rd Vic To Kelly Rd Vic & Sr 9 Vic Granite Construction Company KEN JOHNSON 07/28/1997 05/09/2000 796,081.50

005239 Completed ER-9602(048) 018 Sr 18, Issaquah/Hobart I/C & Raging River Br. Road Terra Dynamics Inc AMIR RASAIE 08/18/1997 05/02/2000 1,122,967.17

005240 Completed STATE 240 Sr 240, Stevens Drive Intersection Granite Northwest Inc VIRGIL E. SCHMIDT 08/07/1997 07/17/1998 374,139.15

005241 Completed STATE 405 Sr 405, Coal Creek I/C Sb On Ramp Improvements Sb Tri-State Construction Inc RAY ARNOLD 07/30/1997 06/15/1998 103,063.45

005243 Completed STATE 005 Sr 5/14 Ramp Metering Signal Electric, Inc. JIM MCCLELLAN 08/04/1997 07/20/1998 84,360.51

005246 Completed IM-405-3(834) 405 Sr 405, Northup To Bothell High Woodlands Noise Wa Granite Construction Company RON ERICKSON 08/04/1997 01/13/1999 384,000.00

005248 Completed ER-9701(035/036) City Of Edgewood, Jovita Blvd. E. And 48th Street Lloyd Enterprises, Inc. MIKE MORISHIGE 08/14/1997 09/02/1998 116,194.60

005249 Completed STATE 544 Sr 544, W. Main St./Everson Rd To Sr 9 Lakeside Industries KEN JOHNSON 08/26/1997 05/25/1999 261,171.95

Dec 25, 2019 42 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005250 Completed STPU-0027(006) 270 Sr 270, Pullman-Moscow Bike/Ped Path Motley-Motley, Inc. GORDON OLSON 09/08/1997 09/21/1998 1,140,656.50

005251 Completed PSTPFTA96HDP9283( 005 Sr 5, Lynnwood Park & Ride Lot #2 Klb Construction, Inc. S MILLER / M LENSSEN 09/18/1997 03/16/2001 3,754,710.50

005252 Completed STATE 101 Sr 101, Chinook Vic. Drainage - Stage 2 Nutter Corporation Dba Nutter GLENN SCHNEIDER 08/29/1997 03/31/1999 1,439,094.15

005253 Completed ER-9602(109) 004 Sr 4, Stella Vicinity Slide Ostrander Rock & Construction AMY E. REVIS 09/29/1997 02/17/1999 549,270.00

005254 Completed STATE 101 Sr 101, O'Brien To Lewis Road Granite Construction Company JERRY MOORE 11/25/1997 08/31/2000 5,906,040.50

005255 Completed STPF-0141(001) 141 Sr 141, Bingen To Loop Road Granite Northwest Inc JIM MCCLELLAN 08/28/1997 05/08/2000 703,128.10

005256 Completed STATE 002 Sr 2, Mp 37.5 - Sink Hole Sink Hole Midmountain Contractors, Inc. STEVE MILLER 08/19/1997 01/05/1999 363,543.00

005257 Completed STATE Edmonds Ferry Terminal Overhead Loading And Termin General Construction Company BRIAN HOLLING 10/21/1997 04/04/2003 9,581,904.20

005258 Completed ER-9701(104) 303 Sr 303, Barker Creek Culvert Replacement Engberg Construction, Inc. CRAIG MCDANIEL 08/27/1997 02/11/1999 314,371.70

005259 Completed BRM-9905(003) 101 Sr 101, Black Diamond Road Bridge 101/340 Bridge 1 F.E. Ward, Inc. JERRY MOORE 09/10/1997 01/10/2000 924,628.40

005260 Completed ER-9702(016) 012 Sr 12, Bridge 12/31 S Bridge Scour Countermeasure Northwest Rock, Inc. JOHN L. HART 08/22/1997 11/21/1997 492,533.50

005261 Completed BROS-0660(001) City Of Lake Stevens, 16th & 20th Street Ne Bridge Pacific Road & Bridge Co. RON ERICKSON 08/22/1997 06/10/1999 784,637.67

005262 Completed ER-9701(020) 525 Sr 525, Vic. 76th Street Sw Slide Repair Klb Construction, Inc. CATHY ARNOLD 08/11/1997 04/01/1999 1,154,956.00

005263 Completed STPE-0536(004) 536 Sr 536, Mount Vernon Wcl Vic. To Skagit River Brid Lakeside Industries KEN JOHNSON 08/28/1997 04/29/1999 414,642.35

005264 Completed ER-9701(030) 900 Sr 900, Junction 68th Ave S/Monster Road Slide Rep Tri-State Construction Inc RAY ARNOLD 08/11/1997 08/26/1999 552,129.20

005265 Completed ER-9702(015) 025 Sr 25, Slide Vic. Mp 63.00 West Company, Inc. GORDON OLSON 07/17/1997 02/12/1998 335,863.00

005266 Completed STP-PM97(003) 113 Sr 113, Sr 101 To Sr 112 Lakeside Industries JERRY MOORE 09/11/1997 07/15/1999 2,353,405.08

005267 Completed STATE 099 Sr 99, Spring Valley Weigh Station Signal Electric, Inc. JOE SCANLON 09/03/1997 02/17/1999 163,755.20

005268 Completed STATE 005 Sr 5, Chamber Way Bridge No. 5/227 Girder Repair Diamaco Inc. RON POLLOCK 09/12/1997 03/26/1998 197,795.00

005270 Completed STATE 005 N.W. 319th St. To East Fork Lewis River Br. Northern Con-Agg Inc JIM MCCLELLAN 12/31/1997 03/25/1999 284,555.50

005272 Completed NH-0906(188) 090 Sr 90, Sprague Ave. To Pines Road Acme Materials & Construction Co KEN OLSON 09/24/1997 01/08/1999 922,377.90

005273 Completed ER-9602(241)&(245 082 Sr 82, Mp 27 And Mp 46 Vicinity Pipkin Inc., Dba Pipkin Constructio R.F. GIFFORD 09/11/1997 01/08/1998 72,572.00

005274 Completed ER-9701(127) City Of Normandy Park, 1st Ave. S. Vic. Pct Construction, Inc. CATHY ARNOLD 09/02/1997 11/17/1998 1,075,072.51

005276 Completed ER9601(060) 002 Sr 2, Anderson Creek Vicinity One Way Construction, Inc. STEVE MILLER 08/20/1997 03/04/1999 171,069.00

005279 Completed STP96-03(001) 105 Sr 105, North Cove Vic. - Stage 1 Emergency Stabil Dulin Construction, Inc. RON POLLOCK 10/01/1997 02/19/1998 563,321.00

005280 Completed STPFG-0531(002) 531 Sr 531, Jct. 67th Ave Ne Signalization Marshbank Construction, Inc. STEVE MILLER 11/05/1997 08/02/2000 1,247,313.15

005281 Completed NH-0002(174) 002 Sr 2, Eby Slough Bridge No. 2/6s, Pier Webbing Pie Hurlen Construction Company STEVE MILLER 10/16/1997 01/05/1999 174,800.00

Dec 25, 2019 43 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005282 Completed ER-9602(249) 005 Sr 5, Stillaquamish River Bridges 5/670 E&W Tempor Marshbank Construction, Inc. STEVE MILLER 09/05/1997 02/06/1998 98,729.00

005284 Completed ITS-9653(002) 005 Sr 5, Tacoma Area Model Deployment Initiative Totem Electric Of Tacoma, Inc. RON LANDON 10/27/1997 06/09/1999 199,649.00

005286 Completed STATE 005 Sr 5, Mp 41.35 Slide-Culvert Repair Diamaco Inc. AMY E. REVIS 10/07/1997 12/01/1999 67,696.20

005287 Completed ER-9702(025) 530 Sr 530, Skaglund Hill Vicinity One Way Construction, Inc. JOE SCANLON 09/23/1997 09/08/1998 87,627.46

005288 Completed STATE 020 Sr 20, Bonaparte Creek Bridge 20/651 Slope Stabili Harrison Western Construction Corp. PAUL J. MAHRE 10/10/1997 02/26/1998 137,350.00

005289 Completed STATE Lakeview Bridge Storage Building Kaufman Brothers Construction, Inc. CHRIS KEEGAN 11/19/1997 06/05/1998 77,962.00

005290 Completed NH-0017(029) 017 Sr 17, Sr 26 To Lind Coulee Bridge Inland Asphalt Company KIRK D. BERG 12/03/1997 10/16/1998 2,528,873.45

005291 Completed STATE 005 Sr 5 And Sr 520 Shoulder Sweeping Best Parking Lot Cleaning Trust PHIL GEORGE 11/24/1997 04/02/2003 235,606.26

005292 Completed STATE 169 Sr 169, Culvert Collapse Tunnel Systems, Inc. CATHY ARNOLD 09/26/1997 04/16/1998 119,461.00

005293 Completed STATE 161 Sr 161, Overflow Pipe Installation Tri-State Construction Inc JOE SCANLON 10/21/1997 09/04/1998 48,000.00

005295 Completed NH-0099(047) 099 Sr 99, Thomas Street To N 152nd Street Csr Associated KIM HENRY 12/17/1997 11/16/2000 4,499,205.50

005296 Completed BROS-2005(016,020 Clallam County, Sol Duc River Bridge And Weel Brid Root Paint & Glass Co. Inc. JERRY MOORE 11/14/1997 07/02/1999 116,718.00

005297 Completed STATE 018 Sr 18, Auburn-Black Diamond Road To 312th Revegeta Paul Brothers, Inc. AMIR RASAIE 01/07/1998 08/23/2000 447,171.25

005298 Completed STPU-STPF-0027(00 027 Sr 27, 32nd Avenue To Sr 90 Acme Materials & Construction Co LARRY L. EIK 12/17/1997 05/18/1999 1,136,168.48

005299 Completed 016 Sr 16, Tacoma Narrows Bridge Elevators Elevators Marles Corporation Dba Amaya RON LANDON 02/06/1998 05/09/2000 798,157.00

005300 Completed STATE 163 Sr 163, Sr 16 To Point Defiance Landing Tucci & Sons, Inc. RON LANDON 01/13/1998 06/17/1999 1,791,851.80

005301 Completed NH-0099(049) 099 Sr 99, E. Marginal Way To Spokane St Oc 99/538 Lakeside Industries TOM MADDEN 12/30/1997 04/04/2000 763,809.44

005302 Completed STP-PM97(003) 202 Sr 202, Ne Ames Lake Road Vicinity Tri-State Construction Inc RON ERICKSON 12/30/1997 04/03/2001 1,098,000.00

005303 Completed STATE 262 Sr 262, Bridge 262/7 Replacement Selland Construction, Inc. KIRK D. BERG 01/15/1998 07/06/1998 146,742.10

005304 Completed ER-9701(068) 096 Sr 96, Seattle Hill Road/Lowell-Larimer Road Culve Klb Construction, Inc. KIM HENRY 11/17/1997 12/22/1998 94,564.00

005305 Completed BR-STPF-0009(024) 009 Sr 9, Stillaguamish River-Haller Br 9/132 Granite Construction Company MARLIN LENSSEN 03/05/1998 04/01/2002 8,092,260.00

005306 Completed IM-090-2(184) 090 Sr 90, Hyak Vic. To Ellensburg - Phase 2 Icon Materials, Inc. PAUL GONSETH 01/07/1998 04/19/2000 8,716,088.60

005307 Completed NH-0012(100) 090 Sr 730/12, Oregon S/L To Sr 12 And Vancycle Creek Granite Northwest Inc VIRGIL E. SCHMIDT 12/31/1997 06/29/1999 1,489,658.01

005308 Completed IM-0052(180) 005 Sr 5, Capitol Lake I/C To Nisqually River Br Lakeside Industries NEAL J. CAMPBELL 01/12/1998 04/13/2001 4,167,215.85

005309 Completed NH-0012(098) 012 Sr 12, Jct. Albany St. Vic. Granite Construction Company NEAL J. CAMPBELL 01/20/1998 09/29/1999 365,575.85

005310 Completed STATE Seattle Passenger Ferry Modification General Construction Company BRIAN HOLLING 01/05/1998 11/19/1998 537,800.00

005312 Completed STPF-0195(030) 195 Sr 195, City Of Colfax Main Street Enhancement Quad-Cities Construction, Inc. KEN OLSON 02/03/1998 05/01/2000 2,941,607.91

Dec 25, 2019 44 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005313 Completed NH-0020(088) 020 Sr 20, Jct. Pulver Rd. Vicinity Strider Construction Co., Inc. KEN JOHNSON 01/20/1998 04/19/1999 488,089.10

005315 Completed STP-PM97(003) 009 Sr 9, Bassett Rd To Park Rd Csr Associated KEN JOHNSON 02/23/1998 10/04/1999 1,574,159.30

005319 Completed STP-PM97(003) 410 Sr 410/169, Pierce Co. Line To Se 416th St. Watson Asphalt Paving Company, JOE SCANLON 02/12/1998 11/29/1999 1,277,058.75

005320 Completed 0L2837 028 Sr 28/281, Douglas County Line To Winchester To Wi Central Washington Asphalt, Inc. PAUL J. MAHRE 01/30/1998 03/09/1999 1,847,391.72

005321 Completed STATE Seattle-Trestle Towers & Wingwall Repair General Construction Company BRIAN HOLLING 02/06/1998 04/29/1999 943,147.08

005322 Completed STPF-9999(257) 090 Sr 90, Regional Trans. Communication Management Sy Colvico, Inc. HAROLD WHITE 02/26/1998 01/29/2001 558,158.00

005323 Completed STPF-9999(285) 026 Sr 26 Et Al, 1998 Region Wide Guardrail Update Petersen Brothers, Inc. KIRK D. BERG 01/30/1998 09/08/1998 611,193.19

005326 Completed STATE Wsf, Edmonds Dolphin Replacement Hurlen Construction Company BRIAN HOLLING 02/11/1998 09/10/1999 1,944,080.00

005327 Completed STATE 002 Sr 2 Et Al, Ncr Seal - 1998 Granite Northwest Inc STAN MOORE 02/12/1998 02/23/1999 2,124,816.50

005328 Completed STATE 005 Sr 5, Bridge 5/411 Ncd Girder Replacement Mowat Construction Company RON LANDON 02/20/1998 05/13/1999 161,627.00

005329 Completed STP-PM97(003) 241 Sr 241, Summit Vic. Yakima County Motley-Motley, Inc. J.D. DWYER 03/03/1998 03/02/1999 473,912.91

005330 Completed STP-PM97(003) 523 Sr 523,Sr 99 To Sr 522 Stage 1 Csr Associated KIM HENRY 02/19/1998 11/30/1999 731,604.00

005331 Completed STATE 110 Sr 110/12/101/116, Region Wide Bridge Painter 12/5 Long Painting Company JOHN L. HART 03/16/1998 03/29/1999 893,641.53

005332 Completed STATE Bainbridge Island Elevator Deck Repairs Abacus Construction, Llc BRIAN HOLLING 03/27/1998 12/29/1998 78,554.00

005333 Completed NH-0002(216) 002 Sr 2, Mp 33 To S. Fork Skykomish River Bridge 2/40 Granite Construction Company AL DYER 03/05/1998 05/14/1999 621,624.50

005334 Completed NH-005-3(839) 005 Sr 5, Vic. Northgate Way To Vic. Ne 145th St. Totem Electric Of Tacoma, Inc. JOE SCANLON 03/12/1998 05/22/2000 1,614,641.61

005335 Completed STATE 529 Bridges 529/8w, 10e & W Deck Rehab, Seismic, And P Concrete Barrier, Inc. MARLIN LENSSEN 03/19/1998 01/02/2001 4,834,603.00

005336 Completed STATE 205 Sr 205/5, Vancouver Vic. I/C Ramp Paver Granite Northwest Inc JIM MCCLELLAN 03/05/1998 09/27/1999 589,882.60

005337 Completed STATE Bremerton Passenger Only Modifications Tec Construction, Inc. BRIAN HOLLING 02/27/1998 02/03/1999 129,100.00

005338 Completed STATE 395 Sr 395, Franklin County Line To Sr 21 Poe Asphalt Paving, Inc. HAROLD WHITE 03/23/1998 03/17/1999 2,226,788.24

005339 Completed STP-PM97(003) 009 Sr 9, 60th St Ne To 132nd St Ne Csr Associated RON ERICKSON 03/09/1998 03/23/1999 745,983.50

005340 Completed NH-0014(031) 014 Sr 14/97, Lyle Vic. To Centerville Rd. Granite Northwest Inc AMY E. REVIS 03/27/1998 06/24/1999 3,354,393.74

005341 Completed STATE Bainbridge Island Terminal Eagle Harbor Maintenanc Manson Construction Co. BRIAN HOLLING 04/01/1998 01/26/1999 2,694,215.00

005343 Completed STATE 547 Sr 547, Rock Rd. To Cherry St. Granite Construction Company KEN JOHNSON 04/03/1998 01/31/2000 274,069.00

005344 Completed STATE 101 Sr 101, Mp 78.9 Vicinity Slide Rognlin'S, Inc. JOHN L. HART 03/13/1998 12/02/1998 708,109.00

005345 Completed STATE 101 Sr 101, Sequim Bypass Scarsella Bros., Inc. JERRY MOORE 04/15/1998 08/06/2001 17,371,276.89

005346 Completed BR-0110(002) 110 Sr 110, Mora Rd Bridge 110/25sp Quigg Bros., Inc. JOHN L. HART 03/13/1998 09/20/1999 2,483,497.58

Dec 25, 2019 45 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005347 Completed STATE 104 Sr 104, Hood Canal Bridge And Hydraulic System Reh Hurlen Construction Company CRAIG MCDANIEL 03/24/1998 01/08/2001 1,264,928.00

005349 Completed STATE 005 Sr 5, George Hopper Road Park & Ride Lot Strider Construction Co., Inc. STEVE MILLER 05/04/1998 06/22/2000 239,409.00

005350 Completed NH-0002(217) 002 Sr 2, Skinney Creek To Peshastin Creek Bridge Morrill Asphalt Paving Co., Inc. STAN MOORE 03/27/1998 05/26/1999 1,670,859.85

005351 Completed IM-0051(244) 005 Sr 5, Todd Road Vic To Hq Road Lakeside Industries AMY E. REVIS 04/03/1998 10/26/2000 3,918,398.10

005353 Completed STATE Fauntleroy/Vashon/Southworth Ferry Terminals A. H. Powers, Inc. TOM CASTOR 12/14/1998 10/12/1999 432,505.75

005354 Completed NH-005-5(205) 005 Sr 5, Jct. Sr 536 Nb & Sb Ramps Vic. Signal Electric, Inc. MARLIN LENSSEN 04/01/1998 01/08/2001 368,192.98

005355 Completed STP-PM97(003) 155 Sr 155/215, Omak Vicinity Morrill Asphalt Paving Co., Inc. PAUL J. MAHRE 04/03/1998 03/03/1999 1,323,797.90

005356 Completed IM-005-3(849) 005 Sr 5, Corson To Ravenna Sb - Stage 1 Walter & Sci Construction Ltd DIANE BERGE 04/22/1998 08/20/1999 3,204,066.25

005358 Completed NHG-002(214) 206 Sr 206, Sr 2 To Bruce Road Phase 2 Acme Materials & Construction Co BOB HILMES 04/21/1998 08/10/2000 3,014,667.62

005360 Completed STATE 022 Sr 22/221, Prosser Hill Granite Northwest Inc J.D. DWYER 04/15/1998 12/21/1998 858,941.75

005362 Completed STP-PM98(003) 527 Sr 527, 112th St. Se Vic. To Sr 5 Vic. Granite Construction Company JOE SCANLON 04/10/1998 07/13/1999 386,735.20

005363 Completed STP96-03(002) 105 Sr 105, North Cove Vicinity - Stage 2 Kiewit Infrastructure West Co. RONALD J. POLLOCK 04/22/1998 11/16/1999 8,302,870.00

005364 Completed NH-0014(030) 014 Sr 14, Vancouver City Limits To Ne 164th Ave. Granite Northwest Inc JIM MCCLELLAN 04/15/1998 09/27/1999 3,045,513.90

005366 Completed NH-0195(003) 195 Sr 195, Bridge 195/27 To Mp 44.40 Quad-Cities Construction, Inc. KEN OLSON 06/05/1998 05/08/1999 1,091,442.91

005367 Completed NH-0002(212) 002 Sr 2, Reardan To Espanola Rd. Inland Asphalt Company LARRY L. EIK 04/24/1998 01/28/1999 970,255.00

005369 Completed STP-PM98(003) 900 Sr 900, Sr 167 Wye To Sr 405 U'Xing Lakeside Industries JOE SCANLON 04/15/1998 11/05/1999 829,528.00

005370 Completed STATE 004 Sr 4 Et Al, Swr Bridge Painter 1998 A & A Coatings, Inc. GLENN SCHNEIDER 05/08/1998 07/26/1999 822,989.20

005371 Completed STATE 002 Sr 2, Icicle Spillway Slide Repair Goodfellow Bros Inc STAN MOORE 04/16/1998 08/27/1998 184,316.00

005372 Completed IM-005-3(852) 005 Sr 5, Tukwila To Lucile St Pvmt Rehab Penhall Company CATHY ARNOLD 06/10/1998 05/10/2000 5,075,718.32

005373 Completed IM-082-2(111) 082 Sr 82/97, Valley Mall Blvd. To Yakima River Bridge Granite Northwest Inc J.D. DWYER 05/08/1998 04/16/1999 1,596,871.55

005375 Completed ER-96-02(253) 004 Sr 4 Mp 25 Slide Repair Harold Sorensen Trucking Inc GLENN SCHNEIDER 05/08/1998 02/11/1999 424,147.10

005377 Completed NH-0097(076) 097 Sr 97, Orondo To Daroga State Park Basin Paving Co. KIRK D. BERG 05/08/1998 07/27/1999 705,450.25

005378 Completed NHG-9999(289) 012 Sr 12 Et Al, 1998 Companion Safety Restoration Frank Gurney, Inc. J.D. DWYER 05/04/1998 10/06/1998 537,689.48

005379 Completed BH-NH-0520(025) 520 Sr 520, Evergreen Pt Br 520/8 Rehab Mowat Construction Company DAVE BECHER 05/20/1998 11/14/2001 8,046,694.00

005380 Completed NH-0003(034) 003 Sr 3, Shelton Ecl To Agate Rd. Ace Paving Co., Inc. STEVE ROARK 04/24/1998 11/23/1998 706,959.30

005381 Completed STATE 512 Sr 512, Railroad Crossing To Canyon Rd. Woodworth & Company, Inc. MIKE MORISHIGE 05/04/1998 05/06/1999 966,870.85

005384 Completed STP-PM98(003) 285 Sr 285, Maple St. To Bridge 285/20 Morrill Asphalt Paving Co., Inc. KIRK D. BERG 05/18/1998 12/10/1998 521,420.20

Dec 25, 2019 46 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005385 Completed ACBH-9801(001) 165 Sr 165, Carbon River Bridge Fire Repairs Hurlen Construction Company MIKE MORISHIGE 04/02/1998 11/12/1998 338,800.00

005386 Completed NH-0014(027) 014 Sr 14, Cape Horn To Nelson Creek Road Granite Northwest Inc GLENN SCHNEIDER 05/27/1998 10/05/1999 3,866,549.90

005387 Completed STPE-9999(269) 005 Sr 5, Ship Canal Stormwater Bmp Facility Tri-State Construction Inc JOE SCANLON 05/13/1998 06/02/1999 298,000.00

005388 Completed NH-0020(075) 020 Sr 20, Vic Campbell Lake Road Strider Construction Co., Inc. MARLIN LENSSEN 05/18/1998 05/29/2003 1,220,158.20

005389 Completed NH-0525(020) 525 Sr 525, Maxwelton Rd Vic To Honeymoon Bay Rd Lakeside Industries MARLIN LENSSEN 05/18/1998 04/03/2000 1,479,554.65

005390 Completed NH-0101(157) 101 Sr 101, Mp 174 Vicinity Scarsella Bros., Inc. JOHN L. HART 05/27/1998 01/20/2000 2,543,843.76

005391 Completed STATE 101 Sr 101, Dosewallips Relief Structures Concrete Barrier, Inc. STEVE ROARK 05/14/1998 02/01/1999 203,534.60

005392 Completed STATE 173 Sr 173, Brewster Bridge 173/10 Painting Long Painting Company STAN MOORE 05/22/1998 11/09/1998 154,554.00

005393 Completed STP-PM98(003) 002 Sr 2 Et Al, Eastern Region 1998 Chip Seal South Morrill Asphalt Paving Co., Inc. LARRY L. EIK 05/11/1998 04/12/1999 1,597,667.65

005394 Completed STP-PM98(003) 504 Sr 504, Kid Valley Vic. To Maple Flats Vic. West Company, Inc. AMY E. REVIS 05/27/1998 10/21/1999 2,440,094.15

005395 Completed NH-0432(009) 432 Sr 432, Junction Sr 4 To Rr Crossing Lakeside Industries GLENN SCHNEIDER 06/10/1998 07/21/1999 1,307,598.20

005396 Completed STP-PM98(003) 024 Sr 24, Moxie To Experiment Station Vic. Granite Northwest Inc J.D. DWYER 06/05/1998 03/04/1999 1,554,697.25

005397 Completed IM-BH-9999(272) 005 Sr 5/509, Bridges Seismic Retrofit 5/525n-N, 509/1 Guy F. Atkinson Construction Corp. INGO GOLLER 06/01/1998 09/23/1999 358,818.00

005398 Completed STATE 397 Sr 397, Oregon Street To Sr 12 Acme Materials & Construction Co VIRGIL E. SCHMIDT 05/18/1998 07/07/1999 547,680.94

005400 Completed NH-002(015) 002 Sr 2, Sr 90 To Trent Avenue Acme Materials & Construction Co DARREL MCCALLUM 06/22/1998 10/27/1999 1,107,838.40

005401 Completed NH-0101(158) 101 Sr 101, Sr 107 Intersection Realignment Lakeside Industries JOHN L. HART 05/20/1998 03/23/1999 498,822.00

005402 Completed STP-PM98(003) 020 Sr 2/21/25, Er 1998 Chip Seal - North Poe Asphalt Paving, Inc. KEN OLSON 05/27/1998 02/24/2000 1,753,919.37

005403 Completed STATE 101 Sr 101, Chehalis & Riverside Bridges Mowat Construction Company JOHN L. HART 05/27/1998 01/07/1999 258,467.00

005404 Completed STATE 002 Sr 2, Profitt'S Point Along Tye River Klb Construction, Inc. CATHY ARNOLD 06/17/1998 02/10/2000 169,328.00

005405 Completed STATE 307 Sr 307, Sr 305 To Sr 104 Ace Paving Co., Inc. CRAIG MCDANIEL 05/22/1998 10/25/1999 1,449,114.40

005407 Completed STATE 082 Sr 82, Bridge 82/20s Deck Rehab. N.A. Degerstrom, Inc. J.D. DWYER 05/08/1998 09/09/1998 240,065.90

005408 Completed STATE 240 Sr 240, Sr 182 To Sr 395 Granite Northwest Inc VIRGIL E. SCHMIDT 05/29/1998 06/14/1999 2,596,651.15

005410 Completed BR-0542(012) 542 Sr 542, Nugents Vic. Bridge Replacement Max J. Kuney Company MARCO FOSTER 06/10/1998 05/17/2001 8,983,629.43

005411 Completed STATE 008 Sr 8, Summit Lake Rd To Sr 101 O/C Granite Construction Company NEAL J. CAMPBELL 06/10/1998 09/29/1999 966,162.15

005412 Completed ACH-0028(023) 028 Sr 28, Sunset Highway Channelization Selland Construction, Inc. PAUL MAHRE 06/04/1998 06/09/1999 1,555,977.80

005413 Completed STATE 020 Sr 20 Spur, Culvert Replacement Strider Construction Co., Inc. KEN JOHNSON 06/10/1998 06/15/1999 88,239.00

005414 Completed STATE 004 Sr 4, Old Mill Creek Bridge Removal Iconco Inc GLENN SCHNEIDER 06/15/1998 03/05/1999 241,400.00

Dec 25, 2019 47 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005415 Completed STATE 291 Sr 291, Vic. Mp 9.00 To Stevens County Line Inland Asphalt Company KEN OLSON 06/17/1998 01/04/1999 506,517.00

005416 Completed STATE 012 Sr 12, Walla Walla To Dixie And Dayton To Turner R Quad-Cities Construction, Inc. VIRGIL SCHMIDT 06/15/1998 12/21/1999 1,487,964.48

005417 Completed STATE 167 Sr 167, 84th Ave S To S Grady Way Stage 1a Scarsella Bros., Inc. INGO GOLLER 06/18/1998 02/25/2003 3,447,035.55

005418 Completed STATE Clinton Wingwall, Tower & Dolphin Repair Hurlen Construction Company BRIAN HOLLING 12/02/1998 08/20/1999 216,688.00

005419 Completed STATE 031 Sr 31, Clean And Paint Bridges 31/36 And 31/42 Root Paint & Glass Co. Inc. KEN OLSON 06/15/1998 12/08/1998 427,780.00

005420 Completed STATE 169 Sr 169, Enumclaw & Black Diamond Vic. Pedestrian E Dennis R. Craig Construction, Inc. JULIA MIZUHATA 06/17/1998 06/22/1999 177,990.88

005421 Completed ER-9603(002) 105 Sr 105, N. Cove Vic. Emerg. Stabilization - Stage Quigg Bros., Inc. RON POLLOCK 05/18/1998 02/04/1999 8,257,500.00

005422 Completed STP-PM98(003) 231 Sr 231, Mp 22.1 To Sr 2 Poe Asphalt Paving, Inc. DARREL MCCALLUM 07/07/1998 06/17/1999 716,873.80

005423 Completed ACNH-0109(008) 109 Sr 109, Mp 5 To Grass Creek Rognlin'S, Inc. JOHN L. HART 06/11/1998 12/02/1998 811,450.86

005424 Completed DEMO-1995(001) 395 Sr 395, North Corridor Channelization Stage 3 Hap Taylor And Sons, Inc. Dba DARREL MCCALLUM 06/22/1998 11/23/1999 848,825.00

005425 Completed STATE 090 Sr 90, Franklin Falls & Cabin Creek Vic. Unstable Roy E. Ladd, Inc. PAUL GONSETH 07/01/1998 04/12/2000 1,211,813.50

005426 Completed STATE 395 Sr 395, Mp 32.53 To Mp 33.27 N. Pasco Weigh Site - Acme Materials & Construction Co VIRGIL E. SCHMIDT 07/01/1998 05/18/1999 372,729.60

005428 Completed STATE 005 Sr 5, Stillaguamish River Bridges & Pilchuck Creek Pacific Road & Bridge Co. BOB LINDEN 06/29/1998 11/01/1999 96,588.60

005429 Completed STP-PM98(003) 020 Sr 20 Mp 312 To Vic. Graves Mtn. Rd. Central Washington Asphalt, Inc. GORDON OLSON 07/07/1998 12/16/1999 2,470,134.00

005430 Completed STATE 097 Sr 97, Ruby Creek Slopes - 1998 Goodfellow Bros Inc STAN MOORE 06/26/1998 01/26/1999 284,030.50

005431 Completed STATE 129 Sr 129, Critchfield Rd. & 13th St. I/S Poe Asphalt Paving, Inc. VIRGIL E. SCHMIDT 06/26/1998 03/22/1999 333,962.35

005432 Completed STATE 548 Sr 546, 4th Street Vic. To Sr 5 Granite Construction Company MARLIN LENSSEN 07/20/1998 01/02/2001 251,492.00

005433 Completed 97A063 104 Sr 104, 35th Ave Ne Signalization Totem Electric Of Tacoma, Inc. DAVE LINDBERG 07/07/1998 01/24/2000 253,313.47

005434 Completed NH-0002(200) 002 Sr 2, W. Portal Tunnel 2/108 To Profitts Point Lakeside Industries GIL MCNABB 07/07/1998 10/24/2000 2,379,238.50

005435 Completed STATE 900 Sr 900, Newport Way Dennis R. Craig Construction, Inc. RON ERICKSON 07/06/1998 01/12/2000 77,546.00

005437 Completed STP-PM98(003) 821 Sr 821, Sr 823 Harrison Rd. To Sr 82 I/C Coral Construction Company J.D. DWYER 07/30/1998 06/08/1999 966,688.00

005438 Completed NH-0906(190) 090 Sr 90, Sprague Ave I/C Phase 2 Frontier Kemper Constructors, Inc. DARREL MCCALLUM 08/06/1998 12/17/2001 13,988,784.65

005439 Completed STP-PM98(003) 026 Sr 26/395, 97-98 Chip Seal Safety Restoration Frank Gurney, Inc. LARRY L. EIK 07/14/1998 02/02/1999 545,461.53

005440 Completed STATE Lopez Island Ferry Terminal Bridge Seat Replacemen Hurlen Construction Company BRIAN HOLLING 07/07/1998 02/10/1999 378,800.00

005441 Completed STATE 011 Sr 11, Mp 12 Vic To Rest Area Vic. Rock Wall Repla Pacific Road & Bridge Co. KEN JOHNSON 08/14/1998 04/05/1999 344,396.20

005442 Completed STATE 009 Sr 9, Sr 542 To South Pass Rd. Granite Construction Company KEN JOHNSON 07/22/1998 05/25/1999 1,111,849.00

005443 Completed STP-PM98)003) 023 Sr 23, Lincoln County Line To I-90 Shamrock Paving, Inc. DARREL MCCALLUM 07/27/1998 12/03/1998 599,727.00

Dec 25, 2019 48 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005445 Completed STATE 395 Sr 395, 7th, 10th, 19th & 27th Ave I/S Acme Materials & Construction Co VIRGIL E. SCHMIDT 08/10/1998 07/21/1999 1,826,233.75

005446 Completed NH-005-4(234) 005 Sr 5, Stanwood/Bryant Vic Nb Weigh Station Scarsella Bros., Inc. RON ERICKSON 08/14/1998 02/20/2002 3,118,774.08

005447 Completed ER-9602(113) 012 Sr 12, Slide Repair Mp 156.4 Vicinity Jensen Drilling Company RON POLLOCK 07/30/1998 04/14/1999 134,224.35

005448 Completed DEMO-1995(005) City Of Bainbridge Island, Wardwell Rd. Realignmen Ace Paving Co., Inc. CRAIG MCDANIEL 07/30/1998 07/19/1999 134,337.00

005450 Completed STATE 167 Sr 167, 84th Ave S. To S. Grady Way - Culvert Scarsella Bros., Inc. INGO GOLLER 08/14/1998 09/26/2000 572,274.40

005451 Completed STATE 547 Sr 547, Vic. Paradise Lakes Granite Construction Company KEN JOHNSON 07/27/1998 03/23/2000 58,789.00

005452 Completed STPR-J183(001) City Of Bainbridge Island, Ferncliff Ave Reconstru Scoccolo Construction, Inc. CRAIG MCDANIEL 08/05/1998 05/14/2001 1,506,558.05

005455 Completed STATE 090 West Lake Sammamish Pkwy Vic Roundabout And Ramp M Totem Electric Of Tacoma, Inc. DAVE LINDBERG 08/14/1998 08/18/1999 153,306.50

005456 Completed STATE 104 Sr 104, Hood Canal Bridge 104/5 Expansion Joint Re Mowat Construction Company CRAIG MCDANIEL 08/05/1998 04/15/1999 119,704.00

005457 Completed STATE 096 Sr 96, Vic. Seattle Hill Road To Sr 9 Lakeside Industries GIL MCNABB 07/29/1998 11/20/1998 50,765.50

005458 Completed ER-9702(017) 504 Sr 504, Mp 25.8 Landslide Cems Inc AMY E. REVIS 08/06/1998 08/17/1999 592,239.00

005459 Completed STATE 020 Sr 20/21, Ferry County Emergency Repair Central Washington Asphalt, Inc. GORDON OLSON 07/01/1998 12/09/1999 1,153,245.50

005460 Completed STATE Seattle Slip 2 Emergency Repairs Jesse Engineering Co BRIAN HOLLING 06/29/1998 02/03/1999 362,148.00

005461 Completed STATE Clinton F/T Dock Expansion Phase I Mkb Constructors TOM CASTOR 11/17/1998 07/30/2002 12,011,307.15

005462 Completed STATE 410 Sr 410, Greenwater River Bridge 410/25 Scour Repai Dulin Construction, Inc. JOE SCANLON 07/31/1998 11/12/1998 78,777.00

005463 Completed STATE 002 Sr 2, Deer Park/Milan Rd. Signalization Aztech Electric Inc DARREL MCCALLUM 08/17/1998 09/03/1999 157,886.65

005466 Completed NH-0012(101) 012 Sr 12, East Aberdeen Slope Revision Rognlin'S, Inc. JOHN L. HART 08/03/1998 02/04/1999 806,435.00

005468 Completed NH-ER-999(291) 005 Sr 5/12, Salzer Creek To Thurston C/L & Peters Sli Max West Inc RON POLLOCK 08/05/1998 06/16/1999 131,632.20

005469 Completed STATE Seattle Slip 2 Damaged Structure Removal Manson Construction Co. BRIAN HOLLING 06/29/1998 01/22/1999 467,000.00

005470 Completed STATE 014 Sr 14, Jewett Creek Culvert Replacement James Dean Construction, Inc. JIM MCCLELLAN 08/06/1998 11/02/1999 517,458.94

005471 Completed ER-9602(246) 005 Sr 5, Mp 53.9 Vic. Washout & Mp 55.9 Vic. Slide Elting Incorporated RON POLLOCK 08/12/1998 06/01/1999 375,142.00

005475 Completed STATE 536 Sr 536, Bennett Rd. I/S Realignment Marshbank Construction, Inc. G MCNABB / M LENSSEN 08/21/1998 04/24/2000 110,798.75

005477 Completed STATE 005 Sr 5, Gee Creek R/A Sewage Disposal System Webfoot Construction, Inc. JIM MCCLELLAN 09/03/1998 03/13/2002 204,528.00

005478 Completed 017 Sr 202, Ribary Creek Overflow Culvert Tri-State Construction Inc DAVE LINDBERG 08/25/1998 03/23/1999 85,591.50

005479 Completed Seattle Ferry Terminal Slip 2 Repair General Construction Company BRIAN HOLLING 08/04/1998 04/27/1999 1,104,972.00

005482 Completed STATE 005 Sr 5, Pierce Co Line To Tukwila I/C Stage 1a Roads Engberg Construction, Inc. INGO GOLLER 09/11/1998 05/16/2002 258,751.00

005483 Completed STATE 536 Sr 536, Sr 20 To Avon-Allen Road Rinker Materials West, Llc Dba KEN JOHNSON 09/16/1998 02/12/1999 91,219.00

Dec 25, 2019 49 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005484 Completed ER-9701(028) 012 Sr 12, Lewis & Clark Trail State Park T L J Construction, Inc. VIRGIL E. SCHMIDT 09/11/1998 03/10/1999 98,959.00

005485 Completed STATE 405 Sr 405, Coal Creek Pkwy. To Sr 522 Hov Lanes Restr Mowat Construction Company DAVE LINDBERG 09/08/1998 09/29/1999 640,233.70

005486 Completed STATE 101 Sr 101, Naselle River Slide Dulin Construction, Inc. JIM MCCLELLAN 09/03/1998 06/08/1999 251,263.10

005489 Completed STATE 411 Sr 6/411, Region Wide Seismic Retrofit Concrete Barrier, Inc. RON POLLOCK 10/07/1998 05/17/1999 105,309.00

005490 Completed STATE 092 Sr 92, 84th St Ne Vic To Granite Falls Flood Mitig Marshbank Construction, Inc. MARLIN LENSSEN 10/01/1998 03/28/2002 108,759.00

005494 Completed STP-PM(003) 505 Sr 505, Jackson Hwy. I/S Dulin Construction, Inc. RONALD J. POLLOCK 10/19/1998 04/03/2000 361,883.50

005495 Completed STATE 821 Sr 821, Washout Repair - Phase 2 Granite Northwest Inc J.D. DWYER 09/09/1998 02/03/1999 271,321.50

005496 Completed STATE 099 Sr 99, Alaskan Way Viaduct Pier 44 Slope Repair R.W. Scott Construction Co. JULIA MIZUHATA 08/28/1998 06/08/1999 120,000.00

005497 Completed NH-0002(218) 002 Davenport To Reardan Inland Asphalt Company KEN OLSON 10/23/1998 03/09/2000 2,020,620.30

005498 Completed IM-005-4(236) 005 Sr 5, Ne 195th St To Sr 524 Roadside Restoration Ohno Construction Company DAVE LINDBERG 10/22/1998 01/13/2004 918,424.48

005501 Completed STATE 302 Sr 3/303, Belfair & Purdy Signal Replacement Signal Electric, Inc. CRAIG MCDANIEL 10/30/1998 11/04/1999 152,041.00

005502 Completed P-STPR-TA96(218) 101 Sr 101 Et Al, County Wide Curb Cuts Rognlin'S, Inc. JOHN L. HART 10/30/1998 06/03/1999 237,778.35

005503 Completed STATE Clinton Ferry Terminal - Slip 1 Wingwall Repair Manson Construction Co. BRIAN HOLLING 09/11/1998 01/22/1999 50,500.00

005504 Completed STPF-9999(283) 002 Sr 2 Et Al, Ncr Sign Update - 1999 Sharp-Line Industries, Inc. KIRK D. BERG 10/19/1998 10/04/1999 196,289.00

005505 Completed STATE 017 Sr 17, Siphon Revision At 3 Se Tommer Construction Co., Inc. KIRK D. BERG 10/25/1998 03/23/1999 47,950.00

005506 Completed STATE 020 Sr 20, Rock Slope Mitigation One Way Construction, Inc. DIANE BERGE 09/29/1998 12/18/1998 85,025.70

005507 Completed STATE 823 Sr 823, Yakima River Bank Restoration Dkr Construction, Inc. J.D. DWYER 10/08/1998 03/05/1999 30,599.00

005508 Completed NH-0018(024) 018 Sr 18, Se 312th Way To Se 304th St Roadside Restor Fuji Industries, Inc. DAVE STANDAHL 11/18/1998 05/13/2003 1,209,481.00

005509 Completed IM53(853)BH9999(2 016 Sr 5, 7, 16, 512, Pacific Ave. I/C, Et Al Seismic Max J. Kuney Company JEFF CARPENTER 11/23/1998 06/21/2000 1,620,737.40

005511 Completed ACBR-0002(174) 002 Sr 2, Snohomish River To Cavalero Corner Replace E General Construction Company MARLIN LENSSEN 01/27/1999 06/02/2008 33,375,290.40

005512 Completed 395 Sr 395, Court St. I/C Signal Replacement Aztech Electric Inc VIRGIL E. SCHMIDT 11/18/1998 08/24/1999 167,091.95

005515 Completed (AC)NH-9999(287) 002 Sr 2/97, Ncr Electrical Update - 1999 Aztech Electric Inc PAUL J. MAHRE 12/01/1998 08/05/1999 155,532.00

005516 Completed STP-PM98(003) 161 Sr 161, Jct. Kapowsin Hwy. Vic. Totem Electric Of Tacoma, Inc. MIKE MORISHIGE 11/24/1998 05/15/2000 330,996.20

005517 Completed STATE 090 Sr 90, Schrag Rest Area Re-Bid Williams Bros. Construction Inc. HAROLD WHITE 12/01/1998 09/21/2000 773,576.00

005519 Completed NH-0395(048) 395 Sr 395, Mp 172.3 To Hamilton Rd. Acme Materials & Construction Co DARREL MCCALLUM 11/19/1998 10/27/1999 763,866.00

005521 Completed STATE 002 Sr 2, Skykomish River Bridge 2/35 C.A. Carey Corporation RON ERICKSON 12/10/1998 04/28/2000 261,308.00

005522 Completed STATE 167 Sr 167, Bridge 127 E&W Bearing Replacement Donald B Murphy Contractors Inc INGO GOLLER 12/01/1998 09/26/2000 327,308.00

Dec 25, 2019 50 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005523 Completed STATE 005 Sr 5, Ne 179th Interchange Granite Northwest Inc JIM MCCLELLAN 12/15/1998 06/05/2000 1,210,623.30

005524 Completed STATE 090 Sr 90, Bridge 90/77 Vic. Slope Stabilization Hurlen Construction Company DAVE LINDBERG 12/01/1998 07/13/1999 105,488.00

005525 Completed STATE 104 Sr 104, 5th Ave Ne To 6th Ave Ne Illumination Totem Electric Of Tacoma, Inc. PATRICK MCCORMICK 12/01/1998 07/19/1999 54,738.00

005527 Completed BH-0099(053) 099 Sr 99, Spokane St. Oc Seismic Stage 1 Guy F. Atkinson Construction Corp. JULIA MIZUHATA 01/11/1999 06/05/2000 1,050,000.00

005528 Completed STATE 548 Harrison Ave. Slide Repair Marshbank Construction, Inc. KEN JOHNSON 12/10/1998 02/28/2000 247,445.90

005533 Completed NH-STPF-9999(299) 002 Sr 2 Et Al, Ncr Seal - 1999 Granite Northwest Inc KIRK D. BERG 01/06/1999 03/24/2000 1,854,439.20

005534 Completed IM-0055(207) 005 Sr 5, Lake Samish Vic. To Bellingham Ecl Slope Pro Scarsella Bros., Inc. KEN JOHNSON 01/25/1999 03/06/2000 1,287,498.95

005535 Completed P-STPR-TA96(259) 002 Sr 2, Old Owen Rd. Signal & Sidewalk Moose City Service Electric DAVE LINDBERG 02/02/1999 07/28/2000 179,944.75

005537 Completed STATE Shaw Ferry Terminal Wingwall And Tower Repair Manson Construction Co. TOM CASTOR 12/30/1998 06/03/1999 359,900.00

005538 Completed STPF-NH-9999(293) 017 Sr 17 Et Al, Ncr Guardrail Update 1999 Frank Gurney, Inc. TERRY L. BERENDS 01/04/1999 10/04/1999 394,878.56

005539 Completed IM-0906(192) 090 Sr 90, Hangman Creek Br. 90/540 N&S Pct Construction, Inc. LARRY L. EIK 02/02/1999 11/01/1999 302,567.31

005540 Completed STP-PM(003) 523 Sr 523, Sr 99 To Sr 522 Stage 2 Rinker Materials West, Llc Dba DAVE LINDBERG 01/25/1999 01/19/2001 810,060.00

005541 Completed ITS-9653(002) 099 Sr 599/99, Cctv And Data Stations Elcon Corporation JOE SCANLON 12/30/1998 08/21/2000 587,050.80

005542 Completed STATE Orcas Ferry Terminal - Slip Repair Hurlen Construction Company BRIAN HOLLING 02/05/1999 11/05/1999 139,478.00

005543 Completed STATE Coleman Dock Slip 1 Overhead Loading Manson Construction Co. TOM CASTOR 03/01/1999 01/21/2003 2,751,250.00

005544 Completed NH-STPF-9999(297) 002 Sr 2/211, Vic. Four Lanes To Sr 20 Acme Materials & Construction Co LARRY L. EIK 02/01/1999 10/25/2000 4,671,346.10

005545 Completed NH-0002(219) 002 Sr 2, Peshastin Cr. Bridge To Red Apple Rd. Basin Paving Co. TERRY L. BERENDS 02/04/1999 03/01/2000 2,886,076.41

005546 Completed STATE 024 Sr 241 To Cold Creek Road Granite Northwest Inc J.D. DWYER 01/11/1999 01/26/2000 597,935.80

005547 Completed Anacortes F/T Cathodic Protection Modifications Intermountain Electric, Inc. BRIAN HOLLING 03/02/1999 04/30/2001 92,000.00

005549 Completed STATE Friday Harbor Ferry Terminal General Construction Company TOM CASTOR 02/18/1999 08/05/1999 277,700.00

005550 Completed STATE 002 Sr 2, Eby Island Viaduct Wb Br. 2/6n Repair Westbo Concrete Barrier, Inc. GIL MCNABB 04/23/1999 12/14/2000 803,332.50

005552 Completed STATE 005 Sr 5, Cherry Street To N 103rd - Stage 3 Elcon Corporation JOE SCANLON 03/05/1999 11/26/2001 1,387,304.89

005553 Completed STATE 104 Sr 104, W.A. Bugge Bridge 104/52 Painting Long Painting Company AMITY TROWBRIDGE 02/24/1999 08/14/2000 805,452.00

005554 Completed STP-PM(003) 155 Sr 155/174, Grand Coulee Vicinity Morrill Asphalt Paving Co., Inc. KIRK D. BERG 02/10/1999 12/08/1999 970,205.95

005555 Completed STATE Seattle Ferry Terminal - Slip 3 Vehicle Tower Repa Advanced Commercial Diving BRIAN HOLLING 01/22/1999 10/22/1999 289,451.26

005558 Completed STATE Fauntleroy Ferry Terminal - Dolphin Manson Construction Co. BRIAN HOLLING 01/08/1999 05/12/1999 360,450.00

005559 Completed STPF-0020(97) 020 Sr 20, Sr 395 To Vic. Laundry Road Eller Corporation GORDON OLSON 02/19/1999 05/09/2000 2,660,619.49

Dec 25, 2019 51 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005560 Completed STATE 005 Sr 5, Boeing Access Road Ramp Modifications Ramp M R.W. Scott Construction Co. BRIAN NIELSEN 02/04/1999 04/14/2000 526,995.15

005561 Completed STATE 520 Sr 520, Sr 202 Bear Creek Enhancement Granite Construction Company BRIAN DOBBINS 02/26/1999 09/26/2006 2,496,957.00

005562 Completed STP-PM98(003) 530 Sr 530, Stillaguamish River Bridge To 171st St. 53 Rinker Materials West, Llc Dba MARLIN LENSSEN 02/04/1999 01/29/2001 1,334,581.95

005563 Completed STATE 971 Sr 971, First Creek Fish Vicinity Goodfellow Bros Inc KIRK D. BERG 02/10/1999 10/25/1999 742,745.00

005564 Completed NH-0054(237) 005 Sr 5, Sr 530 Nb & Sb Ramps Signal/Channelization Signal Electric, Inc. G MCNABB / M LENSSEN 02/04/1999 11/02/2000 452,945.73

005565 Completed BR0101(159) 101 Sr 101, Dosewallips River Bridge Quigg Bros., Inc. JOHN L. HART 02/24/1999 07/30/2001 4,929,012.39

005566 Completed STATE 508 Sr 508, Onalaska Settlement Dulin Construction, Inc. RON POLLOCK 12/31/1998 03/09/1999 24,269.00

005568 Completed STPF-PM98(003) 027 Sr 27/90, Pines I/C Wb On Ramp Inland Asphalt Company LARRY L. EIK 02/17/1999 07/18/2000 969,688.00

005570 Completed BH-NH-0513(002) 513 Sr 513, Montlake Bridge 513/12, Deck/Seismic Retro Guy F. Atkinson Construction Corp. MESSAY SHIFERAW 02/19/1999 09/13/2000 2,099,261.00

005572 Completed STATE 530 Sr 530 Sauk River Bridge 530/207 Bridge Painting Long Painting Company MARLIN LENSSEN 02/19/1999 01/31/2000 297,448.00

005573 Completed STP-PM98(003) 014 Sr 14, Sr 221 To Mp 175 Granite Northwest Inc J.D. DWYER 03/11/1999 01/05/2000 954,150.40

005574 Completed STP-PM98(003) 548 Sr 548, Sr 5 To Blaine Rd Granite Construction Company TODD HARRISON 02/25/1999 03/23/2000 930,182.00

005575 Completed STP-PM98(003) 823 Sr 823, Naches Ave To Sr 823 Wye Columbia Asphalt & Gravel, Inc. J.D. DWYER 03/22/1999 01/07/2000 343,859.00

005576 Completed NH-0002(221) 002 Sr 2, Deception Creek To Chelan County Line Lakeside Industries TERRY L. BERENDS 02/26/1999 05/23/2000 2,170,684.95

005577 Completed NH-0053(851) 005 Sr 5, Military Road Nb Ramps, Signal Totem Electric Of Tacoma, Inc. JOE SCANLON 03/10/1999 10/20/2000 233,302.70

005578 Completed NH-0020(100) 020 Sr 20, Sr 536 To Sr 5 Rinker Materials West, Llc Dba KEN JOHNSON 04/08/1999 03/06/2000 513,323.58

005579 Completed STATE 027 Sr 27, Rattler Run Creek Uprr Br. 27/108 Bridge 27 N.A. Degerstrom, Inc. LARRY L. EIK 03/02/1999 01/27/2000 216,765.80

005581 Completed IM-0822(112) 082 Sr 82, W. Prosser I/C To Oregon State Line Granite Northwest Inc VIRGIL E. SCHMIDT 03/31/1999 03/28/2000 2,451,612.55

005582 Completed NH-0012(104) 012 Sr 12, Nine Mile Hill To Lower Dry Creek Rd. Dry C Acme Materials & Construction Co MOE DAVARI 03/22/1999 12/20/1999 1,163,815.60

005586 Completed STP-PM(003) 171 Sr 171, Moses Lake Vicinity Central Washington Asphalt, Inc. PAUL J. MAHRE 03/25/1999 02/02/2000 672,601.16

005587 Completed STATE 010 Sr 10 Et Al, 1999 Region Wide Chip Seal Granite Northwest Inc J.D. DWYER 03/11/1999 03/13/2000 1,718,316.65

005588 Completed NH-0020(101) 020 Sr 20, Jct. Reservation Rd. Signalization Sail Electric, Inc. KEN JOHNSON 03/10/1999 12/20/1999 284,738.60

005589 Completed STATE 169 Sr 169, Cedar River Bridges 169/20, 900/20 & Sr 90 Long Painting Company JOE SCANLON 03/22/1999 04/17/2000 519,362.00

005590 Completed NH-0525(025) 525 Sr 525, Cameron Rd. To Sr 20 Stage 4 - Section 3 Northwest Construction, Inc. MARLIN LENSSEN 04/05/1999 10/13/2000 801,583.01

005591 Completed STATE 101 Sr 101, Hoodsport Vic. Slides Hi Tech Rockfall Construction, Inc. STEVE ROARK 03/15/1999 07/19/1999 296,203.00

005592 Completed STP-PM(003) 160 Sr 160, Sr 16 To Ferry Terminal Ace Paving Co., Inc. AMITY TROWBRIDGE 03/22/1999 06/26/2000 1,412,692.87

005593 Completed NH-0012(103) 012 Sr 12, Vic. Snake River Bridge To Mcnary Pool To M Granite Northwest Inc VIRGIL E. SCHMIDT 03/25/1999 03/16/2000 967,356.00

Dec 25, 2019 52 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005596 Completed NH-0012(105) 012 Sr 12, Naches Vic. Weigh Station Granite Northwest Inc J.D. DWYER 03/31/1999 01/31/2000 373,148.50

005597 Completed STATE 011 Sr 11, Mp 12 Vic. And Rest Area Vic. Half Bridges Mowat Construction Company KEN JOHNSON 04/22/1999 04/04/2000 775,841.50

005598 Completed STP-PM(003) 024 Sr 24, Keys Road To Moxee Columbia Asphalt & Gravel, Inc. J.D. DWYER 04/05/1999 01/21/2000 462,568.11

005599 Completed STATE 532 Sr 532, 88th Ave. Nw Granite Construction Company MARLIN LENSSEN 04/08/1999 02/21/2001 196,243.80

005601 Completed NH-0020(098) 020 Sr 20, Keystone Ferry Terminal To Sr 525 Krieg Construction, Inc. MARLIN LENSSEN 04/15/1999 11/22/2000 646,465.45

005602 Completed NH-0097(076) 097 Sr 97, Tonasket & Ellisforde Channelization Basin Paving Co. PAUL J. MAHRE 03/26/1999 03/01/2000 464,996.30

005604 Completed STATE 020 Sr 20, Gorge Creek Bridge 10/323 Diamaco Inc. KEN JOHNSON 05/12/1999 12/14/1999 117,182.00

005605 Completed NHSTPF0017(031) 017 Sr 17, Vic Sr 90 To Grant C/L Airport Central Washington Asphalt, Inc. TERRY MATTSON 04/09/1999 12/19/2001 2,443,250.31

005606 Completed NH-0195(034) 195 Sr 195, Colton To Vic. Babbit Road Poe Asphalt Paving, Inc. KEN OLSON 04/21/1999 03/09/2000 2,578,812.30

005607 Completed STATE 512 Sr 512, Wb Off Ramp To Steele Street Woodworth & Company, Inc. MIKE MORISHIGE 04/07/1999 09/29/2000 391,397.50

005608 Completed STATE 012 Sr 12 Bridge Painter Root Paint & Glass Co. Inc. RONALD J. POLLOCK 04/08/1999 01/25/2000 537,930.00

005609 Completed NH-0395(054) 395 Sr 395, Columbia River Bridge To Boyds Re-Bid Hap Taylor And Sons, Inc. Dba DARREL MCCALLUM 04/14/1999 02/28/2000 1,135,604.05

005610 Completed STPF-0902(189) 902 Sr 902, Medical Lake To I-90 Inland Asphalt Company KEN OLSON 04/12/1999 02/24/2000 995,620.00

005614 Completed STATE 006 Sr 6, Pe Ell To Adna Lakeside Industries RON POLLOCK 04/21/1999 05/14/2001 1,326,086.22

005615 Completed HP-ACHP-0055(209) 005 Sr 5, Nb Pace Lane Extension Strider Construction Co., Inc. TODD HARRISON 05/03/1999 09/20/2001 2,620,957.25

005616 Completed IM-005(245) 005 Sr 5, Carrolls Bluff Slope Protection Hi Tech Rockfall Construction, Inc. AMY E. REVIS 05/19/1999 06/01/2000 1,227,694.50

005617 Completed STPF-0906(191) 090 I-90 Bicycle Signing And Fencing Wespac Construction, Inc. KEN OLSON 04/26/1999 08/30/1999 86,827.00

005618 Completed NH-STPF-0516(014 516 Sr 516, Sr 509 To I-5 Vicinity Lakeside Industries DAVE STANDAHL 04/22/1999 10/01/2000 947,118.77

005619 Completed IM-090-(187) 090 Sr 90, Cle Elum Weigh Station Scarsella Bros., Inc. PAUL GONSETH 04/28/1999 10/11/2000 4,021,906.85

005620 Completed STPUL-0520(026) 520 Sr 520, Ne 40th St Vicinity Granite Construction Company JAY LAVASSAR 06/07/1999 06/10/2002 11,871,660.70

005621 Completed NH-0002(222) 002 Sr 2/97, Monitor Intersection Signal Knobel'S Electric, Inc. TERRY L. BERENDS 05/10/1999 09/22/2000 264,510.08

005622 Completed STATE Fauntleroy Toll Booths Synergy Construction, Inc. TOM CASTOR 04/28/1999 12/22/2000 580,402.00

005625 Completed NH-0125(003) 125 Sr 125, College Place Vicinity Sierra Electric, Inc. MOE DAVARI 05/03/1999 04/25/2000 899,891.99

005626 Completed STP-PM98(003) 524 Sr 524, 64th Ave W. Vic. To 40th Ave. W. Vic. Rinker Materials West, Llc Dba DAVE LINDBERG 05/25/1999 08/04/2000 834,191.25

005627 Completed NH-0017(030) 017 Sr 17, Lind Coulee Bridge To Vic. Sr 90 Granite Northwest Inc KIRK D. BERG 05/13/1999 03/09/2000 1,399,920.50

005628 Completed IM-0904(105) 090 Sr 90, Grant County Line To Sr 21 Granite Northwest Inc DARREL MCCALLUM 04/26/1999 02/11/2000 1,438,649.00

005629 Completed STATE 011 Sr 11, Vic. Colony Creek Bridge Coral Construction Company KEN JOHNSON 04/23/1999 08/03/1999 35,350.00

Dec 25, 2019 53 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005630 Completed STATE 005 Sr 5/512 Interchange - Ramp Widening Tucci & Sons, Inc. JEFF CARPENTER 05/10/1999 07/14/2000 565,809.76

005631 Completed IM-HP-0055(210) 005 Sr 5, Blaine Vicinity Ramps Granite Construction Company TODD HARRISON 05/19/1999 05/23/2005 3,089,184.82

005632 Completed STP-PM98(003) 007 Sr 7, Alder To Sr 702 Tucci & Sons, Inc. MIKE MORISHIGE 06/18/1999 04/04/2000 1,802,637.25

005633 Completed IM-005(246) 005 Sr 5/4, Toutle River/Grays River Bridge Painter S & K Painting, Inc. RON POLLOCK 05/19/1999 04/06/2000 716,641.50

005634 Completed STATE 020 1999 Eastern Region Chip Seal Morrill Asphalt Paving Co., Inc. LARRY L. EIK 05/10/1999 04/17/2000 1,539,437.15

005635 Completed STP-PM98(003) 904 Sr 904, Vic. Betz Rd. To I-90 Inland Asphalt Company KEN OLSON 05/17/1999 02/24/2000 844,620.00

005636 Completed STP-PM98(003) 020 Sr 20/31, Narcisse Rd. To Vic. Spruce Canyon Rd. Acme Materials & Construction Co GORDON OLSON 06/04/1999 01/23/2001 3,120,738.50

005637 Completed STATE 090 Sr 90, Sprague Ave To Argonne Rd - Stage 2 Max J. Kuney Company BOB HILMES 05/28/1999 02/27/2002 16,204,553.70

005640 Completed IM-0053(856) 005 Sr 5, Galer-Lakeview To Ravenna Reversible Lanes Mowat Construction Company JULIA MIZUHATA 05/25/1999 05/23/2003 2,660,422.73

005641 Completed IM-STPE-0053(850) 005 Sr 5/520, Ship Canal Br 5/570 - Stage 2 Seismic Balfour Beatty Rail Inc Dba BRIAN NIELSEN 07/02/1999 12/11/2003 7,695,062.00

005642 Completed STPR-0203(003) 203 Sr 203, King/Snohomish County Line To Sr 2 Watson Asphalt Paving Company, DAVE LINDBERG 05/25/1999 05/19/2000 1,141,619.98

005643 Completed NH-0513(003) 513 Sr 513, Montlake Br 513/12 Mechanical/Electrical R Mowat Construction Company MESSAY SHIFERAW 06/03/1999 05/28/2003 1,931,305.00

005644 Completed IM-0902(188) 090 Sr 90, Elk Heights I/C Vic. To Taneum Creek Br. Goodfellow Bros Inc J.D. DWYER 06/16/1999 02/14/2000 2,076,588.20

005645 Completed STPR-0099(057) 099 Sr 99, S 138th St To W Marginal Way Icon Materials, Inc. JULIA MIZUHATA 05/27/1999 10/31/2002 2,390,830.25

005646 Completed STATE 005 Sr 5, Silver Lake Rest Area Replace Incoming Water Marshbank Construction, Inc. GIL MCNABB 06/03/1999 03/20/2000 42,112.00

005647 Completed STPF-0507(017) 507 Sr 507, Bald Hills Rd To Mp 36.5 Lakeside Industries NEAL J. CAMPBELL 06/17/1999 03/29/2002 1,607,414.20

005648 Completed STATE 005 Sr 5, Seatac Nb Weigh Station D. A. Zuluaga Construction, Inc. DAVE STANDAHL 05/19/1999 01/04/2000 72,460.00

005649 Completed STATE 018 Sr 18, Green River Bridge Vic. Slide Repair Emerge Condon-Johnson & Associates, Inc. DAVE STANDAHL 04/29/1999 04/18/2000 1,694,105.00

005651 Completed STATE Kingston Ferry Terminal Shore Construction Dalton Electric Company BRIAN HOLLING 06/22/1999 01/28/2000 161,544.00

005652 Completed NH-0195(035) 195 Sr 195, Mp 44.40 To Bridge 195/34 Acme Materials & Construction Co LARRY L. EIK 07/07/1999 01/29/2001 4,383,076.44

005654 Completed NH-00189023) 018 Sr 18, Issaquah/Hobart Rd. I/C To Sr 90 Lakeside Industries DAVE STANDAHL 06/08/1999 10/05/2000 1,498,785.10

005655 Completed NH-0101(161) 101 Sr 101, Ruby Beach Vic. Safety Improvements Scarsella Bros., Inc. JOHN L. HART 06/09/1999 03/31/2000 1,233,213.13

005656 Completed NH-0101(160) 101 Sr 101, Levee Street To S. H Street Lakeside Industries JOHN L. HART 06/01/1999 04/27/2000 2,232,906.10

005657 Completed ACNH-0020(099) 020 Sr 20, Boon Rd To Swantown Rd Vic. Lakeside Industries MARLIN LENSSEN 06/09/1999 09/13/2000 496,706.10

005658 Completed STATE 005 Sr 5, Everett Park & Ride Bingo Hall Demolition Thomco Construction Inc. GIL MCNABB 06/04/1999 03/23/2000 128,699.00

005659 Completed NH-0395(570) 395 Sr 395, Lind To Sr 90 Inland Asphalt Company LARRY L. EIK 05/26/1999 05/22/2000 1,811,000.00

005660 Completed STATE 026 Sr 26, Sr 243 Intersection To Mp 5.5 Vic. Central Washington Asphalt, Inc. TERRY L. BERENDS 06/18/1999 03/27/2000 1,740,163.95

Dec 25, 2019 54 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005661 Completed STATE 005 Sr 5, Burnt Bridge Creek To Ne 78th St Selby Bridge Company Inc DON OWINGS 07/02/1999 07/28/2003 41,107,090.50

005663 Completed IM-0821(081) 082 Sr 82, Naches River Bridge To Valley Mall Blvd. Granite Northwest Inc J.D. DWYER 06/15/1999 02/07/2000 1,242,441.27

005664 Completed STPR-0387(003) 397 Sr 397, Piert Road To Yew Street Acme Materials & Construction Co MOE DAVARI 06/15/1999 06/15/2000 1,279,796.41

005665 Completed NH-0525(023) 525 Sr 525, 92nd St. Sw To Front St. Rinker Materials West, Llc Dba MARLIN LENSSEN 06/15/1999 03/28/2001 4,468,975.40

005666 Completed NH-0012(106) 012 Sr 12, Cedar Creek To Vic. Moon Rd. Granite Construction Company NEAL J. CAMPBELL 06/08/1999 02/07/2001 2,254,135.00

005668 Completed NH-0002(220) 002 Sr 2, Fern Bluff Rd To Gold Bar Vic Csr Associated DAVE LINDBERG 07/02/1999 05/10/2001 2,172,678.02

005669 Completed IM-0053(837) 005 Sr 5, Federal Way Park & Ride Lot Scarsella Bros., Inc. STANLEY ENG 08/02/1999 10/11/2004 3,086,274.66

005670 Completed NH-0522(024) 522 Sr 522, Snohomish River Vic To Sr 2 Concrete Barrier, Inc. MATTHEW PREEDY 06/30/1999 06/28/2001 1,776,297.30

005671 Completed STATE 525 Sr 525, Useless Bay Road Marshbank Construction, Inc. MARLIN LENSSEN 06/11/1999 02/05/2001 283,046.00

005672 Completed STATE 500 Sr 500, Sr 5 To Burnt Bridge Creek Granite Northwest Inc AMY E. REVIS 06/24/1999 05/02/2000 1,196,694.00

005673 Completed STATE 101 Sr 101, Jct. Sr 4 To Jct. Sr 6 Lakeside Industries AMY E. REVIS 06/17/1999 02/01/2001 3,938,426.03

005674 Completed IM-0822(114) 082 Sr 82 Ramp Paving Columbia Asphalt & Gravel, Inc. PAUL GONSETH 06/21/1999 06/08/2000 552,751.90

005675 Completed IM-0903(055) 090 Sr 90, Sr 82 To Boylston Rd. Vic. Phase 2 Granite Northwest Inc PAUL GONSETH 07/12/1999 03/29/2000 3,472,833.59

005676 Completed BH-0099(048) 099 Sr 99, Aurora Ave Br 99/560 Seismic Retrofit Flatiron Structures Company DAVE BECHER 07/02/1999 04/06/2001 1,403,022.00

005677 Completed NH-0012(108) 012 Sr 12, Surrey Creek To Lake Creek Vic Lakeside Industries RONALD J. POLLOCK 07/08/1999 08/06/2001 2,153,615.98

005678 Completed STPF-0006(012) 006 Sr 6, Old Sr 603 To Scheuber Rd. Granite Construction Company R.J.POLLOCK 06/18/1999 06/14/2000 518,927.20

005679 Completed STPF-0020(109) 020 Sr 20, Vic. Graves Mtn Rd To Sr 395 Hap Taylor And Sons, Inc. Dba GORDON OLSON 06/21/1999 04/24/2000 2,997,198.00

005680 Completed IM-0053(860) 005 Sr 5, 164th To Sr 526 Hov Lanes Stage 2 Tri-State Construction Inc JULIA MIZUHATA 07/15/1999 07/07/2005 8,056,478.63

005683 Completed STATE 508 Sr 508, Mp 5 Vic. To Hyak Rd. Vic. Ostrander Rock & Construction RON POLLOCK 07/02/1999 09/29/2000 599,090.00

005685 Completed NH-0054(233) 005 Sr 5, 116th St Ne Nb & Sb Ramps Signal And Channel D.W. Close Company, Inc. G MCNABB / M LENSSEN 07/12/1999 04/04/2001 841,976.30

005686 Completed IM-0055(204) 005 Sr 5, Sunset/Sr 542 Vic To Nooksack River Br 5/828 Granite Construction Company KEN JOHNSON 07/12/1999 08/08/2001 6,675,924.83

005687 Completed ER9601(045) 090 Sr 90, Sr 970, Teanaway River Vic. Br. 970/10 Goodfellow Bros Inc J.D. DWYER 07/08/1999 01/18/2000 215,510.00

005688 Completed STATE 525 Sr 525, Sr 99 Interchange Max J. Kuney Company DAWN MCINTOSH, P.E. 08/17/1999 11/13/2002 19,998,128.88

005689 Completed STATE 101 Sr 101, Lake Crescent Vic. Slides Delhur Industries Inc JERRY MOORE 07/08/1999 04/17/2000 529,676.75

005690 Completed NH-0020(102) 020 Sr 20, Zylstra Road Krieg Construction, Inc. MARLIN LENSSEN 06/25/1999 02/14/2003 726,317.81

005691 Completed STATE 261 Sr 261, Benge To Sutton Poe Asphalt Paving, Inc. LARRY L. EIK 06/28/1999 02/29/2000 1,020,200.30

005692 Completed STATE Mukilteo Ferry Terminal Bridgeseat Repair Hurlen Construction Company BRIAN HOLLING 08/10/1999 03/26/2001 263,800.00

Dec 25, 2019 55 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005693 Completed STPF-0009(030) 009 Sr 9, Park Rd. Vic. To Sr 542 Csr Associated KEN JOHNSON 07/12/1999 06/26/2000 1,711,340.16

005694 Completed IM-4053(829) 405 Sr 405, Bothell To Swamp Cr I/C Hov Lanes - Stage Granite Construction Company DAVE BECHER 08/17/1999 04/29/2004 28,306,781.52

005695 Completed ACHP-HP-0522(023) 522 Sr 522, Sr 9 To Paradise Lake Rd Scarsella Bros., Inc. DAVE LINDBERG 07/15/1999 06/14/2004 7,199,535.00

005697 Completed STATE 543 Sr 543, Northbound Border Crossing D.W. Close Company, Inc. TODD HARRISON 07/12/1999 02/20/2001 125,834.00

005698 Completed NH-0097(077) 097 Sr 97, Rock Cut North Of Orondo West Company, Inc. KIRK D. BERG 07/02/1999 04/26/2000 472,312.90

005699 Completed STATE 016 Sr 16, Mulenix Rd. To Clifton Ace Paving Co., Inc. AMITY TROWBRIDGE 07/12/1999 06/26/2000 1,170,378.69

005700 Completed STATE 101 Sr 101, Golf Course Rd. To Morse Creek Lakeside Industries JERRY MOORE 07/09/1999 03/13/2001 2,470,520.94

005701 Completed ACNH-0014(032) 014 Sr 14, Nw 6th Ave Vic. To Clark County Line Wildish Standard Paving Co JIM MCCLELLAN 07/12/1999 06/14/2000 2,683,001.20

005702 Completed STATE 395 Sr 395, Kettle Falls Weigh Station West Company, Inc. LARRY L. EIK 07/01/1999 06/13/2000 283,835.00

005704 Completed STATE Keystone Ferrry Terminal - Paint Transfer Span And A & A Coatings, Inc. TOM CASTOR 07/30/1999 01/04/2000 106,343.00

005705 Completed STPF-0224(003) 224 Sr 224, Ambassador Dr. To Red Mt. Rd. Deatley Company, Inc. MOE DAVARI 07/12/1999 03/27/2000 419,246.30

005706 Completed STPF-0020(107) 020 Sr 20, Sterling Rd. Vic. To Lyman Wcl Lakeside Industries KEN JOHNSON 07/12/1999 10/30/2000 2,013,782.06

005707 Completed STATE 090 Sr 90, Tunnel Rebroadcast System Elcon Corporation MESSAY SHIFERAW 08/27/1999 09/25/2003 704,298.10

005708 Completed STATE 016 Sr 16, Anderson Hill Rd. Deceleration Lane Ace Paving Co., Inc. AMITY TROWBRIDGE 07/12/1999 03/28/2000 107,638.00

005709 Completed IM-2051(228) 205 Sr 205 To Sr 500 Ramp Extension Granite Northwest Inc JIM MCCLELLAN 07/15/1999 09/18/2000 697,243.27

005710 Completed IM-0904(106) 090 Sr 90, Dodson Rd. To Rr O'Xing 90/232 Granite Northwest Inc KIRK D. BERG 08/05/1999 03/23/2001 257,464.72

005711 Completed HP-0395(056) 395 Sr 395, Hastings Rd To Mp 172 - Stage 2 S A Gonzales Construction Inc GORDON OLSON 08/04/1999 10/03/2002 11,168,203.30

005712 Completed IM-0053(048) 005 Sr 5, Gravelly Lake To Puyallup River Br Gary Merlino Construction Co., Inc. JEFF CARPENTER 08/02/1999 06/01/2001 6,248,265.40

005713 Completed STATE 005 Sr 5, Southcenter Drainage Repair Scarsella Bros., Inc. JOE SCANLON 07/26/1999 01/23/2001 293,388.50

005714 Completed BR-0020(110) 020 Sr 20, Twisp River Bridge Replacement One Way Construction, Inc. TERRY MATTSON 07/15/1999 08/08/2002 1,819,730.78

005715 Completed STPF-0110(003) 110 Sr 110, Sr 101 To La Push Road Mp 0.01 To 11.1 Lakeside Industries JOHN L. HART 08/02/1999 03/31/2000 1,851,575.95

005716 Completed STATE 005 Sr 5, Fort Lewis Interchange Totem Electric Of Tacoma, Inc. STEVE ROARK 07/22/1999 07/25/2000 437,976.00

005717 Completed STPUS-5213(001) 101 Sr 101, Crosby Blvd/Cooper Point Rd I/C Improvemen Pacific Road & Bridge Co. NEAL J. CAMPBELL 08/05/1999 11/07/2002 3,481,633.35

005718 Completed STPF-9901(001) 003 Sr 3, Allyn Vic Slide Repair Condon-Johnson & Associates, Inc. NEAL J. CAMPBELL 07/20/1999 11/29/2001 2,746,402.00

005719 Completed STATE 012 Sr 12 Unstable Slope Mitigation Hi Tech Rockfall Construction, Inc. RON POLLOCK 07/26/1999 01/04/2000 157,862.00

005720 Completed STATE 005 Sr 5/167, S. King Co. Bridges, Brige Deck Repair Concrete Barrier, Inc. DAVE STANDAHL 08/05/1999 11/28/2000 159,451.50

005722 Completed STATE 020 Sr 20, Jackman Cr. Br. 20/262 Vic. To Gulch Br 20/ Csr Associated KEN JOHNSON 08/02/1999 10/30/2000 655,958.37

Dec 25, 2019 56 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005723 Completed STATE 520 Sr 520, Lake Washington Blvd. Eb On-Ramp Lakeside Industries JAY LAVASSAR 08/02/1999 04/07/2000 117,583.00

005724 Completed STATE 101 Sr 101, Vic. Mp 73 To Artic Vic. W. F. Anderson Construction Co. In JOHN L. HART 07/27/1999 01/06/2000 446,854.11

005725 Completed STATE 109 Sr 109, X-Trib Pacific Rognlin'S, Inc. JOHN L. HART 07/27/1999 01/11/2000 154,169.00

005726 Completed STPF-9902(005) 112 Sr 112, Field Creek Addleman Logging Co., Inc. JERRY MOORE 07/26/1999 01/28/2000 359,037.48

005727 Completed IM-0051(248) 005 Sr 5, Gee Creek Rest Area Paver Granite Northwest Inc JIM MCCLELLAN 07/26/1999 03/15/2000 357,598.60

005728 Completed IM-0950(093) 090 Sr 90, Sprague Lake R/A Sewage Lagoon Goodfellow Bros Inc DARREL MCCALLUM 08/13/1999 01/13/2000 411,781.50

005732 Completed STATE 518 Sr 5, Sr 518 Ramps And Bridge 5/521 N-W Icon Materials, Inc. MATTHEW PREEDY 08/05/1999 05/22/2000 411,592.00

005733 Completed IM-0054(239) 005 Sr 5, 23rd St Vic. To 236th St Ne Vic. Coral Construction Company MARLIN LENSSEN 08/17/1999 01/22/2001 1,627,586.80

005734 Completed STATE 082 Sr 82, Prosser Rest Area Rv Dump Station Ray Poland & Sons, Inc. MOE DAVARI 08/17/1999 03/09/2000 154,306.00

005735 Completed IM-4053(837) 405 Sr 405, Northup To Bothell Roadside Restoration Paul Brothers, Inc. DAVE LINDBERG 09/03/1999 02/18/2004 1,200,965.00

005736 Completed STATE 090 Sr 90, Sr 18 I/C Wb Ramp Traffic Signal Totem Electric Of Tacoma, Inc. DAVE STANDAHL 08/12/1999 01/19/2001 205,479.00

005737 Completed STP-PM98(003) 099 Sr 99, Sr 525 N. I/S To Manor Way Signal Electric, Inc. PATRICK MCCORMICK 08/09/1999 11/20/2000 118,016.85

005742 Completed STATE 012 Sr 12, Wishkah River Bridges Mechanical/Electrical Strider Construction Co., Inc. JOHN L. HART 09/02/1999 10/22/2001 1,601,309.00

005743 Completed STATE 002 Sr 2, Pine Canyon Slopes Goodfellow Bros Inc KIRK D. BERG 08/26/1999 04/20/2000 469,937.00

005745 Completed STATE 005 Sr 5, Capitol Blvd. Undercrossing Deck Repair Diamaco Inc. NEAL J. CAMPBELL 08/20/1999 03/23/2000 186,305.00

005747 Completed STATE 005 Sr 5, Convention Center Tunnel Foam System Mod. North American Power & Control Corp BRIAN NIELSEN 08/27/1999 08/18/2000 117,573.00

005749 Completed STATE 005 Sr 5, Ostrander Rd. Vic. Drainage Gonzales Boring & Tunneling, Inc. AMY E. REVIS 09/03/1999 03/01/2000 338,309.30

005750 Completed STATE 548 Sr 548, Bay Road I/S Modifications Granite Construction Company TODD HARRISON 08/26/1999 03/27/2000 105,111.00

005751 Completed STATE Kingston Tie-Up Slip Dolphins Replacement General Construction Company BRIAN HOLLING 10/01/1999 06/13/2000 864,440.00

005752 Completed STATE Shaw Ferry Terminal Shore Power Back Feed Dalton Electric Company BRIAN HOLLING 10/29/1999 05/18/2000 18,990.00

005754 Completed HP-0166(002) 166 Sr 166, Ross Point Vic. Slide Scoccolo Construction, Inc. AMITY TROWBRIDGE 09/03/1999 12/04/2000 1,091,243.54

005755 Completed STATE 003 Sr 3, Belfair Vic. Signals Totem Electric Of Tacoma, Inc. AMITY TROWBRIDGE 09/07/1999 12/27/2000 234,254.00

005756 Completed IM-09-6(189) 090 Sr 90, Evergreen Road Interchange Harcon Incorporated KEN OLSON 09/23/1999 01/09/2003 11,230,975.60

005757 Completed IM-ILCS-7053(006) 509 Sr 509, Pacific Ave To Marine View Dr Buckley Nursery Company, Inc. FRED THARP 09/20/1999 07/09/2002 1,041,274.45

005760 Completed STATE 012 Sr 12, Rimrock Tunnel 12/308 Portal Rehab Dulin Construction, Inc. RON POLLOCK 09/20/1999 04/10/2000 232,148.60

005761 Completed NH-9902(010) 101 Sr 101, Lilliwaup Vicinity Slide Granite Construction Company STEVE ROARK 09/16/1999 07/27/2000 733,831.00

005762 Completed STATE 002 Sr 2, Newport Traffic Signal Colvico, Inc. LARRY L. EIK 09/27/1999 09/26/2000 114,735.00

Dec 25, 2019 57 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005764 Completed NH-9902(025) 101 Sr 101, Mp 322.3 Vic. Slide Dlb Earthwork Co. JOHN L. HART 09/20/1999 08/01/2000 576,067.50

005765 Completed STATE 005 Sr 5, Gee Creek Slide Elting Incorporated JIM MCCLELLAN 09/16/1999 07/18/2000 450,418.71

005771 Completed STATE 090 Sr 90, Spokane Poe Approach Slabs N.A. Degerstrom, Inc. LARRY L. EIK 10/14/1999 04/04/2000 92,636.00

005774 Completed STPF-IM-HP-1998(0 510 Sr 510, Sr 5 Overcrossing Fuji Industries, Inc. STEVE ROARK 12/10/1999 12/19/2001 5,652,515.20

005775 Completed STATE 090 Sr 90, Island Crest Way Ramp Modifications Signal Electric, Inc. RAY ARNOLD 12/28/1999 04/30/2001 62,483.83

005778 Completed IM-0053(867) 005 Sr 5, N & S Express Lane Portals Diamaco Inc. BRIAN NIELSEN 12/28/1999 06/12/2001 145,411.00

005779 Completed IM-0903(056) 090 Sr 90, Vantage Bridge To Burke Inland Asphalt Company KIRK D. BERG 01/20/2000 06/15/2001 2,444,425.55

005782 Completed STATE Bainbridge Ferry Terminal Maintenance Repairs Diamaco Inc. TOM CASTOR 12/27/1999 11/22/2000 138,000.00

005787 Completed NH-9999(313) 002 Sr 2/97, Rocky Reach Dam To Orando Basin Paving Co. TERRY MATTSON 01/05/2000 02/26/2001 1,208,587.13

005792 Completed NH-STPF-9999(312) 002 Sr 2 Et Al, Nc Region 2000 Seal Granite Northwest Inc TERRY L. BERENDS 02/02/2000 01/11/2001 2,275,840.20

005793 Completed BH-0530(022) 530 Sr 530, N. Fork Stillaguamish River Br. 530/124 Se S & K Painting, Inc. G MCNABB / M LENSSEN 01/27/2000 10/03/2000 380,868.00

005794 Completed NH-STPF-9999(314) 002 Ncr Bridge Rail Retrofit - 2000 Petersen Brothers, Inc. KIRK D. BERG 02/22/2000 04/03/2001 276,328.91

005796 Completed STATE Anacortes Ferry Terminal Tie-Up & Slip 1 Repair Hurlen Construction Company TOM CASTOR 01/04/2000 05/19/2000 302,980.00

005800 Completed NH-0525(027) 525 Sr 99 I/C Wetland Mitigation Tri-State Construction Inc JOHN CHI 03/15/2000 04/19/2006 642,625.00

005801 Completed STATE 018 Sr 18, Sr 169 Maple Valley I/C Mowat Construction Company STANLEY ENG 03/31/2000 03/17/2005 3,615,935.30

005802 Completed NH-0028(024) 028 Sr 28, Vulcan To Grant County Line Basin Paving Co. TERRY L. BERENDS 03/01/2000 08/14/2000 662,238.90

005803 Completed STPF-0027(008) 027 Sr 27, Fallon To Palouse Poe Asphalt Paving, Inc. DARREL MCCALLUM 02/25/2000 11/09/2000 834,520.10

005804 Completed STPF-9999(317) 022 Sr 22/24/240, 2000 Region Wide Seal Granite Northwest Inc PAUL GONSETH 02/22/2000 01/08/2001 1,373,321.75

005805 Completed NH-STPR-0525(024) 525 Sr 525, Fish Rd Vic To Honeymoon Bay Rd Vic Klb Construction, Inc. MARLIN LENSSEN 03/14/2000 03/28/2006 906,502.30

005807 Completed STPF-0542(016) 542 Sr 542, Hatchery Rd Vic To N Fork Nooksack River B Csr Associated KEN JOHNSON 03/16/2000 03/26/2001 1,527,409.12

005809 Completed ER-9802(002) 021 Sr 21, Ferry County Drainage Improvements N.A. Degerstrom, Inc. LARRY L. EIK 05/08/2000 06/28/2001 308,486.32

005810 Completed NH-0101(169) 101 Sr 101, Chehalis River Br 101/115 Electrical/Mecha Mowat Construction Company JOHN L. HART 05/19/2000 04/16/2003 833,268.00

005811 Completed STPF-0510(010) 510 Sr 510, Bingo Hall Vicinity Lakeside Industries STEVE ROARK 03/20/2000 03/01/2001 449,577.37

005812 Completed STPF-0150(002) 150 Sr 150, Manson To Houser Road Basin Paving Co. KIRK D. BERG 03/23/2000 06/04/2001 1,353,152.10

005814 Completed NH-0167(028) 167 Sr 167, 8th St E To 15th St Sw Tucci & Sons, Inc. INGO GOLLER 05/24/2000 04/01/2003 1,851,744.60

005815 Completed STPF-0122(014) 122 Sr 122, Huntting Rd Vic To Mossyrock Lakeside Industries RON POLLOCK 05/10/2000 08/06/2001 541,612.22

005816 Completed STPF-0500(007) 500 Sr 500, Ne 162nd Ave To Jct Sr 14 Granite Northwest Inc JIM MCCLELLAN 05/10/2000 01/22/2001 1,592,890.79

Dec 25, 2019 58 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005817 Completed BR-0529(011) 529 Sr 529, Bridges 529/20 E&W, 529/25 Elec/Mech Rehab Mowat Construction Company AMIR AHMADI 05/24/2000 07/11/2005 7,813,619.20

005818 Completed NH-0012(113) 012 Sr 12, Mitchel Dr. To Cowiche Creek Br. Granite Northwest Inc J.D. DWYER 05/10/2000 12/14/2000 378,628.15

005819 Completed STPF-0240(007) 240 Sr 240, Hagen/Robertson Road Intersection Acme Materials & Construction Co MOE DAVARI 05/19/2000 04/02/2001 187,050.60

005820 Completed STATE 002 Sr 2, North Spokane/Division Street Stage 3 Cameron Contracting, Inc. DARREL MCCALLUM 05/15/2000 08/24/2000 102,079.19

005821 Completed STATE Edmonds Ferry Terminal - Dolphin Repair Hurlen Construction Company BRIAN HOLLING 03/09/2000 06/27/2000 85,580.00

005822 Completed BH-IM-STPF-9999(3 082 Sr 82, Exit 58 I/C Bridge 233/5 And Indian Church Concrete Barrier, Inc. PAUL GONSETH 05/24/2000 05/21/2002 682,120.60

005823 Completed NH-0012(114) 012 Sr 12, Nine Mile Canyon To Wallula Road Acme Materials & Construction Co MOE DAVARI 05/19/2000 01/26/2001 1,349,073.39

005824 Completed IM-STPF-9999(321) 124 Sr 12 To South Lake Road And Sr 182 Ramp Paving Granite Northwest Inc MOE DAVARI 05/11/2000 01/16/2001 1,296,823.31

005825 Completed BH-0169(014) 169 Sr 169, Green River Br Deck Rehab & Painting Mowat Construction Company JOE SCANLON 05/24/2000 08/12/2003 1,007,679.00

005827 Completed IM-0059249) 005 Sr 5, Sr 508 To Thurston County Line Wildish Standard Paving Co R.J.POLLOCK 05/12/2000 07/27/2001 3,672,136.50

005828 Completed STP-PM00(001) 020 Sr 20, Winthrop Vicinity Morrill Asphalt Paving Co., Inc. TERRY MATTSON 05/22/2000 02/05/2001 371,946.73

005829 Completed NH-0097(085) 097 Sr 97, Biggs Rapids Br 97/1 Deck Rehab Concrete Barrier, Inc. AMY E. REVIS 05/18/2000 12/05/2002 1,151,521.60

005830 Completed STP-PM00(001) 019 Sr 19, Jct. Sr 20 Intersection Ace Paving Co., Inc. JERRY MOORE 05/17/2000 02/06/2001 490,443.50

005831 Completed NH-0002(227) 002 Sr 2, Lower Sunnyslope Rd To Easy St. Basin Paving Co. KIRK D. BERG 05/24/2000 03/30/2001 808,797.58

005833 Completed ACHP-HP-NH-059(01 509 Sr 509, Port Of Tacoma Rd Grade Separation Balfour Beatty Rail Inc Dba FRED THARP 05/24/2000 06/09/2003 19,349,417.00

005834 Completed NH-0097(083) 097 Sr 97, Satus Pass Settlement Correction Scarsella Bros., Inc. AMY E. REVIS 05/24/2000 08/15/2001 1,892,165.98

005835 Completed NH-0012(115) 127 Sr 12, Sr 125 Spur To Bnrr Bridge Granite Northwest Inc J.D. DWYER 05/12/2000 02/20/2001 2,776,001.40

005836 Completed IM-0903(057) 090 Sr 90, Ryegrass Summit Rest Area Septic Tank Repla Pipkin Inc., Dba Pipkin Constructio PAUL GONSETH 05/22/2000 01/02/2001 174,748.00

005837 Completed NH-0097(082) 097 Sr 97, Dry Creek Bridge To Weigh Station Granite Northwest Inc PAUL GONSETH 05/12/2000 10/24/2000 912,116.54

005838 Completed STATE Anacortes F/T Additional Illumination & Paving Sail Electric, Inc. BRIAN HOLLING 05/12/2000 04/10/2002 106,375.00

005839 Completed NH-9999(329) 028 Vicinity Sr 2/97 To Grant Road Morrill Asphalt Paving Co., Inc. TERRY MATTSON 05/22/2000 01/31/2002 1,858,738.45

005840 Completed STP-PM00(001) 174 Sr 174 Safety Restoration Frank Gurney, Inc. DARREL MCCALLUM 05/15/2000 08/31/2000 512,297.17

005841 Completed STP-PM00(001) 027 Sr 27, Freeman To Vic 32nd Avenue Inland Asphalt Company LARRY L. EIK 05/10/2000 06/19/2001 970,011.00

005843 Completed STP-PM00(001) 129 Sr 129, 2nd St. To Highland Ave. Steelman-Duff, Inc. J.D. DWYER 05/17/2000 02/05/2001 682,311.94

005844 Completed NH-0520(030) 520 Sr 520, Evergreen Pt Br 520/8 Guide Roller Install Advanced American Diving DAVE BECHER 05/17/2000 05/07/2001 288,079.00

005845 Completed STP-PM00(001) 531 Sr 531, Lakewood Rd. To 172nd St Nw Vic. Rinker Materials West, Llc Dba MARLIN LENSSEN 05/24/2000 03/23/2001 389,436.00

005846 Completed STP-PM00(001) 516 Sr 516, Jct Witte Road Se Channelization And Signa Marshbank Construction, Inc. INGO GOLLER 05/17/2000 04/26/2004 648,413.20

Dec 25, 2019 59 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005847 Completed BH-9999(330) 124 Sr 124/125, Harshaw Rd O/C & Spring Valley Ck N.A. Degerstrom, Inc. MOE DAVARI 05/11/2000 08/03/2000 240,101.00

005848 Completed NH-0395(059) 395 Sr 395, E. Elm Rd. To Sr 17 - Sb Granite Northwest Inc MOE DAVARI 05/26/2000 12/21/2000 1,320,521.71

005849 Completed IM-0055(214) 005 Sr 5, Great Northern Rr Br 5/710 Pin Piles Donald B Murphy Contractors Inc MARCO FOSTER 05/19/2000 12/03/2001 265,446.00

005850 Completed NH-0012(109) 012 Sr 12, Touchet River To Dayton Granite Northwest Inc J.D. DWYER 06/09/2000 02/05/2001 1,160,974.60

005851 Completed NH-9999(328) 022 Sr 22/97, Mcdonald Rd To Wapato Rd & Sr 97 Slope F Columbia Asphalt & Gravel, Inc. J.D. DWYER 06/05/2000 05/04/2001 2,691,166.90

005852 Completed IM-STPF-9999(327) 090 Sr 90 Et Al, W Summit I/C To Hyak I/C & Snoqualmie Columbia Asphalt & Gravel, Inc. PAUL GONSETH 05/26/2000 04/10/2001 840,738.60

005854 Completed NH-0026(016) 026 Sr 26, Union Flat Creek To Colfax Inland Asphalt Company KEN OLSON 05/15/2000 03/15/2001 1,484,000.00

005855 Completed STP-PM00(001) 115 Sr 115, Ocean Shores To Sr 109 Lakeside Industries JOHN L. HART 05/22/2000 08/17/2000 696,426.50

005858 Completed NH-0195(036) 195 Sr 195, Plaza To Vic Cornwall Rd Poe Asphalt Paving, Inc. LARRY L. EIK 05/24/2000 01/31/2002 1,569,530.65

005860 Completed STP-PM00(001) 021 Sr 21 Et Al, 2000 Er Chip Seal Morrill Asphalt Paving Co., Inc. LARRY L. EIK 05/24/2000 02/05/2001 1,648,300.70

005861 Completed STP-PM00(001) 243 Sr 243, Crab Creek Bridge No. 243/10 Deck Repair Concrete Barrier, Inc. TERRY L. BERENDS 06/05/2000 01/17/2001 175,521.70

005862 Completed STPF-0014(034) 014 Sr 14, Goodnoe Rd To Wood Cr & Alderdale Rd Granite Northwest Inc JIM MCCLELLAN 06/21/2000 12/06/2001 5,431,094.00

005863 Completed IM-0052(183) 005 Sr 5, Maytown I/C To 93rd Ave Sw I/C Granite Construction Company NEAL J. CAMPBELL 06/27/2000 11/29/2001 1,479,338.50

005864 Completed IM-0901(416) 090 I-90 Sunset I/C Modifications Stage 1 Scarsella Bros., Inc. MATTHEW PREEDY 06/09/2000 06/28/2004 3,761,486.15

005865 Completed STATE Kingston Dolphin Replacement Ph 1 General Construction Company NICOLE MCINTOSH 06/13/2000 12/29/2000 1,130,105.00

005866 Completed IM-0053(879) 005 Sr 5, Mercer Street On & Off Ramps Engberg Construction, Inc. BRIAN NIELSEN 07/18/2000 09/21/2001 1,122,353.10

005867 Completed IM-4053(839) 405 Sr 405, Sr 900 (Ne Park Dr) Br 405/23 & Coal Ck Pk Pct Construction, Inc. MATTHEW PREEDY 06/07/2000 01/09/2001 462,028.39

005868 Completed NH-0395(060) 395 Sr 395, W 27th Ave I/S & Kennewick Ave To Sr 182 Acme Materials & Construction Co MOE DAVARI 06/30/2000 06/27/2001 3,646,506.00

005869 Completed ER-9902(009) 020 Sr 20, Eaglemount Slides Tbh & Associates Llc JERRY MOORE 06/21/2000 06/01/2001 537,790.65

005871 Completed NH-0012(118) 012 Sr 12, Wishkah Blvd To Solki Road Lakeside Industries JOHN L. HART 06/23/2000 06/15/2001 2,285,642.95

005872 Completed STP-PM00(001) 506 Sr 506, Ryderwood To Jct Sr 5 Granite Construction Company AMY E. REVIS 06/21/2000 12/13/2001 998,353.13

005873 Completed STATE 202 Sr 202, Vic Mp 25 Landslide At Tokul Creek Soldier Tri-State Construction Inc MATTHEW PREEDY 06/23/2000 06/06/2001 1,575,744.00

005874 Completed IM-0055(217) 005 Sr 5, Bow Hill Rest Area - Waterline Replacement Larry Brown Construction, Inc. MARCO FOSTER 06/28/2000 12/06/2000 138,237.85

005875 Completed STP-PM00(001) 009 Sr 9, Sr 544 Vic. To Sr 546 Granite Construction Company TODD HARRISON 06/27/2000 01/11/2001 340,880.20

005876 Completed STP-PM00(001) 542 Sr 542, Lincoln St. To Britton Rd. Vic. Granite Construction Company TODD HARRISON 06/27/2000 01/31/2001 591,755.10

005877 Completed STP-PM00(001) 020 Sr 20, Bannon Cr To Aeneas Valley Rd Goodfellow Bros Inc TERRY L. BERENDS 06/28/2000 05/13/2002 2,939,175.20

005878 Completed NH-0012(107) 012 Sr 12, Tucker Rd To Lacamas Cr Vic James Dean Construction, Inc. RONALD J. POLLOCK 06/27/2000 03/11/2002 494,049.85

Dec 25, 2019 60 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005879 Completed NH-0003(036) 003 Sr 3, Sr 304 To Anderson Hill Rd Vic Ace Paving Co., Inc. AMITY TROWBRIDGE 06/23/2000 01/14/2002 3,142,908.74

005880 Completed STATE Southworth Wingwall Replacement General Construction Company BRIAN HOLLING 07/21/2000 12/29/2000 919,022.00

005881 Completed IM-0005(874) 005 Sr 5, Mounts Road Weigh In Motion Gary Merlino Construction Co., Inc. STEVE ROARK 06/27/2000 11/28/2000 257,006.00

005882 Completed IM-0905(092) 090 Sr 90, Ritzville To Tokio - Stone Matrix Inland Asphalt Company KEN OLSON 06/08/2000 01/05/2001 1,088,888.00

005884 Completed STPF-0900(013) 900 Sr 900, 162nd Ave Se Vic To Se 78th St Vic Lakeside Industries JAY LAVASSAR 06/23/2000 03/19/2001 1,305,172.15

005887 Completed STP-PM00(001) 009 Sr 9, Lake Cavanaugh Rd Vic To Skagit Hwy Vic Csr Associated KEN JOHNSON 07/07/2000 04/17/2001 1,395,204.86

005889 Completed STP-PM00(001) 017 Sr 17, County Rd To Sun Lakes State Park Central Washington Asphalt, Inc. TERRY L. BERENDS 06/30/2000 02/02/2001 108,693.54

005890 Completed STATE 153 Sr 153, Beaver Creek Fish Passage Pipkin Inc., Dba Pipkin Constructio TERRY L. BERENDS 07/05/2000 08/08/2001 385,291.60

005891 Completed NH-0016(013)/STAT 016 Sr 16, Jackson Ave I/C To Tacoma Narrows Bridge We Tucci & Sons, Inc. JEFF CARPENTER 07/25/2000 03/09/2001 696,507.62

005892 Completed STATE Mukilteo F/T Wingwall Replacement American Construction Co., Inc. BRIAN HOLLING 09/13/2000 03/25/2002 1,422,594.19

005893 Completed BH-0002(226) 002 Sr 2, Sultan River Br & Wallace River Br Bridge Pa Root Paint & Glass Co. Inc. PATRICK MCCORMICK 07/05/2000 02/23/2001 407,991.40

005894 Completed NH-0101(171 101 Sr 101, Mp 321 & 322 Vic. Slides Bruch & Bruch Construction Inc JOHN L. HART 06/30/2000 02/05/2001 3,371,918.78

005896 Completed BH-9999(336) 002 Sr 2 Et Al, Region Wide Scour Repair 2000 Pipkin Inc., Dba Pipkin Constructio KIRK D. BERG 07/12/2000 12/21/2000 134,306.50

005897 Completed NH-0167(029) 167 Sr 167, Sr 405 Vic To Sr 900 Couplet Icon Materials, Inc. JOE SCANLON 07/13/2000 10/22/2001 859,721.59

005898 Completed ACIM-IM-0904(111) 090 Sr 90, Sr 171 I/C And Br 90/223 Replacement F.E. Ward, Inc. KIRK D. BERG 07/20/2000 02/14/2003 6,628,935.05

005899 Completed STP-PM00(001) 410 Sr 410, Jct Se 456th St & 2m E Of Scatter Creek Totem Electric Of Tacoma, Inc. DAVE STANDAHL 07/13/2000 06/19/2001 251,357.00

005900 Completed STP-PM00(001) 515 Sr 515/516, Se 256th St To 132nd Ave Se And Se 204 Watson Asphalt Paving Company, INGO GOLLER 07/13/2000 07/02/2002 704,650.91

005901 Completed NH-0525(032) 525 Sr 525, Cameron Rd To Sr 20 - Stage 4/Sect 1 Callen Construction Company, Inc. MARLIN LENSSEN 07/20/2000 05/21/2003 1,382,056.00

005902 Completed BH-0261(005) 261 Sr 261, Snake River Br 261/125 Dunkin & Bush, Inc. MOE DAVARI 07/18/2000 09/17/2001 1,310,131.00

005903 Completed STP-PM00(001) 011 Sr 11, Estes Rd Vic To Whatcom Co Line And Belling Lakeside Industries MARCO FOSTER 07/19/2000 02/13/2001 1,084,695.50

005904 Completed NH-0101(164) 101 Sr 101, Gardiner To West Uncas Road Vic. Lakeside Industries JERRY MOORE 07/19/2000 03/27/2001 1,860,461.92

005905 Completed STPF-ER-0001(101) 020 Sr 20, Debris Channel Structure Pacific Road & Bridge Co. MARCO FOSTER 08/03/2000 02/02/2004 1,379,870.94

005906 Completed IM-0902(193) 090 Sr 90, Gold Creek To Easton Hill Columbia Asphalt & Gravel, Inc. PAUL GONSETH 08/02/2000 07/24/2001 1,439,701.80

005907 Completed LOCAL 512 Sr 512, 94th Ave I/C South Hill P & R Lot Pacific Road & Bridge Co. MIKE MORISHIGE 08/24/2000 05/06/2003 2,128,443.20

005908 Completed STP-PM00(001) 547 Sr 547, Sr 542 To Southpass Rd Vic Csr Associated TODD HARRISON 08/03/2000 04/17/2001 994,911.57

005909 Completed AC-NH0512(011) 512 Sr 512, Sr 5 To Vic Sr 7 I/C Woodworth & Company, Inc. MIKE MORISHIGE 07/20/2000 10/10/2001 1,471,430.43

005910 Completed BH-NH-9999(332) 278 Sr 278/395, 2000 Er Scour Repair West Company, Inc. DARREL MCCALLUM 08/07/2000 02/05/2001 54,082.15

Dec 25, 2019 61 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005913 Completed STATE 539 Sr 539, Junction Kelly Road Callen Construction Company, Inc. TODD HARRISON 08/03/2000 01/06/2006 389,383.00

005914 Completed STP-PM00(001) 225 Sr 225, I-82 To Benton City Granite Northwest Inc MOE DAVARI 08/03/2000 01/25/2001 159,255.60

005915 Completed NH-0101(172) 101 Sr 101, Bogachiel Vic Slide Addleman Logging Co., Inc. JOHN L. HART 08/03/2000 07/17/2001 860,485.00

005916 Completed HP-0166(003) 166 Sr 166, Ross Point Vic Repair - Phase 2 Dlb Earthwork Co. AMITY TROWBRIDGE 08/02/2000 06/11/2001 596,722.35

005917 Completed IM-0904(107) 090 Sr 90, Rural Interstate Rumble Strips Diversified Concrete-Cutting DARREL MCCALLUM 08/10/2000 12/04/2000 132,574.00

005924 Completed NH-0270(005) 270 Sr 270, Pullman To Idaho State Line Poe Asphalt Paving, Inc. DARREL MCCALLUM 08/15/2000 09/26/2001 1,223,120.16

005925 Completed HSRP-1010(003) 505 Sr 505, Railroad Crossing At Winlock Granite Construction Company RON POLLOCK 08/09/2000 04/22/2002 361,034.50

005926 Completed NH-0054(240) 005 Sr 5, Stanwood/Bryant Signing & Pavement Grinding D. A. Zuluaga Construction, Inc. G MCNABB / M LENSSEN 08/11/2000 12/21/2000 141,802.40

005927 Completed NH-0018(025) 018 Sr 18, Holder Creek Vic Slope Stabilization Mowat Construction Company DAVE STANDAHL 08/08/2000 01/20/2004 1,821,111.35

005928 Completed STATE 525 Sr 525, Old State Highway Vicinity Petersen Brothers, Inc. MARLIN LENSSEN 08/08/2000 02/07/2001 64,712.98

005929 Completed BH-0821(082) 082 Sr 82, Yakima & Naches River Bridges 82/114 S & N Long Painting Company PAUL GONSETH 08/16/2000 07/12/2001 1,581,843.53

005930 Completed BH-0009(037) 009 Sr 9, Nookachamps Creek Br. 9/208 Scour Repair One Way Construction, Inc. KEN JOHNSON 08/02/2000 01/09/2001 59,014.00

005931 Completed STATE 005 220th St Sw & Northgate Way Off Ramp Modifications Engberg Construction, Inc. BOB LINDEN 08/16/2000 06/11/2001 107,288.61

005932 Completed NH-0003(045) 003 Sr 3, Sr 106 To Mp 26.70 Ace Paving Co., Inc. AMITY TROWBRIDGE 08/11/2000 02/15/2001 500,430.00

005935 Completed STATE 005 Sr 5, 38th St Interchange Max J. Kuney Company TROY COWAN 09/21/2000 11/04/2003 10,339,252.25

005936 Completed STATE 020 Sr 20, Tiger Reseeding Wildlands Inc GORDON OLSON 08/25/2000 01/17/2001 42,000.00

005938 Completed NH-0002(229) 002 Sr 2, Sultan-Startup Rd Channelization Lakeside Industries DAVE LINDBERG 08/31/2000 04/12/2004 533,200.25

005939 Completed BH-0009(035) 009 Sr 9, Samish River Br 9/223 Scour Repair One Way Construction, Inc. MARCO FOSTER 08/31/2000 12/11/2003 122,710.00

005943 Completed IM-0053(877) 005 Sr 5, Nb Downtown Channelization C.A. Carey Corporation BRIAN NIELSEN 09/18/2000 11/20/2002 1,366,121.00

005945 Completed STP-PM00(001) 105 Sr 105 Spur, Sr 105 Vic. To Montesano St. Lakeside Industries JOHN L. HART 09/06/2000 01/26/2001 858,363.00

005947 Completed ACIM-0906(106) 090 Sr 90, Sprague Ave I/C Phase 3 Max J. Kuney Company DARREL MCCALLUM 10/03/2000 04/16/2003 14,651,629.25

005950 Completed STATE 162 Sr 162, 128th St E Signal Stage 1 Totem Electric Of Tacoma, Inc. MIKE MORISHIGE 11/06/2000 05/25/2001 86,915.00

005951 Completed IMG-IGFSB-0822(11 082 Sr 82, Union Gap To Oregon State Line Apply-A-Line, Inc. PAUL GONSETH 10/10/2000 09/10/2001 961,543.20

005954 Completed BH-0099(065) 099 Sr 99, Spokane St O/C Seismic Stage 2 Mowat Construction Company BRIAN NIELSEN 11/01/2000 02/07/2003 2,251,761.00

005955 Completed STATE 303 Sr 303, Ridgetop Blvd Wb Off Ramp Signalization Potelco Inc AMITY TROWBRIDGE 11/06/2000 12/13/2001 166,262.41

005956 Completed ACNH-0097(087) 097 Sr 97, Okanogan To Riverside Basin Paving Co. TERRY L. BERENDS 11/09/2000 06/27/2002 3,689,574.70

005957 Completed STATE 024 Sr 24, Hatton Rd Channelization Basin Paving Co. KIRK D. BERG 11/14/2000 08/13/2001 145,472.75

Dec 25, 2019 62 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005958 Completed GCA-2363(AGREEMEN 504 Sr 504, Castle Lake Viewpoint Nutter Corporation Dba Nutter AMY E. REVIS 11/28/2000 03/08/2002 327,473.00

005961 Completed STP-PM01(001) 290 Sr 290, 2nd Ave O'Xing Br 290/4.6 N N.A. Degerstrom, Inc. LARRY L. EIK 11/15/2000 11/19/2001 209,806.00

005963 Completed ACNH-0017(027) 026 Sr 17, Sr 26 Grade Separation Steelman-Duff, Inc. TERRY MATTSON 12/11/2000 11/05/2003 3,301,148.58

005964 Completed STATE 020 Sr 20, Methow River Br 20/624 Vertical Clearance Diamaco Inc. TERRY MATTSON 11/15/2000 01/08/2002 139,000.00

005965 Completed ACSTP-PM01(001) 024 Sr 24, Vernita Rest Area Replace Sewage Lagoons Halme Construction, Inc. PAUL GONSETH 12/14/2000 04/18/2001 329,688.00

005966 Completed HP-ACHP-0020(103) 020 Sr 20, Deception & Canoe Pass Br 20/204 & 20/207 Strider Construction Co., Inc. MARLIN LENSSEN 12/22/2000 11/16/2004 996,833.00

005968 Completed AC-IM-0053(873) 005 Sr 5, Pierce C/L To Tukwila - Stage 2s Kiewit Infrastructure West Co. MESSAY SHIFERAW 01/11/2001 06/17/2004 5,766,000.00

005969 Completed NH-002(231) 002 Sr 2, Cashmere Rock Cut One Way Construction, Inc. TERRY MATTSON 12/15/2000 04/02/2002 734,359.21

005970 Completed STATE 016 Sr 16, Sprague Ave I/C To Snake Lake Hov Mowat Construction Company MIKE MORISHIGE 01/26/2001 04/21/2004 16,301,421.22

005972 Completed STATE San Juan Offshore Maintenance Manson Construction Co. TOM CASTOR 12/20/2000 05/16/2001 263,199.00

005973 Completed STP-PM01(001) 097 Sr 97a, Lakeside Vicinity Basin Paving Co. TERRY L. BERENDS 12/20/2000 02/19/2002 578,728.20

005974 Completed STP-PM01(001) 002 Sr 2 Et Al, Ncr Sign Update 99-01 Sharp-Line Industries, Inc. KIRK D. BERG 12/15/2000 07/17/2001 352,218.00

005975 Completed STP-PM01(001) 150 Sr 150, Boyd Rd & Dietrick Rd Channelization Goodfellow Bros Inc KIRK D. BERG 01/11/2001 10/31/2001 941,701.00

005976 Completed IM-0901(418) 090 Sr 90, Homer M Hadley Bridge Anchor Cable Replacem General Construction Company DAVE BECHER 01/04/2001 10/01/2003 660,799.00

005977 Completed NH-0240(008) 240 Sr 240, Stevens Drive To Sr 182 Inland Asphalt Company MOE DAVARI 01/11/2001 03/20/2002 3,016,016.25

005978 Completed STATE 002 Sr 2, Odabashian Bridge Widening Pct Construction, Inc. TERRY L. BERENDS 01/04/2001 11/07/2002 1,210,422.60

005979 Completed IM-0054(246) Sr 5, Lowell Rd To Broadway Ave Sb Rinker Materials West, Llc Dba MARLIN LENSSEN 01/11/2001 12/20/2002 654,746.99

005981 Completed IM-0053(886) 005 Sr 5, Pierce C/L To Tukwila Hov Lanes & Its - Stag Tri-State Construction Inc STANLEY ENG 03/08/2001 06/13/2006 21,928,264.70

005982 Completed STP-PM01(001) 017 Nc Region 2001 Seal Granite Northwest Inc TERRY MATTSON 01/11/2001 06/17/2002 2,327,651.95

005983 Completed HP-NH-0519(004) 090 Sr 90/519, Intermodal Access Phase 1 S Atlantic St Balfour Beatty Rail Inc Dba JOHN LEFOTU 04/17/2001 07/20/2009 32,887,455.00

005985 Completed ACIM-STPE-0053(88 005 Sr 5, 175th Sb On Ramp Channelization & Signal Marshbank Construction, Inc. BRIAN NIELSEN 01/26/2001 10/08/2003 1,569,441.70

005986 Completed STP-PM01(001) 097 Sr 97a, Knapps Hill Tunnel Goodfellow Bros Inc KIRK D. BERG 01/11/2001 08/22/2001 629,195.00

005987 Completed STATE Eagle Harbor Marine Maintenance General Construction Company BRIAN HOLLING 02/21/2001 05/13/2002 301,362.00

005988 Completed LOCAL 005 Sr 5, Trosper Road Signals Sci Infrastructure, Llc NEAL J. CAMPBELL 02/22/2001 08/16/2002 486,486.50

005989 Completed STATE Eagle Harbor Maintenance Facility Pile Replacement Hurlen Construction Company BRIAN HOLLING 01/12/2001 03/25/2002 234,580.00

005990 Completed STATE 395 Sr 395 Et Al, Eastern Region Snow Fence Wesslen Construction, Inc. DARREL MCCALLUM 01/29/2001 05/24/2001 63,810.28

005991 Completed STP-PM01(001) 524 Pine St - Sr 524 Vic To Sr 104 Spur Watson Asphalt Paving Company, DAWN MCINTOSH, P.E. 02/21/2001 02/05/2002 337,752.51

Dec 25, 2019 63 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

005994 Completed BH-0053(887) 005 Sr 5, S 129th St U'Xing Br 5/526 Seismic Retrofit Robison Construction, Inc. INGO GOLLER 01/26/2001 08/29/2002 256,433.00

005995 Completed NH-0026(017) 026 Sr 26, E Sw Rd To Adams County Line Granite Northwest Inc KIRK D. BERG 01/29/2001 04/18/2002 3,155,196.55

005996 Completed STP-PM01(001) 024 Sr 24, Birchfield Road Intersection Knobel'S Electric, Inc. PAUL GONSETH 01/25/2001 10/22/2001 173,780.55

005997 Completed STATE 101 Sr 101, Chicken Coop Rd Eb Passing/Truck Lane Primo Construction, Inc. JERRY MOORE 01/18/2001 03/19/2002 411,730.08

006004 Completed LOCAL 007 Sr 7, Mp 40 To Mp 42.5 Scarsella Bros., Inc. TROY COWAN 02/21/2001 06/11/2002 1,357,428.25

006005 Completed STATE 002 Sr 2/97, Aplets Way Signal Aztech Electric Inc TERRY MATTSON 02/01/2001 01/22/2002 261,799.40

006006 Completed STP-PM01(001) 271 Sr 271, Dry Creek Br 271/5.55 & 271/4.45 A & R Construction, Inc. LARRY L. EIK 02/20/2001 03/28/2002 342,755.90

006007 Completed STATE 028 Sr 28, Sr 282 Signal Colvico, Inc. TERRY L. BERENDS 02/02/2001 04/30/2002 197,861.42

006008 Completed STATE 018 Sr 18, 180th Ave Se To Maple Valley Scarsella Bros., Inc. DAVE STANDAHL 04/16/2001 05/17/2005 22,631,315.92

006009 Completed NH-0104(030) 104 Sr 104, Hood Canal Br Electrical/Mechanical Rehab General Construction Company AMITY TROWBRIDGE 02/02/2001 07/02/2004 674,395.00

006010 Completed ACHP-IM-0901(416) 090 I-90, I-90 Sunset I/C Modifications Stage 2 Kiewit Construction Company BRIAN DOBBINS 03/13/2001 03/10/2008 39,100,843.70

006012 Completed NH-0520(029) 520 Sr 520, Evergreen Pt Br 520/8 Rehab General Construction Company BRIAN NIELSEN 02/21/2001 03/14/2003 1,014,839.00

006015 Completed IM-0054(247) 528 Sr 528 I/C, Electrical And Mechanical Signal Electric, Inc. MARLIN LENSSEN 03/07/2001 03/20/2003 204,588.00

006016 Completed STATE 090 Sr 90, Bridge 90/227 Raising Donald B Murphy Contractors Inc KIRK D. BERG 03/28/2001 10/22/2001 377,794.50

006017 Completed BH-0020(122) 020 Sr 20, Methow River Br 20/624 Painting Root Paint & Glass Co. Inc. TERRY MATTSON 03/07/2001 09/05/2001 117,934.00

006018 Completed NH-STPR-0097(088) 097 Sr 97, Daroga State Park To Twin W Orchards Basin Paving Co. TERRY MATTSON 03/05/2001 08/05/2002 1,865,443.58

006019 Completed NH-0014(037) 014 Sr 14, Lyle Tunnel 14/216 Portals And Liner Scarsella Bros., Inc. CHUCK RUHSENBERGER 03/07/2001 03/10/2003 1,244,874.00

006020 Completed STP-PM01(001) 508 Sr 508, Sr 5 To Sr 7 Columbia Asphalt & Gravel, Inc. RON POLLOCK 03/06/2001 01/07/2003 2,919,424.43

006024 Completed NH-0200(119) 020 Sr 20, Four Corners Rd To Ferry Terminal Lakeside Industries JERRY MOORE 03/14/2001 03/27/2002 2,053,060.78

006025 Completed IM-0053(888) 005 Sr 5, Federal Way Sb Weigh Station Weigh-In-Motion Totem Electric Of Tacoma, Inc. DAVE STANDAHL 03/15/2001 08/22/2002 462,855.79

006026 Completed STP-PM01(001) Sr 2 Et Al, Ncr Electrical Update 1999-2001 Power City Electric, Inc. TERRY MATTSON 03/08/2001 08/01/2002 292,080.00

006027 Completed ACNH-NH-0500(005) 500 Sr 500/Thurston Way Interchange Max J. Kuney Company AMY E. REVIS 03/08/2001 04/01/2005 22,725,000.00

006030 Completed NH-0014(036) 014 Sr 14, Nelson Creek To Lyle Jc Compton Contractor Inc CHUCK RUHSENBERGER 03/30/2001 01/31/2003 2,461,273.50

006031 Completed STATE/LOCAL 005 Sr 5, Sleater-Kinney Rd U'Xing Bicycle/Pedestrian Glacier Construction & Equipment TROY COWAN 04/16/2001 04/22/2003 1,434,315.90

006032 Completed STATE/FEDERAL 285 Sr 285, Wenatchee River Br 285/20 E & W Painting Dunkin & Bush, Inc. TERRY L. BERENDS 03/15/2001 01/28/2002 889,988.00

006035 Completed STP-PM01(001) 092 Sr 92, Sr 9 To Granite Avenue Granite Construction Company MARLIN LENSSEN 03/28/2001 03/20/2003 1,010,010.75

006036 Completed STP-PM01(001) 112 Sr 112, Mp 19.5 To Mp 20.5 Safety Improvements West Company, Inc. JERRY MOORE 04/17/2001 05/29/2002 2,786,940.35

Dec 25, 2019 64 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006037 Completed STATE/LOCAL 525 Sr 525, Sr 5 To Sr 99 Granite Construction Company AMIR AHMADI 04/11/2001 01/24/2006 7,656,666.67

006038 Completed STATE Vashon Ferry Terminal Sewer Modifications Everett Shipyard, Inc. TOM CASTOR 03/29/2001 04/05/2002 74,648.00

006040 Completed NH-9999STPF-9999( 012 Sr 12, Pt Of Wilma To Idaho S/L And 15th St To Sna Steelman-Duff, Inc. J.D. DWYER 03/28/2001 05/08/2002 627,271.15

006041 Completed STP-PM01(001) 017 Sr 17, Columbia River Br 17/401 Painting And Rail Root Paint & Glass Co. Inc. TERRY L. BERENDS 04/04/2001 01/15/2002 882,806.50

006042 Completed STPF-PM01(001) Sr 124 Et Al, 2001 Region Wide Seal Granite Northwest Inc MOE DAVARI 04/04/2001 11/09/2001 1,234,933.80

006043 Completed BH-0053,IM-0053(8 005 Sr 5, Nb Ravenna & N 103rd Exp Ramp Bridge Mc Over Concrete Barrier, Inc. BRIAN NIELSEN 04/06/2001 03/28/2002 1,289,390.95

006045 Completed NH-9999(325) 003 Sr 16, Sunnyslope To Gorst Rr Br And Anderson Hill Ace Paving Co., Inc. AMITY TROWBRIDGE 04/02/2001 04/03/2002 1,463,669.73

006046 Completed STP-PM01(001) 024 Sr 24, Vernita Bridge 24/105 Repair Advanced American Diving PAUL GONSETH 03/30/2001 01/07/2002 129,203.00

006047 Completed IM-0051(250) 005 Sr 5, Mp 41.9 Rock Stabilization Hi Tech Rockfall Construction, Inc. AMY E. REVIS 04/05/2001 02/20/2002 353,456.50

006048 Completed STP-PM00(001) 161 Sr 161, Sr 7 To Eatonville Vicinity Tucci & Sons, Inc. MIKE MORISHIGE 04/11/2001 10/24/2001 522,131.05

006049 Completed IM9999,NH9999 353 005 Sr 5 To Columbia St & Vancouver Area Ramp Paver Lakeside Industries DON OWINGS 04/09/2001 01/10/2002 1,570,246.65

006050 Completed STP-PM01(001) 002 Sr 2 Et Al, Ncr Guardrail Update 2001 Coral Construction Company TERRY L. BERENDS 04/04/2001 01/18/2002 497,399.91

006052 Completed STP-PM01(001) 012 Sr 5 Et Al, Swr Signing 2001 Chandler Construction, Inc. RON POLLOCK 04/17/2001 12/11/2001 158,179.00

006053 Completed NH-9999(354) 097 Sr 970, Teanaway River To Sr 97 Granite Northwest Inc J.D. DWYER 04/04/2001 12/18/2001 777,632.30

006054 Completed STATE,LOCAL 203 Sr 203, Ne Stillwater Hill Rd & Fay Rd Fury Construction Company BRIAN DOBBINS 04/12/2001 05/03/2005 1,765,269.99

006055 Completed STATE Eagle Harbor Exhaust Fan, Lighting & Power Upgrade Totem Electric Of Tacoma, Inc. BRIAN HOLLING 04/12/2001 04/05/2002 139,000.00

006056 Completed STP-PM01(001) 904 Sr 904, Rhett'S Creek Bridge 904/4 N.A. Degerstrom, Inc. DARREL MCCALLUM 04/02/2001 10/29/2001 138,388.00

006057 Completed STP-PM01(001) 241 Sr 241, Alexander Rd To Factory Rd Granite Northwest Inc J.D. DWYER 04/16/2001 11/25/2002 679,800.80

006058 Completed BH-STPF-9999(350) 821 Sr 823 Wye To Sr 821 & Sr 82 To Selah Creek Granite Northwest Inc PAUL GONSETH 05/04/2001 07/02/2002 713,907.04

006059 Completed NH-0395(065) 395 Sr 395, Sr 17 To Adams County Line Granite Northwest Inc MOE DAVARI 04/27/2001 12/13/2001 2,569,119.71

006060 Completed STATE 005 Sr 5 & 101, Lewis & Pacific County Signals Totem Electric Of Tacoma, Inc. DOUG FICCO 04/25/2001 04/11/2002 508,542.00

006061 Completed STATE/CN/FEDERAL 090 Sr 90, W Ellensburg I/C To S Ellensburg I/C Granite Northwest Inc J.D. DWYER 05/04/2001 01/31/2003 1,994,931.40

006062 Completed STATE/LOCAL 012 Sr 12, Snake River Br 12/915 At Clarkston Colvico, Inc. J.D. DWYER 05/11/2001 05/07/2004 589,892.88

006063 Completed STATE 005 Sr 5/99, Nb Sr 516 O/C And Battery St Tunnel Tri-State Construction Inc BRIAN NIELSEN 04/19/2001 12/13/2001 520,963.00

006064 Completed IM-BH-0053(858) 005 Sr 5, Interstate Bridge Decks Concrete Barrier, Inc. FRED THARP 04/17/2001 02/19/2002 669,718.00

006065 Completed NH-0099(066) 099 Sr 99, Lander St Pedestrian Br 99/539 Pacific Road & Bridge Co. JULIA MIZUHATA 04/19/2001 04/23/2002 258,614.00

006067 Completed STP-PM01(001) 021 Sr 174, Hesseltine To Sr 21 Poe Asphalt Paving, Inc. LARRY L. EIK 04/04/2001 06/10/2002 1,517,833.85

Dec 25, 2019 65 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006072 Completed NH-0004(014) 004 Sr 4, Mp 47 Vic Rockfall Stabilization Elting Incorporated AMY E. REVIS 04/19/2001 07/31/2002 598,707.00

006074 Completed IGFSB-2000(17) 005 Sr 5, 54th Ave E To King County Line Cable Barrier Petersen Brothers, Inc. FRED THARP 04/27/2001 12/12/2001 139,487.30

006075 Completed BH-0105(014) 105 Sr 105, Elk River Bridge 105/104 Deck Rehab Concrete Barrier, Inc. JOHN L. HART 04/27/2001 10/12/2001 856,586.50

006077 Completed HP-0166(004) 166 Sr 16 U'Xing To Port Orchard Mp 2 Vicinity Slide R West Company, Inc. AMITY TROWBRIDGE 05/01/2001 02/28/2002 855,753.60

006078 Completed IM-0051(251) 005 Sr 5, Median Cable Barrier & Pccp Rehab Granite Northwest Inc CHUCK RUHSENBERGER 05/09/2001 07/28/2003 3,389,510.73

006079 Completed STATE 005 Sr 5, Maytown I/C To 93rd Ave Sw I/C Sci Infrastructure, Llc NEAL J. CAMPBELL 05/11/2001 01/31/2003 7,635,523.55

006080 Completed NH-0097(090) 097 Sr 97, Ellensburg To Hungry Jct Road Granite Northwest Inc J.D. DWYER 05/04/2001 12/18/2001 459,969.96

006081 Completed STP-PM01(001) 024 Sr 24, S Othello C/L To Sr 26 U'Xing Central Washington Asphalt, Inc. KIRK D. BERG 05/01/2001 02/13/2002 259,402.15

006082 Completed NH-0522(031) 522 Sr 522, I-405 I/C Illumination Rebuild Signal Electric, Inc. JAY LAVASSAR 05/08/2001 11/14/2002 617,634.25

006083 Completed NH-0012(102) 012 Sr 12, 183rd To Joselyn Granite Construction Company NEAL J. CAMPBELL 04/27/2001 02/04/2002 257,784.14

006084 Completed IM-0053(865) 005 Sr 5, Olive Way To Boylston Electrical System Upgr Elcon Corporation BRIAN NIELSEN 05/18/2001 07/16/2003 1,812,841.28

006085 Completed STP-PM01(001) 002 Sr 2 Et Al, 2001 Eastern Region Chip Seal Granite Northwest Inc LARRY L. EIK 05/14/2001 03/18/2002 1,791,026.05

006086 Completed STATE 012 Sr 12, Tieton River To Naches River Granite Northwest Inc J.D. DWYER 04/25/2001 12/18/2001 1,284,798.35

006087 Completed STATE 097 Sr 97, Biggs Rapids Bridge 97/1 Repair General Construction Company CHUCK RUHSENBERGER 03/01/2001 12/27/2001 237,990.00

006090 Completed STP-PM01(001) 020 Sr 20, Panther Creek Br 20/354 Deck Rehab Concrete Barrier, Inc. MARCO FOSTER 06/01/2001 02/26/2002 265,068.75

006091 Completed STPF-PM01(001) 509 Sr 509, 21st Ave Sw To 1st Ave S Bridge 509/105 Ac Woodworth & Company, Inc. MESSAY SHIFERAW 05/11/2001 05/16/2003 380,828.55

006092 Completed NH-0097(089) 097 Sr 97, Biggs Rapids Bridge 97/1 Navigational Light Colvico, Inc. CHUCK RUHSENBERGER 05/08/2001 02/07/2002 398,190.35

006093 Completed STATE 090 Sr 90, Vantage Bridge Vic Its Solutions Opp & Seibold General Construction KIRK D. BERG 05/10/2001 04/19/2002 701,017.00

006094 Completed STATE 090 Sr 90, Denny Creek Road To Mp 49.7 Fury Construction Company PAUL GONSETH 05/10/2001 08/23/2001 103,279.00

006095 Completed IM-0053(891) 005 Sr 5, Tacoma Vic Guardrail Improvements Petersen Brothers, Inc. FRED THARP 04/27/2001 12/16/2002 1,338,607.39

006096 Completed NH-0395(064) 395 Sr 395, Deer Park Weigh Station Rehab Hap Taylor And Sons, Inc. Dba LARRY L. EIK 05/04/2001 02/25/2002 284,215.70

006097 Completed NH-9999(352) 012 Sr 12, Lewiston Rd To Coppei Creek Br Granite Northwest Inc MOE DAVARI 05/29/2001 11/08/2001 763,446.53

006098 Completed NH-0004(015) 004 Sr 4, Jct Sr 101 To West Valley Creek Jc Compton Contractor Inc AMY E. REVIS 05/14/2001 04/16/2003 3,927,599.00

006099 Completed IM-9999(361) 005 Sr 5, 236th St Ne To Starbird Rd And 12th Ave Nw V Rinker Materials West, Llc Dba MARLIN LENSSEN 05/09/2001 07/03/2003 2,727,489.05

006100 Completed NH-9999(355) 005 Sr 5/205, Variable Message Sign Replacement Signal Electric, Inc. DON OWINGS 05/29/2001 10/14/2004 1,140,990.00

006101 Completed STATE 500 Sr 500, Ne 131st Avenue Signal Mill Plain Electric, Inc. CHUCK RUHSENBERGER 05/10/2001 07/18/2002 218,181.00

006102 Completed STATE 002 Sr 2, Skinney Creek Fish Passage Pipkin Inc., Dba Pipkin Constructio TERRY L. BERENDS 05/24/2001 10/28/2002 1,147,833.00

Dec 25, 2019 66 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006104 Completed IM-0901(415) 090 Sr 90, Mercer Slough To 128th Ave Se Lakeside Industries JAY LAVASSAR 05/22/2001 09/25/2002 2,792,192.70

006105 Completed STP-PM01(001) 099 Sr 99, 148th St Sw To Evergreen Way Rinker Materials West, Llc Dba DAVE LINDBERG 05/24/2001 08/14/2002 1,211,557.35

006106 Completed STATE 410 Sr 410, Pierce-King C/L & Jct Se 456th St Tucci & Sons, Inc. DAVE STANDAHL 05/09/2001 03/06/2003 405,908.64

006107 Completed STATE 547 Sr 547, Mp 9.44 To Mp 9.98 Granite Construction Company MARK RUSSELL 05/22/2001 01/15/2002 52,777.00

006108 Completed STATE 548 Sr 548, Mp 7.98 To Mp 8.52 Granite Construction Company MARK RUSSELL 05/18/2001 01/22/2002 47,321.00

006109 Completed NH-0020(123) 020 Sr 20, Swinomish Slough Bridges Bridge Pier Protec American Construction Co., Inc. MARCO FOSTER 06/07/2001 07/08/2002 185,839.00

006110 Completed STATE 017 Sr 17/Sr 26 Interchange Its Solutions Opp & Seibold General Construction TERRY MATTSON 05/24/2001 04/01/2002 199,994.00

006111 Completed IM-0053(868) 005 Sr 5, Dearborn To Olive Way Electrical System Upgr Mt Electric, Inc. BRIAN NIELSEN 06/15/2001 05/20/2004 2,348,832.00

006112 Completed ITS-1999(014) 005 Sr5/104, State Route To Edmonds Ferry Terminal Totem Electric Of Tacoma, Inc. MARLIN LENSSEN 05/30/2001 10/28/2003 473,431.00

006113 Completed NH-STPF-0522(028) 522 Sr 522, Sr 5 To Ne 155th St Rinker Materials West, Llc Dba BRIAN NIELSEN 06/01/2001 07/10/2003 1,950,688.00

006115 Completed NH-0014(038) 014 Sr 14, Se 192nd Ave Interchange Scarsella Bros., Inc. CHUCK RUHSENBERGER 06/29/2001 03/22/2005 13,826,075.91

006116 Completed IM-0052(184) 005 Sr 5, Airdustrial I/C To Capitol Lake I/C Lakeside Industries NEAL J. CAMPBELL 06/14/2001 08/05/2002 1,119,294.45

006117 Completed STP-PM01(001) 290 Sr 290, Mission Ave To Vic Sullivan Rd Cpm Development Corporation DARREL MCCALLUM 06/29/2001 04/03/2003 6,888,888.00

006119 Completed IVH-9353(603) 099 Sr 99, North Seattle Atms Control System Totem Electric Of Tacoma, Inc. DAVE LINDBERG 06/19/2001 11/19/2003 286,336.00

006120 Completed BH-999(358) 005 Sr5/520, Stewart St Ramp To Sr 520, Montlake Ramp Guy F. Atkinson Construction, Llc. BRIAN NIELSEN 06/21/2001 04/28/2003 1,744,469.00

006123 Completed STATE Sr 104, Kingston Ferry Terminal Phase Ii Dolphin R General Construction Company BRIAN HOLLING 06/14/2001 06/06/2002 1,429,121.00

006124 Completed ER(FHWA) 099 Sr 99, Alaskan Way Viaduct Balfour Beatty Rail Inc Dba JULIA MIZUHATA 04/03/2001 09/04/2001 250,000.00

006125 Completed NH-0016(014) 016 Sr 16, Olympic I/C Vic To Burnham Drive Tucci & Sons, Inc. FRED THARP 06/07/2001 10/31/2002 1,396,600.35

006126 Completed IM-0054(244) 005 Sr 5, Hill Ditch Br 5/702w To Skagit Br 5/712 Rinker Materials West, Llc Dba MARCO FOSTER 06/19/2001 04/24/2003 2,640,845.56

006127 Completed STATE/FEDERAL 530 Sr 530, Fortson Mill Rd To Fullerton Ave Granite Construction Company BRIAN DOBBINS 06/07/2001 07/09/2003 1,095,518.50

006128 Completed STP-PM01(001) 105 Sr 105, John'S River Vic To Edward Smith Dr Granite Construction Company JOHN L. HART 06/14/2001 07/22/2002 2,925,423.49

006129 Completed STP-PM00(001) 112 Sr 112, Sr 113 To Mp 38 Vic Lakeside Industries JERRY MOORE 06/19/2001 03/03/2003 2,091,637.40

006130 Completed STATE 525 Sr 525, Junction Bayview Road Srv Construction, Inc. MARLIN LENSSEN 06/15/2001 11/10/2003 886,951.90

006131 Completed LOCAL/TIB 090 Sr 90, Sullivan Rd I/C Loop Ramp Cpm Development Corporation KEN OLSON 06/25/2001 10/02/2002 1,310,737.00

006132 Completed IM-0902(194) 090 Sr 90, Gold Creek To Easton Hill Glare Screen Guyline Construction, Inc. PAUL GONSETH 06/19/2001 10/02/2001 482,160.50

006133 Completed STP-PM01(001) 104 Sr 104, 22nd Ave Ne Vic To Sr 522 Vic Granite Construction Company BRIAN NIELSEN 06/07/2001 08/22/2003 960,053.25

006134 Completed BR-0020(116) 020 Sr 20, Methow River Bridge Replacement One Way Construction, Inc. TERRY MATTSON 06/13/2001 01/27/2004 3,910,163.80

Dec 25, 2019 67 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006136 Completed IM-0905(094) 090 Sr 90/260, Ritzville To Tokio Cpm Development Corporation KEN OLSON 06/12/2001 04/24/2003 4,694,206.61

006137 Completed ID-405-3(836) 090 Sr 405, Coal Creek Pkwy To Sr 522 Tri-State Construction Inc DAVE LINDBERG 07/02/2001 04/05/2004 2,545,684.23

006138 Completed STP-PM00(001) 510 Sr 510, Old Pacific Hwy To Reservation Rd Woodworth & Company, Inc. STEVE ROARK 06/22/2001 01/28/2002 638,175.50

006139 Completed STP-PM01(001) 020 Sr 20, Hornbeck Ln Vic To Rocky Cr Br 20/271 Granite Construction Company MARCO FOSTER 06/25/2001 08/01/2002 1,431,831.55

006140 Completed STATE 005 Sr 5, Nulle Rd To Samish Hwy Stormwater Treatment Callen Construction Company, Inc. MARK RUSSELL 06/27/2001 09/13/2002 498,358.00

006141 Completed IM-0901(420) 090 Sr 90, I-5 To I-405 Communication Retrofit Elcon Corporation JAY LAVASSAR 07/06/2001 01/31/2003 790,103.92

006142 Completed STP-PM01(001) 099 Sr 99, Pierce C/L To S 340th St And S 310th St To Tucci & Sons, Inc. MESSAY SHIFERAW 06/29/2001 07/11/2003 1,717,410.75

006143 Completed NH-0101(166) 101 Sr 101, Jorsted Creek Vic To Sund Creek Ace Paving Co., Inc. STEVE ROARK 06/15/2001 03/21/2002 961,135.83

006144 Completed STP-PM01(001) 020 Republic To Mp 312 & Sr 20 To Mp 166 Hap Taylor And Sons, Inc. Dba LARRY L. EIK 06/19/2001 10/30/2002 3,577,389.03

006145 Completed IM-4053(941) 405 Sr 405, Sr 167 I/C Modification Max J. Kuney Company STANLEY ENG 08/14/2001 03/21/2007 5,270,169.15

006147 Completed ER-0101(179) 099 Sr 99, Bridge 99/540 Nb & 99/540 Sb Earthquake Rep Balfour Beatty Rail Inc Dba JULIA MIZUHATA 05/24/2001 03/30/2005 995,552.00

006149 Completed STATE/LOCAL 500 Sr 500, Ward Rd To Ne 162nd Ave - Stage 1 Tapani Underground Inc DON OWINGS 07/02/2001 06/03/2003 1,757,666.85

006150 Completed STATE/FEDERAL 520 Sr 520 Bike Path - Bellevue To Redmond Granite Construction Company JAY LAVASSAR 07/11/2001 03/12/2003 1,892,000.00

006151 Completed IM-0904(104) 090 Sr 90, Sr 21 Vic To Ritzville Cpm Development Corporation BOB HILMES 07/02/2001 01/21/2003 2,536,130.00

006152 Completed STP-PM01(001) 166 Sr 166, Blackjack Creek To Port Orchard Woodworth & Company, Inc. AMITY TROWBRIDGE 06/22/2001 05/08/2002 759,645.38

006153 Completed STATE 005 Sr 5, Bow Hill Rest Area Paving Mp 238.08 Nb & Mp Granite Construction Company MARK RUSSELL 06/19/2001 11/21/2001 133,544.38

006156 Completed NH-0002(228) 002 Sr 2, 10th St In Sultan To 339th Ave Se Vic Rinker Materials West, Llc Dba DAWN MCINTOSH, P.E. 07/06/2001 04/15/2002 469,087.05

006157 Completed NH-BH002(233) 002 Sr 5 To Old Sr 2, Br 2/6n & 7n Repair Pct Construction, Inc. MARLIN LENSSEN 07/06/2001 10/10/2003 3,773,246.15

006158 Completed STP-PM01(001) 020 Sr 20, Colville Hs To Narcisse Rd West Company, Inc. BOB HILMES 07/23/2001 09/15/2003 5,815,605.67

006159 Completed BR-0020(124) 020 Sr 20, Damnation Creek Br 20/283 Replacement Pacific Road & Bridge Co. MARCO FOSTER 06/28/2001 08/07/2002 1,240,278.75

006160 Completed STP-PM01(001) 532 Sr 532, Stillaguamish River Br 532/2 Bridge Painti A & A Coatings, Inc. MARLIN LENSSEN 07/06/2001 02/26/2002 320,205.00

006161 Completed STATE 202 Sr 202, Junction 228th Ave Se Klb Construction, Inc. JAY LAVASSAR 07/11/2001 04/25/2003 1,045,132.50

006162 Completed STATE/LOCAL 167 Sr 167, River Road Safety Improvement Midmountain Contractors, Inc. FRED THARP 07/15/2001 10/16/2002 1,285,551.55

006163 Completed NH-0012(128) 012 Sr 12, Rock Stabilization Mp 155 Vic L.R.L. Construction Co. RON POLLOCK 07/02/2001 02/27/2002 336,448.01

006164 Completed STP-PM01 202 Sr 202, Evans Creek Drainage Slough Bridge To Sr 2 Lakeside Industries, Inc. MARK SAWYER 07/23/2001 02/03/2009 2,875,052.64

006165 Completed STP-PM01(001) 164 Sr 18 Vic To Dogwood St Se Cpm Development Corporation INGO GOLLER 07/15/2001 02/24/2003 637,616.42

006166 Completed STP-PM01(001) 142 Sr 142, Mp 3.7 Culvert Replacement James Dean Construction, Inc. CHUCK RUHSENBERGER 07/23/2001 04/30/2002 238,126.00

Dec 25, 2019 68 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006167 Completed STP-PM01(001) 020 Sr 20, Cascade Rd Vic To Bacon Cr Rd Vic & Goodell Granite Construction Company MARCO FOSTER 07/14/2001 06/17/2002 2,916,909.56

006168 Completed ER-0101(178) 101 Sr 101, Mp 361.26 Vic Slide Repair Granite Construction Company ERIC SODERQUIST 07/11/2001 04/15/2002 186,293.00

006170 Completed STP-PM01(001) 531 Sr 531, 43rd Avenue Ne To Sr 9 Rinker Materials West, Llc Dba MARLIN LENSSEN 07/14/2001 12/22/2003 414,784.21

006172 Completed NH-0522(026) 522 Sr 522, 80th Ave Ne Vic To City St Vic C.A. Carey Corporation BRIAN NIELSEN 07/30/2001 02/06/2003 1,382,684.50

006173 Completed NH-0097(091) 097 Sr 97, Ruby Creek Rock Slopes Goodfellow Bros Inc TERRY L. BERENDS 07/17/2001 12/09/2002 1,129,159.00

006174 Completed NH-0020(121) 020 Sr 20, Main Street Intersection Sail Electric, Inc. MARCO FOSTER 07/23/2001 09/24/2003 363,610.75

006175 Completed STATE 099 Sr 99, 62nd Ave E To King County Line Woodworth & Company, Inc. FRED THARP 08/07/2001 12/02/2002 807,432.84

006176 Completed ER-0101(195) 099 Sr 99, 1st Ave S Bridge 99/530e Tip Repair Pct Construction, Inc. MESSAY SHIFERAW 06/06/2001 07/11/2002 45,766.88

006178 Completed 362220 Anacortes F/T Slip 2 Refurbishement, Slip 1 And Sl General Construction Company BILL CARTER 08/08/2001 12/04/2002 4,581,284.00

006179 Completed NH-0002(223) 002 Sr 2, Sr 9 Interchange To Sr 522 Thomco Construction Inc. MARLIN LENSSEN 08/06/2001 07/10/2007 1,798,270.83

006180 Completed STATE Clinton Ferry Terminal Dock Expansion Phase Ii Manson Construction Co. BILL CARTER 08/16/2001 04/06/2004 11,993,196.00

006181 Completed STP-PM01(001) 410 Sr 410, Sr 167 To Linden Drive Woodworth & Company, Inc. MIKE MORISHIGE 07/30/2001 04/30/2002 858,591.50

006182 Completed STATE 405 Sr 405, Bothel To Swamp Creek Stage 1 - Roadside R P & G Landscaping Inc. DAWN MCINTOSH, P.E. 07/27/2001 07/19/2005 484,150.29

006184 Completed STATE/LOCAL 307 Sr 307, Gunderson, Stottlemeyer And Rova Road Real Ace Paving Co., Inc. AMITY TROWBRIDGE 07/24/2001 09/30/2002 639,884.56

006185 Completed IGFSB-1999(004) 099 Sr 99, Shoreline Pedestrian Safety Demonstration P Totem Electric Of Tacoma, Inc. BRIAN NIELSEN 09/10/2001 10/07/2003 345,165.50

006186 Completed BH-0012(115) 012 Sr 12, Black River Br 12/76 Scour Protection Northwest Rock, Inc. NEAL J. CAMPBELL 07/31/2001 02/05/2002 102,987.50

006187 Completed NH-0002(234) 002 Sr 2, Wallace River Br To Proctor Creek Br Lakeside Industries DAVE LINDBERG 08/07/2001 04/19/2004 1,101,177.00

006188 Completed BH-9999(309) 090 Sr 90/405, I-90 Bridge Stage 2 - Renton To Kirklan Granite Construction Company JAY LAVASSAR 08/13/2001 01/29/2003 1,134,000.00

006189 Completed BH-9999(310) 405 Sr 405/520, Br 405/47sw, 405/57n-S & 520/10 Seismi Robison Construction, Inc. JAY LAVASSAR 08/07/2001 03/27/2003 1,144,740.75

006190 Completed STP-PM01(001) 125 Sr 125, Pine Street To May Avenue Granite Northwest Inc MOE DAVARI 08/04/2001 11/02/2001 128,847.90

006191 Completed STATE Kingston F/T Slip 1 Emergency Repairs General Construction Company EDDY CHU 06/29/2001 10/24/2002 1,829,434.20

006193 Completed FEDERAL 105 Sr 105, Bonge Avenue To Westhaven Lakeside Industries JOHN L. HART 08/04/2001 01/31/2003 1,954,806.53

006194 Completed STATE 003 Sr 3, Sweetwater Cr Culvert Replacement Ace Paving Co., Inc. AMITY TROWBRIDGE 07/24/2001 02/28/2002 126,019.60

006195 Completed STATE 395 Sr 395, Nsc-Hawthorne Road To Sr 2 Grading S A Gonzales Construction Inc LARRY L. EIK 08/21/2001 05/12/2003 3,491,863.90

006197 Completed IM-9999(324) 005 Sr 5/90, Convention Ctr, First Hill & Mt Baker Totem Electric Of Tacoma, Inc. JAY LAVASSAR 10/05/2001 06/24/2004 2,162,999.00

006198 Completed IM-0053(859) 005 Sr 5, Mercer St Vic To 42nd St Electrical System R Elcon Corporation STANLEY ENG 09/25/2001 05/11/2004 2,959,635.84

006199 Completed STATE 005 Sr 5, Sr 104 Wb To Nb I-5 On Ramp Pacific Road & Bridge Co. MARLIN LENSSEN 08/31/2001 10/24/2003 384,811.00

Dec 25, 2019 69 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006200 Completed STATE 005 Sr 5, 164th St Sw To Sr 526 Roadside Restoration Terra Dynamics Inc MARLIN LENSSEN 08/17/2001 04/26/2006 1,325,167.60

006201 Completed HP-0055(216) 005 Sr 5, Blaine Vic Ramps & Nb Pace Lane Roadside Res Matia Contractors Inc MARK RUSSELL 08/07/2001 06/20/2005 311,345.00

006202 Completed FEDERAL 005 Sr 5 & 543, Border Crossing Info - Phase 1 Potelco Inc MARK RUSSELL 08/17/2001 02/23/2006 1,360,763.25

006203 Completed FEDERAL 099 Sr 99, 1st Ave S Bridge Repair - Nisqually Earthqu Mowat Construction Company MESSAY SHIFERAW 08/13/2001 05/28/2003 198,595.00

006204 Completed STATE 516 Sr 516, Se Wax Rd To Cedar Heights Jhs & Jct 192nd R.W. Scott Construction Co. DAVE STANDAHL 08/06/2001 06/10/2002 496,807.25

006205 Completed STATE 520 Sr 520, 104th Ave Ne To W Lake Sammamish Parkway R Ohno Construction Company BRIAN DOBBINS 08/16/2001 05/23/2005 2,344,523.30

006206 Completed STATE 527 Sr 527, 144th St Se To 16th Ave Se Wall Constructi Mowat Construction Company BRIAN DOBBINS 08/23/2001 02/05/2003 1,665,272.00

006207 Completed NH-0097(092) 097 Sr 97, Toppenish Creek Vic And Toppenish Cr Br 97/ All State Construction Inc Of Orego PAUL GONSETH 08/16/2001 05/18/2004 3,001,859.65

006209 Completed FEDERAL 525 Sr 525, Cameron Rd To Sr 20 Stage 4 - Section 2 Krieg Construction, Inc. MARLIN LENSSEN 08/14/2001 05/13/2005 2,531,370.49

006210 Completed FEDERAL 303 Sr 303, Riddell Rd To Mp 5.30 Ace Paving Co., Inc. AMITY TROWBRIDGE 08/13/2001 05/27/2003 1,940,894.24

006213 Completed NH-0101(170) 288 Sr 101, Leland Creek Vicinity Lakeside Industries JERRY MOORE 08/17/2001 01/31/2002 157,011.91

006214 Completed BR-0209(019) 290 Sr 290, Bridge Replacement 290/4 All State Construction Inc Of Orego DARREL MCCALLUM 09/06/2001 11/30/2006 8,963,410.78

006215 Completed STATE 507 Sr 507, Mp 27.96 To Bald Hills Rd Granite Construction Company NEAL J. CAMPBELL 08/21/2001 05/08/2002 127,571.00

006217 Completed STATE 003 Sr 3, Barney White Road Ace Paving Co., Inc. AMITY TROWBRIDGE 08/27/2001 02/04/2002 173,639.30

006219 Completed STATE 002 Sr 2, Pine Canyon Slide Pipkin Inc., Dba Pipkin Constructio TERRY MATTSON 09/04/2001 12/28/2001 95,604.00

006220 Completed NH-0097(094) 097 Sr 97, Tronson Creek To Sr 2 Basin Paving Co. TERRY MATTSON 09/14/2001 11/04/2003 3,755,006.87

006221 Completed STPE-0625(001) 405 Sr 405, Ne 100th Street Bridge Pacific Road & Bridge Co. BRIAN DOBBINS 10/11/2001 03/10/2005 2,087,041.70

006225 Completed BH-0102(033) 202 Sr 202, Snoqualmie River Bridges Glacier Construction & Equipment DAVE BECHER 09/27/2001 10/20/2003 77,305.00

006226 Completed ER-0101(179) 099 Sr 99, Bridges 99/540nb & 99/540sb Earthquake Repa Diamaco Inc. JULIA MIZUHATA 09/25/2001 10/27/2005 152,214.00

006227 Completed ER-0101(183) 005 Sr 5, Bnsf Rr Br 5/221 Earthquake Repair Concrete Barrier, Inc. RON POLLOCK 10/15/2001 07/02/2002 304,204.00

006228 Completed ACBH-0012(127) 012 Sr 12 Couplet, Wishkah River Bridge Rehabilitation Diamaco Inc. JOHN L. HART 10/29/2001 11/12/2003 1,988,763.00

006231 Completed BH-0053(876) 005 Sr 5, Holgate To 8th Ave Vic Seismic Retrofit Mowat Construction Company INGO GOLLER 11/15/2001 11/10/2004 2,030,712.50

006237 Completed IMG-0906(198) 090 Sr 90, Barker Road I/C Signal Colvico, Inc. DARREL MCCALLUM 11/09/2001 03/17/2003 352,775.55

006238 Completed STP-0904(113) 090 Sr 90, Rr O'Xing To Adams County Line Central Washington Asphalt, Inc. TERRY L. BERENDS 11/08/2001 01/22/2003 2,374,990.94

006239 Completed STP-002(801) 002 Sr 2, Lincoln County Line To Sr 21 Cpm Development Corporation DARREL MCCALLUM 11/28/2001 02/10/2003 1,132,441.75

006242 Completed BH-0513(004) 513 Sr 513, Montlake Bridge Painting And Crack Repair D.S. Purcell Painting, Inc. DAVE BECHER 11/19/2001 08/29/2003 788,513.00

006243 Completed BH-9999(370) 097 Sr 285, Columbia River Bridges Seismic Retrofit Pct Construction, Inc. KIRK D. BERG 11/14/2001 10/17/2002 233,919.00

Dec 25, 2019 70 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006244 Completed NH-0125(005) 125 Sr 125, State Line Intersection Granite Northwest Inc MOE DAVARI 11/19/2001 11/14/2002 485,765.00

006245 Completed BH-0053(885) 005 Sr 5/518, Military Road To Sr 900 Seismic Retrofit Guy F. Atkinson Construction, Llc. INGO GOLLER 11/26/2001 02/19/2003 641,482.50

006246 Completed BH-0153(002) 153 Sr 153, Methow River Br 153/13 Deck Repair One Way Construction, Inc. ROBERT ROMINE_(ACTG) 11/21/2001 02/19/2003 428,296.50

006248 Completed STATE 002 Sr 2, Icicle Spillway Slide Repair Goodfellow Bros Inc KIRK D. BERG 10/31/2001 01/22/2002 156,414.00

006249 Completed BH-0055(215) 005 Sr 5, Bellingham And Blaine Vic Bridges Seismic Re Granite Construction Company MARK RUSSELL 11/20/2001 12/15/2005 764,709.50

006250 Completed STATE 020 Sr 20, Best Road Signalization & Anacortes Ferry T Elcon Corporation MARCO FOSTER 12/03/2001 02/24/2005 814,140.50

006251 Completed STPF-9999(374) 017 Sr 28, Martin Road To Jct Sr 17 Basin Paving Co. TERRY MATTSON 12/14/2001 11/20/2002 1,555,826.19

006252 Completed ITS-9853(001) 082 Sr 82, Ellensburg/Selah Vic Variable Message Signs Coral Construction Company PAUL GONSETH 11/27/2001 02/24/2003 139,139.00

006253 Completed STP-0906(199) 090 I-90/Harvard Rd I/C Wb Off-Ramp S A Gonzales Construction Inc KEN OLSON 12/20/2001 01/13/2003 1,396,096.34

006254 Completed STP-9999(375) 020 Sr 20, Ncr 2002 Seal Granite Northwest Inc KIRK D. BERG 12/21/2001 10/28/2002 1,609,822.03

006255 Completed STP-0520(031) 520 Sr 520, 10th U'Xing To Evergreen Point Bridge Elec Colvico, Inc. MESSAY SHIFERAW 01/10/2002 08/31/2004 3,186,476.30

006259 Completed STATE 020 Sr 020, Regionwide Guardrail Update Year 2002 Frank Gurney, Inc. TERRY L. BERENDS 12/18/2001 07/31/2002 450,633.65

006262 Completed STATE Wsf, Eagle Harbor Electrical Improvements Colvico, Inc. EDDY CHU 01/15/2002 12/09/2003 1,794,215.00

006263 Completed NH-0012(130) 012 Sr 12, Messner Road To Tucannon River Poe Asphalt Paving, Inc. J.D. DWYER 01/04/2002 09/13/2002 633,293.00

006266 Completed LOCAL 410 Sr 410, White River Bridge 410/101 Repairs Klm Construction, Inc. DAVE STANDAHL 02/06/2002 07/29/2002 161,297.00

006268 Completed FEDERAL Systemwide Overhead Loading Modifications Boss Construction EDDY CHU 02/04/2002 04/07/2003 1,153,951.00

006269 Completed STP-PM02(001) 410 Sr 162, Sr 410 To Old Pioneer Way East Cpm Development Corporation MIKE MORISHIGE 01/29/2002 06/20/2003 1,655,244.40

006270 Completed STATE 241 Sr 241, Sunnyside Vic Drainage Columbia Asphalt & Gravel, Inc. PAUL GONSETH 01/16/2002 05/03/2002 77,771.00

006271 Completed STATE 101 Sr 101, Hoh River Erosion Bruch & Bruch Construction Inc JOHN L. HART 12/06/2001 01/07/2002 57,331.50

006273 Completed NH-9999(377) 012 Us12/Sr 395 To Snake River - Paving Granite Northwest Inc MOE DAVARI 02/01/2002 07/22/2002 544,775.20

006274 Completed NH-0002(803) 002 Sr 2, Tumwater Rock Slopes Johnson Western Gunite Company TERRY L. BERENDS 02/06/2002 01/22/2003 729,966.00

006275 Completed NH-0097(095) 097 Sr 97, Pateros To Brewster Paving Basin Paving Co. KIRK D. BERG 02/08/2002 10/22/2002 1,139,894.73

006276 Completed BR-0002(230) 002 Sr 2, Barclay Creek Bridge 2/48 Replacement Granite Construction Company DAVE LINDBERG 04/05/2002 10/13/2009 3,153,674.00

006277 Completed HP-2001(022) 405 Sr 405, Se 8th St I/C Modifications Mowat Construction Company DAVE BECHER 02/27/2002 10/19/2005 5,798,678.10

006278 Completed IM-0053(860) 005 Sr 5, 164th St Sw I/C Driveway Relocation Grade, Inc. DAWN MCINTOSH, P.E. 02/01/2002 05/12/2003 89,887.00

006281 Completed NH-0009(038) 009 Sr 9, Sr 546 To Sr 547 And Bridge 9/356.75 Replace Granite Construction Company MARK RUSSELL 02/28/2002 12/17/2002 887,500.00

006282 Completed STATE 410 Sr 410, Jct 241st Ave Se/Mud Mtn Rd Tydico, Inc. DEREK CASE 02/06/2002 03/31/2008 376,379.75

Dec 25, 2019 71 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006283 Completed STP-PM02(001) 530 Sr 530, Old Moose Creek West And East Culvert Repl A-1 Landscaping And Construction, MARLIN LENSSEN 02/20/2002 11/10/2003 247,469.59

006286 Completed IM-BH-9999(380) 010 Sr 90, Cle Elum Vic & Sr 10 Br Painting And Bristo Dunkin & Bush, Inc. PAUL GONSETH 03/01/2002 03/20/2003 996,699.00

006287 Completed BH-0002(804) 002 Sr 2, Skykomish River Bridge 2/35 Painting Root Paint & Glass Co. Inc. MARLIN LENSSEN 02/19/2002 11/21/2002 369,609.00

006288 Completed STP-PM00(001) 011 Sr 11, Estes Rd Vic To Whatsome Co Line & Billingh Pacific Road & Bridge Co. DAVE CRISMAN (ACTING 04/01/2002 02/03/2003 760,353.05

006289 Completed NH-0127(005) 127 Sr 127, Snake River Bridge At Central Ferry Concrete Barrier, Inc. MOE DAVARI 04/05/2002 05/16/2002 233,795.00

006293 Completed FBD2002(009) 305 Bainbridge Island Ferry Terminal Dolphin Replaceme General Construction Company EDDY CHU 02/22/2002 06/17/2003 2,015,500.00

006294 Completed HM/IM0054(243) 005 Sr 5,196th St Sw/Sr 524 I/C Westside Phase B-3 & 4 Thomco Construction Inc. DAVE LINDBERG 04/09/2002 06/27/2006 6,357,064.60

006295 Completed NH-0017(034) 017 Sr 17, Mesa Vic Paving Cpm Development Corporation MOE DAVARI 03/01/2002 12/16/2002 322,362.90

006296 Completed NH-0012(129) 012 Sr 12, Sr 5 To Mill Creek Vicinity Lakeside Industries RON POLLOCK 03/18/2002 07/02/2003 2,693,610.00

006299 Completed ITS-1999(013) 020 Sr 20/395 Eastern Region Traveler Information Mccandlish Electric Inc LARRY L. EIK 02/27/2002 11/14/2002 84,674.00

006300 Completed BH-NH-STP-9999(379) 006 Sr 6,7,432, Region Wide Bridge Painter A & A Coatings, Inc. RON POLLOCK 03/11/2002 12/16/2002 728,437.00

006303 Completed STPUS-5238(007) 510 Sr 510, Sr 5 To Pacific Avenue Scarsella Bros., Inc. TROY COWAN 03/18/2002 01/11/2005 7,696,599.20

006306 Completed LOCAL 005 Sr 5, Trosper Road Bridge Widening Pacific Road & Bridge Co. KURT WILLIAMS 05/06/2002 01/20/2004 2,037,947.60

006307 Completed NH-0097(096) 097 Sr 97/Tonasket - Bonaparte Creek Bridge Deck N.A. Degerstrom, Inc. TERRY L. BERENDS 03/18/2002 09/24/2002 153,507.90

006308 Completed STP-PM02(001) 221 Sr 221, Sr 14 To Prosser Hill Paving Granite Northwest Inc J.D. DWYER 04/02/2002 01/07/2003 2,922,182.20

006310 Completed NH-0503(016) 503 Sr 503, Ne 76th St To Ne 144th St Granite Northwest Inc CHUCK RUHSENBERGER 05/08/2002 07/30/2003 2,950,452.13

006311 Completed NH-0127(006) 127 Sr 127, Church Hill Rd To Dusty - Paving Cpm Development Corporation KEN OLSON 04/05/2002 10/31/2002 1,222,722.00

006312 Completed HES-NH-0002(805) 002 Sr 2/97, Turtle Rock Rd Left Turn Lane Basin Paving Co. KIRK D. BERG 03/22/2002 08/01/2002 179,661.00

006313 Completed STP-PM02(001) 024 Sr 24, Cold Creek Road To Sr 240 - Paving Granite Northwest Inc PAUL GONSETH 04/02/2002 01/21/2003 346,553.50

006315 Completed STP-PM02(001) 153 Sr 153, Carlton Bridge 153/20 Repair F.E. Ward, Inc. KIRK D. BERG 03/04/2002 11/04/2002 532,459.50

006317 Completed HP-IM-4053(482) 405 Sr 405, Bellevue Direct Access Ne 8th St Undercros Guy F. Atkinson Construction, Llc. DOUG HAIGHT 05/07/2002 03/24/2005 12,779,599.20

006318 Completed NH-00012(119) 012 Sr 12, Cowiche Creek To I-82 Paving Granite Northwest Inc J.D. DWYER 04/09/2002 03/18/2003 1,612,110.45

006319 Completed STP-PM02(001) 012 Sr 12 Et Al, 2002 Region Wide Seal Granite Northwest Inc J.D. DWYER 05/07/2002 03/13/2003 2,188,436.50

006320 Completed STATE/LOCAL 515 Sr 515, Se 196th Street Vic Signal Potelco Inc INGO GOLLER 04/18/2002 03/30/2004 358,842.50

006322 Completed STATE Fauntleroy & Southworth Preservation American Construction Co., Inc. EDDY CHU 05/03/2002 05/26/2004 9,281,740.65

006323 Completed NH-0270(007) 270 Sr 270, Pullman City Limits To Spring Street Poe Asphalt Paving, Inc. DARREL MCCALLUM 04/22/2002 04/03/2003 675,132.00

006324 Completed NH-0101(175) 101 Sr 101, Clearwater Road To Queets Lakeside Industries JOHN L. HART 04/18/2002 09/30/2002 815,934.80

Dec 25, 2019 72 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006325 Completed STP-PM-02(001) 509 Sr 509, 1st Ave S Br To Sr 99 - Paving Lakeside Industries INGO GOLLER 04/12/2002 06/23/2003 359,658.51

006326 Completed NH-0500(11) 500 Sr 500, Burnt Bridge Creek To Andresen Road Lakeside Industries DON OWINGS 05/16/2002 03/31/2003 1,930,852.00

006327 Completed STP-PM02(001) 507 Sr 507, Sr 5 To Skookumchuck River Lakeside Industries RON POLLOCK 04/12/2002 05/01/2003 569,292.50

006328 Completed NH-0513(005) 513 Sr 513, Mary Gate Memorial Drive To Sand Pt Way Lakeside Industries BRIAN NIELSEN 04/12/2002 12/13/2002 222,891.75

006332 Completed STP-PM02(001) 097 Sr 97a, Us97a Entiat To Chelan Paving Central Washington Asphalt, Inc. TERRY L. BERENDS 05/07/2002 05/21/2003 2,445,697.81

006333 Completed NH-0395(068) 395 Sr 395, Arden To Colville Hap Taylor And Sons, Inc. Dba BOB HILMES 05/07/2002 08/20/2003 1,300,613.75

006334 Completed IM-0055(218) 005 Sr 5/548 Nooksack River To Blaine Vic & Dakota Cr Granite Construction Company DAVE CRISMAN 05/06/2002 11/07/2003 2,578,819.00

006335 Completed STP-PM02(001) 097 Sr 97a/Chelan W Culvert Repair Goodfellow Bros Inc TERRY MATTSON 05/06/2002 08/05/2002 160,271.00

006336 Completed STP-PM02(001) 006 Sr 6, Chehalis River To Vic Cabe Rd Granite Construction Company RON POLLOCK 05/24/2002 06/19/2003 1,147,734.40

006337 Completed NH-0303(009) 303 Sr 303, Mp 5.30 To Sr 3 Overcrossing Ace Paving Co., Inc. AMITY TROWBRIDGE 05/22/2002 11/17/2003 4,194,841.02

006338 Completed NH-0104(028) 104 Sr 104, Jct Sr 3 To Bond Rd Ace Paving Co., Inc. AMITY TROWBRIDGE 05/22/2002 03/26/2003 854,212.97

006339 Completed IM-0901(422) 090 Sr 90, Eastgate Interchange Vic To Front St Vic Ac Lakeside Industries JAY LAVASSAR 06/06/2002 11/14/2003 3,513,978.00

006340 Completed STP-PM02(001) 290 Sr 290, Sullivan Rd To Idaho State Line Cpm Development Corporation DARREL MCCALLUM 05/20/2002 04/21/2003 1,388,888.88

006341 Completed BH-0012(120) 012 Sr 12, Clarkston Vic Bridge Painting Intrastate Painting Corporation J.D. DWYER 06/14/2002 05/16/2003 692,174.00

006342 Completed STP-PM02(001) 904 Sr 904, Tyler To Cheney - Paving Poe Asphalt Paving, Inc. LARRY L. EIK 05/20/2002 02/18/2003 1,134,757.20

006343 Completed IM-0902(197) 090 Sr 90, Snoqualmie Summit Unstable Slope Hi Tech Rockfall Construction, Inc. PAUL GONSETH 05/08/2002 11/12/2002 236,790.00

006344 Completed IM-0906(200) 090 Sr 90, Spokane Sign Bridge Replacement Sharp-Line Industries, Inc. DARREL MCCALLUM 05/02/2002 01/29/2003 145,134.42

006345 Completed NH-0012(133) 012 Sr 12, Nine Mile Hill Vic Roadside Safety Steelman-Duff, Inc. MOE DAVARI 05/10/2002 01/06/2003 454,155.15

006346 Completed STATE 405 Sr 405, Coal Creek Fish Weir Rehab Tri-State Construction Inc DAVE LINDBERG 05/08/2002 11/30/2006 92,774.00

006347 Completed STP-PM01(001) 009 Sr 9, 204th St Ne Vic To Sr 530 Acp Overlay & Culv Rinker Materials West, Llc Dba MARLIN LENSSEN 05/10/2002 04/12/2006 740,003.20

006348 Completed STATE 500 Sr 500, 124th Ave Intersection Improvements Stage Mill Plain Electric, Inc. CHUCK RUHSENBERGER 05/13/2002 10/31/2002 100,429.00

006349 Completed STP-NH-0501(012) 501 Sr 501,Vancouver Port To Wildlife Refuge Lakeside Industries DON OWINGS 05/16/2002 04/11/2003 1,148,578.27

006351 Completed IM-NH-9999(389) 012 Sr 12, 82, 182, Columbia & Snake River Bridges Rep Concrete Barrier, Inc. MOE DAVARI 05/22/2002 02/21/2003 723,110.50

006354 Completed BH-9999(384) 012 Sr 12 Et Al, Olympic Region Bridge Painting 12/12/ Root Paint & Glass Co. Inc. JOHN L. HART 05/28/2002 06/24/2004 741,534.00

006355 Completed STP-PM02(001) 009 Sr 9, Sr 20 To Basseet Rd Vic - Paving Lakeside Industries DAVE CRISMAN 05/16/2002 05/20/2003 380,455.27

006356 Completed STP-PM02(001) 020 Sr 20, Loup Loup Summit Culvert Repair North Central Construction, Inc. TERRY MATTSON 06/21/2002 11/21/2002 73,054.00

006358 Completed STATE 520 Sr 520, 92nd Ave Ne Br 520/12 & 520/10 Pedestrian C.A. Carey Corporation JAY LAVASSAR 06/18/2002 02/21/2003 316,222.00

Dec 25, 2019 73 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006359 Completed NH-0012(135) 012 Sr 12, Stember Creek Vic And Garfield C/L To Alpow Poe Asphalt Paving, Inc. J.D. DWYER 05/16/2002 09/13/2002 638,975.30

006360 Completed STP-PM02(001) 507 Sr 507, Mill Rd To Bald Hill Rd Sci Infrastructure, Llc KURT WILLIAMS 05/31/2002 02/02/2004 1,232,779.59

006361 Completed STP-PM02(001) 124 Sr 124, Rr Bridge To County Rd - Paving Granite Northwest Inc MOE DAVARI 05/08/2002 10/01/2002 919,387.25

006365 Completed NH-9999(387) 005 Sr 5, Sign Bridge Replacement Mowat Construction Company MARLIN LENSSEN 05/24/2002 02/02/2004 884,224.00

006366 Completed STATE 405 Sr 405, Bridge 405/5 Repair Granite Construction Company INGO GOLLER 05/22/2002 02/08/2005 249,566.50

006367 Completed STP-PM02(001) 002 Sr 2 Et Al, 2002 Eastern Region Chipseal Granite Northwest Inc LARRY L. EIK 05/28/2002 12/18/2002 2,289,857.75

006368 Completed IM-0053(871) 005 Sr 5, 84th St To Fife I/C Ramp Repair Woodworth & Company, Inc. FRED THARP 06/06/2002 02/19/2003 1,088,750.81

006369 Completed NH-0395(070) 395 Sr 395, Sr 82 To Kennewick Ave Granite Northwest Inc MOE DAVARI 05/31/2002 01/02/2003 1,478,599.70

006370 Completed NH-002(807) 002 Sr 2, Deer Road To Westwood Rd - Paving Cpm Development Corporation DARREL MCCALLUM 05/29/2002 09/16/2003 2,350,000.00

006371 Completed NH-0512(012) 167 Sr 512, Vic South Hill To Sr 167 I/C Tucci & Sons, Inc. FRED THARP 05/24/2002 01/21/2003 729,078.85

006372 Completed BH-STPF-0009(029) 009 Sr 9, Stillaguamish River Bridge To Lake Creek Bri Rinker Materials West, Llc Dba JOHN CHI 06/18/2002 10/31/2008 2,730,306.65

006373 Completed NH-0002(008) 002 Sr 2, Peshastin Area Unstable Slopes Scarsella Bros., Inc. KIRK D. BERG 05/29/2002 01/30/2003 286,682.66

006376 Completed STATE Seattle Ferry Terminal Slip 2 And Slip 3 Safety Mo Mcclure And Sons, Inc. EDDY CHU 05/30/2002 11/19/2002 54,233.00

006377 Completed NH-0028(30) 028 Sr 28, 35th Street Drainage Selland Construction, Inc. TERRY MATTSON 06/05/2002 11/19/2002 63,667.50

006378 Completed STP-PM02(001) 411 Sr 411, First Avenue To I-5 Lakeside Industries AMY E. REVIS 06/06/2002 04/22/2004 1,989,342.03

006379 Completed NH-9999(388) 005 Sr 5,90,99,520 Sign Bridges Coral Construction Company BRIAN NIELSEN 06/10/2002 01/29/2004 1,865,069.00

006380 Completed STATE 005 Sr 5, Ne 117th Street Bicycle/Pedestrian Improveme Tri-State Construction Inc BRIAN NIELSEN 06/10/2002 07/09/2003 193,803.00

006381 Completed STP-PM02(001) 097 Sr 97, Toppenish Vic Paving (Wapato Road To Wapato Columbia Asphalt & Gravel, Inc. PAUL GONSETH 06/05/2002 06/05/2003 588,013.56

006382 Completed STP-PM02(001) 397 Sr 397, Columbia River To Oregon St Granite Northwest Inc MOE DAVARI 06/10/2002 11/14/2002 247,594.00

006383 Completed STP-PM02(001) 202 Sr 202, Tokul Creek Vicinity Slope Stabilization Tri-State Construction Inc BRIAN DOBBINS 07/10/2002 12/03/2009 2,464,197.50

006384 Completed STATE System Wide Apron End Lip Replacement General Construction Company EDDY CHU 06/04/2002 04/30/2003 158,700.00

006386 Completed STATE 022 Sr 22, Sunnyside Vic & Valley Mall Blvd Vic Safety Columbia Asphalt & Gravel, Inc. PAUL GONSETH 06/21/2002 12/19/2003 1,552,962.08

006387 Completed IM-0903(054) 090 Sr 90,Columbia River Bridge At Vantage Robison-Prezioso, Inc. J.D. DWYER 07/10/2002 07/15/2004 973,341.00

006388 Completed NH-0002(236) 002 Sr 2, Br 2/120 To Deception Cr Br Lakeside Industries DAWN MCINTOSH, P.E. 06/06/2002 02/24/2003 741,884.00

006389 Completed STATE 169 Sr 169, Jct Se 400th St Signal Tri-State Construction Inc DEREK CASE 07/03/2002 06/18/2008 896,559.00

006390 Completed STATE 538 Sr 538, Horton Rd Vic To Sr 9 Callen Construction Company, Inc. DAVE CRISMAN 06/14/2002 01/20/2004 707,125.00

006391 Completed STATE 522 Sr 522, Swamp Creek Bridge Scour Repair Tri-State Construction Inc JOHN CHI 06/18/2002 04/19/2006 167,156.50

Dec 25, 2019 74 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006393 Completed STATE 203 Sr 203, Skykomish River Bridge Painting Long Painting Company MARLIN LENSSEN 06/28/2002 04/09/2003 356,429.00

006394 Completed STPF-0053(890) 005 Sr 5, Mcallister Cr Culvert And Tide Gates Replace Tri-State Construction Inc TROY COWAN 06/18/2002 11/25/2002 144,313.00

006395 Completed STP-PM02(001) 162 S. Prairie Creek Bridge (162/20) Bridge Deck Rehab Concrete Barrier, Inc. MIKE MORISHIGE 07/01/2002 11/06/2002 133,888.00

006396 Completed ER-0101(220) Deschutes Parkway - Phase 2 Robison Construction, Inc. TROY COWAN 06/18/2002 09/25/2003 5,145,989.41

006397 Completed STP-PM02(001) 009 Sr 9, Skagit Co Line To Potter Rd Culvert Replacem Callen Construction Company, Inc. DAVE CRISMAN 06/18/2002 09/20/2006 71,050.00

006398 Completed ER-0101(235) 090 Sr 90, Bnrr O'Xing Br 90/65 N&S & 90/W-W Earthquak Pct Construction, Inc. JAY LAVASSAR 06/21/2002 03/12/2003 425,405.42

006399 Completed NH-0008(006) 008 Sr 8, Mccleary Interchange Scarsella Bros., Inc. KURT WILLIAMS 07/19/2002 09/28/2004 4,304,800.05

006400 Completed HP-0543(002) 543 Sr 543, Boblett St I/S Signalization Potelco Inc MARK RUSSELL 06/26/2002 12/15/2004 675,387.00

006403 Completed IM-0053(866) 005 Sr 5, Northgate Way To 175th St Vic Bridge Deck Re Concrete Barrier, Inc. BRIAN NIELSEN 07/18/2002 10/24/2003 1,378,852.50

006404 Completed STP-PM02(001) 702 Sr 702, Mckenna To Sr 7 - Paving Woodworth & Company, Inc. FRED THARP 07/19/2002 03/13/2003 1,137,295.50

006405 Completed STP-PM02(001) 099 Sr 99, Nb Off Ramp To Sb Sr 599/S 116th & Sr 5 To Cpm Development Corporation MESSAY SHIFERAW 07/16/2002 12/22/2003 1,907,470.30

006411 Completed STATE 999 Vashon Ferry Terminal Slip 2 Right Inner Dolphin R American Civil Constructors EDDY CHU 07/15/2002 01/17/2003 196,980.00

006413 Completed NH-0053(896) 005 Sr 5, Federal Way Nb Weigh Station Weigh In Motion Mowat Construction Company INGO GOLLER 08/06/2002 11/18/2003 616,830.30

006414 Completed NH-0004(203) 004 Sr 4, Germany Creek Rockfall Stabilization Hi Tech Rockfall Construction, Inc. AMY E. REVIS 07/19/2002 02/25/2003 498,867.00

006415 Completed ITS-1999(014) 525 Sr 525, Sr 99 To Sr 526 - Phase 2 Klb Construction, Inc. MARLIN LENSSEN 09/25/2002 10/06/2010 13,762,950.79

006416 Completed NH-HP-0395(055) 395 Sr 395, Hillsboro St Interchange M A Deatley Construction MOE DAVARI 08/13/2002 02/14/2005 6,028,175.95

006417 Completed ER-0201(013) 012 Sr 12, Mp 89 Slide Repair Granite Construction Company RON POLLOCK 08/06/2002 04/21/2003 367,209.88

006419 Completed STATE 090 Sr 90, Indian John Hill Rest Area Paving Columbia Asphalt & Gravel, Inc. PAUL GONSETH 08/23/2002 05/06/2003 397,993.10

006421 Completed NH-0003(104) 003 Sr 3, Vic Falkner Rd Unstable Slope Primo Construction, Inc. AMITY TROWBRIDGE 08/23/2002 01/08/2003 309,239.67

006422 Completed STATE Systemwide Security Gates C.A. Carey Corporation EDDY CHU 08/28/2002 05/11/2005 469,740.00

006423 Completed STATE 305 Bainbridge Ferry Terminal Pavement Repair Ace Paving Co., Inc. EDDY CHU 09/06/2002 11/04/2003 178,546.75

006424 Completed ITS-2000(008) 512 Sr 512, Sr 5 To Traffic Management Center - Fiber Potelco Inc MIKE MORISHIGE 10/02/2002 12/02/2003 308,007.50

006425 Completed ER-0101(193) 101 Sr 101, Evergreen Parkway Vic Slide Repair Granite Construction Company KURT WILLIAMS 10/02/2002 02/13/2003 83,586.00

006426 Completed STATE 005 Sr 5, Interstate Sign Support Structures Coral Construction Company DON OWINGS 09/10/2002 07/29/2003 77,777.00

006427 Completed NH-0028(029) 028 Sr 28, Rock Island - Rock Slopes Stage 1 Scarsella Bros., Inc. TERRY L. BERENDS 10/03/2002 11/04/2004 2,379,465.90

006432 Completed STATE 017 Sr 17/Othello To Moses Lake Centerline Rumble Stri Apply-A-Line, Inc. TERRY L. BERENDS 10/04/2002 01/22/2003 85,652.75

006433 Completed STP-PM02(001) 129 Sr129, Oregon S/L To Onstot Road Frank Gurney, Inc. J.D. DWYER 11/26/2002 09/18/2003 1,049,497.38

Dec 25, 2019 75 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006434 Completed STPR-D295(001) 020 Sr 20, S March Point Road Callen Construction Company, Inc. DAVE CRISMAN 10/07/2002 08/03/2004 1,377,215.00

006435 Completed BH-NA-0012(112) 012 Us 12, Satsop River Bridges Seismic Mowat Construction Company JOHN L. HART 10/11/2002 04/16/2003 193,359.00

006436 Completed AC-STPUL-0528(003 005 I-5, Ash Ave / Park & Ride Improvements Henifin Construction L.L.C. MARLIN LENSSEN 11/05/2002 12/06/2004 1,447,817.55

006438 Completed STATE Talequah Ferry Terminal Dolphin Replacement Phase American Civil Constructors EDDY CHU 10/29/2002 09/17/2003 782,980.00

006440 Completed STATE Bremerton Ferry Terminal Offshore Maintenance General Construction Company EDDY CHU 12/13/2002 06/06/2003 467,500.00

006441 Completed STATE 016 Sr 16, New Tacoma Narrows Bridge Mr. Andy Hoff LINEA LAIRD 07/16/2002 06/08/2009 615,000,000.00

006443 Completed STATE 016 Sr 16, New Tacoma Narrows Bridge Toll Facility Transcore, L.P. LINEA LAIRD 09/27/2002 11/13/2009 9,163,681.00

006444 Completed ACBH-0433(007) 433 Sr433, Lewis And Clark Bridge 433/1 Deck Replaceme Max J. Kuney Company AMY E. REVIS 01/13/2003 04/18/2006 17,944,962.60

006445 Completed STATE 207 Ncr Sign Update 2003 Sharp-Line Industries, Inc. TERRY MATTSON 11/07/2002 12/02/2003 238,956.47

006446 Completed STATE Pt Defiance Ferry Terminal Wingwall Repairs Manson Construction Co. EDDY CHU 11/18/2002 03/11/2003 86,195.00

006449 Completed NH-0012(136) 012 Sr 12, Mcnary Pool To Attalia - Add Lanes Steelman-Duff, Inc. MOE DAVARI 12/06/2002 01/10/2006 6,183,378.18

006451 Completed STATE Keystone / Port Townsend Ferry Termianl Off Shore General Construction Company EDDY CHU 11/25/2002 06/12/2003 298,498.00

006452 Completed NH-0012(134) 012 Us 12 Alpowa Summit West - Paving Granite Northwest Inc J.D. DWYER 12/03/2002 09/18/2003 739,567.30

006453 Completed BRS-E243(004) Oak Street Bridge Replacement Mowat Construction Company JAY DRYE / JOEL VOTH 02/14/2003 09/17/2004 2,857,405.50

006455 Completed STATE Mukilteo Ferry Terminal Tower Repair American Civil Contractors EDDY CHU 12/13/2002 09/15/2003 172,999.00

006456 Completed BH-STPF-9999(363) 712 Sr 712, Skagit River Br 5/712 And Br 9/215 Bridge Americoat Painting Company DAVE CRISMAN 12/16/2002 07/02/2004 1,234,612.00

006458 Completed NH-0002(237) 002 Us 2/S Fk Skykomish R Br 2/40 To Bnrr Br 2/45 Lakeside Industries MARLIN LENSSEN 12/10/2002 11/15/2004 774,760.39

006459 Completed NH-STPH-0002(238) 002 Us 2/Stevens Pass East - Paving Cpm Development Corporation TERRY MATTSON 12/31/2002 11/04/2003 2,208,888.66

006460 Completed STP-PM02(001) 290 Sr 290/Spokane River Bridge 290/5 Repair Associated Underwater Services KEN OLSON 12/18/2002 10/14/2003 141,707.00

006461 Completed STP-PM02(001) 500 Sr 500 Garfield Street/3rd Ave Signal Mill Plain Electric, Inc. CHUCK RUHSENBERGER 12/18/2002 09/09/2003 119,380.50

006462 Completed STPR0002(240) 002 Us 2 / Leavenworth Vicinity - Paving Basin Paving Co. TERRY L. BERENDS 12/16/2002 10/20/2003 407,398.10

006463 Completed STATE Timber Pile Repair American Civil Constructors EDDY CHU 12/13/2002 09/12/2003 224,580.00

006464 Completed STPF-0243/STPH-02 243 Sr 243/Wanapum Area Left Turn Lanes Granite Northwest Inc JAY DRYE / JOEL VOTH 12/20/2002 12/10/2003 319,701.10

006466 Completed BHOS-1130(002) Winnfred Street Bridge Rehabilitation Pct Construction, Inc. DAVE ZIEGLER 01/15/2003 12/10/2003 688,709.09

006468 Completed NH-0101(239) 101 Morse Creek Bridge To Watkins Road Lakeside Industries JERRY MOORE 01/13/2003 10/27/2003 1,199,895.00

006469 Completed SDTRAN-0054(250) 005 I-5, Lynnwood Park & Ride Mowat Construction Company JOHN CHI 03/03/2003 09/19/2007 13,138,246.85

006470 Completed NH-0028(031) 028 Sr 28, Rock Island Weigh Station North Central Construction, Inc. TERRY MATTSON 01/07/2003 10/21/2003 698,621.30

Dec 25, 2019 76 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006471 Completed STATE 005 Sr 5, Smokey Point Rest Area Replacing Incoming Wa Island Construction Inc G MCNABB / M LENSSEN 01/14/2003 05/06/2003 38,747.00

006472 Completed STATE 020 Sr 20, Ncr Guardrail Update 2003 Petersen Brothers, Inc. TERRY MATTSON 01/07/2003 08/12/2003 437,727.96

006473 Completed HP-0055(211) 005 I5/36th St Uc Vic To Sr542 Vic Ph1 Re-Ad Granite Construction Company MARK RUSSELL 02/14/2003 05/06/2004 6,875,689.05

006474 Completed BRS-Z141(003) Bridge Replacement City Of Ocean Shores Cascade Bridge Llc JOHN L. HART 01/07/2003 10/06/2003 1,381,074.00

006475 Completed STATE Tower Repair General Construction Company EDDY CHU 01/28/2003 07/16/2003 415,919.00

006476 Completed STP-PM03(001) 021 Sr 21, Sr 21/Golden Harvest Crk-Replace Culvert N.A. Degerstrom, Inc. LARRY L. EIK 02/03/2003 12/02/2003 121,168.00

006477 Completed NH-0101(252) 101 Us101, Us 101/Truck Route Br To Front St Truck Rou Lakeside Industries JERRY MOORE 01/23/2003 01/26/2004 614,822.50

006478 Completed BH-0002(239) 002 Us 2/Bnrr Bridge 2/516 O'Xing Deck Rehab N.A. Degerstrom, Inc. DARREL MCCALLUM 02/03/2003 11/20/2003 175,018.52

006479 Completed NH-0026(019) 026 Sr 26, Sr 26/Vantage Area To Royal City Paving Central Washington Asphalt, Inc. JAY DRYE / JOEL VOTH 02/14/2003 01/29/2004 4,017,029.30

006480 Completed STP-PM03(001) 202 Sr 202, Sr 202/154th Pl Ne Vic To Gilman Street 15 Lakeside Industries JAY LAVASSAR 02/14/2003 05/10/2004 1,125,919.30

006481 Completed NH-0002(242) 002 Sr 2, Rocklyn Rd To Davenport - Paving / Reardan W Cpm Development Corporation DARREL MCCALLUM 01/31/2003 12/02/2003 924,000.00

006482 Completed BH-9999(386) 009 Sr 9, Nooksack R Br & N Fk Nooksack R Br Americoat Painting Company DAVE CRISMAN 01/31/2003 04/19/2011 886,835.00

006483 Completed STATE 005 I-5, I-5/Ash Way Park & Ride - Direct Access Tri-State Construction Inc AMIR AHMADI 03/13/2003 07/17/2007 7,569,906.10

006484 Completed STATE 002 Us2, Us 2/Cashmere Area Signal Beacons Mccandlish Electric Inc JAY DRYE / JOEL VOTH 02/04/2003 06/10/2003 118,504.00

006485 Completed NH-9999(394) 097 Us 2 & Us97 Orondo Area - Unstable Slope One Way Construction, Inc. JAY DRYE / JOEL VOTH 01/23/2003 01/15/2004 430,951.00

006486 Completed STATE 004 Sr 4 Et Al-Swr Signing 2003 Chandler Construction, Inc. AMY E. REVIS 02/14/2003 08/28/2003 139,655.00

006489 Completed NH0012(142) 012 Us 12/Tucannon River To Sr 261-Paving Poe Asphalt Paving, Inc. J.D. DWYER 02/27/2003 01/20/2004 2,524,840.68

006490 Completed NH-9999(390) 101 Us 101/Us 12 - Aberdeen Vic Signal Rehabilitation Potelco Inc JOHN L. HART 02/28/2003 03/03/2005 958,365.48

006491 Completed NH-0432(009) 432 Sr432, Sr432/Kelso Embankment Failure Longview Emb Tri-State Construction Inc AMY E. REVIS 02/20/2003 12/05/2003 146,818.00

006492 Completed STP-PM03(001) 097 Us 97a, Us97a/S Of Chelan -Tunnel Lining H.E.M. Construction Co., Inc. TERRY MATTSON 02/25/2003 10/13/2003 470,000.00

006493 Completed STPPM03(001) 025 Us 25, Sr 25/395 To Bossburg Rd Paving & Safety Pa Central Washington Asphalt, Inc. BOB HILMES 02/24/2003 12/18/2003 2,120,697.32

006494 Completed STPH-0527(002) 527 Sr 527, 164th Se To 132nd Se Widen To 5 Lanes Tri-State Construction Inc CARL BARKER, ACTING 03/27/2003 05/13/2009 9,128,204.00

006496 Completed NH0303(008) 303 Sr 303, Sr 303/Port Washington Bridge 303/012 Brid Intrastate Painting Corporation AMITY TROWBRIDGE 03/19/2003 03/14/2005 628,551.00

006497 Completed STATE 096 Sr 96, Sr96/132nd St Se To 125th St Se Vic Rinker Materials West, Llc Dba MARLIN LENSSEN 02/28/2003 02/23/2004 256,421.90

006498 Completed NH0012(140) 012 Us12, Us 12/Wallula Junction Vic - Paving Granite Northwest Inc PAUL GONSETH 03/05/2003 01/08/2004 836,346.73

006499 Completed STP-PM03(001) 002 Ncr Sign Structures 2003 Coral Construction Company TERRY MATTSON 03/07/2003 12/02/2003 241,145.00

006500 Completed ER-0101(220) Deschutes Parkway Phase 3 Controlled Rain, Llc TROY COWAN 03/21/2003 08/17/2004 340,372.44

Dec 25, 2019 77 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006501 Completed STP-PM03(001) 285 Sr 285 - Sellar Br Illuminationj Repair Colvico, Inc. TERRY L. BERENDS 03/13/2003 07/29/2003 356,819.00

006503 Completed STP-PM03(001) 017 Sr 17, Sr 17/Patton Blvd Signal Repair Mccandlish Electric Inc TERRY L. BERENDS 03/13/2003 06/17/2003 143,504.00

006504 Completed STATE 002 Regionwide Electrical Update 2001-2003 Mccandlish Electric Inc JAY DRYE / JOEL VOTH 03/14/2003 08/25/2003 193,144.00

006507 Completed STATE 020 Sr20, Sr20/Sw Barlow St To Sw 6th Ave Apply-A-Line, Inc. DAVE CRISMAN 04/09/2003 07/17/2003 99,384.00

006508 Completed NH-0097(104) 097 Us 97 / Chelan Falls South - Paving Paving Central Washington Asphalt, Inc. TERRY L. BERENDS 04/09/2003 11/19/2003 1,414,147.25

006509 Completed STATE 526 Sr 526, Sr 526/Broadway Ave Wye Conn. - Paving Pav Granite Construction Company MARLIN LENSSEN 03/26/2003 06/24/2004 259,000.00

006510 Completed IM-0902(198) 090 I-90, I-90/Indian John Hill-Pccp Replacement Repla Granite Northwest Inc PAUL GONSETH 04/01/2003 01/21/2004 496,362.25

006511 Completed NH-0097(101) 097 Us 97-Klickitat Co Line To Sr 22-Paving/Us 97-Dry Granite Northwest Inc PAUL GONSETH 04/02/2003 03/11/2004 1,726,469.70

006512 Completed STP-PM03(001) 173 Sr 173, Sr 173/Brewster-Columbia River Br Deck Col N.A. Degerstrom, Inc. TERRY L. BERENDS 03/24/2003 06/24/2003 370,613.71

006513 Completed BH-0101(262) 101 Us 101 - Chehalis River Bridge - Seismic Seismic R Pacific Road & Bridge Co. JOHN L. HART 04/01/2003 07/19/2004 918,005.00

006514 Completed STP-PM03(001) 014 Sr 14, Sr 14/4 Mi East Of Maryhill Rd Rockfall L.R.L. Construction Co. CHUCK RUHSENBERGER 04/01/2003 02/02/2004 319,757.39

006515 Completed BH-0053(894) 005 I-5, Puyallup River Rr O/C 5/456w - Deck Overlay D Concrete Barrier, Inc. DAVE ZIEGLER 04/24/2003 05/21/2004 1,459,162.00

006516 Completed BH0020(125) 020 Gorge Creek Bridge Painting Dunkin & Bush, Inc. DAVE CRISMAN 03/24/2003 09/15/2003 268,862.00

006517 Completed NH-0395(071) 395 Us 395-Foster Wells Rd To E Elm Rd - Paving & Elto Granite Northwest Inc MOE DAVARI 04/09/2003 10/27/2003 1,349,595.85

006519 Completed STATE Port Townsend Ferry Terminal, Standard Transfer Sp Jesse Engineering Co EDDY CHU 04/22/2003 07/27/2004 2,166,803.52

006520 Completed IM-0054(252) 005 I-5, I-5/Vic 300th St Nw & Starbird Rd Pacific Road & Bridge Co. AMIR AHMADI 04/14/2003 01/31/2006 1,972,177.90

006521 Completed NH-0520(033) 520 Sr 520/Sr 513 Interchange Ramp - Paving Mowat Construction Company MESSAY SHIFERAW 04/14/2003 07/15/2004 760,508.00

006522 Completed BRD-0240(009) 240 Sr240, Yakima River Bridge At Richland Wildish Standard Paving Co MOE DAVARI 05/01/2003 06/13/2007 16,122,646.30

006523 Completed STP-PM03(001) 410 Sr 410, Sr 164 Vic To Greenwater - Paving Woodworth & Company, Inc. STANLEY ENG 04/24/2003 12/21/2004 1,032,416.03

006524 Completed BH-0012(139) 012 Us 12, Us 12/Snake River Bridge At Burbank W/B Americoat Painting Company PAUL GONSETH 04/16/2003 01/27/2004 880,586.00

006525 Completed BR-0104(025) 104 Sr 104 / Hood Canal Bridge East Half General Construction Co. AMITY TROWBRIDGE 07/30/2003 06/25/2015 204,000,000.00

006526 Completed STP-PM03(001) 141 Klickitat County Pavers-Sr 141,142,& 197 Granite Northwest Inc CHUCK RUHSENBERGER 05/04/2003 03/22/2004 3,675,675.10

006528 Completed STP-PM03(001) 515 Sr 515, Se 222nd Place To Se 217th Street Transtech Electric, Inc. INGO GOLLER 04/24/2003 02/14/2005 483,957.12

006529 Completed NH-0195(039) 195 Us 195, Us 195/Cornwall Rd To Excelsior Dr-Pccp Ex Acme Concrete Paving, Inc. LARRY L. EIK 04/28/2003 01/20/2004 2,069,791.70

006530 Completed NH-167(030) 167 Sr 167, Springbrook Creek Culvert Replacements Granite Construction Company INGO GOLLER 04/14/2003 01/16/2007 456,000.00

006531 Completed BH-0821(084) 082 I-82, Thrall Rd Overcrossing - Bridge Deck Mowat Construction Company PAUL GONSETH 04/18/2003 11/04/2003 203,617.50

006532 Completed IM-0053(900) 005 I-5, Lakeview Viaduct Bridge 5/566 Granite Construction Company MESSAY SHIFERAW 04/16/2003 07/21/2004 682,694.00

Dec 25, 2019 78 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006534 Completed STATE 005 I-5, I-5/Pleasant Hill Undercrossing Bridge 5/129 Tri-State Construction Inc AMY E. REVIS 04/29/2003 03/31/2004 251,776.40

006535 Completed STP-PM03(001) 165 Sr 165, Sr 165/Carbon Rv Br Vic Crib Wall Repair C Henifin Construction L.L.C. MIKE MORISHIGE 04/16/2003 12/02/2003 190,229.00

006536 Completed STP-PM03(001) 169 Sr 169, Sr169/Newaukum Cr Br To Green River Br And Watson Asphalt Paving Company, INGO GOLLER 05/01/2003 07/08/2004 1,149,669.04

006537 Completed STP-PM03(001) 097 Us 97, Us97&97a/Lake Entiat Vic Unstable Slopes One Way Construction, Inc. TERRY MATTSON 04/24/2003 01/27/2004 401,974.00

006538 Completed STP-PM03(001) 504 Sr 504, Castle Rock/Winlock To Toutle River Br Tou Lakeside Industries AMY E. REVIS 05/04/2003 07/15/2004 5,122,537.50

006539 Completed NH-0125(006) 125 Sr 125, Sr 125/Military Rd To Sr 12 - Paving Granite Northwest Inc J.D. DWYER 05/04/2003 12/09/2003 1,777,899.23

006540 Completed NH-0012(137) 012 Us 12/Silver Cr-Fish Passage Barrier Removal Thompson Bros. Excavating, Inc. RICH HENSLEY 05/20/2003 06/17/2004 325,795.00

006541 Completed BH-9999(395) 005 I-5, Sw Region Seismic Retrofit Pct Construction, Inc. DON OWINGS 05/01/2003 07/09/2004 658,845.85

006542 Completed BH-0053(898) 005 I-5, Ne Northgate Way To Vic Ne 175th St-Sb Bridge Concrete Barrier, Inc. BRIAN NIELSEN 04/29/2003 02/09/2004 1,142,075.00

006543 Completed STATE 099 Sr 99, Sr 99/Sr 525 Vicinity To Gibson Rd Access M Granite Construction Company AMIR AHMADI 04/24/2003 01/22/2004 244,881.80

006545 Completed STP-PM03(001) 009 Sr 9, Sr 96 Vic To Sr 204 Vic - Paving Lakeside Industries MARLIN LENSSEN 06/13/2003 08/08/2006 2,469,162.80

006546 Completed STP-PM03(001) 112 Sr 112, Sr 112/Makah Reservation To Hoko River Pav Lakeside Industries JERRY MOORE 04/29/2003 06/07/2004 1,671,161.40

006547 Completed CM-9999(371) 005 I-5/ Vancouver Its - Phase 1 Signal Electric, Inc. DON OWINGS 05/20/2003 06/15/2004 498,493.00

006548 Completed BH-0099(079) 099 Sr 99/George Washington Bridge Seismic Stage 2 Mowat Construction Company JOHN CHI 05/20/2003 03/13/2006 5,645,477.25

006549 Completed IM-4053(843) 405 I405,Bellevue Direct Access Ne 4th/6th I/C'S Guy F. Atkinson Construction, Llc. MARK SAWYER 06/13/2003 07/06/2010 44,157,049.00

006550 Completed BH-0055(221) 005 I-5, Dakota Creek Bridges - Bridge Repair Mowat Construction Company DAVE CRISMAN 05/04/2003 12/29/2006 597,641.54

006552 Completed STP-PM03(001) 161 Vic. Clear Lake Rd. S. To 255th St. E. - Paving Tucci & Sons, Inc. MIKE MORISHIGE 05/30/2003 04/09/2004 1,044,565.14

006553 Completed NH-0051(253) 005 I-5/North Kelso Weigh Station All Concrete Specialties Inc DON OWINGS 05/30/2003 12/16/2004 148,240.82

006554 Completed STP-PM03(001) 507 Skookumchuck River Bridge To County Line Granite Construction Company RICH HENSLEY 05/09/2003 12/04/2003 545,405.15

006555 Completed STP-PM03(001) 534 Sr 534/I-5 To Sr 9 - Paving Rinker Materials West, Llc Dba DAVE CRISMAN 05/13/2003 04/01/2004 650,972.20

006556 Completed STP-PM03(001) 020 I 5 To N Skagit St Paving Granite Construction Company DAVE CRISMAN 05/13/2003 09/21/2004 657,717.80

006557 Completed IM-0905(095) 090 I-90/Salnave Road To Geiger Road - Paving Cpm Development Corporation KEN OLSON 05/14/2003 03/09/2005 2,958,032.00

006558 Completed STP-PM03(001) 020 2003 Eastern Region Chip Seal Granite Northwest Inc LARRY L. EIK 05/14/2003 02/04/2004 2,109,841.75

006559 Completed NH-0012(146) 012 Us 12-Rockfall Mitigation Vic Mp 143-149 Elting Incorporated RICH HENSLEY 05/16/2003 11/04/2004 814,581.30

006560 Completed IM-0822(119) 082 I-82 / Prosser Vic - Weigh Station Granite Northwest Inc PAUL GONSETH 05/28/2003 12/22/2004 2,485,053.80

006561 Completed STATE Wsf, Lopez Ferry Terminal, Counterweight Sheave & American Civil Contractors EDDY CHU 05/15/2003 01/21/2004 81,688.00

006562 Completed STPH-0003(102) 003 Sr 3/Nb Off Ramp At Loxie Eagans Blvd Totem Electric Of Tacoma, Inc. AMITY TROWBRIDGE 06/11/2003 04/15/2004 188,360.30

Dec 25, 2019 79 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006563 Completed STP-PM03(001) 020 Sr 20, Ruby Mountain To Metcalf Lake & Metcalf Lak Cpm Development Corporation BOB HILMES 05/29/2003 02/20/2004 1,881,000.05

006564 Completed NH-0097(097) 097 Us 97/Pateros Storm Drainage Improvement Goodfellow Bros Inc TERRY MATTSON 05/20/2003 12/08/2003 89,700.00

006565 Completed CM-0906(194) 090 I-90/Us 195 To Argonne Road-Its Intermountain Electric, Inc. DARREL MCCALLUM 05/29/2003 07/22/2005 1,637,252.50

006566 Completed NH-0395(067) 395 Us 395 - Immel Road To Arden - Paving And Safety P Hap Taylor And Sons, Inc. Dba BOB HILMES 05/29/2003 05/26/2004 3,292,808.75

006567 Completed STP-PM03(001) 026 Palouse River Br 26/285 Rail Retro Petersen Brothers, Inc. KEN OLSON 05/05/2003 12/10/2003 244,932.20

006568 Completed BR-0012(121) 012 Us 12 / Dixie Vic - Bridge Replacement Weaver Construction Co. J.D. DWYER 05/20/2003 12/07/2004 1,044,253.80

006569 Completed STATE 900 Sr 900 - 57th Ave S Vic To S 129th St Wye Pedestri C.A. Carey Corporation INGO GOLLER 06/03/2003 05/17/2005 351,042.00

006570 Completed STP-PM03(001) 129 Sr 129, Asotin To Clarkston - Unstable Slopes Hi Tech Rockfall Construction, Inc. J.D. DWYER 05/16/2003 01/05/2004 650,258.00

006573 Completed NH-0054(251) 005 I-5 / Silver Lake Sb Weigh Station-Weigh-In-Motion Granite Construction Company MARLIN LENSSEN 05/30/2003 09/11/2006 546,054.20

006574 Completed NH-0020(126) 020 Deception And Canoe Pass Bridges Anchor Concrete D Diamaco Inc. DAVE CRISMAN 05/28/2003 02/01/2005 712,154.00

006575 Completed STATE 203 Vic 268th Ave Ne Unstable Slope Granite Construction Company JAY LAVASSAR 05/16/2003 05/28/2004 328,000.06

006576 Completed STATE Shaw Island Ferry Terminal Slip Reconstruction American Civil Contractors LISA PARRIOTT 06/11/2003 10/11/2004 6,477,797.06

006577 Completed NH-0529(013) 529 Sr 529/I-5 To Rr Bridge Paving Rinker Materials West, Llc Dba AMIR AHMADI 05/20/2003 01/28/2004 277,564.50

006578 Completed STP-PM03(001) 161 Sr 161 / 128th St To Sr 512 I/C - Paving Tucci & Sons, Inc. TROY COWAN 06/12/2003 08/30/2004 723,293.25

006579 Completed STP-PM03(001) 006 Sr 6/ S Fk Chehalis River Bridge To Chehalis River Lakeside Industries RICH HENSLEY 05/23/2003 09/09/2003 375,036.50

006580 Completed NH-0167(031) 167 N. Meridian To King County Line Paving Cpm Development Corporation DAVE ZIEGLER 06/16/2003 05/24/2004 3,481,936.20

006581 Completed STATE 405 Sr 405 / Eastside Freeway Safety Improvements Granite Construction Company STANLEY ENG 05/30/2003 01/13/2005 935,320.44

006582 Completed IM-0906(201) 090 Sullivan Rd. To Idaho State Line Phase 1 Cpm Development Corporation DARREL MCCALLUM 05/29/2003 04/05/2004 1,680,032.00

006583 Completed STP-PM-03(003) 900 Sr 900 / Newport Way To I-90 - Widening Mowat Construction Company MARK SAWYER 07/23/2003 02/16/2010 9,103,866.33

006584 Completed BH-0202(035) 202 Sr 202 / Sammamish River Bridges - Scour Repair Ohno Construction Company BRIAN DOBBINS 06/03/2003 07/29/2008 136,618.80

006585 Completed STATE Wsf, Bremerton Ferry Terminal Dolphin Replace Ment American Civil Contractors EDDY CHU 05/30/2003 12/23/2003 377,880.00

006586 Completed BH-0101(031) 104 Sr 104 / Hood Canal Bridge 104-5.1 Anchor Cable Cn General Construction Company AMITY TROWBRIDGE 06/04/2003 05/11/2004 416,000.00

006587 Completed NH-0509(013) 509 Sr 509 / S. Normandy Rd To S 160th St Woodworth & Company, Inc. INGO GOLLER 06/09/2003 02/14/2005 1,359,136.20

006588 Completed STP-PM03(001) 515 Sr 515, S 15th St To Wells Ave S - Paving Cpm Development Corporation STANLEY ENG 06/12/2003 09/30/2004 341,555.36

006589 Completed STP-PM03(001) 522 Sr 527 / Sr 522 To I-405 Vic - Paving Rinker Materials West, Llc Dba MESSAY SHIFERAW 06/16/2003 12/04/2004 750,226.70

006590 Completed NH-0018(030) 018 Sr18,"C" St Sw I/C To Se 304th St Br And Green Riv Lakeside Industries STANLEY ENG 07/02/2003 11/22/2005 3,453,361.74

006591 Completed IM-0051(255) 005 I-5, Ne 179th St To Nw 319th St - Paving Paving Knife River Corporation-Northwest CHUCK RUHSENBERGER 06/12/2003 02/12/2004 334,337.05

Dec 25, 2019 80 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006592 Completed IM-9999(397) 005 I-5, Et Al Clark Co Vic Sign Structure Replacement Coral Construction Company CHUCK RUHSENBERGER 06/03/2003 03/17/2004 92,379.00

006594 Completed BH-9999(396) 003 Sr 3 & Us 101 Bridges - Seismic Retrofit Mowat Construction Company KURT WILLIAMS 06/16/2003 04/05/2004 629,226.00

006595 Completed STP-PM03(001) 103 Sr 103-Bay Ave To Leadbetter Point State Park Lead Lakeside Industries DON OWINGS 06/12/2003 01/26/2004 969,045.70

006596 Completed STP-PM03(001) 508 Sr508, Vic Guerrier Rd To Vic Mp8.0 Paver Granite Construction Company RICH HENSLEY 06/16/2003 12/11/2003 652,459.00

006597 Completed STATE 167 Sr 167 - North Sumner Interchange Scarsella Bros., Inc. HOWARD DIEP 06/20/2003 07/28/2006 12,687,396.59

006598 Completed NH-0012(141) 012 Us 12 & Sr 124, Waitsburg Vic - Paving Us12-Coppei Cpm Development Corporation J.D. DWYER 06/16/2003 05/04/2004 944,299.25

006602 Completed NH0012(145) 012 Us 12 / Brady To Malone - Paving Lakeside Industries JOHN L. HART 06/20/2003 03/31/2004 2,148,350.00

006603 Completed STATE 099 Sr 99 / Aurora Ave At Galer St Vicinity Pedestrian Pct Construction, Inc. JOHN CHI 06/24/2003 03/15/2006 1,520,642.09

006604 Completed STATE 005 I-5, Ferndale To Blaine - Replace Fence Chandler Construction, Inc. DAVE CRISMAN 06/24/2003 03/17/2004 65,774.00

006607 Completed STP-PM03(001) 202 Sr 202, Jct Preston Fall City Rd & Jct Sr 203 Granite Construction Company BRIAN DOBBINS 06/27/2003 12/09/2004 551,600.30

006608 Completed BH-0522(037) 522 Sr 522, I-405 I/C East To North Ramp-Bridge Deck R Concrete Barrier, Inc. BRIAN DOBBINS 07/01/2003 02/12/2004 239,332.00

006609 Completed ER-0001(104) 101 Us 101/Nolan Creek Vic Bridge 101/214 And Realignm Bruch & Bruch Construction Inc JOHN L. HART 06/12/2003 11/01/2004 3,282,705.50

006610 Completed NH-0051(257) 005 I-5 / Salmon Creek To Sr 205 Hamilton Construction Co D. OWINGS/C. LILES 07/28/2003 11/12/2008 25,920,956.90

006611 Completed STP-PM03(002) 018 Sr 18/Maple Valley To Issaquah/Hobart Rd Guy F. Atkinson Construction, Llc. DEREK CASE 09/02/2003 12/29/2008 55,904,937.00

006612 Completed STP-PM03(001) 410 Sr 410 / Crystal Mtn Blvd Vic Paving Paving Watson Asphalt Paving Company, DEREK CASE 07/11/2003 12/15/2003 435,542.80

006613 Completed BR-0101(205) 101 Us 101 / So Fork Boulder Cr Br 101/157 Br. 101/157 Rognlin'S, Inc. JOHN L. HART 07/18/2003 08/23/2004 1,768,905.00

006614 Completed BH-0099(076) 099 Sr 99, 1st Ave S Bridge - Painting Intrastate Painting Corporation JULIA MIZUHATA 08/06/2003 02/14/2005 616,590.00

006615 Completed STATE 012 Us 12 - Sargent Blvd - Temporary Signal Potelco Inc JOHN L. HART 07/03/2003 04/20/2004 115,871.00

006616 Completed NH-0526(006) 526 Sr 526, Evergreen Way Interchange Illumination Reb Transtech Electric, Inc. AMIR AHMADI 07/03/2003 12/17/2004 348,941.50

006617 Completed BR-9999(392) 009 Sr 9 & 542 / Stillaguamish River & Nugents Vic Br Mowat Construction Company DAVE CRISMAN 07/02/2003 04/19/2007 1,022,052.00

006618 Completed STATE 291 Sr 291 / Long Lake Unstable Slope Repair L.R.L. Construction Co. KEN OLSON 07/17/2003 12/12/2003 162,074.00

006619 Completed BH-0053(902) 005 I-5 / Spokane Street I/C Bridges - Seismic Granite Construction Company MESSAY SHIFERAW 07/18/2003 03/07/2005 2,565,000.05

006620 Completed NH-0906(203) 090 I-90 / Argonne Rd To Sullivan Rd Scarsella Bros., Inc. DARREL MCCALLUM 07/30/2003 01/02/2007 23,915,737.76

006621 Completed IM-0053(901) 005 I-5 / Northgate Way To Ne 175th Street Granite Construction Company JOHN CHI 07/15/2003 11/23/2004 1,992,814.45

006625 Completed NH-0500(013) 500 Sr 500 / Ne 112th Ave Gher Rd Interchange Tapani Underground Inc CHUCK RUHSENBERGER 08/11/2003 12/26/2006 18,162,104.78

006626 Completed BH-0101(176) 101 Us 101 / Hoquiam River Bridges - Seismic Retrofit Advanced American Diving Servinc JOHN L. HART 08/06/2003 09/27/2004 699,161.00

006627 Completed STATE 241 Sr 241 / Yakima River Br 241/5 Bridge Repair Weaver Construction Co. PAUL GONSETH 07/16/2003 11/25/2003 104,000.00

Dec 25, 2019 81 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006628 Completed NH-0018(028) 018 Sr 18 / Weyerhaeuser Way To Sr 167 Tri-State Construction Inc MARK SAWYER 08/18/2003 03/01/2007 12,079,022.65

006629 Completed STP-0531(005) 531 Sr 531 / 11th Ave To 16th Dr Ne Vic Granite Construction Company DAWN MCINTOSH, P.E. 07/30/2003 06/30/2004 106,989.50

006630 Completed IM-0903(058) 090 I-90 / Ryegrass Summit To Vantage Granite Northwest Inc WILL SMITH 08/18/2003 03/18/2005 6,709,324.30

006633 Completed STPH-0904(115) 904 Sr 904 / Hes Safety Improvements Colvico, Inc. GLENN A. WAGEMANN 08/13/2003 02/04/2004 254,988.40

006635 Completed STPF-0162(014) 162 Sr 162 / Voights Creek Bridge 162/11 Vic Pacific Road & Bridge Co. TROY COWAN 08/18/2003 05/16/2005 2,161,082.00

006636 Completed STATE 203 Sr 203 / Morrison St To Ne 55th St Pedestrian Safe Granite Construction Company BRIAN DOBBINS 08/11/2003 06/03/2004 258,000.00

006637 Completed IM-0902(195) 090 Sr 90 / Highline Canal To Elk Heights Scarsella Bros., Inc. PAUL GONSETH 09/08/2003 04/07/2005 3,132,267.57

006638 Completed STATE 005 I-5 / Murray Creek - Stormwater Retrofit Olson Brothers Excavating, Inc. JOHN MCNUTT 09/10/2003 01/30/2004 153,946.00

006639 Completed STATE 182 I-182 / Us 395 I/C - Roadside Safety Granite Northwest Inc MOE DAVARI 08/25/2003 12/10/2003 55,417.80

006646 Completed NH-0167(033) 167 Sr 167 / Vicinity Bridge 167/125e - Drainage Mods Tri-State Construction Inc INGO GOLLER 09/08/2003 09/02/2004 129,088.00

006650 Completed ITS-2002(031) 005 I-5/Gravelly Lake To 49th St Fiber Optics Fiber Op Elcon Corporation HOWARD DIEP 09/22/2003 04/06/2005 455,837.10

006652 Completed ER0302(005) 005 I-5 / Lynnwood 44th Ave Bridge Repair - Er Project Concrete Barrier, Inc. BRIAN NIELSEN 09/12/2003 01/22/2004 498,309.00

006653 Completed IGFSB-2000(017) 005 I-5 / Puyallup River To 54th St - Guardrail Guardr Coral Construction Company DAVE ZIEGLER 10/03/2003 03/24/2004 309,309.00

006655 Completed NH-0002(245) 002 Us 2 / 1/4 Mile East Of Anderson Creek Bridge Slo Coral Construction Company MARLIN LENSSEN 10/24/2003 06/24/2004 157,751.00

006657 Completed STATE Vashon Ferry Terminal Maintenance General Construction Company EDDY CHU 10/17/2003 04/15/2004 199,774.00

006658 Completed STATE 090 I-90 / Tibbetts Creek Vicinity Culvert Replacement Pacific Road & Bridge Co. BRIAN DOBBINS 11/24/2003 07/09/2009 3,117,207.90

006659 Completed STATE 005 I-5/Military Rd Vic Culvert Replacement Mid-Mountain Contractors, Inc. STANLEY ENG 09/29/2003 04/10/2007 587,506.00

006661 Completed STATE Systemwide On Call Wingwall And Dolphin Repair General Construction Company EDDY CHU 12/16/2003 06/03/2005 692,699.00

006664 Completed NH-9999(407) 002 Ncr Durable Pavement Markings 03/05 2004 Apply-A-Line, Inc. TERRY MATTSON 11/12/2003 07/13/2004 291,094.60

006665 Completed STP-0542(022) 542 Sr 542/Wells Creek Rd To Mt Baker Vic Strider Construction Co., Inc. MARK RUSSELL 05/12/2004 10/18/2007 4,242,979.00

006667 Completed STATE Anacortes Ferry Terminal Maintenance Culbertson Marine Construction, Inc EDDY CHU 11/24/2003 01/18/2005 218,482.00

006668 Completed STP-0028(032) 028 Sr 28 / Quincy East - Left Turn Lanes Basin Paving Co. ROBERT ROMINE 11/24/2003 06/02/2005 398,533.95

006669 Completed NH-0097(106) 097 Us 97, Blewett Pass South - Paving Granite Northwest Inc TERRY MATTSON 12/29/2003 05/25/2005 2,218,434.25

006670 Completed IM-0053(904) 005 I-5/7th & Cherry/5th & Cherry/Stewart St/ Eastlake Elcon Corporation JULIA MIZUHATA 12/31/2003 02/14/2006 588,550.30

006672 Completed STATE 009 Sr 9 / Sr 528 Intersection - Signal Signal Electric, Inc. MARLIN LENSSEN 12/04/2003 01/24/2007 374,517.91

006675 Completed STATE Point Defiance Ferry Terminal Trestle Maintenance American Civil Contractors EDDY CHU 12/15/2003 07/06/2004 194,999.00

006676 Completed STP-0112(011) 112 Sr 112, Jim Creek Culvert Replacement Bruch & Bruch Construction Inc JOHN L. HART 12/16/2003 12/10/2004 632,026.70

Dec 25, 2019 82 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006677 Completed STP-0011(036) 011 Sr 11, Whatcom Cl To Bellingham Cl Lakeside Industries DAVE CRISMAN 12/17/2003 02/04/2005 880,600.35

006680 Completed STATE 005 Emergency Project: I-5/Mp 190.65g- G-Line Drainage Granite Construction Company MARLIN LENSSEN 11/04/2003 03/09/2004 125,810.20

006681 Completed NH-0028(033) 028 Sr 28/Rock Island - Rock Slopes Stage 2,Soil Nail Scarsella Bros., Inc. ROBERT ROMINE 12/22/2003 10/12/2005 863,631.00

006682 Completed STATE 161 Sr 161/234th St "E" To 204th St "E" Scarsella Bros., Inc. HOWARD DIEP 01/20/2004 08/03/2006 6,923,753.42

006685 Completed NH-0012(150) 012 Us 12/White Pass Fill Erosion Vic Mp 148.7 Vic Mp Tri-State Construction Inc RICH HENSLEY 12/22/2003 08/01/2005 403,197.00

006686 Completed STP-0155(013) 155 Sr 155, Ncr Guardrail Update 2004 Frank Gurney, Inc. ROBERT ROMINE 01/05/2004 11/30/2004 824,000.00

006687 Completed IM-0904(114) 090 I-90/Moses Lake West Paving Central Washington Asphalt, Inc. ROBERT ROMINE 01/15/2004 07/05/2005 3,738,084.58

006688 Completed STP-0097(109) 097 Us 97a, Wenatchee North - Paving Basin Paving Co. TERRY MATTSON 12/31/2003 03/15/2005 1,715,256.19

006690 Completed STATE 016 Sr 16 / 6th Ave To Jackson Ave - Hov Tri-State Construction Inc DAVE ZIEGLER 02/13/2004 05/15/2006 4,040,159.50

006691 Completed STP-0024(021) 024 Sr24/Fire Station To Taylor Ranch-Paving Columbia Asphalt & Gravel, Inc. WILL SMITH 01/15/2004 01/24/2005 923,355.55

006692 Completed NH-0012(147) 012 Us 12 / Dixie Vicinity - Paving Granite Northwest Inc WILL SMITH 01/09/2004 11/09/2004 617,934.30

006693 Completed STATE 395 Sr 395/Kennewick Varible Message Sign Colvico, Inc. MOE DAVARI 01/30/2004 02/16/2005 109,521.00

006694 Completed STP-0028(034) 028 Sr 28/Harrington To Davenport - Paving Paving Poe Asphalt Paving, Inc. GLENN A. WAGEMANN 02/09/2004 12/20/2004 1,577,724.54

006695 Completed IM-0053(911) 005 I-5/Ramps At Michigan-Corson/Albro/Swift Mowat Construction Company JULIA MIZUHATA 02/20/2004 03/28/2006 1,995,983.55

006696 Completed NH-0101(268) 101 Us 101/Sitkum-Sol Duc Rd To Bear Creek Rd Paving Lakeside Industries JOHN L. HART 02/13/2004 01/14/2005 3,247,811.44

006697 Completed IM-0901(431) 090 I-90/W Lk Sammamish I/C To 436th St Se Granite Construction Company BRIAN DOBBINS 02/13/2004 03/21/2006 5,780,500.00

006698 Completed NH-0097(111) 097 Us 97 / Ellensburg To Virden - Paving Paving Granite Northwest Inc JOEL VOTH 02/09/2004 05/27/2005 1,856,136.30

006699 Completed STATE 124 Sr 124/Mp 6.65 East Jct Sr 12-Reconstruction/Curve Granite Northwest Inc MOE DAVARI 02/09/2004 06/09/2004 142,400.25

006700 Completed STPH-0002(248) 002 Us 2 / Coles Corner Vicinity - Paving Paving Central Washington Asphalt, Inc. ROBERT ROMINE 02/13/2004 03/30/2005 1,730,899.90

006701 Completed BH-0901(417) 090 I-90/I-405 Vicinity Bridges - Seismic Mowat Construction Company BRIAN DOBBINS 01/30/2004 07/06/2009 1,725,575.00

006702 Completed STP-0529(014) 528 Sr528/Sr529 Paving/Columbia Ave To 55th Dr Ne Vic Granite Construction Company MARLIN LENSSEN 02/09/2004 11/20/2007 1,223,190.17

006704 Completed GCA3636 127 Sr 127 / Central Ferry To Church Hill Rd Granite Northwest Inc BOB HILMES 02/09/2004 01/21/2005 1,248,947.32

006705 Completed STP-9999(409) 021 Sr21/Et Al-2004 Eastern Region Chip Seal Chip Sea Granite Northwest Inc GLENN A. WAGEMANN 02/23/2004 02/16/2005 2,829,346.05

006706 Completed ER-0401(016) 020 Sr 20, Diablo Vic Emergency Repair Scarsella Bros., Inc. DAVE CRISMAN 12/31/2003 03/08/2005 523,498.90

006707 Completed STP-9999(404) 017 Ncr Seal 2004 Granite Northwest Inc TERRY MATTSON 02/09/2004 06/08/2005 2,338,462.65

006708 Completed IM-0905(097) 090 I-90, Adams County Line To Spokane County Line Cpm Development Corporation KEN OLSON 03/01/2004 02/28/2005 3,388,388.00

006709 Completed IM-0905(096) 090 I-90. Tokio To Lincoln County Line Paving Poe Asphalt Paving, Inc. BOB HILMES 02/12/2004 03/14/2005 1,437,305.85

Dec 25, 2019 83 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006710 Completed STATE 203 Sr 203, Ne 124th / Novelty Rd Vic Roundabout Granite Construction Company BRIAN DOBBINS 02/13/2004 07/15/2009 1,544,000.00

006711 Completed STATE 527 Sr 527, 132nd St. Se To 112th St. Se Klb Construction, Inc. MARLIN LENSSEN 03/29/2004 09/29/2010 15,631,259.51

006713 Completed NH-0018(029) 018 Sr 18, Eb Offramp To West Valley Highway Tri-State Construction Inc MESSAY SHIFERAW 02/13/2004 06/28/2005 677,901.38

006714 Completed STPH-0024(020) 024 Sr 24, South Wahluke Slope Guardrail North Central Construction, Inc. ROBERT ROMINE 02/13/2004 02/23/2005 267,017.42

006715 Completed NH-0026(020) 026 Sr 26, Union Flat Creek Improve Drainage M.L. Albright & Sons, Inc. KEN OLSON 02/23/2004 01/26/2005 112,768.55

006716 Completed STATE Pier 52, Colman Dock Interim Retail Improvements Biwell Construction Inc. EDDY CHU 04/28/2004 05/05/2006 1,905,234.00

006717 Completed STP-9999(410) 410 South Central Region Seal 2004 Central Oregon Pavers, Inc. JOEL VOTH 03/10/2004 03/30/2005 1,883,794.77

006718 Completed IM-9999(411) 082 I-82 & Sr 22, Prosser Vicinity - Paving Granite Northwest Inc WILL SMITH 04/09/2004 12/07/2004 592,401.27

006719 Completed IM-0823(058) 082 I-82, Coffin Road Vicinity - Paving Cpm Development Corporation WILL SMITH 03/03/2004 10/05/2004 330,828.00

006720 Completed STATE 395 Us 395, Nsc - Farwell Road Lowering Max J. Kuney Company BOB HILMES 03/16/2004 10/26/2006 4,975,935.03

006721 Completed NH-0502(008) 502 Sr 502, I-5 To Battle Ground Knife River Corporation-Northwest DON OWINGS 04/05/2004 12/14/2004 908,860.90

006723 Completed STATE 097 Us 97, Toppenish To Wapato - Drainage Drainage Columbia Asphalt & Gravel, Inc. WILL SMITH 04/27/2004 12/09/2004 391,758.80

006725 Completed STP-0542(020) 542 Sr 542, Truck Rd Vicinity-Culvert Replace C W Williams Construction Co MARK RUSSELL 03/10/2004 11/14/2007 128,794.25

006726 Completed NH0522(038) 522 Sr 522, Paradise Lake Rd To Snohomish River Interc Scarsella Bros., Inc. DAVE LINDBERG 06/08/2004 07/05/2012 22,810,188.25

006727 Completed NH-0002(252) 002 Us 2, Reiter Road Vicinity-Rechannelize Srv Construction, Inc. AMIR AHMADI 03/18/2004 08/16/2005 446,370.36

006728 Completed ITS-2002(037) 005 I-5, Its Pcl To 320th Traveler Info. System Expans Elcon Corporation DAVE FALTER 03/29/2004 01/12/2006 570,425.00

006736 Completed NH-9999(413) 970 Sr 970 Et Al, Cle Elum Vicinity - Paving Columbia Asphalt & Gravel, Inc. JOEL VOTH 04/05/2004 06/20/2005 1,294,040.95

006737 Completed STATE Friday Harbor Ferry Terminal, Preservation American Civil Contractors EDDY CHU 04/21/2004 04/17/2007 9,401,680.00

006738 Completed IM-0052(186) 005 I-5, County Line To Prairie Creek Bridge- Paving Granite Construction Company RICH HENSLEY 04/05/2004 10/19/2004 852,606.90

006739 Completed NH-0101(273) 101 Us 101, Sr 106 To Brockdale Rd - Paving Ace Paving Co., Inc. TROY COWAN 04/05/2004 10/31/2005 636,068.95

006740 Completed REV-7299(001) Goldenrod Bridge & Road Improvements City Of Burl Strider Construction Co., Inc. DAVE CRISMAN 05/20/2004 08/10/2006 2,099,500.75

006741 Completed STATE 161 Sr 161, Mp 3.87 To Ski Park Rd. Safety Improvement Cpm Development Corporation DAVE ZIEGLER 04/01/2004 09/28/2004 88,529.00

006742 Completed NHG-0101(272) 101 Us 101 & Sr 401 Intersection Signal Mccandlish Electric Inc AMY E. REVIS 04/15/2004 02/01/2005 349,405.04

006743 Completed STP-0302(006) 302 Sr 302, N Bay Rd To Key Peninsula Hwy - Paving Tucci & Sons, Inc. JOHN MCNUTT 04/22/2004 05/10/2005 1,593,249.15

006745 Completed NH-0097(110) 097 Us 97, Chelan Falls South Unstable Slopes One Way Construction, Inc. JOEL VOTH 04/19/2004 02/08/2005 637,230.50

006746 Completed IM-0901(426) 090 I-90, Vicinity Lake Sammamish Parkwayslope Stabil Pacific Road & Bridge Co. BRIAN DOBBINS 04/22/2004 06/30/2009 763,942.29

006747 Completed BH-0099(082) 099 Sr 99, 1st Ave S Br 99/530w Hydraulic & Plc System Pct Construction, Inc. MESSAY SHIFERAW 04/28/2004 08/03/2006 1,002,417.27

Dec 25, 2019 84 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006748 Completed STP-0124(014) 124 Sr 124, Mcfeely Rd To Coppei Cr - Paving Poe Asphalt Paving, Inc. PAUL GONSETH 05/04/2004 01/11/2005 1,585,612.20

006749 Completed NH-0012(151) 012 Us 12/Lake Creek To Wildcat Creek Etal-Paving Et A Central Washington Asphalt, Inc. RICH HENSLEY 05/12/2004 04/28/2005 6,690,350.20

006750 Completed IM-0053(908) 005 I-5/Nisqually River Br To Fort Lewis Rd Acp Inlay Woodworth & Company, Inc. TROY COWAN 05/12/2004 10/09/2006 1,430,160.05

006751 Completed STATE 129 Sr 129 / Clarkston Vicinity - Paving Poe Asphalt Paving, Inc. WILL SMITH 05/03/2004 11/24/2004 547,226.00

006752 Completed STATE 090 I-90/Cle Elum River Br 90/134n Diamaco Inc. PAUL GONSETH 05/28/2004 02/28/2005 507,326.00

006754 Completed STPH-0016(016) 016 Sr 16, Burley-Olall/Burley-Olalla Intersection-Saf Tri-State Construction Inc DAVE ZIEGLER 05/03/2004 10/25/2005 673,570.00

006756 Completed NH-0101(270) 101 Sr 101, Kitchen-Dick Rd To Dungeness River Paving Lakeside Industries JERRY MOORE 04/27/2004 01/07/2005 1,239,060.30

006757 Completed IM-0053(910) 005 I-5/Federal Way - S 317th Street Hov Direct Access Cpm Development Corporation JOHN CHI 06/01/2004 02/16/2010 22,441,120.38

006758 Completed IM-0052(188) 005 I-5, Pacific Ave I/C Sb Off Ramp - Signal Signal Signal Electric, Inc. JOHN MCNUTT 04/29/2004 06/14/2005 119,911.22

006759 Completed IM-0055(223) 005 I-5/North Of Lakeway Interchange Ph.1a Granite Construction Company CHRIS DAMITIO 05/18/2004 04/18/2008 5,276,373.20

006760 Completed IM-4053(829) 405 Sr 405, Bothell To Swamp Creek I/C Hov L Granite Construction Company MARK SAWYER 04/29/2004 07/02/2009 94,977.00

006761 Completed STPF-0105(016) 105 Sr 105, County Line To Bonge Ave. Lakeside Industries JOHN L. HART 05/12/2004 01/04/2005 819,186.25

006762 Completed IM-0901(429) 090 I 90, Sunset Way I/C Retaining Wall 16 Thomco Construction Inc. BRIAN DOBBINS 06/17/2004 05/03/2007 2,544,136.30

006763 Completed NH-0022(101) 022 Sr 22, I-82 To Toppenish - Paving Granite Northwest Inc PAUL GONSETH 04/28/2004 10/21/2004 245,237.75

006764 Completed NH-0020(115) 020 Sr 20, Oak Harbor Ncl To Frostad Road Thomco Construction Inc. DAVE CRISMAN 05/12/2004 01/31/2007 3,403,074.97

006765 Completed STATE Lopez Ferry Terminal Pavement & Floating Dolphin R Manson Construction Co. TOM CASTOR 05/19/2004 10/20/2004 161,579.00

006766 Completed NH-0101(271) 101 Us 101/Sr 104 To Brinnon Lane - Paving Paving Lakeside Industries JOHN MCNUTT 05/18/2004 07/11/2005 3,017,527.50

006767 Completed STATE 016 Sr 16 / Union Ave To Jackson - Hov Tri-State Construction Inc RUMINA SUAFOA 02/28/2005 08/10/2010 47,295,053.85

006768 Completed BH-0053(899) 005 I-5 / North Seattle Bridges - Seismic Pct Construction, Inc. JULIA MIZUHATA 06/01/2004 05/20/2005 1,471,987.55

006769 Completed NHG-0014(043) 014 Sr 14/Hood River Bridge Signalization Ec Company Dba All Power CHUCK RUHSENBERGER 05/28/2004 06/16/2005 188,820.00

006770 Completed IM-0051(256) 005 I-5, Toutle River Bridge-Structural Reha Pacific Road & Bridge Co. AMY E. REVIS 05/28/2004 10/27/2005 1,321,127.10

006771 Completed NH-0512(013) 512 Sr 512/Sr 7 I/C Safety Improvement Safety Improvem Tucci & Sons, Inc. HOWARD DIEP 06/08/2004 02/03/2006 1,510,702.15

006772 Completed STPF-0503(017) 503 Sr 503/Rock Creek Rd To Ham Rd - Paving Granite Northwest Inc AMY E. REVIS 05/28/2004 08/18/2006 2,047,007.85

006773 Completed STATE 548 Sr 548, Northstar Rd & Kickerville Rr Xing Culvert Colacurcio Brothers, Inc. MARK RUSSELL 06/08/2004 11/20/2007 269,438.00

006774 Completed STATE 532 Sr 532/Junction 102nd Ave Nw Signal And Channeliza Sail Electric, Inc. AMIR AHMADI 05/12/2004 02/07/2005 306,674.35

006775 Completed STATE 203 Sr 203, Skykomish River Bridge 203/106 Scour Repai Tri-State Construction Inc MARLIN LENSSEN 05/28/2004 06/16/2005 67,334.00

006776 Completed STPH-0020(132) 020 Sr 20, Sapp Rd To Reed St Channelization Granite Construction Company DAVE CRISMAN 05/18/2004 04/06/2005 268,256.00

Dec 25, 2019 85 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006777 Completed STATE 005 I-5, 288th St Siphon Culvert Sci Infrastructure, Llc STANLEY ENG 05/27/2004 03/31/2005 189,258.50

006778 Completed STATE 014 Sr 14, West Camas Slough Bridge 14/25 Bridge Rail Petersen Brothers, Inc. DON OWINGS 05/26/2004 10/21/2004 175,487.55

006779 Completed STPH-0002(244) 002 Us 2, Old Us 2 Vic To Sr 522 Vic Safety Granite Construction Company DAWN MCINTOSH, P.E. 05/26/2004 03/03/2005 365,365.65

006780 Completed STPF-0092(003) 092 Sr 92, Sr 9 To 84th St Ne Vic Channelization & Saf Marshbank Construction, Inc. AMIR AHMADI 06/08/2004 02/08/2008 2,925,513.00

006783 Completed IM-0906(205) 090 I-90, Sullivan Rd To Idaho State Line - Phase 2 Ph Cpm Development Corporation DARREL MCCALLUM 06/29/2004 08/19/2005 1,438,888.00

006784 Completed STATE 507 Sr 507, Nisqually River Bridge 507/128 Scour Prote Northwest Rock, Inc. RICH HENSLEY 06/08/2004 10/19/2004 207,740.50

006785 Completed STATE Edmonds Ferry Terminal Cathodic Protection System Premier Cathodic Protection Inc. TOM CASTOR 06/25/2004 12/03/2004 97,675.00

006786 Completed STPF-NH-9999(414) 308 Sr 308/Sr 3, Naval Res. Boundary To Sr 1 Lakeside Industries JOHN MCNUTT 06/17/2004 02/28/2006 4,078,317.05

006788 Completed STPF-0007(018) 007 Sr7, 108th St. To I-5 Tucci & Sons, Inc. DAVE ZIEGLER 06/08/2004 05/31/2005 2,161,335.60

006790 Completed IM-0901(435) 090 I-90, Homestead Valley To Tinkham Rd. Granite Construction Company PAUL GONSETH 06/24/2004 04/27/2005 433,000.00

006791 Completed HP-0166(006) 166 Sr 166, Ross Point Vic. Slide Repair Granite Construction Company JOHN MCNUTT 06/22/2004 08/17/2005 3,241,466.50

006792 Completed STATE 507 Sr 507, Roy Wye Rechannelization Signal Electric, Inc. TROY COWAN 06/03/2004 11/15/2004 46,491.70

006793 Completed IM-0055(226) 005 I-5, 2nd Street Bridge Bridge Replacement Mowat Construction Company DAVE CRISMAN 06/21/2004 01/31/2008 9,362,049.35

006794 Completed STPF-0009(046) 009 Sr 9, Us-2 Interchange I/C Modification Granite Construction Company DAVE LINDBERG 06/17/2004 04/24/2012 2,482,000.00

006795 Completed STATE 544 Sr 544, E Fork Johnson Creek Br 544/13.2 Scour Rep Granite Construction Company MARK RUSSELL 06/17/2004 01/24/2005 69,640.00

006796 Completed STPF-0121(001) 121 Sr 121, Maytown I/C To 93rd Ave I/C Paving Granite Construction Company JOHN ASPAAS 06/22/2004 03/01/2005 1,115,029.66

006797 Completed NH-0539(011) 539 Sr 539, King Tut Rd And Bartlett Rd Granite Construction Company CHRIS DAMITIO 06/17/2004 12/23/2004 561,863.00

006798 Completed STATE Clinton Ferry Terminal Southside Waterline Repairs Washington Mechanical Contractors, TOM CASTOR 07/01/2004 03/31/2005 98,499.00

006799 Completed STATE 410 Sr 410, Jefferson Ave. I/S Woodworth & Company, Inc. DAVE ZIEGLER 06/24/2004 03/29/2005 278,404.25

006800 Completed NH-0101(269) 101 Us 101, West Sequim Bay Rd. To Dawley Rd. Vic. Primo Construction, Inc. JERRY MOORE 06/24/2004 03/09/2005 343,618.49

006801 Completed IM-STPF-9999(417) 005 I 5, 172nd St Ne I/C Bridge Replacement Phase 1 Graham Construction & AMIR AHMADI 08/12/2004 04/27/2007 7,117,431.94

006802 Completed NH-0104(035) 104 Sr 104, Miller Bay Rd. I/S Stan Palmer Construction, Inc. JOHN MCNUTT 06/30/2004 03/03/2005 247,877.00

006803 Completed STPF-0021(013) 021 Sr21, San Poil Bridge 21/311,21/312, 21/322/21/323 Pipkin Inc., Dba Pipkin Constructio BOB HILMES 06/24/2004 04/04/2005 243,965.00

006804 Completed STPF00161(023) 161 Sr 161, 128th To 176th Safety Tucci & Sons, Inc. NEAL UHLMEYER 07/26/2004 05/08/2009 7,275,455.48

006807 Completed STATE Tahlequah Dolphin Replacement - Phase Ii American Civil Contractors EDDY CHU 07/08/2004 02/18/2005 355,680.00

006808 Completed NH-0002(253) 002 Us 2, Stevens Pass - West Slope Stabilization Or U Hi Tech Rockfall Construction, Inc. AMIR AHMADI 07/15/2004 11/14/2005 1,478,763.50

006809 Completed IM-0053(913) 005 I-5, Bridgeport Way On-Ramps - Safety Woodworth & Company, Inc. DAVE ZIEGLER 07/14/2004 03/31/2005 464,184.30

Dec 25, 2019 86 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006811 Completed STATE Tide Board Installations, Phase1 - Wsf System Wide General Construction Company EDDY CHU 06/17/2004 01/04/2005 25,295.00

006812 Completed STATE 011 Sr 11, (Edison Slough) Cook Rd To Colony Rd Vic - C. Johnson Construction Inc DAVE CRISMAN 07/14/2004 10/30/2007 191,929.00

006813 Completed BH-0522(025) 522 Sr 522, Snohomish River Scour Repair Scour Repair Tri-State Construction Inc JOHN CHI 07/19/2004 03/21/2007 236,213.25

006814 Completed NH-0012(143) 012 Us 12, Wildcat Cr. To Windy Point - Paving Granite Northwest Inc PAUL GONSETH 07/15/2004 03/08/2005 1,119,251.10

006816 Completed ER-STPF-0401(030) 020 Sr 20, Falls Creek Vic Unstable Slope Granite Construction Company DAVE CRISMAN 06/24/2004 06/13/2007 6,946,216.00

006817 Completed ER-0401(003) 101 Us 101, Hoh River Erosion Delhur Industries Inc JOHN L. HART 07/06/2004 12/27/2004 7,086,157.00

006818 Completed IM-0901(436) 090 I-90, Sunset I/C Modifications Roadside Restoratio Buckley Nursery Company, Inc. BRIAN DOBBINS 08/02/2004 08/31/2009 1,061,738.85

006821 Completed STPF-0542(023) 542 Sr 542, Coal Creek Vic To Excelsior Trai Guardrail Petersen Brothers, Inc. CHRIS DAMITIO 07/28/2004 12/01/2005 806,183.42

006822 Completed HP-0543(001) 543 Sr 543, I-5 To International Bndy Test Shafts Condon-Johnson & Associates, Inc. CHRIS DAMITIO 07/30/2004 12/21/2004 226,547.00

006823 Completed ITS-2002(039) 005 I-5, Pacific Ave To King Co Line- Fiber Optic Syst Signal Electric, Inc. TROY COWAN 07/26/2004 11/14/2005 631,270.87

006825 Completed ITS-2003(062) 097 I-90, Dodson Road, Variable Message Sign Aztech Electric Inc ROBERT ROMINE 08/23/2004 05/03/2005 90,531.00

006827 Completed (AC)NH-0201(012) 004 Sr 4, Slide Repair Km Mountain Km Mountain Ostrander Rock & Construction AMY E. REVIS 08/31/2004 10/27/2005 299,252.80

006828 Completed STATE 409 Sr 409, Ferry Dock To Sr 4 Lakeside Industries LEON WINGER 08/23/2004 02/23/2006 883,537.03

006829 Completed STATE 025 Sr 21 Et. Al., Sr 25/231 Guardrail Impro Eastern R Petersen Brothers, Inc. KEN OLSON 08/16/2004 01/10/2006 1,814,333.54

006830 Completed STATE 101 Us 101, Francis St. To Alder St. - Pavement Repair Lakeside Industries JERRY MOORE 08/23/2004 12/17/2004 156,063.00

006831 Completed STATE Anacortes Ferry Terminal, Upland Parking And Trail Tiger Construction, Ltd. CHARLES TORRES 08/24/2004 06/27/2005 1,431,108.81

006832 Completed STATE 018 Sr 18, Covington Way To Maple Valley Roadside Rest Terra Dynamics Inc DEREK CASE 08/31/2004 12/05/2007 3,071,148.90

006834 Completed STATE Systemwide Ferry Terminal, Vehicle Trans Hydraulic Manson Construction Co. TOM CASTOR 09/13/2004 08/02/2005 853,496.00

006835 Completed STATE 005 I-5, Roanoke Vicinity Noise Wall Mowat Construction Company STANLEY ENG 09/13/2004 05/29/2007 543,701.00

006836 Completed STATE 290 Sr 290, Helena St. Left Turn Channelization Cpm Development Corporation KEN OLSON 09/13/2004 01/13/2006 522,888.00

006837 Completed STATE 090 I-90, Geiger Rd To Us 2 Median Barrier N.A. Degerstrom, Inc. BOB HILMES 09/03/2004 05/09/2005 501,797.00

006838 Completed STATE 005 I-82, Plymouth Poe-Wim Mccandlish Electric Inc WILL SMITH 09/13/2004 12/28/2004 441,529.05

006839 Completed STPF-0202(044) 202 Sr 202, Sr 520 To Sahalee Way Widening & Channeliz Sci Infrastructure, Llc BRIAN DOBBINS 10/05/2004 04/28/2011 5,976,782.60

006840 Completed IM-090(117) 090 I-90, Grant County Line To Vicinity Sr 21 Central Washington Asphalt, Inc. GLENN A. WAGEMANN 09/07/2004 03/17/2005 1,221,307.20

006841 Completed STATE 525 Sr 525, Sr 99 To Sr 526 Roadside Restoration A-1 Landscaping And Construction, MARLIN LENSSEN 11/01/2004 01/25/2007 438,114.50

006845 Completed IM-0053(916) 005 I-5, Sr 16 To Yakima Avenue Sb Auxiliary Lanes-Pav Tucci & Sons, Inc. DAVE ZIEGLER 09/08/2004 05/16/2005 497,726.05

006847 Completed ER-0401(008) 112 Sr 112, Mp 0.00 Sail River Vic. Slide Repair Primo Construction, Inc. JOHN L. HART 09/24/2004 03/22/2005 513,418.62

Dec 25, 2019 87 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006848 Completed STATE 202 Sr 202, Preston Fall City Erosion Site Pacific Road & Bridge Co. BRIAN DOBBINS 10/01/2004 07/14/2009 491,316.20

006849 Completed STPF-0527(002) 527 Sr 527, 164th St Se To 132nd St Se Roadside Restor Paul Brothers, Inc. JOHN CHI 10/27/2004 01/15/2009 922,015.83

006850 Completed STATE 012 Us 12, Sr 124 To Mcnary Pool - Irrigation Work Ray Poland & Sons, Inc. MOE DAVARI 10/27/2004 03/28/2005 469,107.40

006851 Completed STATE 031 Sr 31, Metaline Falls To The International Border M A Deatley Construction BOB HILMES 11/02/2004 10/15/2007 10,989,022.18

006854 Completed STATE Kingston Ferry Terminal, Pavement Renova Lakeside Industries TOM CASTOR 10/18/2004 08/08/2006 70,930.93

006855 Completed STATE 304 Bremerton Ferry Terminal, Lift Tower Pil Associated Underwater Services TOM CASTOR 10/29/2004 04/13/2005 74,531.00

006857 Completed ER-0302(005) 005 I 5, Lynnwood 44th Ave Bridge Repair Stage 2 Diamaco Inc. DAWN MCINTOSH, P.E. 12/08/2004 09/20/2005 82,859.00

006858 Completed STATE 161 Sr 161, Jovita Blvd To S 360th St Widen To Five La Tri-State Construction Inc MESSAY SHIFERAW 01/13/2005 04/20/2010 16,299,955.55

006859 Completed LOCAL 005 I-5, Ash Way Park And Ride Direct Access Bridge Mowat Construction Company AMIR AHMADI 01/05/2005 12/12/2006 1,841,640.37

006860 Completed STATE 124 Us12, Sr124 To Mcnary Pool - Add Lanes Steelman-Duff, Inc. WILL SMITH 12/20/2004 03/07/2006 5,576,283.10

006861 Completed IM-0053(883) 005 I-5, Ne 175th St To Ne 205th St Nb Auxiliary Lane Pacific Road & Bridge Co. AMIR AHMADI 12/28/2004 10/07/2008 5,817,221.75

006862 Completed NH-0011(037) 011 Sr 11, Padden Creek Vic To I-5 Paving Lakeside Industries DAVE CRISMAN 12/06/2004 04/14/2006 447,758.00

006863 Completed STATE 024 Sr 24 Et. Al., 03-05 Region Wide Guardra & Bridge Petersen Brothers, Inc. PAUL GONSETH 12/06/2004 10/25/2005 506,583.35

006864 Completed STATE 014 Sr 14, Et Al, Sw Region Permanent Signin 2005 Coral Construction Company LEON WINGER 12/08/2004 08/18/2005 232,312.00

006865 Completed STATE Bainbridge Island Ferry Terminal, Overhe General Construction Company TOM CASTOR 11/24/2004 04/26/2005 76,799.00

006866 Completed LOCAL 090 I-90, Harvard Road I/C Shared Use Path Max J. Kuney Company KEN OLSON 01/10/2005 04/17/2006 1,153,930.11

006867 Completed STP-999(419) 002 Ncr Seal 2005 Granite Northwest Inc JOEL VOTH 12/08/2004 01/06/2006 2,444,112.54

006868 Completed STATE 017 , Ncr Sign Update 2005 Sharp-Line Industries, Inc. TERRY MATTSON 01/03/2005 10/06/2005 382,359.12

006869 Completed STATE Port Townsend Ferry Terminal Tie-Up, Sli General Construction Company CHARLES TORRES 11/04/2004 04/18/2005 537,501.00

006870 Completed 2003-EU-T3-0054 Bremerton Terminal, Physical Security In Valley Electric Co Of Mt Vernon Inc DANA MORELAND 12/22/2004 12/21/2005 338,001.00

006871 Completed STATE 014 Sr 14, Cape Horn Br. Vic. Mp 25 - Rockfall Diamaco Inc. CHUCK RUHSENBERGER 12/21/2004 12/26/2006 213,891.00

006872 Completed STATE 395 Us 395, Nsc - Gerlach To Wandermere Klb Construction, Inc. BOB HILMES 02/23/2005 08/27/2007 9,986,897.05

006873 Completed STP-0097(112) 097 Us 97, Tonasket South Paving Basin Paving Co. TERRY MATTSON 01/03/2005 04/07/2006 3,488,938.20

006874 Completed STATE , Seattle Ferry Terminal Timber Trestle Preservati Manson Construction Co. TOM CASTOR 12/21/2004 08/02/2005 512,600.00

006875 Completed STATE 014 Sr 14, Southwest Regionwide Guardrail Retrofit Petersen Brothers, Inc. CHUCK RUHSENBERGER 12/20/2004 06/08/2005 757,723.39

006876 Completed STATE 028 , Nc Region Guardrail Improvement 03-05 Frank Gurney, Inc. TERRY MATTSON 12/28/2004 07/06/2005 522,773.79

006877 Completed STATE 161 Sr 161, 204th Street E To 176th Street E Scarsella Bros., Inc. HOWARD DIEP 01/04/2005 08/15/2006 5,135,646.96

Dec 25, 2019 88 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006878 Completed STATE 016 Sr 16, 36th St. To Olympic Drive Nw - Hov Woodworth & Company, Inc. RUMINA SUAFOA 12/21/2004 02/06/2008 3,875,845.70

006879 Completed LOCAL 090 I-90, Eastgate Transit Access 142nd Place Se Mowat Construction Company MARK SAWYER 03/10/2005 04/12/2010 17,761,492.24

006880 Completed STATE 016 Sr 16, Olympic Dr To Sr 302 Eb Ramp Meters Totem Electric Of Tacoma, Inc. DENNIS ENGEL 01/03/2005 07/06/2005 381,550.50

006881 Completed IM-0904(116) 090 I-90, George East Paving Central Washington Asphalt, Inc. ROBERT ROMINE 01/20/2005 04/03/2006 3,847,155.69

006882 Completed NH-0097(113) 097 Us 97, Brewster North Paving Central Washington Asphalt, Inc. JOEL VOTH 01/05/2005 02/09/2006 644,530.15

006883 Completed STATE 005 I 5, Pierce Co Line To Tukwila I/C Hov - Stage 4 Cpm Development Corporation MARK SAWYER 02/08/2005 09/08/2009 35,846,519.31

006884 Completed STP-011(035) 011 Sr 11, Cook Rd To Colony Rd Vic Paving Rinker Materials West, Llc Dba DAWN YANKAUSKAS 01/18/2005 04/20/2007 1,037,672.29

006885 Completed STPE-9999(344) 101 Us 101, Fort Columbia Vic. Realignment Ostrander Rock & Construction LEON WINGER 01/18/2005 11/29/2006 1,119,760.40

006886 Completed IM-0053(909) 005 I-5, James St. Vic. To Olive Way Vic. Pavement Reh Gary Merlino Construction Co., Inc. JULIA MIZUHATA 03/03/2005 09/05/2006 3,947,724.55

006889 Completed STPF-0204(002) 204 Sr 204, Us 2 To Sr 9-Paving Granite Construction Company MARLIN LENSSEN 02/14/2005 03/16/2007 841,900.00

006890 Completed STPF-0169(017) 169 Sr 169, Green River Br Vic To Sr 516 Hma Overlay A Watson Asphalt Paving Company, STANLEY ENG 03/10/2005 03/06/2006 1,886,173.48

006891 Completed NH-0020(128) 020 Sr 20, Sr 20 Spur To Sr 536 Vic -Stage 1 Paving Rinker Materials West, Llc Dba DAVE CRISMAN 02/17/2005 10/27/2006 2,065,421.50

006892 Completed STPF-0285(013) 285 Sr 285, Wenatchee Area Paving Central Washington Asphalt, Inc. ROBERT ROMINE 02/08/2005 04/17/2006 2,091,111.11

006893 Completed STATE 005 I5, Bow Hill Weigh-In-Motion Scale Replacement Pacific Road & Bridge Co. DAVE CRISMAN 01/18/2005 05/19/2005 91,195.52

006894 Completed STPF-0225(004) 225 Sr 225, Benton City Vicinity Paving Granite Northwest Inc PAUL GONSETH 02/14/2005 10/03/2005 422,755.85

006895 Completed IMD-0240(010) 240 Sr 240, I-182 To Columbia Center I/C Cpm Development Corporation MOE DAVARI 03/15/2005 10/02/2009 30,473,330.63

006896 Completed STPF-0097(114) 097 Us 97a, Chelan Vicinity Paving Basin Paving Co. TERRY MATTSON 03/01/2005 02/13/2006 1,756,780.47

006897 Completed STP-0410(043) 410 Sr 410, 214th To Mundy Loss Rd Tucci & Sons, Inc. TROY COWAN 02/09/2005 03/23/2006 740,938.50

006898 Completed IM-0903(061) 090 I-90, Sr 26 Interchange Ramp Improvements Steelman-Duff, Inc. JOEL VOTH 02/14/2005 07/27/2006 4,176,465.85

006899 Completed STP-0516(020) 516 Sr 516, I 5 To N Central Ave - Paving Cpm Development Corporation STANLEY ENG 02/08/2005 03/13/2007 1,769,199.00

006903 Completed NH-0395(072) 395 Us 395, Colville To Columbia River Hap Taylor And Sons, Inc. Dba BOB HILMES 03/10/2005 12/06/2005 2,096,000.00

006904 Completed IM-0054(256) 005 I 5, Sb On Ramp From Broadway To Cd Signalization Transtech Electric, Inc. CARL BARKER, ACTING 03/08/2005 04/03/2007 256,786.50

006905 Completed IM-0906(204) 090 I 90, Argonne Rd. I/C Electrical Systems Power City Electric, Inc. DARREL MCCALLUM 02/28/2005 11/15/2005 410,191.50

006906 Completed NH-0546(005) 546 Sr 546, Sr 539 To Fishtrap Creek Bridge Hma Overla Lakeside Industries DAVE CRISMAN 02/24/2005 06/21/2006 605,182.90

006907 Completed IM-0905(098) 090 I-90, Lincoln County Line To Salnave Road Cpm Development Corporation KEN OLSON 02/23/2005 03/09/2006 2,080,080.00

006908 Completed NH-0009(045) 009 Sr 9, Cherry St To Int`L Boundary-Paving Hma Overl Granite Construction Company CHRIS DAMITIO 02/08/2005 06/23/2005 291,500.00

006909 Completed NH-0003(108) 003 Sr 3, Imperial Way To Sunnyslope Road Paving Ace Paving Co., Inc. JOHN MCNUTT 02/16/2005 03/08/2006 377,110.84

Dec 25, 2019 89 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006911 Completed STP-0530(024) 530 Sr 530, Arlington Heights Rd To 139th Ave Ne Granite Northwest Inc MARLIN LENSSEN 03/08/2005 04/07/2009 979,000.50

006912 Completed STPF-999(421) 014 Sr 14/Us 97, Us 97 To Benton Co. Line/ Box Canyon Central Washington Asphalt, Inc. CHRIS TAMS 03/01/2005 03/28/2006 1,568,994.10

006913 Completed STATE 164 Sr 164, 158th Ave Se Channelization Tri-State Construction Inc STANLEY ENG 03/24/2005 10/31/2006 458,029.50

006914 Completed STPFG-0501(014) 501 Sr 501, Ramp Signals Ostrander Rock & Construction CHUCK RUHSENBERGER 04/04/2005 05/17/2007 1,207,759.88

006915 Completed STATE 005 I-5, Roanoke Vicinity Noise Wall Stage 2 Granite Northwest Inc MARK SAWYER 03/28/2005 04/09/2009 1,880,576.00

006916 Completed IM-2051(229) 205 I 205, Sr 500 To I-5 Pccp Rehabilitation Dowel Bar Kiewit Infrastructure West Co. CASEY LILES 04/04/2005 10/03/2007 5,777,951.65

006917 Completed STATE 005 I-5, Salmon Creek To Ne 129th Street Noise Wall Selby Bridge Company Inc CASEY LILES 03/28/2005 03/23/2007 715,803.00

006918 Completed WA-90-X278(FT072) Washington State Ferries, Efs Systemwide Improveme Summit Central Construction, Inc. JOHN CALLAHAN 04/04/2005 03/01/2006 867,000.00

006919 Completed IGFSB-2002(027) 002 Us 2, Union Ave & Walnut St Intersection Modificat Cpm Development Corporation GLENN A. WAGEMANN 03/24/2005 11/10/2005 95,300.00

006920 Completed NH-0104(037) 104 Sr 104, 244th St Sw To Ne 190th St - Sta Paving Sr Watson Asphalt Paving Company, AMIR AHMADI 03/24/2005 09/27/2005 348,397.71

006921 Completed NH-0014(044) 014 Sr 14, 32nd St. Intersection Improvements Tapani Underground Inc CHUCK RUHSENBERGER 04/05/2005 11/07/2005 285,721.71

006922 Completed STPF-0542(025) 542 Sr 542, Nooksack R Br To Coal Creek Br Hma Overlay Granite Construction Company CHRIS DAMITIO 03/24/2005 11/08/2005 799,869.77

006924 Completed STATE Washington State Ferries, Seattle Ferry Coating Re A & A Coatings, Inc. EDDY CHU 04/07/2005 09/28/2005 293,190.00

006925 Completed STPF-0009(036) 009 Sr 9, 56th St Se To 60th St Ne Paving & Safety Granite Construction Company MARLIN LENSSEN 04/07/2005 04/05/2007 1,894,000.00

006926 Completed STATE 005 I-5, North Kelso Sb Wim Signal Electric, Inc. LEON WINGER 03/29/2005 11/17/2005 270,297.55

006927 Completed NH-0305(013) 305 Sr 305, Madison Avenue Intersection - Si Lakeside Industries JOHN MCNUTT 03/31/2005 04/04/2006 450,492.46

006928 Completed STPF-0161 161 Sr 161, 255th Street East To 234th Street East - P Cpm Development Corporation HOWARD DIEP 04/04/2005 09/27/2005 427,988.00

006929 Completed STPH-0104(038) 104 Sr 19, Jct Intersection - Safety Safety Ace Paving Co., Inc. JERRY MOORE 04/13/2005 10/31/2005 624,682.42

006930 Completed STPF-0823(057) 823 Sr 823, Selah Vic - Paving Granite Northwest Inc WILL SMITH 04/15/2005 12/02/2005 529,733.30

006931 Completed NH/STP-9999(420) 107 Us 101/107, County Line To Chehalis River Bridge - Lakeside Industries JOHN L. HART 04/15/2005 01/27/2006 2,187,384.88

006932 Completed STATE 405 I-405, Totem Lake/Ne 128th St Hov Direct Access/Fr Max J. Kuney Company MARK SAWYER 06/06/2005 06/22/2011 42,021,909.76

006933 Completed HP-STPF-0024(019) 024 Sr 24, I-82 To Keys Road Max J. Kuney Company PAUL GONSETH 05/11/2005 09/24/2009 33,963,845.47

006934 Completed NH-0104(025) 104 Sr 104, Hood Canal Bridge East Half Anchor Cable R General Construction Company AMITY TROWBRIDGE 04/22/2005 12/21/2005 3,383,500.00

006935 Completed STPF-0507(022) 507 Sr 507, Old Highway 99 To Rainier Wcl - Paving Pav Woodworth & Company, Inc. JOHN MCNUTT 04/20/2005 04/20/2006 1,046,000.95

006936 Completed STP-0302(004) 302 Sr 302, Elgin - Clifton Road Intersection Totem Electric Of Tacoma, Inc. JOHN MCNUTT 04/27/2005 07/25/2006 331,873.30

006937 Completed STATE 106 Sr 106, Skobob Creek Fish Passage Quigg Bros., Inc. JOHN MCNUTT 04/27/2005 09/11/2006 1,168,027.00

006939 Completed STP-0009(044) 009 Sr 9, Lake Stevens Weigh Station Granite Construction Company MARLIN LENSSEN 04/20/2005 11/29/2006 629,000.00

Dec 25, 2019 90 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006940 Completed STATE 005 Northwest Region-Wide Guardrail Upgrade Guardrail Coral Construction Company JULIA MIZUHATA 04/20/2005 04/24/2006 493,459.00

006941 Completed STPF-0202(046) 202 Sr 202, 127th Pl Ne Vic To Ne 124th St - Hma Overl Watson Asphalt Paving Company, MARLIN LENSSEN 05/25/2005 03/02/2007 1,014,746.69

006942 Completed STATE 099 Sr 99, George Washington Memorial-Aurora Ave Br, 9 Mowat Construction Company JOHN CHI 05/25/2005 03/08/2006 1,825,481.83

006944 Completed STPF-999(025) 006 Sr 6, Sr 105 - Paving Guardrail Upgrade Bridge Rai Granite Construction Company RICH HENSLEY 05/06/2005 11/20/2006 4,149,404.60

006945 Completed STATE 519 Sr 519, Se Ramp To I-90, Bridge 519/125 E Epic Construction Llc JULIA MIZUHATA 04/22/2005 11/16/2006 356,984.00

006946 Completed STATE 101 Us 101, Simpson Ave. Bridge - Seismic Klm Construction, Inc. JOHN L. HART 04/27/2005 11/07/2005 186,400.00

006947 Completed NH/STPH-0002(243) 002 Us 2, 179th Ave To Woods Creek Bridge 2/22 Its, Ac Lakeside Industries, Inc. DAVE LINDBERG 05/31/2005 02/21/2007 1,819,010.32

006948 Completed STPF-0509(016) 509 Sr 509, 11th St To Brown'S Point - Paving Paving Tucci & Sons, Inc. AMITY TROWBRIDGE 04/22/2005 01/13/2006 466,703.00

006949 Completed STATE 525 Clinton Slip Apron & Wingwall Repair Manson Construction Co. TOM CASTOR 04/28/2005 11/18/2005 110,999.00

006951 Completed CM-0906(202) 090 I-90, Us 195 To Sullivan Its Colvico, Inc. DARREL MCCALLUM 05/12/2005 09/26/2006 730,874.00

006952 Completed BH-0099(076) 099 Sr 99, 1st Ave S Bridge - Painting Intrastate Painting Corporation JULIA MIZUHATA 06/02/2005 11/30/2006 710,000.00

006953 Completed NH-0522(041) 522 Sr 522, Ne 155th St Vic To 61st Vic Granite Construction Company AMIR AHMADI 05/13/2005 02/08/2006 1,088,000.00

006954 Completed STATE 020 Sr 20, Fruitdale Road Intersection Channelization Signal Electric, Inc. DAVE CRISMAN 05/05/2005 10/20/2006 455,379.61

006955 Completed NH-0539(012) 539 Sr 539, I-5 I/C Vic To Horton Road - Paving Paving Granite Construction Company DAVE CRISMAN 05/06/2005 07/27/2006 908,428.45

006958 Completed STATE 005 I-5, South 48th To Pacific Avenue - Core Hov Kiewit Infrastructure West Co. JON DEFFENBACHER 07/14/2005 09/14/2011 72,869,000.30

006959 Completed NH-0395(073) 395 Us 395, East Elm Road To Sr 17 - Sb Paving Cpm Development Corporation MOE DAVARI 05/23/2005 03/27/2006 557,197.50

006960 Completed STP-0203(009) 203 Sr 203, Ne Big Rock Road To Slough Br Vi Hma Overl Watson Asphalt Paving Company, MARLIN LENSSEN 05/20/2005 02/05/2008 916,749.95

006961 Completed STPF-0903(063) 903 Sr 903, Cle Elum Vicinity- Ada Ramp Retrofit Ray Poland & Sons, Inc. WILL SMITH 05/17/2005 11/10/2005 117,678.22

006962 Completed STATE 012 Us 12, Jantz Road - Construct Frontage Rd. Cpm Development Corporation WILL SMITH 05/17/2005 11/28/2005 405,935.14

006963 Completed STPF-041(042) 410 Sr 410, Mp 60 Vic To Sr 123 Vic Paving Tucci & Sons, Inc. DEREK CASE 05/13/2005 02/15/2008 997,224.53

006964 Completed STATE Kingston Ferry Terminal, Structural Stee Intrastate Painting Corporation TOM CASTOR 05/24/2005 02/06/2006 147,749.00

006965 Completed STPF-0531(006) 531 Sr 531, Smokey Pt Blvd Vic To 40th Ave N Access Ma Srv Construction, Inc. AMIR AHMADI 05/23/2005 12/18/2006 237,366.55

006966 Completed STPF-0507(021) 507 Sr 507, Roy To Sr 7 Paving Lakeside Industries JOHN MCNUTT 05/31/2005 03/08/2006 969,985.32

006967 Completed IM-0901(430) 090 I 90, Tinkham Rd. To Cle Elum- Sign Structure Coral Construction Company WILL SMITH 05/20/2005 02/07/2006 322,680.00

006968 Completed IM-4053(849) 405 I 405, Sr 520 I/C Vicinity Drainage Improvements Tri-State Construction Inc DOUG HAIGHT 05/23/2005 11/10/2005 68,175.12

006969 Completed STPF-0027(010) 027 Sr 27, Jct Us 195 To Palouse-Albion Road Poe Asphalt Paving, Inc. GLENN A. WAGEMANN 06/06/2005 02/01/2007 2,783,651.80

006970 Completed STPF-9999(422) 007 Sr 7 / Sr 706, Alder To Mt. Rainier Park Paving Woodworth & Company, Inc. JOHN MCNUTT 05/31/2005 06/06/2006 1,840,932.40

Dec 25, 2019 91 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

006971 Completed STPF-9999(423) 020 Sr 20 Et Al, 2005 Eastern Region Chip Seal Central Washington Asphalt, Inc. GLENN A. WAGEMANN 05/24/2005 01/02/2007 4,619,159.09

006974 Completed STPF-0524 524 Sr 524, I-5 To Richmond Rd Vic, Hma Overlay Rinker Materials West, Llc Dba MARLIN LENSSEN 06/06/2005 02/21/2008 983,191.90

006975 Completed IM-0901(444) 090 I-90, Mp34.19 To Mp 47.94 - Interchange Pavi Lakeside Industries WILL SMITH 05/27/2005 02/13/2006 1,675,599.25

006976 Completed ITS-2003(062) 005 Sr 500, I-5 To Andresen Fiber Optics Signal Electric, Inc. CHRIS TAMS 06/02/2005 03/14/2006 689,750.00

006977 Completed IM-0302(210) 090 I-90, Mp55.51-Mp84.63 I/C - Paving; Gold Cre Granite Northwest Inc WILL SMITH 05/31/2005 02/16/2006 1,735,042.15

006978 Completed STATE 104 Wsf Tide Board Installations, Phase 2 American Construction Co., Inc. TOM CASTOR 05/05/2005 06/23/2005 33,894.00

006979 Completed STPF-0020(138) 020 Sr 20, Mazama Area Fish Passage Snelson Companies Inc. JOEL VOTH 06/01/2005 06/13/2006 409,435.00

006980 Completed BH-0099(086) 099 Spokane Street Overcrossing Seismic Retrofit Stage Granite Construction Company JULIA MIZUHATA 06/30/2005 07/03/2007 708,000.00

006981 Completed IM-0901(434) 090 I-90, W Lake Sammamish Parkway I/C Roundabout Reco Marshbank Construction, Inc. CARL BARKER, ACTING 06/06/2005 05/08/2006 500,723.00

006982 Completed IM/NH-9999(427) 432 Sr 432, Oregon Way To I-5 Paving Lakeside Industries LEON WINGER 06/13/2005 09/20/2006 2,376,684.30

006983 Completed BH-0054(257) 005 I-5, Steamboat Slough Bridges 5/648 E & W Scour Re American Construction Co., Inc. AMIR AHMADI 06/22/2005 03/10/2006 122,084.00

006985 Completed STATE 092 Sr 92, Stevens Creek - Culvert Replacement Granite Construction Company AMIR AHMADI 06/13/2005 09/15/2008 338,000.00

006987 Completed STATE 009 Sr 9, Gribble Creek Vicinity Fish Barrier Re Callen Construction Company, Inc. DAVE CRISMAN 06/06/2005 02/09/2009 113,042.00

006988 Completed BR-0012(125) 012 Us 12, Coppei Creek Bridge At Waitsburg A & R Construction, Inc. PAUL GONSETH 06/28/2005 08/28/2006 1,466,745.25

006989 Completed 2003-EU-T3-0054 Bainbridge/Seattle Terminal Physical Security Infr Totem Electric Of Tacoma, Inc. JOHN CALLAHAN 06/28/2005 07/07/2006 803,495.00

006990 Completed IM-0054(258) 005 I-5, Sb Off Ramp To Sr 526-Safety Apply-A-Line, Inc. CARL BARKER, ACTING 06/16/2005 11/15/2005 107,237.90

006991 Completed STATE 005 I 5, Everett Hov Design Build Atkinson Ch2m Hill A Joint Venture CHRIS BROWN 05/25/2005 05/26/2011 184,992,860.00

006992 Completed STP-0530(023) 530 Sr 530, Skaglund Hill Vic To Fortson Mill Road Granite Construction Company AMIR AHMADI 07/06/2005 08/21/2008 1,493,493.00

006993 Completed STP-0503(018) 503 Sr 503, Ham Rd To I-5-Paving Granite Northwest Inc LEON WINGER 07/06/2005 10/03/2006 2,009,524.00

006994 Completed STATE 009 Sr 9, Sr 522 To 212th St Se-Widening Granite Construction Company JOHN CHI 08/08/2005 10/20/2011 17,993,100.40

006995 Completed FBD-2002(009) 305 Bainbridge Island Trestle & Slip 2 Preservation Pr General Construction Company JOHN CALLAHAN 08/02/2005 05/09/2007 6,594,138.00

006997 Completed ITS-2003(062) 002 Us 2, Stevens Pass- Variable Speed Limit System Sail Electric, Inc. KEVIN WALIGORSKI 07/05/2005 03/08/2006 320,307.50

006998 Completed NH/CM-0002(259) 002 Us 2, Spokane River To Euclid Ave-Paving Spokane Rock Products Inc. GLENN A. WAGEMANN 07/29/2005 03/01/2007 1,186,486.40

006999 Completed ITS/CM-2001(028) 002 Us 2, Houston Ave To Center Road-Paving Cpm Development Corporation KEN OLSON 07/11/2005 03/19/2007 4,125,000.00

007000 Completed STPF-0020(140) 020 Sr 20 & 31, Tiger To Ruby Mountain - Paving Central Washington Asphalt, Inc. GLENN A. WAGEMANN 07/20/2005 03/02/2007 3,022,000.00

007002 Completed ER/STP-9603(002) 105 Sr 105, Mitigation Willapa River Estuarine Restora Scarsella Bros., Inc. RICH HENSLEY 07/05/2005 08/08/2006 2,785,098.50

007003 Completed STATE Washington State Ferries, Terminal On-Ca Maintenan Intrastate Painting Corporation TOM CASTOR 07/26/2005 02/01/2007 205,499.00

Dec 25, 2019 92 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007006 Completed STPF-0544(001) 544 Sr 544, Sr 539 To Sr 9 Paving Granite Construction Company CHRIS DAMITIO 07/28/2005 03/09/2006 1,994,545.07

007008 Completed IMD/IM-1823(054) 182 I-182, Queensgate/Thayer I/C Improvements Improvem Cpm Development Corporation MOE DAVARI 08/30/2005 01/12/2007 1,599,001.00

007009 Completed STATE 101 Jimmycomelately Creek Estuary Restoration Primo Construction, Inc. JERRY MOORE 07/26/2005 11/08/2005 332,172.50

007010 Completed STPF-0202(049) 202 Sr 202, Sr 520 To Sahalee Way Stage 2 Wetland Miti Northwest Construction, Inc. BRIAN DOBBINS 08/10/2005 12/17/2009 3,475,441.70

007011 Completed STATE Bremerton Ferry Terminal, Pavement Repai Concrete Barrier, Inc. TOM CASTOR 08/08/2005 03/30/2006 99,645.00

007012 Completed STATE Kingston Ferry Terminal, Toll Booth Repl Drury Construction Co., Inc. JOHN CALLAHAN 08/08/2005 07/10/2006 399,000.00

007013 Completed STATE Eagle Harbor Maintenance Facility Slip B Manson Construction Co. JOHN CALLAHAN 08/01/2005 02/23/2007 3,968,508.00

007014 Completed STPFG&HG-0206(002 206 Sr 206, Sr 206/Bruce Road I/S (Roundabout) Cpm Development Corporation KEN OLSON 08/05/2005 01/28/2008 750,000.00

007015 Completed CM-0007(016) 007 Sr 7, Sr 507 To Sr 512 Safety Scarsella Bros., Inc. NEAL UHLMEYER 10/17/2005 12/01/2011 13,744,744.44

007016 Completed STATE 999 Systemwide Ferry Terminal - Hydraulic & Controls U General Construction Company TOM CASTOR 08/23/2005 03/13/2007 1,276,611.00

007017 Completed STATE 999 Systemwide On-Call Wingwall & Dolphin Repair American Construction Co., Inc. TOM CASTOR 08/19/2005 12/14/2007 910,809.00

007018 Completed NH/STPR-0020(136) 020 Sr 20, Monkey Hill Road To Troxell Road Thomco Construction Inc. DAVE CRISMAN 09/01/2005 06/17/2009 2,669,742.02

007020 Completed IM-0053(922) 005 I-5, 96th St Vic To 56th St Vic - Concrete Panel R Tri-State Construction Inc HOWARD DIEP 08/11/2005 11/09/2005 537,958.00

007021 Completed BH-0529(015) 529 Sr 529, Snohomish River Bridge Repair Movable Brid Mowat Construction Company AMIR AHMADI 10/10/2005 06/27/2007 1,252,707.40

007022 Completed STATE 090 I-90 - Median Crossover Protection Frank Gurney, Inc. ROBERT ROMINE 08/25/2005 01/12/2006 868,841.50

007023 Completed NH-0020(133) 020 Sr 20, Deception Pass State Park Vicinity Granite Construction Company DAVE CRISMAN 08/25/2005 10/04/2006 279,849.00

007024 Completed IM-0052(192) 005 Prairie Creek To Maytown - Median Barrier Median B Petersen Brothers, Inc. JOHN MCNUTT 08/29/2005 05/12/2006 395,730.60

007025 Completed STPE/STPUL-0054(2 005 I-5, 124th St Sw Bicycle/Pedestrian Overcrossing B Mowat Construction Company MARLIN LENSSEN 10/12/2005 10/17/2007 1,591,317.00

007026 Completed STATE 005 I-5 Et Al, Puget Sound Vic Cable Guardrail Cable G Petersen Brothers, Inc. DAVE CRISMAN 09/16/2005 02/16/2007 3,508,389.73

007027 Completed ITS-2002(032) 012 Us12&I82, Alpowa Vic & Columbia River Variable Mes Aztech Electric Inc PAUL GONSETH 09/16/2005 11/28/2007 293,754.00

007028 Completed STATE 307 Sr 307, Stottlemeyer Rd/Gunderson Rd I/S Signal Valley Electric Co Of Mt Vernon Inc AMITY TROWBRIDGE 09/09/2005 03/01/2006 119,998.00

007029 Completed BH-9999(378) 002 Us 2, I-5, Everett Vicinity Bridges, Seismic Granite Construction Company AMIR AHMADI 10/07/2005 09/18/2008 3,231,000.00

007030 Completed STPU/STPF0202(047 202 Sr 202, Sr 520 To Sahalee Way Widening & Channeliz Tri-State Construction Inc HIEN TRINH 01/06/2006 10/19/2012 40,785,756.55

007031 Completed NH-0281(037) 281 Sr 281, Quincy South Paving Central Washington Asphalt, Inc. MICHAEL FLEMING 10/18/2005 11/07/2006 1,474,474.00

007032 Completed STATE/LOCAL 003 Sr 3, Sr 303 Interchange - New Ramps (Waaga Way) Scarsella Bros., Inc. BRENDEN CLARKE 12/15/2005 02/26/2009 16,744,082.90

007033 Completed LOCAL 182 I-182, Mp 9 Vic Road 68 I/C Modifications Granite Northwest Inc MOE DAVARI 10/10/2005 11/30/2006 374,832.91

007034 Completed MH-2003038 Wsf, Friday Harbor Ferry Terminal Tie-Up Slip Proj General Construction Company JOHN CALLAHAN 11/01/2005 10/05/2006 1,170,764.00

Dec 25, 2019 93 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007035 Completed GGPS653H Security Infrastructure Project - Edmonds/Kingston Service Electric Co., Inc. JOHN CALLAHAN 10/18/2005 04/06/2007 519,777.00

007036 Completed STPF-0410(045) 410 Sr 410, Scenic Viewpoint Vicinity - Erosion Contro Jansen Inc. PAUL GONSETH 10/07/2005 05/21/2007 274,356.67

007038 Completed LOCAL/STATE 202 Sr 202, Jct 292nd Ave Se Signal & Channelization Transtech Electric, Inc. MARLIN LENSSEN 11/21/2005 03/28/2008 293,095.00

007041 Completed STATE 003 Sr 3 & 161, Olympic Region Centerline Rumble Strip Apply-A-Line, Inc. TROY COWAN 10/26/2005 01/20/2006 181,684.50

007042 Completed STATE 405 I-405, Sr 520-Sr 522 Stage 1 Design Build Project Kiewit Construction Company BRIAN NIELSEN 10/17/2005 04/17/2009 47,500,004.00

007045 Completed FLH-STPF-0164(012 164 Sr 164, 158th Ave Se To Highpoint St Vic Signal, C Rodarte Construction Inc DEREK CASE 01/03/2006 09/08/2008 3,405,411.95

007046 Completed STATE 207 Sr 207, Wenatchee River Bridge 207/4 Rail Retrofit Frank Gurney, Inc. KEVIN WALIGORSKI 11/07/2005 07/11/2006 101,124.00

007047 Completed STPH-0203(011) 203 Sr 203, Ne 60th St To Skykomish River Safety Rumbl Apply-A-Line, Inc. MARLIN LENSSEN 11/15/2005 11/15/2006 118,449.00

007048 Completed STATE Keystone Ferry Terminal, Wingwall And Dolphin Repa American Civil Contractors TOM CASTOR 11/28/2005 08/22/2006 220,980.00

007049 Completed BH-0097(117) 097 Us 97a, S. Of Chelan Tunnel Lining Stage 3 Epic Construction Llc KEVIN WALIGORSKI 12/09/2005 07/17/2006 519,530.00

007050 Completed STP-9999(428) 002 Ncr Seal 2006 Granite Northwest Inc ROBERT ROMINE 12/06/2005 05/25/2007 3,343,832.40

007051 Completed LOCAL 097 Us 97, Wells Dam Starr Boat Launch - Turn Lanes Basin Paving Co. ROBERT ROMINE 11/29/2005 02/01/2007 458,938.85

007054 Completed BH-0053(899) 005 I-5 North Seattle Bridges - Seismic Retrofit Mowat Construction Company JULIA MIZUHATA 12/12/2005 10/06/2008 1,787,517.60

007056 Completed NH-0028(036) 028 Sr 28, Rock Island To Crescent Bar Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 12/28/2005 05/07/2007 2,047,756.75

007058 Completed STATE 260 Sr260, Us 12 Et. Al., Region Wide Guardrail Upg Frank Gurney, Inc. PAUL GONSETH 12/06/2005 01/11/2007 1,846,275.75

007059 Completed NH-0002(257) 002 Us 2/97, Cashmere East Paving Basin Paving Co. KEVIN WALIGORSKI 01/03/2005 06/28/2007 2,587,144.17

007060 Completed NH-0017(035) 017 Sr 17, Franklin Co. Line To Othello Paving Central Washington Asphalt, Inc. MICHAEL FLEMING 12/28/2005 08/24/2006 778,719.10

007062 Completed STPF-0112(013) 112 Sr 112, Bear Creek Culvert Replacement Bruch & Bruch Construction Inc JERRY MOORE 12/28/2005 10/27/2006 327,566.75

007063 Completed CM-0906(207) 090 I-90, Medical Lake I/C To Us 195 I/C - Its Aztech Electric Inc DARREL MCCALLUM 01/06/2006 08/09/2007 1,230,734.00

007064 Completed HP/NH/ITS0543(001 543 Sr 543, I-5 To International Boundary Widening & B Imco General Construction, Inc. CHRIS DAMITIO 04/03/2006 12/29/2009 28,315,135.57

007068 Completed FBD/AC-STPF-2004(060 Southworth Ferry Terminal, Deck Replacement Epic Construction Llc DAVID SOWERS 01/13/2006 12/07/2006 737,810.00

007069 Completed STATE/BH-9999(464) 283 Sr 283, Omak & Winchester Wasteway, Bridge Deck Re Concrete Barrier, Inc. MICHAEL FLEMING 01/10/2005 02/15/2007 416,134.00

007070 Completed STATE.STPF-9999(436) 155 Ncr Guardrail Update Frank Gurney, Inc. MICHAEL FLEMING 12/28/2005 06/22/2006 437,072.56

007071 Completed STATE 090 I-90, Moses Lake Area, Potato Hill Road - Bridge C Weaver Construction Co. MICHAEL FLEMING 02/08/2006 09/13/2007 2,701,190.35

007072 Completed NH-STPH-0016(018) 016 Sr 16, Wollochet Dr Nw Signal & Paving Tucci & Sons, Inc. DAVE ZIEGLER 01/10/2006 04/02/2007 679,922.85

007074 Completed NH/STPF-9999(466) 002 Sr 2, North Wenatchee Area, Paving Basin Paving Co. KEVIN WALIGORSKI 02/08/2006 06/28/2007 1,859,926.98

007077 Completed STATE 305 Bainbridge Island Ferry Terminal Timber Overhead W American Construction Co., Inc. TOM CASTOR 02/08/2006 02/02/2007 137,199.00

Dec 25, 2019 94 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007078 Completed STATE 009 Sr 9, Nooksack Rd Vic To Cherry St Imco General Construction, Inc. CHRIS DAMITIO 03/30/2006 07/31/2008 8,999,378.50

007079 Completed NH-0020(111),STATE, 020 Sr 20, Troxell Rd Vic To Cornet Bay Rd, Stg 1 Wide G G Excavation, Inc. DAVE CRISMAN 02/28/2006 07/15/2009 3,778,150.01

007080 Completed STATE 167 Sr 167, 15th St Sw To S 180th St Stage 3 Stage 3 Cpm Development Corporation BRYANT BULLAMORE 04/03/2006 05/16/2011 27,848,991.50

007081 Completed STATE,STPX-0548(0 548 Sr 548, Vic Portal Way - Signalization Signal Electric, Inc. DAVE CRISMAN 02/16/2006 10/23/2007 253,910.25

007082 Completed STATE,NH-0012(155 012 Us 12, Attalia Vic - Add 4 Lanes Apollo Inc WILL SMITH 06/29/2006 01/22/2008 11,221,772.72

007084 Completed IM-0051(259)/STAT 005 I-205 To N Fork Lewis River Bridge Pccp Rehabilita Acme Concrete Paving, Inc. CASEY LILES 03/15/2006 01/02/2008 6,818,172.50

007085 Completed NH-0500(005) 500 Sr 500, Thurston Way Wetland - Planting Thompson Bros. Excavating, Inc. CHRIS TAMS 02/28/2006 11/27/2006 361,480.50

007086 Completed STATE/LOCAL 516 Sr 516, 208th And 209th Ave Se Channelization Road Construction Northwest, Inc. MARK SAWYER 03/27/2006 12/23/2008 677,812.00

007087 Completed STATE/NH-0026(024 026 Sr 26, Sand Hollow Culvert Repair N.A. Degerstrom, Inc. ROBERT ROMINE 02/10/2006 09/19/2006 385,000.00

007089 Completed IM-0902(215) 090 I-90, Kachess River Bridge - Deck Rehabilitation Concrete Barrier, Inc. WILL SMITH 03/07/2006 10/10/2006 266,406.50

007090 Completed STATE Friday Harbor Terminal Bldg Remodel Hollinger Construction, Inc. JOHN CALLAHAN 03/02/2006 06/05/2007 385,821.00

007091 Completed STATE/IM-0902(213 090 I-90, Sr 970 I/C - Illumination Aztech Electric Inc WILL SMITH 03/06/2006 10/25/2006 256,915.00

007092 Completed STATE/STPF-0510(0 510 Sr 510, Sitka St To 93rd Ave Se - Paving Tucci & Sons, Inc. NEAL UHLMEYER 03/17/2006 10/04/2007 1,180,293.83

007093 Completed STATE/STPF-0547(0 547 Sr 547, Frost Rd To Rock Rd - Paving Granite Construction Company DAVE CRISMAN 03/09/2006 05/31/2007 615,972.00

007094 Completed STPFG-0291(021) 291 Sr 291, Nine Mile Falls Safety Improvements Steelman-Duff, Inc. KEN OLSON 03/21/2006 10/14/2009 2,827,234.92

007095 Completed STATE 014 Sr 14, Lieser Road Bridge Repair Selby Bridge Company Inc CHRIS TAMS 02/28/2006 11/13/2006 549,693.00

007096 Completed STATE 291 Sr 291, Whitney Canyon Washout West Company, Inc. KEN OLSON 01/23/2006 04/24/2006 163,780.00

007097 Completed NH/STPF-9999(470) 024 Us 97, Yakima C/L To Satus Creek And Sr 24 & Us 97 Granite Northwest Inc WILL SMITH 04/03/2006 01/03/2007 597,171.72

007098 Completed NH-0101(279) 101 Sr 101, Brockdale Rd To Skookum Creek Paving Ace Paving Co., Inc. JOHN L. HART 03/22/2006 06/18/2007 3,613,544.34

007099 Completed NH-0512(014) 512 Sr 512, 104th St E To Sr 167 O/C Paving Tucci & Sons, Inc. HOWARD DIEP 03/22/2006 11/21/2006 2,326,450.91

007100 Completed STATE,IM-0053(931 005 I-5, Mcallister Creek - Stormwater Terra Dynamics Inc NEAL UHLMEYER 03/10/2006 01/08/2007 168,939.00

007101 Completed STPH-0112(014) 112 Sr 112, 1.76 Miles East Of Sr 113 Juncti Bruch & Bruch Construction Inc JERRY MOORE 03/22/2006 10/27/2006 333,368.20

007102 Completed NH-0017(036) 017 Sr 17, Mesa To Basin City Rd - Paving Granite Northwest Inc MOE DAVARI 04/03/2006 12/01/2006 408,527.10

007103 Completed STATE Colman Dock Pedestrian Access Control Project Biwell Construction Inc. JOHN CALLAHAN 04/06/2006 05/17/2007 387,742.00

007104 Completed STPF/IM-9999(448) 022 Sr 10, 2006 Sc Region Wide Chip Seal Also Known As Granite Northwest Inc WILL SMITH 04/06/2006 02/21/2007 3,620,752.75

007105 Completed BH-0901(445) 090 I-90 East Channel Bridge Bridge Painting Purcell P & C, Llc Dba Purcell JULIA MIZUHATA 04/11/2006 11/02/2006 196,804.00

007106 Completed STATE/LOCAL 202 Sr 262, 244th Ave Ne Intersection Signalization & Tri-State Construction Inc DAVE LINDBERG 04/10/2006 01/11/2011 462,823.90

Dec 25, 2019 95 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007108 Completed IM-0906(209) 090 I-90, Spokane Viaduct Bridge Deck Repairs Degerstrom - Acme Joint Venture DARREL MCCALLUM 04/24/2006 01/23/2008 8,808,356.70

007109 Completed STPF-9999(446) 021 2006 Eastern Region Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 04/12/2006 05/15/2007 5,245,148.40

007111 Completed STATE/NICKELFUNDS 090 I90, Argonne Road Landscape Work Roadside Restorat Am Landshaper, Inc. DARREL MCCALLUM 04/10/2006 07/22/2008 457,297.00

007112 Completed LOCAL 005 I-5, Cherry/Columbia Hs-Its Improvements Vic Mp 16 Signal Electric, Inc. JULIA MIZUHATA 03/30/2006 11/02/2006 103,750.80

007113 Completed ITS-0054(254) 005 I-5, Sb Ramps At Sr 11 Signalization And Channeliz Granite Construction Company DAVE CRISMAN 04/17/2006 02/09/2010 1,319,500.00

007114 Completed HSTS0404GGPS348 Mukilteo / Clinton Terminals Physical Security Valley Electric Co Of Mt Vernon Inc JOHN CALLAHAN 04/14/2006 05/10/2007 248,000.00

007116 Completed NHG-0002(263) 002 Us 2, Stevens Pass To Leavenworth C/L Rumble Strip Apply-A-Line, Inc. ROBERT ROMINE 04/10/2006 07/18/2006 145,283.10

007117 Completed STATE 167 Sr 167, Ellingson Road E/C Nb Off Ramp Signal Electric, Inc. MARK SAWYER 04/13/2006 04/06/2009 356,999.60

007118 Completed NH-0012(152) 012 Us 12, Heron Street Bridge Repair & Seismic Advanced American Construction JOHN L. HART 05/08/2006 06/13/2008 813,311.00

007119 Completed STATE 539 Sr 539, Ten-Mile Road To Sr 546 Test Piles American Construction Co., Inc. CHRIS DAMITIO 04/24/2006 08/22/2007 397,969.00

007120 Completed BR-0270(002) 270 Sr 270, Pullman To Idaho State Line North Central Construction, Inc. CHAD SIMONSON 05/08/2006 10/15/2009 18,090,191.85

007121 Completed STPF-9999(472) 106 Sr 106, 2006 Olympic Region Bst Doolittle Construction, Llc JOHN L. HART 05/12/2006 02/12/2007 2,795,415.24

007122 Completed STATE 090 I-90, Eastbound Off-Ramp To Sr 18 Phase 2 - Signal Klb Construction, Inc. JOHN LEFOTU 07/05/2006 11/18/2008 2,598,817.19

007123 Completed NH-0305(014) 305 Sr 305, Ferry Terminal To Hostmark St Paving Ace Paving Co., Inc. JOHN MCNUTT 05/02/2006 08/09/2007 3,679,756.31

007124 Completed STATE 012 Us 12, Vic Montesano To Elma, Median Crossover Pro Petersen Brothers, Inc. JOHN HART 05/24/2006 01/05/2007 1,469,065.90

007125 Completed NH-9999(439) 020 Sr 20, Sr 104, Sr 116 Paving State Roads Jefferson Lakeside Industries JERRY MOORE 04/27/2006 11/29/2007 5,496,418.30

007126 Completed IM-0052(191) 005 I-5, Chehalis Western Trail Pedestrian Bridge Granite Construction Company NEAL UHLMEYER 06/08/2006 12/11/2008 1,737,000.00

007127 Completed STATE 532 Sr 532, Northbound Interchange Ramps Trimaxx Construction, Inc. CHAD BROWN 05/18/2006 10/08/2010 3,768,854.28

007129 Completed (AC)STPF-ER-0601( 530 Sr 530, Skaglund Hill Slide Repair Pacific Road & Bridge Co. DAVE CRISMAN 04/11/2006 02/27/2007 3,339,825.00

007130 Completed NH-0822(126) 082 I-82 Yakima To Prosser Vic, Weigh In Motion And We Aztech Electric Inc PAUL GONSETH 05/31/2006 08/30/2007 576,384.20

007131 Completed STATE 020 Sr20, Twisp East - Fish Passage Barrier N.A. Degerstrom, Inc. ROBERT ROMINE 05/09/2006 11/29/2007 820,000.00

007133 Completed STPF-9999(426) 165 Sr 165/Sr 162 Paving & Realignment & Sr 162 I/S Re Woodworth & Company, Inc. NEAL UHLMEYER 05/17/2006 10/02/2007 1,454,459.51

007134 Completed IM-0054(263) 005 I-5, 52nd Ave W To Sr 520 Paving & Safety Sb Pavin Granite Construction Company MARLIN LENSSEN 06/01/2006 02/09/2010 5,710,000.00

007136 Completed STATE 205 I-205, Mill Plain Blvd Sb Off Ramp Improvement Sb Nutter Corporation Dba Nutter CASEY LILES 05/24/2006 12/10/2007 428,428.00

007137 Completed NH-0014(048) 014 Sr 14, Bergen Road Vicinity Rockfalls Scarsella Bros., Inc. CHRIS TAMS 05/11/2006 03/19/2007 377,495.00

007139 Completed NH-0018(033) 018 Sr 18/99 Median Cross-Over Protection Petersen Brothers, Inc. DEREK CASE 05/11/2006 01/16/2008 358,267.10

007140 Completed NH-0012(167) 012 Us 12, Corn Creek Bridge Vic. To Davis Lake Rd Vic Lakeside Industries RICH HENSLEY 05/31/2006 04/25/2007 3,249,097.00

Dec 25, 2019 96 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007141 Completed STATE 097 Us 97, Ncr Roadside Safety Petersen Brothers, Inc. KEVIN WALIGORSKI 05/11/2006 10/11/2006 835,293.66

007143 Completed NH-0002(255) 002 Us 2, Mill Creek Fish Passage Fish Passage Strider Construction Co., Inc. KEVIN WALIGORSKI 05/26/2006 07/26/2007 1,177,634.00

007144 Completed STATE 405 I-405, Canyon Park Freeway Station Granite Construction Company CARL BARKER, ACTING 07/18/2006 06/14/2011 5,478,000.00

007145 Completed STATE 014 Sr 14, Bridge Rail Retrofit Bridges 14/10 And 14/2 Petersen Brothers, Inc. CHRIS TAMS 05/24/2006 12/26/2006 173,017.65

007146 Completed STPF-9999(465) 501 Sr 501, 503 Ridgefield & Battleground Vicinity - P Knife River Corporation-Northwest CHRIS TAMS 06/07/2006 04/10/2007 1,378,238.51

007147 Completed NH-0195(042) 195 Us 195, Jct. Sr 271 To Vicinity Plaza Rd Degerstrom Corporation CHAD SIMONSON 06/07/2006 12/19/2007 1,732,000.00

007148 Completed BH-0012(173) 012 Us 12, Snake River Bridge At Clarkston Concrete Barrier, Inc. WILL SMITH 06/05/2006 04/23/2007 1,743,453.00

007149 Completed STATE 021 Sr 21, Sr 23, Sr 27, And Sr 272, Guardrail Improve Frank Gurney, Inc. BOB HILMES 05/30/2006 08/14/2007 533,685.26

007151 Completed STPFG-0410(044) 410 Sr 410, 288th Ave Se To Crystal Mt Blvd Centerline Apply-A-Line, Inc. DEREK CASE 06/01/2006 01/17/2007 142,825.10

007152 Completed IM-0902(211) 090 I-90, Rock Removal & Slope Stabilization Scarsella Bros., Inc. WILL SMITH 06/07/2006 05/29/2007 4,337,167.50

007153 Completed IM-0051(261) 005 I-5 East Fork Lewis River Bridge Repair Klm Construction, Inc. LEON WINGER 06/23/2006 06/05/2007 553,000.00

007154 Completed STATE 194 Sr 194, Almota Road To Hamilton Road Guardrail Petersen Brothers, Inc. BOB HILMES 06/07/2006 05/14/2007 809,183.95

007155 Completed STATE Mukilteo Ferry Terminal Test Pile Project American Construction Co., Inc. JOHN CALLAHAN 06/20/2006 08/10/2007 979,600.00

007157 Completed STATE 099 Sr 99, South 284th To South 272nd St Hov Lanes Sci Infrastructure, Llc MESSAY SHIFERAW 06/30/2006 08/23/2011 8,614,860.88

007158 Completed BH-0433(008) 433 Sr 433, Lewis & Clark Bridge Painting Abhe & Svoboda, Inc. DENYS TAK 06/26/2006 12/16/2008 14,663,310.00

007159 Completed NH-9999(476) 101 Us 101 & Sr 112, State Highways In Clallam County Lakeside Industries JERRY MOORE 06/23/2006 08/21/2007 2,074,923.18

007160 Completed IM-9999(457) 005 I-5. I-205 Pavement Marking Apply-A-Line, Inc. LEON WINGER 06/07/2006 12/15/2006 344,238.00

007161 Completed STATE Lopez Lsland Dolphin Replacement 05w111 General Construction Company JOHN CALLAHAN 07/05/2006 08/10/2007 2,804,978.00

007162 Completed STATE 005 I-5 Ebey Slough Br To Stilliaguamish R Br Median C Petersen Brothers, Inc. AMIR AHMADI 06/08/2006 06/29/2007 1,436,264.35

007163 Completed IM-0054(264) 005 I-5, S Everett Freeway Station 112th Street Se I-5 Guy F. Atkinson Construction, Llc. JANICE FAHNING 08/23/2006 06/04/2013 24,152,278.70

007164 Completed NH-0305(012) 305 Sr 305, Hostmark Street Vicinity To Bond Road - Ho Stan Palmer Construction, Inc. JERRY MOORE 07/10/2006 04/11/2012 14,886,809.00

007169 Completed STPF-0142(016) 142 Sr 142, Bowman & Snyder Fish Barrier Removals Granite Construction Company CHRIS TAMS 06/23/2006 06/19/2007 1,495,495.00

007170 Completed IM-9999(451) 005 I-5 Et Al, Sign Structure Replacement Signal Electric, Inc. MARK SAWYER 06/15/2006 12/02/2008 249,985.50

007172 Completed IM-0053(903) 005 I-5, Military Rd S To I-405 Profiled Mma Apply-A-Line, Inc. JULIA MIZUHATA 07/10/2006 06/22/2007 931,344.78

007173 Completed STATE 520 Sr 520, Vic Draw Span - Bridge 520/008 Hs Its Impr Signal Electric, Inc. JULIA MIZUHATA 07/10/2006 06/11/2007 185,664.00

007174 Completed BH-0101(284) 101 Us 101, Sol Duc River Bridge 101/314 Sappho Vicini Rognlin'S, Inc. JERRY MOORE 06/29/2006 01/31/2007 194,014.00

007176 Completed NH-0003(115) 003 Sr 3/Sr 16, Kitsap Way To Sr 305 Median Crossover Petersen Brothers, Inc. RUMINA SUAFOA 07/14/2006 09/25/2007 2,054,636.73

Dec 25, 2019 97 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007177 Completed STATE 395 Us395, Nsc Francis Ave. To Us2 Structures - Rebid Max J. Kuney Company KEN OLSON 07/24/2006 12/04/2009 17,235,525.45

007178 Completed SB-WA02(001) 002 Us 2, Iron Goat Interpretive Site Trimaxx Construction, Inc. ROBERT ROMINE 07/13/2006 05/14/2007 599,414.00

007179 Completed STATE Bainbridge Island Ferry Terminal Hydra, General Construction Company JOHN CALLAHAN 07/26/2006 08/23/2007 490,999.00

007180 Completed STATE 509 Sr 509, Vic Mp 2295 Mitigation Site Tri-State Construction Inc MARK SAWYER 09/05/2006 04/28/2009 343,628.00

007181 Completed STATE Wsf Eagle Harbor Seep Remediation Caicos Corporation DAVE SOWERS 07/17/2006 12/07/2006 145,479.00

007182 Completed BH-0053(923) 005 I-5, Mcallister Creek Bridge Repair Active Construction, Inc. NEAL UHLMEYER 08/14/2006 01/23/2008 596,580.60

007185 Completed HP-0018(035) 018 Sr 18, Maple Valley To Issaquah/Hobart Road Roadsi Buckley Nursery Company, Inc. MESSAY SHIFERAW 09/08/2006 08/13/2012 4,456,000.55

007186 Completed ITS-2005(033) 018 Sr 18, I-5 To Maple Valley I/C Intell Trans System Elcon Corporation MIKE ASKARIAN 08/31/2006 08/03/2007 1,295,830.88

007187 Completed (AC)IM-0903(068) 090 I-90, Ryegrass Hill - Paving Granite Northwest Inc WILL SMITH 08/06/2006 02/06/2007 1,065,865.00

007189 Completed STATE Sr20, Anacortes Ferry Terminal Dolphin Replacement American Civil Contractors JOHN CALLAHAN 10/05/2006 02/08/2008 1,594,670.00

007190 Completed (AC)NH-0012(161) 012 Us 12, White Pass Vicinity 2006 Rockfall Preventio Granite Northwest Inc PAUL GONSETH 08/16/2006 03/17/2009 2,026,829.00

007191 Completed STATE 017 Sr 17, Pioneer Way To Stratford Road - Widen To Fo Central Washington Asphalt, Inc. ROBERT ROMINE 08/29/2006 08/12/2009 14,606,805.49

007192 Completed NH-0522(040) 522 Sr 522, Corridor Improvement 153rd Signal & Roadwa Tri-State Construction Inc DAVE LINDBERG 09/28/2006 05/03/2012 4,037,653.15

007193 Completed (ER)NH-0601(003) 101 Us 101, 5 Miles South Of Artic Unstable Slope Rognlin'S, Inc. JOHN L. HART 08/11/2006 11/13/2006 378,347.00

007194 Completed ITS-2003(062) 005 I-5, Nisqually Valley Ice Warning System Totem Electric Of Tacoma, Inc. NEAL UHLMEYER 08/18/2006 07/11/2007 114,456.00

007195 Completed STATE 122 Sr 122, Cinebar Rd To Jerrells Rd - Guardrail Upda Petersen Brothers, Inc. RICH HENSLEY 09/05/2006 12/11/2006 129,843.20

007196 Completed (AC)NH-9999(478) 101 Us101/Sr512 - Median High Tension Cable Barrier Ca Petersen Brothers, Inc. JOHN MCNUTT 09/08/2006 07/09/2007 1,521,423.43

007197 Completed CM-2005(059)H400 005 I-5 Et Al, Fiber Optic Atis Urban Infill Mill Plain Electric, Inc. CHAD HANCOCK 10/03/2006 01/11/2008 412,737.00

007199 Completed STATE 090 King Street Station 4th Ave Retaining Wall Scarsella Bros., Inc. JOHN LEFOTU 09/22/2006 02/06/2008 855,855.00

007200 Completed STATE 405 I-405, Springbook Creek Wetland & Habitat Mitigati Scarsella Bros., Inc. MARK SAWYER 11/06/2006 01/24/2013 12,539,193.10

007201 Completed ER-STPF-0601(009) 107 Sr 107, Unstable Slope Unstable Slope Granite Construction Company JOHN L. HART 09/29/2006 09/07/2007 3,364,493.00

007203 Completed STATE 016 Sr 16, 36th St. To Olympic Drive Nw Roadside Resto A-1 Landscaping And Construction, RUMINA SUAFOA 10/30/2006 12/22/2010 1,061,132.00

007204 Completed (AC)NH-0028(037) 028 Sr 28, Crescent Bar To Quincy - Paving Paving Granite Northwest Inc KEVIN WALIGORSKI 11/06/2006 11/20/2007 1,425,936.25

007205 Completed STPF-0020(144) 020 Sr 20, Walker Hill Rd. To Graves Mtn. Rd Paving Central Washington Asphalt, Inc. BOB HILMES 10/26/2006 05/05/2008 2,975,000.00

007206 Completed (AC)IM-0901(448) 090 I-90, Mt Baker Tunnel & Mercer Island Li Power Dis D.W. Close Company, Inc. MESSAY SHIFERAW 12/04/2006 05/27/2009 476,280.00

007207 Completed (AC)STPF-9999(453 097 Nc Region Sign Update 2007 Construction Ahead, Inc. Dba TERRY MATTSON 11/06/2006 05/29/2008 136,679.00

007211 Completed STATE Anacortes Ferry Terminal Upland Parking Lot Landsc Matia Contractors Inc FRED WEPFER 11/15/2006 04/07/2008 52,360.00

Dec 25, 2019 98 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007212 Completed ITS-2003(062) 014 Sr 14, Traveler Info Enhancement Project Enhanceme Northeast Electric, Llc CHAD HANCOCK 11/14/2006 05/29/2007 119,121.00

007213 Completed STATE Orcas Ferry Terminal Electrical Distribution & Gen Service Electric Co., Inc. JOHN CALLAHAN 11/29/2006 10/25/2007 249,499.00

007214 Completed STATE 090 I-90 / Sr 397, Bridge Rail Retrofit Bridges 90/180 Frank Gurney, Inc. MOE DAVARI 12/11/2006 06/13/2007 1,054,241.00

007215 Completed STATE Wsf, Clinton Ferry Terminal Mechanical Utilities R Epic Construction Llc JOHN CALLAHAN 11/29/2006 06/13/2007 89,901.00

007216 Completed STPF-0104(037) 104 Sr 104, 244th St Sw To Ne 190th Stage 2 Rinker Materials West, Llc Dba AMIR AHMADI 12/14/2006 12/11/2008 1,536,611.22

007217 Completed NICKEL-STATE&LOCA 090 I-90, 2-Way Transit & Hov Operations Stage 1 Max J. Kuney Company ALETA BORSCHOWA 03/08/2007 05/24/2013 22,459,943.06

007218 Completed STPF-0002(811) 002 Us 2, Leavenworth To Cashmere - Paving Paving Central Washington Asphalt, Inc. MICHAEL FLEMING 12/11/2006 03/17/2009 3,319,470.45

007219 Completed DEMO-2004(059)GAH170 Vashon Ferry Terminal, Interim Trestle P Manson Construction Co. LEI LU 12/11/2006 07/27/2007 446,553.00

007220 Completed STMP-9999(458) 002 Us 2, Ncr Seal 2007 Central Washington Asphalt, Inc. ROBERT ROMINE 01/08/2007 09/17/2008 4,294,543.10

007223 Completed NH-0028(039) 028 East Wenatchee 31st To Hadley Goodfellow Bros Inc KEVIN WALIGORSKI 01/08/2007 01/09/2008 2,731,907.03

007224 Completed STATE Kingston Ferry Terminal Generator Power Installati Totem Electric Of Tacoma, Inc. JOHN CALLAHAN 12/26/2006 12/10/2007 249,999.00

007225 Completed STATE 410 Us 12 & Sr 410 Wildcat Cr To I-82 & Morse Cr To Us Petersen Brothers, Inc. PAUL GONSETH 02/05/2007 12/20/2007 740,540.46

007226 Completed STPF-0020(151)L24 020 Sr 20 Spur To Sr 536 Vic Paving - Also Thompson Ro Rinker Materials West, Llc Dba DAVE CRISMAN 01/03/2007 05/04/2009 1,437,157.72

007227 Completed STPF-0231(032)L24 231 Sr231,Spokane River Bridge-Deck Rehab Deck Rehabil West Company, Inc. KEN OLSON 12/14/2006 11/20/2008 410,441.20

007228 Completed STATE 012 Us 12, Yakima - 40th Ave Interchange Improvements Granite Northwest Inc PAUL GONSETH 12/22/2006 04/11/2008 1,047,471.65

007229 Completed (AC)BH-0153(004)H 153 Sr 153, Methow River Bridges Repair - Stage 1 Mrm Construction, Inc. MICHAEL FLEMING 01/09/2007 09/28/2009 2,341,718.35

007230 Completed STATE 165 Sr 165, Carbon River Bridge Vic To 1 Mile South Of Dirt And Aggregate Interchange, Inc HOWARD DIEP 12/20/2006 12/18/2007 538,902.00

007231 Completed STATE 169 Sr 169, Se 291st St Vic Safety & Channelization Sa Tri-State Construction Inc MESSAY SHIFERAW 02/21/2007 02/21/2012 1,195,145.85

007232 Completed NH-0020(104)L050 020 Sr 20, Sidney St Vic To Scenic Heights Safety And G G Excavation, Inc. DAVE CRISMAN 01/12/2007 12/15/2009 4,107,490.21

007233 Completed STATE 014 Columbia River Gorge Guardrail Upgrade Upgrade Frank Gurney, Inc. CHRIS TAMS 01/03/2007 03/14/2007 316,320.00

007234 Completed NHG-0395(082)L050 395 Us 395, Wild Rose Road Channelization West Company, Inc. KEN OLSON 01/05/2007 01/04/2007 323,376.50

007235 Completed NH-0097(123)L050 097 Us 97, Satus Creek Bridge Vic, Paving Columbia Asphalt & Gravel, Inc. WILL SMITH 01/04/2007 01/09/2008 534,374.40

007236 Completed HSTS04-G-GPS653 Anacortes Terminal Security & Utility , Service Electric Co., Inc. JOHN CALLAHAN 02/01/2007 07/18/2008 698,777.00

007239 Completed STATE Wsf, Clinton Ferry Terminal Electrical Utility Rep Dalton Electric Company JOHN CALLAHAN 01/16/2007 06/20/2007 96,767.00

007240 Completed STPF-0509(017)L24 509 Sr 509 Slayden Rd To Sw 185th St Paving Paving Cpm Development Corporation JOHN LEFOTU 02/22/2007 01/27/2009 1,153,358.25

007241 Completed STATE 003 Sr 3/Sr 106, South Belfair Signal - Safety Safety Totem Electric Of Tacoma, Inc. JOHN L. HART 01/04/2007 10/09/2007 399,341.25

007242 Completed STATE 020 Sr 20, Fredonia I-5 Widening Stage 1 Stage 1 Scarsella Bros., Inc. DAVE CRISMAN 03/07/2007 05/02/2012 15,139,250.25

Dec 25, 2019 99 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007243 Completed STATE 007 Sr 7, 165, 507 & 510, Roadside Safety Improvements Petersen Brothers, Inc. JOHN MCNUTT 01/12/2007 12/07/2007 575,552.83

007245 Completed STATE 005 I-5, Wsctc Tunnel Fire Detection System Replacemen Valley Electric Co Of Mt Vernon Inc JOHN LEFOTU 02/21/2007 07/02/2008 823,946.00

007246 Completed STPF0097(124)L240 097 Us97, Us97a, Sr 243 & Sr 821, Et Al. Centerline Ru North Star Enterprises 1, Inc. TERRY MATTSON 01/16/2007 08/22/2007 296,203.45

007247 Completed STATE 002 Sr 2, French Creek Br Vic To Farm Road Br Vic Guar Dirt And Aggregate Interchange, Inc CARL BARKER, ACTING 01/26/2007 09/11/2007 373,771.50

007248 Completed NH0097(121)L050 097 Us 97, Oroville Vicinity, Paving Hap Taylor And Sons, Inc. Dba MICHAEL FLEMING 03/12/2007 01/10/2008 2,661,000.00

007249 Completed STPF-0262(008)L24 262 Sr 262, Potholes Reservoir, Shoulder Widening For Hurst Construction Llc TERRY MATTSON 02/13/2007 03/18/2008 222,602.00

007250 Completed NH9999(473)L050 539 Sr 539, 546, 548 Bst Overlay Granite Construction Company KEVIN WALIGORSKI 02/08/2007 02/12/2008 1,167,329.00

007251 Completed STPF-0202(042)L24 202 Sr 203 Vic To W North Bend Way Hma Overlay Watson Asphalt Paving Company, DAVE LINDBERG 02/07/2007 10/10/2008 1,585,225.45

007252 Completed IM0821(088)L010 082 I-82 / I-90 Thrall Road, Paving Granite Northwest Inc WILL SMITH 02/05/2007 11/19/2007 1,060,810.15

007254 Completed HP-0906(214)HY10 090 I-90, Harvard Road Pedestrian Bridge Wesslen Construction, Inc. KEN OLSON 03/05/2007 10/02/2008 892,498.60

007256 Completed STATE 202 Sr 202 / Jct 203 Roundabout Tri-State Construction Inc DAVE LINDBERG 02/28/2007 10/19/2009 1,390,879.60

007258 Completed STATE 005 I-5, Spring Valley Restoration Bridge Replacement Midmountain Contractors, Inc. RUMINA SUAFOA 03/16/2007 04/26/2011 2,419,088.20

007259 Completed STATE 502 I-5, Sr 502 Interchange Kerr Contractors Oregon, Inc. CHRIS TAMS 03/08/2007 08/01/2011 28,394,391.70

007260 Completed STPF-9999(483) 014 Sr 14 Et Al, Swr Permanent Signing 2007 Construction Ahead, Inc. Dba CHRIS TAMS 02/21/2007 08/01/2007 175,769.00

007262 Completed STPF-0020(141)L050 020 Sr 20, Cornet Bay To Rosario Road, Safety Improvem Strider Construction Co., Inc. DAVE CRISMAN 04/16/2007 08/06/2009 4,543,589.00

007263 Completed STPF-0020(147)L24 020 Sr 20, Prevedell Rd To Damnation Cr Paving Lakeside Industries, Inc. DAVE CRISMAN 02/28/2007 03/17/2009 1,631,817.69

007264 Completed STATE 090 I 90, Eastbound Ramps To Sr 202 Roundabout Tri-State Construction Inc MESSAY SHIFERAW 03/08/2007 06/25/2013 1,163,880.80

007265 Completed STPF-0099(091)L24 099 Sr 99, 112th St Sw To I-5 Vic Paving Paving Granite Construction Company DAVE LINDBERG 02/28/2007 10/02/2009 1,889,800.00

007266 Completed STPF-0024(024)L24 024 Sr 24/Sr 240, Intersection Improvements Cpm Development Corporation WILL SMITH 03/12/2007 08/09/2007 228,771.10

007267 Completed STATE 009 Sr 9, Schloman Rd To 258th Ne And 268th St Ne Inte Scarsella Bros., Inc. JANICE FAHNING 04/12/2007 08/10/2011 10,747,747.47

007270 Completed STPF-9999(372) 021 Sr 21 Et Al, 2005/07 Eastern Region Bst Safety Res Frank Gurney, Inc. BOB HILMES 03/19/2007 05/27/2008 1,239,614.09

007271 Completed NHG-0502(010) 502 Sr 502, Ne 199th Intersection Signal Signalization Northeast Electric, Llc CASEY LILES 03/21/2007 09/20/2007 229,748.05

007272 Completed STATE 520 Sr 520, West Lake Sammamish Parkway Flyover Ramp Tri-State Construction Inc BRIAN DOBBINS 04/05/2007 02/21/2013 9,987,659.00

007273 Completed NH-0539(008) 539 Sr 539, Horton Rd To 10 Mile Road Widen To Five La Imco General Construction, Inc. CHRIS DAMITIO 05/08/2007 03/16/2011 31,466,232.29

007275 Completed NH-0520(037) 520 Sr 520, Wb Off-Ramp To Ne 51st St And Wb Off-Ramp Tri-State Construction Inc ALETA BORSCHOWA 04/23/2007 06/14/2011 596,097.00

007276 Completed BH-0109(011) 109 Sr 109, Grass Creek Bridge Quigg Bros., Inc. JOHN L. HART 03/21/2007 09/24/2007 310,964.00

007277 Completed STATE 003 Sr 3, Imperial Way To Sunnyslope Ace Paving Co., Inc. JOHN MCNUTT 03/30/2007 02/29/2008 953,119.10

Dec 25, 2019 100 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007278 Completed STATE 395 Sr 395, Freya To Fairview, Grading And Structures Steelman-Duff, Inc. KEN OLSON 04/27/2007 06/10/2010 10,571,218.95

007280 Completed IM-0903(070) 090 I-90, Boylston Rd To Vantage & Ryegrass Columbia Asphalt & Gravel, Inc. WILL SMITH 03/30/2007 12/12/2007 3,432,395.08

007281 Completed STATE 395 Sr 395, Freya To Farwell Rd, Paving Pccp Paving Acme Concrete Paving, Inc. BOB HILMES 05/23/2007 11/18/2010 19,490,000.00

007282 Completed NH-0395(077) 395 Us 395 & Hastings Rd Intersection Rehab Pccp Inter Cameron-Reilly Llc BOB HILMES 05/03/2007 03/17/2008 1,050,730.30

007283 Completed STATE 405 I-405, 112th Ave Se To Se 8th - New Lanes Widening Guy F. Atkinson Construction, Llc. SEEMA JAVERI 03/13/2007 05/22/2012 124,000,000.00

007285 Completed NH-0012(174)L050 012 Us 12, Wynoochee River To Brady I/S Paving Granite Construction Company JOHN L. HART 04/06/2007 07/16/2008 3,775,439.48

007287 Completed STPF-9999(491) 397 Ainsworth Ave To I-182 Paving Foster Wells Road I/ Granite Northwest Inc MOE DAVARI 04/16/2007 02/21/2008 1,115,969.30

007288 Completed HH-9999(488) 003 Sr 3, Sr 310/304, I/C & Weston Place Paving Weslon Ace Paving Co., Inc. BRENDEN CLARKE 03/30/2007 10/13/2008 1,552,377.06

007289 Completed STPF-0903(064) 903 Sr 903, Cle Elum To National Forest- Paving Granite Northwest Inc WILL SMITH 04/16/2007 12/13/2007 1,386,491.40

007290 Completed NH-0522(045)L050 522 Sr522, Ne 195th St Signal & Channelizati Marshbank Construction, Inc. DAVE LINDBERG 04/30/2007 12/01/2009 1,177,409.55

007291 Completed IM-0906(211)L010 090 I-90, Sullivan Road I/C, Pccp Rehab & Signals Pccp Acme Concrete Paving, Inc. DARREL MCCALLUM 04/26/2007 05/05/2008 1,792,096.52

007292 Completed STPF-0503(020)L240 503 Sr 503 Spur, Sr 503 To Skamania County L Chip Seal Granite Northwest Inc CASEY LILES 04/06/2007 03/19/2008 953,626.45

007293 Completed NH-0195(041) 195 Sr 195, Cornwall Rd To Hatch Rd Acme Concrete Paving, Inc. CHAD SIMONSON 04/26/2007 03/19/2008 2,994,013.80

007295 Completed STATE 405 I-405, I-5 To Sr 169 Stage 1 - Widening Tri-State Construction Inc LISA HODGSON 07/02/2007 12/17/2012 91,500,005.00

007296 Completed IM-0053(932)L010 005 I-5, Dearborn To Dayton Ave Fiber Replacement Elcon Corporation JOHN LEFOTU 04/30/2007 09/05/2008 924,792.00

007297 Completed (AC)STPF-0215(005 215 Sr 215, Omak Area Signal Systems Colvico, Inc. KEVIN WALIGORSKI 04/09/2007 11/07/2007 191,858.40

007298 Completed STATE 009 Sr 9, 108th St Ne Channelization Pacific Road & Bridge Co. MARLIN LENSSEN 04/23/2007 04/29/2009 882,429.00

007299 Completed NH-0012(170) 012 Us 12, Pomeroy Vicinity - Paving Granite Northwest Inc MOE DAVARI 04/30/2007 04/14/2008 2,238,230.13

007300 Completed DPI-0088(001) 101 Simpson Ave Bridge, Mechanical Work Rehabilitation Rognlin'S, Inc. JOHN L. HART 04/12/2007 07/22/2009 9,198,840.00

007301 Completed DEMO-031(027) 031 Sr 31, Pend Orielle Bridge Deck Repair Rehabilitat Concrete Barrier, Inc. BOB HILMES 04/20/2007 04/07/2008 596,163.50

007302 Completed (AC)IM-0902(229) 090 I-90, East Easton Interchange, Paving Mp 71.28 To Columbia Asphalt & Gravel, Inc. PAUL GONSETH 04/27/2007 03/17/2008 3,019,746.43

007303 Completed STATE 004 Sr 4, Stella Vic 11/2006 Rockfall Granite Northwest Inc DENYS TAK 03/14/2007 06/17/2008 431,724.00

007304 Completed BH-0002(275)H1C0 002 Us 2, 50th Ave Se To Sr 204 Bridge Rehabilitation Granite Construction Company AMIR AHMADI 04/27/2007 09/18/2008 7,471,000.00

007305 Completed STPF-0161(026)L24 161 Sr 161/Sr 167 Couplet To 36th St E Paving Tucci & Sons, Inc. HOWARD DIEP 04/23/2007 06/05/2008 1,407,401.85

007306 Completed IBRC-0020(153)HX2 020 Sr 20, Fredonia Vic Test Shafts Test Shafts Pile Contractors, Inc. DAVE CRISMAN 04/27/2007 04/01/2008 489,262.00

007307 Completed (AC)NH-004(206)L0 004 Sr 4, Coal Creek Road To I-5 Paving (Urban) Lakeside Industries, Inc. DENYS TAK 04/30/2007 01/15/2009 4,923,672.93

007308 Completed (AC)STPF-9999(480) 021 2007 Eastern Region Chip Seal Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 05/14/2007 11/13/2007 3,891,540.75

Dec 25, 2019 101 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007309 Completed IM-9999(493) 082 I-82 And I-182, Yakima Vicintiy And Pasc - Median Frank Gurney, Inc. PAUL GONSETH 05/07/2007 08/28/2008 1,457,833.93

007310 Completed LOCAL Anacortes/Seattle Terminals Passenger Partnership Burke Electric, Llc. JOHN CALLAHAN 04/24/2007 10/02/2007 18,599.00

007311 Completed (AC)NH-0002(278) 002 Us2, West Stevens Pass Paving Paving Granite Construction Company MICHAEL FLEMING 05/14/2007 07/21/2008 4,538,000.00

007312 Completed AC-NH-9999(492)L0 004 Sr 4 Et Al, Paving And Safety Lakeside Industries, Inc. CASEY LILES 05/14/2007 09/08/2008 7,423,040.30

007313 Completed (AC)STPF-0028(040 028 Sr 28, West Of Ephrata, Paving Paving Central Washington Asphalt, Inc. ROBERT ROMINE 05/02/2007 11/06/2008 2,347,149.00

007314 Completed STPU-0531(007) 531 Sr 531, Lakewood Schools Sidewalks Sidewalk Granite Construction Company MARLIN LENSSEN 05/02/2007 05/23/2008 226,917.00

007315 Completed (AC)STPF-0532(011 532 Sr 532, 72nd Ave Vic Paving Rinker Materials West, Llc Dba AMIR AHMADI 05/14/2007 09/28/2009 1,373,000.00

007316 Completed STATE 026 Sr 26, Vantage East Rumble Strips Centerline Rumbl North Star Enterprises 1, Inc. TERRY MATTSON 04/23/2007 08/16/2007 61,353.00

007317 Completed (AC)STPF-0530(026) 530 Sr 530, Cavanaugh Rd To Montague Creek - Paving Granite Northwest Inc MARLIN LENSSEN 06/12/2007 03/02/2009 678,400.00

007320 Completed NH-0018(034) 018 Carey Creek Tributary To I-90 Vic Paving And Safet Watson Asphalt Paving Company, JOHN LEFOTU 05/24/2007 10/13/2008 909,346.40

007322 Completed 00000 005 I-5, Spokane St To I-90, Bridge Repairs Expansion Concrete Barrier, Inc. JOHN LEFOTU 05/17/2007 11/27/2007 11,917,777.00

007324 Completed HP-IMD-0052(185) 005 I-5, Rush Road To 13th Street Scarsella Bros., Inc. COLIN NEWELL 06/13/2007 08/29/2011 33,750,315.27

007325 Completed HP-1823(056) 182 I-182, Road 100 I/C Vic - Improvements Interchange Sierra Electric, Inc. MOE DAVARI 06/01/2007 02/07/2008 822,271.10

007327 Completed STATE 405 I-405/I-5 Swamp Creek Fish Barrier(S) Removal Tri-State Construction Inc DAVE LINDBERG 05/24/2007 01/17/2012 567,010.00

007328 Completed STPF-0548(005) 548 Sr 548, Terrell Creek, Major Drainage Callen Construction Company, Inc. CHRIS DAMITIO 05/24/2007 06/11/2009 1,317,664.00

007329 Completed STATE 101 Sr 16, Tacoma Narrows Sign Bridge Signal Electric, Inc. RUMINA SUAFOA 05/14/2007 08/20/2008 438,806.00

007330 Completed STATE 504 Mt St Helens Travel Info Phase 2 Information Syste Northeast Electric, Llc CHAD HANCOCK 05/21/2007 10/12/2007 99,473.00

007331 Completed (AC)NH-0395(078) 395 Us 395, Franklin Co Line - Paving Y Granite Northwest Inc DARREL MCCALLUM 06/15/2007 09/08/2008 4,149,158.42

007332 Completed ER-0701(040) 508 Sr508, Bear Canyon Vicinity Slope Repair Scarsella Bros., Inc. COLIN NEWELL 04/13/2007 03/31/2008 3,187,542.75

007334 Completed STATE Mukilteo Terminal Generator Power Connection Dalton Electric Company JOHN CALLAHAN 05/30/2007 01/11/2008 61,269.00

007335 Completed STATE Fauntleroy Terminal Generator Connection Dalton Electric Company JOHN CALLAHAN 05/31/2007 12/18/2007 58,009.00

007336 Completed STATE Friday Harbor Ferry Terminal Paving Lakeside Industries JOHN CALLAHAN 05/22/2007 08/23/2007 170,024.00

007337 Completed NH-0513(006) 513 Sr 513, Ne 45th St To 40th Ave Ne Paving Lakeside Industries JOHN LEFOTU 06/01/2007 04/07/2008 858,428.93

007338 Completed STPF-0007(020) 007 Sr 7, Eatonville Cutoff Rd-Sr 507, Paving Woodworth & Company, Inc. NEAL UHLMEYER 06/01/2007 04/27/2009 3,909,942.90

007339 Completed STPF-0527(004) 527 Sr 527, 186th Pl Se Signal & Channelization Valley Electric Co Of Mt Vernon Inc CARL BARKER, ACTING 05/24/2007 04/27/2009 431,667.52

007342 Completed (AC)BR-0542(019) 542 Sr 542, Boulder Creek Bridge Replacement Pacific Road & Bridge Co. CHRIS DAMITIO 06/01/2007 12/30/2009 3,749,085.40

007343 Completed DEMO-0304(013) 304 Bremerton Transp Center Access Improve Tri-State Construction Inc JEFF COOK 06/13/2007 09/16/2011 30,695,477.20

Dec 25, 2019 102 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007344 Completed BH-0009(050) 009 Sr 9, Pilchuk Creek Bridge Scour Klm Construction, Inc. JANICE FAHNING 06/05/2007 06/01/2009 123,147.00

007346 Completed CBI-0055(232) 005 I-5, Blaine Customs Facility Its Improvements Valley Electric Co Of Mt Vernon Inc JANICE MARLEGA 06/11/2007 06/25/2009 1,994,482.00

007347 Completed STATE 101 Us 101, Mt Walker Nb/Sb Pass/Truck Lane Lakeside Industries, Inc. JERRY MOORE 06/05/2007 11/14/2008 1,495,699.89

007348 Completed NH-0101(280)L050 101 Us 101, Lilliwap Vic Slide; Stabilize Slope Unstab Granite Construction Company NEAL UHLMEYER 06/13/2007 01/28/2008 940,916.00

007349 Completed IM-0053(925)L010 005 I-5, Gravelly Lake Dr I/C - Paving Tucci & Sons, Inc. RUMINA SUAFOA 07/03/2007 05/21/2008 2,550,621.95

007350 Completed NH-0518(008) 518 Sr 518, Sr 509 To I-5/I-405 - Widening Tri-State Construction Inc MARK SAWYER 07/11/2007 10/16/2015 26,631,265.90

007351 Completed STPF-0112(017)L240 112 Sr 112, West Twin River To Us 101, Chip Seal Chip Lakeside Industries JERRY MOORE 06/11/2007 01/04/2008 1,998,128.05

007353 Completed STATE 520 Sr 520, Quieter Pavement Evaluation Lake Washingto Granite Northwest Inc DOUG HAIGHT 06/18/2007 06/01/2008 2,492,000.00

007354 Completed STATE 002 Us 2, Pickle Farm Road / Gunn Road Granite Construction Company DAVE LINDBERG 06/14/2007 12/01/2011 669,000.00

007356 Completed BH-9999(456) 005 I-5 Et Al, Southwest Region Bridge Seismic Retrofi Mowat Construction Company CHRIS TAMS 07/11/2007 07/21/2008 1,292,798.00

007358 Completed NH-0020(131)L050 020 Sr 20, Safety Improve Quiet Cove Rd Stg 1 Marshbank Construction, Inc. DAVE CRISMAN 07/16/2007 05/15/2012 6,128,698.16

007359 Completed STATE 025 Sr 25, Columbia/Spokane River Bridges Guard Rail U Frank Gurney, Inc. BOB HILMES 07/05/2007 03/28/2008 501,876.25

007360 Completed STATE Wsf Systemwide Transfer Span Overlays Concrete Barrier, Inc. JOHN CALLAHAN 07/11/2007 01/31/2008 286,719.00

007361 Completed STATE Wsf Terminal On Call Maint. Painting Long Painting Company TOM CASTOR 07/12/2007 04/02/2009 523,509.00

007363 Completed STATE 167 Sr 167, Hot Lanes Pilot Project Signal Electric, Inc. MARK SAWYER 07/02/2007 04/06/2009 7,087,088.00

007365 Completed STATE 116 Sr 116, Portage Canal Bridge Rail Retrofit Petersen Brothers, Inc. JERRY MOORE 07/23/2007 07/03/2008 368,250.51

007366 Completed NH-0012(175) 012 Us 12, Vic Joselyn St To I-5, Paving Granite Construction Company JOHN MCNUTT 07/12/2007 08/08/2008 899,381.50

007367 Completed BH-0053(929) 005 I-5, South Seattle Vic Seismic Retrofits Granite Construction Company JOHN LEFOTU 07/12/2007 09/14/2009 4,734,003.98

007370 Completed STPF-9999(438) 101 Us 101, Aberdeen Signals Rehabilitation Totem Electric Of Tacoma, Inc. JOHN L. HART 07/12/2007 10/27/2008 533,705.63

007371 Completed STP-0101(295) 101 Us 101, Mp 72.06 - Slope Stabilization Rognlin'S, Inc. JOHN L. HART 07/12/2007 02/11/2008 927,831.20

007372 Completed IM-0823(060) 082 I-82, Plymouth Poe, Pavement Rehab Pavement Rehabi Cpm Development Corporation MOE DAVARI 07/17/2007 11/05/2007 458,859.50

007373 Completed 1M0051(271) 005 I-5 Woodland Vic-Ostrander Cr Vic Rut Repair Granite Northwest Inc DENYS TAK 07/18/2007 03/16/2009 2,166,710.90

007374 Completed CM-0054(268) 005 I-5, 124th Sw Bicycle/Ped O-Xing Phase 2 Marshbank Construction, Inc. MARLIN LENSSEN 07/16/2007 05/20/2010 1,391,429.83

007375 Completed STATE 021 2007 Eastern Region Roadside Safety Improvements R Frank Gurney, Inc. CHAD SIMONSON 07/26/2007 09/02/2008 2,038,614.50

007376 Completed STPF-0508(005) 508 Sr 508, Roadway Embankment Erosion Protect Embankm Dulin Construction, Inc. COLIN NEWELL 07/26/2007 04/17/2008 207,496.00

007378 Completed STATE 101 Us 12 Et Al, Bridge Rails Retrofit Petersen Brothers, Inc. JOHN L. HART 08/28/2007 03/27/2008 564,270.08

007379 Completed STATE 005 I-5, Milton Road - Paving I-5 Frontage Tucci & Sons, Inc. MARK SAWYER 07/23/2007 05/21/2008 322,560.10

Dec 25, 2019 103 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007381 Completed STATE Systemwide On-Call Wingwall & Dolphin Repair Manson Construction Co. JOHN CALLAHAN 08/13/2007 12/07/2009 1,526,999.00

007382 Completed STATE 002 Us 2, Fern Bluff Rd To Sultan Startup Rd C Pacific Road & Bridge Co. AMIR AHMADI 08/07/2007 10/07/2008 391,135.00

007383 Completed LOCAL 005 I-5, Sb Ramp @ Port Of Tacoma Road Woodworth & Company, Inc. NEAL ULYMEYER 07/26/2007 01/24/2008 1,129,142.70

007387 Completed BH-0097(119) 097 Us 97, Biggs Rapids Br Deck Replacement Mowat Construction Company CHRIS TAMS 09/20/2007 06/26/2009 12,228,837.05

007388 Completed STATE 161 Jovita Blvd To S. 360th St, Embankment Repair Construct Company Llc MIKE ASKARIAN 08/13/2007 08/13/2010 321,094.00

007389 Completed STATE 020 Post Efs Port Townsend/Keystone Project Drury Construction Co., Inc. JOHN CALLAHAN 09/07/2007 06/19/2008 258,000.00

007390 Completed ITS-2005(033) 005 I-5/Sr512 Traffic Map Expansion Marles Corporation Dba Amaya RUMINA SUAFOA 08/28/2007 11/21/2008 731,185.50

007391 Completed STATE 090 I-90, Latah Creek & Lindeke St Bridges Upgrade Bri Frank Gurney, Inc. DARREL MCCALLUM 08/16/2007 07/29/2008 528,954.00

007392 Completed STATE 016 Sr 16, Univ. Place Stormwater Mitigation N Construct Company Llc RUMINA SUAFOA 08/20/2007 09/10/2008 374,634.00

007395 Completed BH-0105(018) 105 Sr 105, Johns River Bridge - Pier Repair Epic Construction Llc JOHN L. HART 08/17/2007 06/30/2008 277,004.00

007397 Completed BH-1823(055) 182 I-182, Columbia River Bridges Joint Repair Joint R Concrete Barrier, Inc. MOE DAVARI 08/28/2007 07/17/2008 399,908.00

007398 Completed STATE 500 Sr 500, Ne 162nd Avenue Noise Wall Noise Wall Selby Bridge Company Inc DENYS TAK 09/06/2007 10/09/2008 518,939.00

007399 Completed STATE 016 Sr 16, Cedar St To Olympic Dr Nw, Misc Work Marles Corporation Dba Amaya RUMINA SUAFOA 08/28/2007 11/21/2008 499,744.00

007401 Completed ER-0701(025) 101 Us101, Vic Sunnyside Rd- Unstable Slope Unstable S Pile Contractors, Inc. JOHN MCNUTT 09/18/2007 08/01/2008 420,659.00

007402 Completed ER0101(304) 099 Yesler Way Vic Foundation Stabilization C.A. Carey Corporation MIKE ASKARIAN 09/27/2007 05/22/2009 3,023,364.00

007403 Completed HP-1998(030) 005 I-5, 13th Street Signal Signal Electric, Inc. COLIN NEWELL 09/27/2007 10/08/2008 233,687.00

007404 Completed STATE 092 Us 2 & Sr 92 Roadside Safety Improvement Petersen Brothers, Inc. JANICE FAHNING 10/09/2007 02/26/2009 501,838.57

007405 Completed STPF-0530(025) 530 Sr 530, Sauk River Bank Protection Granite Construction Company JANICE MARLEGA 09/18/2007 08/13/2009 1,870,887.00

007407 Completed STATE Seattle Ferry Terminal Sewer Piping Mod Bering Industrial Contractors, JOHN CALLAHAN 10/23/2007 06/04/2008 111,434.00

007408 Completed STATE Keystone Ferry Terminal Generator Power Instal Dalton Electric Company JOHN CALLAHAN 10/31/2007 06/26/2008 102,888.00

007409 Completed STPF-9999(452) 097 Us 97/ Roadside Safety Improvements Scarsella Bros., Inc. TERRY MATTSON 10/18/2007 04/15/2010 681,997.82

007410 Completed STATE Mulilteo Inner Dolphin Replacement General Construction Company JOHN CALLAHAN 11/19/2007 05/14/2008 542,739.00

007411 Completed STPF-0515(011) 515 Sr 515, Se 192nd To Benson, Pave & Channel Cpm Development Corporation JOHN LEFOTU 11/07/2007 09/15/2009 1,373,240.00

007413 Completed STATE 395 Us 395, Us 395/Nsc-Bnsf Rr Tunnel Scarsella Bros., Inc. CHAD SIMONSON 12/14/2007 02/25/2010 17,294,960.35

007414 Completed STATE Wsf, Fauntleroy Ferry Terminal Trestle Interim Pre Klm Construction, Inc. JOHN CALLAHAN 11/06/2007 07/18/2008 156,779.00

007417 Completed (AC)HP-4053(855&8 405 I-405, Ne 10th St Bridge Crossing, Stage 2 Max J. Kuney Company ALETA BORSCHOWA 12/17/2007 09/13/2013 13,866,639.00

007418 Completed STATE/LOCAL 002 Us 2/97 Peshastin East- Interchange Klb Construction, Inc. MICHAEL FLEMING 12/12/2007 04/20/2010 9,776,446.25

Dec 25, 2019 104 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007419 Completed (AC)IM-0903(069) 090 I-90, Paving West Of George Central Washington Asphalt, Inc. MICHAEL FLEMING 11/19/2007 03/25/2009 1,359,595.95

007420 Completed STATE 305 Systemwide Terminal Cable Replacement Manson Construction Co. JOHN CALLAHAN 11/28/2007 06/20/2008 111,499.00

007421 Completed STPF0823(063) 823 Sr 823, Goodlander To Harrison Rd-Bld Sidewalk Granite Northwest Inc PAUL GONSETH 11/27/2007 01/23/2009 381,853.72

007422 Completed NH-0003(116) 003 Pioneer Way And Big Valley Rd- Signals Totem Electric Of Tacoma, Inc. JOHN MCNUTT 11/30/2007 11/26/2008 695,729.93

007423 Completed (AC0IM-0821(089) 082 I-82 Selah Creek To Yakima- Paving Granite Northwest Inc WILL SMITH 12/12/2007 12/10/2008 2,857,857.00

007424 Completed (AC)NH-0002(265) 002 Sunset Falls Slope Stabilization Scarsella Bros., Inc. DAVE LINDBERG 11/27/2007 03/31/2011 1,362,147.75

007425 Completed STATE 005 I-5 Bridge 005/518 Girder Replacement Tri-State Construction Inc MIKE ASKARIAN 11/27/2007 11/10/2009 737,984.00

007426 Completed STPUL0099(094) 099 Sr 99, North Of Lincoln Way Sidewalks Granite Construction Company MARLIN LENSSEN 12/27/2007 02/04/2009 665,000.00

007427 Completed NH-9999(508) 022 1st Ave Intersection Safety Improvements Columbia Asphalt & Gravel, Inc. WILL SMITH 12/26/2007 10/07/2009 1,124,939.00

007428 Completed ITS-APIAP-2004(064) 005 I-5, Oly Arterial Traffic Mgmt/Sign-Amber Alert Totem Electric Of Tacoma, Inc. NEAL UHLMEYER 12/31/2007 11/30/2009 1,493,044.00

007429 Completed STATE 305 Wsf Bainbridge Ferry Terminal Sr305/Harborview Dr. Signal Electric, Inc. JOHN CALLAHAN 12/04/2007 03/24/2009 429,387.55

007431 Completed STPUL0522(042) 522 Sr522, U/W Bothell Cascadia South Access Mowat Construction Company JANICE FAHNING 02/08/2008 03/18/2014 36,650,726.20

007432 Completed HP-1998(030) 005 I-5 Lewis County Variable Message Sign Coral Construction Company CHAD HANCOCK 12/03/2007 01/08/2009 186,253.00

007433 Completed STATE 090 I-90 Bridges 025n & 025s Hs-Its Improvements Signal Electric Inc DAVE LINDBERG 12/12/2007 12/01/2011 393,528.00

007434 Completed CM0002(264) 002 Us 2/N Foothills Dr To Houston Ave Its Re-Advertis Colvico, Inc. BOB HILMES 02/07/2008 10/07/2008 1,257,163.90

007435 Completed STATE/TPA 410 Sr410/Sr164, Rdsde Safety Improvements Apply-A-Line, Inc. MIKE ASKARIAN (ACT.) 01/14/2008 11/24/2009 718,973.50

007436 Completed NH-0002(285) 002 Us2 7 Miles E Of Coles Corner- Unstable Slope L.R.L. Construction Co. TERRY MATTSON 12/06/2007 01/28/2009 135,446.00

007438 Completed CBI-0025(009) 025 Sr25 Bossburg Rd To Canada- Paving & Safety Hap Taylor And Sons, Inc. Dba BOB HILMES 01/17/2008 06/12/2009 4,251,940.00

007439 Completed STPFSTPH0900(023) 900 Sr 900, I-405 Vic To Harrington Ave Ne Sci Infrastructure, Llc MARK SAWYER 12/26/2007 04/06/2010 1,733,623.95

007443 Completed STATE/LOCAL 012 Naches River N Of Yakima-Stabilize Slope Scarsella Bros., Inc. PAUL GONSETH 01/09/2008 02/01/2010 1,515,944.00

007445 Completed STPF-0017(038) 017 Moses Lake North- Paving Central Washington Asphalt, Inc. MICHAEL FLEMING 12/27/2007 04/27/2009 2,042,209.95

007447 Completed STPF-0504(007) 504 Tower Rd To Reynolds Rd Safety Improvements Nutter Corporation Dba Nutter DENYS TAK 12/26/2007 10/30/2008 481,111.00

007448 Completed NH0104(045) 104 Hwy 307 To East Of Balmoral Place Ne Paving Ace Paving Co., Inc. BRENDEN CLARKE 01/04/2008 01/06/2009 972,123.09

007450 Completed NH0028(043) 028 Sr 28, Rock Island, Rock Slope Nettings Janod Inc ROBERT ROMINE 01/15/2008 03/26/2009 2,393,095.18

007452 Completed STATE/TPA 241 Sr241 Rattlesnake Hills Vic, Roadside Safety M A Deatley Construction WILL SMITH 01/07/2008 01/13/2009 890,042.30

007453 Completed BH0055(228) 005 I-5 Burlington Vic Bridges- Seismic Granite Construction Company JANICE MARLEGA 01/28/2008 06/17/2009 358,825.00

007454 Completed CM-NH-0104(042) 104 5th Ave Ne To 15th Ave Ne- Sidewalk Vetch Construction Llc PAUL E. JOHNSON 01/14/2008 07/30/2009 621,896.05

Dec 25, 2019 105 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007455 Completed NH-0002(272) 002 Us 2, Creston To Rocklyn Road - Paving Poe Asphalt Paving, Inc. KATE STEWART, ACTING 02/25/2008 04/03/2009 2,774,794.10

007456 Completed STATE 395 Us 395 And Us 195, Intersection Low-Cost Spokane Rock Products Inc. DARREL MCCALLUM 02/21/2008 01/15/2009 398,698.00

007457 Completed NH-0101(297) 101 Uncas-Fllr Rds,Doswalps Riv-Jrstd Cr-Paving Lakeside Industries, Inc. JERRY MOORE 01/31/2008 07/22/2009 4,257,229.77

007460 Completed IM-0055(231) 005 I-5, 36th Vic To Slater Rd Vic Granite Construction Company DAVE CRISMAN 02/14/2008 12/21/2009 3,199,938.00

007461 Completed STPF-9999(499) 017 Ncr Seal 2008 Central Washington Asphalt, Inc. ROBERT ROMINE 02/15/2008 05/21/2009 5,133,752.75

007462 Completed TPAFUNDS 024 Sr241 To Cold Creek Rd, Add Passing Lane Granite Northwest Inc WILL SMITH 02/12/2008 01/27/2009 2,720,720.00

007463 Completed BH9999(504) 090 Mltry Rd Oc & Yak Rvr Br - Deck Repair Penhall Company PAUL GONSETH 02/04/2008 05/18/2009 604,009.00

007465 Completed NICKEL/LOCAL 005 I-5 Grand Mound-Maytown Stg 1-Add Lanes Scarsella Bros., Inc. MCNUTT/ENGEL 04/07/2008 12/08/2015 61,494,605.66

007466 Completed NH0002(274) 002 Us 2, Safety Improvements W Of Cashmere Granite Northwest Inc ROBERT ROMINE 02/12/2008 01/27/2009 1,812,109.65

007467 Completed BH-NH-0101(282) 101 Sr 101 Mud Bay Bridge Special Repair Epic Construction Llc JOHN MCNUTT 02/12/2008 01/27/2009 555,203.00

007468 Completed HSIP0053(938) 005 I-5, 47th Ave To S 48th St Median Barrier Petersen Brothers, Inc. HOWARD DIEP 02/08/2008 01/07/2009 1,254,092.53

007469 Completed NICKEL 539 Sr539, 10-Mile Rd To Sr 546 Widen Stage 1 Max J. Kuney Company CHRIS DAMITIO 03/03/2008 10/19/2012 53,986,541.95

007470 Completed NICKEL 012 Us12, Clemons Rd, Intersection Improvements Inters Nova Contracting Inc JOHN L. HART 02/04/2008 10/07/2008 646,040.00

007471 Completed IM0053(920) 005 I-5 Spokane St I/C Illumination Signal Electric, Inc. PAUL E. JOHNSON 02/22/2008 08/04/2010 3,468,239.20

007472 Completed NICKEL 410 Sr 410 Rattlesnake Crk Stabalize Slopes Granite Northwest Inc PAUL GONSETH 02/12/2008 10/27/2008 206,306.00

007474 Completed (AC)HP0012(148/15 012 Us 12, Frenchtown To Walla2, Add Lanes Apollo Inc MOE DAVARI 02/13/2008 01/30/2012 33,732,740.07

007476 Completed BR-0101(294) 101 Us 101, Walker Creek Bridge Replacement Quigg Bros., Inc. JERRY MOORE 02/22/2008 06/22/2009 2,117,132.00

007477 Completed STPF0169(023) 169 Sr 169, Se 231 To 196th, Paving Paving Woodworth & Company, Inc. PAUL E. JOHNSON 02/22/2008 08/14/2009 1,880,689.88

007478 Completed STATE 014 Sr 14, Lieser Rd I/C Add Ramp Signal Mill Plain Electric, Inc. CASEY LILES 02/15/2008 11/14/2008 352,711.00

007479 Completed STATE/TPA 009 Sr 9, 176th St Se To Marsh Rd I/S Widen Scarsella Bros., Inc. JOHN CHI 03/14/2008 11/05/2012 18,877,585.77

007480 Completed STPF0181(016) 181 Sr 181, James St Paving Cpm Development Corporation MARK SAWYER 03/03/2008 11/18/2009 2,827,036.05

007483 Completed IM0902(214) 090 W Nelson Siding & Golf Course Rd Illumin Totem Electric Of Tacoma, Inc. WILL SMITH 03/10/2008 10/09/2008 589,180.00

007484 Completed STATE 020 Fredonia To I-5, Widen Stage 2 Stage 2 Imco General Construction, Inc. DAVE CRISMAN 03/24/2008 10/18/2011 28,355,110.95

007485 Completed NH-0525(035) 525 Sr525, Clinton Ferry To Bob Galbreath Rd Pave Krieg Construction, Inc. DAVE CRISMAN 03/10/2008 12/14/2009 599,977.75

007488 Completed NH0003(117) 003 Dawson Dr To Homestead Dr - Paving Ace Paving Co., Inc. RUMINA SUAFOA 03/24/2008 04/28/2009 964,412.80

007489 Completed STATE Vashon-Southworth Terminal Security Valley Electric Co Of Mt Vernon Inc JOHN CALLAHAN 05/27/2008 05/11/2009 638,157.00

007490 Completed STATE 009 Sr 9 Et Al Roadside Safety Coral Construction Company DAVE CRISMAN 03/28/2008 09/08/2009 1,463,337.00

Dec 25, 2019 106 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007491 Completed STATE 405 I-405 Seismic Retrofit 3 Bridges Klm Construction, Inc. JOHN LEFOTU 03/28/2008 08/19/2008 916,332.50

007492 Completed NH0539(013) 539 Sr 539/Horton - Wetland Mitigation Matia Contractors Inc MARK HAMMER 03/24/2008 11/18/2010 3,449,704.61

007493 Completed NH0012(177) 012 Us 12 Columbia To Rr Bridges Paving Cpm Development Corporation MOE DAVARI 03/31/2008 10/16/2008 695,652.53

007495 Completed STATE 005 I-5, 5th Avenue Ne To Ne 92nd - Noise Wall Granite Construction Company MIKE ASKARIAN 04/22/2008 05/24/2013 3,315,000.12

007496 Completed NH0002(291) 002 Us 2, Corridor Rumble Strips Granite Construction Company DAVE LINDBERG 04/22/2008 10/12/2009 2,282,000.00

007497 Completed STPF9999(507) 507 Thurston Co Line To Old 99 Chip Seal Doolittle Construction, Llc NEAL UHLMEYER 04/07/2008 03/30/2009 965,778.90

007498 Completed STATE 007 Sr 7 Roadside Safety Improvements Coral Construction Company COLIN NEWELL 03/31/2008 10/21/2008 404,404.00

007499 Completed STATE 432 Sr 432 Roadside Safety Improvements Coral Construction Company CASEY LILES 03/25/2008 08/15/2008 229,229.00

007500 Completed NH0012(178) 012 Rimrock Lake Vic Stabilize Slopes Hi Tech Rockfall Construction, Inc. PAUL GONSETH 04/02/2008 02/23/2008 631,381.00

007501 Completed STATE 290 Starr Rd Intersection Improvements Spokane Rock Products Inc. DARREL MCCALLUM 04/09/2008 01/15/2009 146,348.03

007502 Completed STPF-9999-497 020 Sr 20 Et Al, 2008 Er Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 05/05/2008 03/02/2009 5,094,720.90

007504 Completed STATE 101 Us 101/Sr 3 Onramp To Us 101 Nb Add New Ramp Tri-State Construction Inc NEAL UHLMEYER 04/21/2008 12/14/2011 2,372,593.50

007506 Completed BH-STPF-9999(517) 009 Sr 9/ Sr 20, Thunder Cr & Coal Cr Bridge Scour Trimaxx Construction, Inc. DAVE CRISMAN 04/21/2008 03/16/2012 303,759.65

007507 Completed NH-STPF-9999(519) 012 Pasco-Clarkston, Centerline Rumble Strips Stripe Rite, Inc. MOE DAVARI 04/15/2008 11/06/2008 187,808.50

007508 Completed (AC)STPF0162(018) 162 Orville Rd To Sr 165, Paving Tucci & Sons, Inc. HOWARD DIEP 04/14/2008 02/12/2009 2,569,810.80

007509 Completed STATE 503 Battleground To Brush Prairie Rumble Strips Median Apply-A-Line, Inc. CHAD HANCOCK 04/08/2008 07/08/2008 21,734.00

007510 Completed ER-NH-0801(007) 405 I-405 Thunder Hills Cr Emerg Culvert Replace Tri-State Construction Inc DAVE LINDBERG 03/11/2008 10/14/2010 2,861,013.00

007513 Completed STATE 008 Hwys/Grays Harbor, Jeff, Clallam Safety Petersen Brothers, Inc. JOHN L. HART 04/14/2008 12/23/2008 779,950.00

007514 Completed STPF-0112(018) 112 Makah Reservation To Us101 - Safety Petersen Brothers, Inc. JERRY MOORE 04/21/2008 07/10/2009 2,595,963.43

007515 Completed BH-9999(454) 500 Sr 500 Clark/Wahkiakum Co Seismic Retrofit Bridges Brant Construction, Inc. CHRIS TAMS 04/21/2008 05/18/2010 735,529.00

007516 Completed STATE Orcas Terminal Floating Dolphin Replace Manson Construction Co. JOHN CALLAHAN 04/15/2008 03/24/2009 4,356,298.00

007517 Completed NH-9999(486) 012 Wishkah River To Sargent Blvd Lakeside Industries, Inc. JOHN L. HART 04/30/2008 04/09/2009 2,470,584.35

007518 Completed STATE 500 I-205 Interchange Improvements Goodfellow Bros Inc CHRIS TAMS 04/29/2008 09/22/2008 243,153.50

007519 Completed STPF-0014(061) 014 Benton County, Roadside Safety Frank Gurney, Inc. WILL SMITH 04/29/2008 09/26/2008 1,167,401.88

007520 Completed STPF-9999(502) 012 Us 12 Et. Al., 2008 Region Wide Chip Seal Granite Northwest Inc PAUL GONSETH 05/02/2008 05/06/2009 3,350,350.00

007521 Completed STATE 101 W Fork Hoquiam River Bridge All State Construction Inc Of Orego JOHN L. HART 04/29/2008 06/21/2010 3,545,320.80

007522 Completed STATE 205 I-205, Mill Plain I/C To Ne 18th St - Stage 1 Selby Bridge Company Inc C. LILES/L. WINGER 05/19/2008 03/11/2011 14,874,970.33

Dec 25, 2019 107 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007523 Completed STPF9999(510) 003 Safety, State Hiways 5 Counties Petersen Brothers, Inc. RUMINA SUAFOA 04/28/2008 07/28/2009 1,787,769.73

007524 Completed NH-0002(816) 002 Us 2, F S Road Vic To Money Cr Vic Paving Watson Asphalt Paving Company, DAVE LINDBERG 04/29/2008 10/08/2009 1,548,525.23

007525 Completed HSIP-9999(522) 082 Scr Safety Shield Land Forms Frank Gurney, Inc. PAUL GONSETH 05/12/2008 03/16/2009 1,497,946.10

007526 Completed STPF0528(006) 528 Sr 528, I-5 To Sr 529 Vic Paving Granite Construction Company AMIR AHMADI 05/21/2008 06/16/2009 2,354,467.09

007529 Completed NH-0526(009) 526 Sr526 40th Ave W-Casino Rd Hma Overlay Granite Construction Company AMIR AHMADI 05/20/2008 02/09/2010 7,991,000.00

007531 Completed IM-STPF-0900(024) 900 S Boeing Access Rd To I-5, I/C Paving Watson Asphalt Paving Company, PAUL E. JOHNSON 05/15/2008 04/09/2009 816,491.44

007532 Completed NH-0020(160) 020 Quiet Cove Rd To Sr 20 Spur Stage 2 Scarsella Bros., Inc. DAVE CRISMAN 05/26/2008 02/28/2013 11,125,547.15

007533 Completed IM-0053(918) 005 James, Spring & Ne 50th Sts, Traffic Signals Signal Electric, Inc. PAUL E. JOHNSON 05/27/2008 01/21/2010 1,448,790.38

007534 Completed STATE 002 Us 2, Roadside Safety Improvements Frank Gurney, Inc. MICHAEL FLEMING 05/12/2008 12/08/2008 417,798.43

007535 Completed STATE 142 Sr 142/ Sr14 To Us 97 Roadside Safety Dirt And Aggregate Interchange, Inc CHRIS TAMS 04/30/2008 08/04/2008 299,801.00

007536 Completed STATE 002 Wenatchee-Trail Connection Strider Construction Co., Inc. KEVIN WALIGORSKI 06/12/2008 09/17/2009 1,170,460.00

007537 Completed FLH-0704(001) 704 Sr 704 Cross-Base Highway, Spanaway Loop To Sr 7 Ceccanti, Inc. NEAL UHLMEYER 07/07/2008 02/11/2013 7,350,281.40

007538 Completed STATE 005 I-5, Boston - E Shelby, Westside Noisewalls C.A. Carey Corporation MIKE ASKARIAN 06/04/2008 01/31/2014 5,375,508.00

007539 Completed NH-9999(530) 028 East Wenatchee Area - Paving Granite Northwest Inc KEVIN WALIGORSKI 06/04/2008 12/01/2008 1,239,239.00

007540 Completed BH-0105(019) 105 Johns River Bridge - Painting Purcell P & C, Llc Dba Purcell JOHN L. HART 05/30/2008 03/26/2009 432,404.00

007541 Completed STATE 012 Swr Centerline Rumble Strips Install Specialized Pavement Marking Inc. COLIN NEWELL 06/05/2008 10/30/2008 245,412.20

007542 Completed IM-0901(454) 090 Asahel Curtis To Easton Upgrade Specialized Pavement Marking Inc. PAUL GONSETH 06/04/2008 01/05/2009 592,582.30

007543 Completed STATE-TPA 097 Klickitat County Roadside Safety Improvements Dirt And Aggregate Interchange, Inc PAUL GONSETH 05/21/2008 11/25/2008 498,815.50

007544 Completed IM-0901(457) 090 Denny Creek Viaduct Stabilize Slope Northwest Cascade, Inc. WILL SMITH 05/26/2008 02/04/2009 992,023.25

007546 Completed STPF-0221(018) 221 Prosser Hill To Sr 22 Paving Granite Northwest Inc MOE DAVARI 06/04/2008 01/09/2009 1,249,386.00

007550 Completed STATE 016 Sr 16, Burley Olalla Interchange Ceccanti, Inc. BRENDEN CLARKE 07/07/2008 05/18/2011 16,328,900.85

007551 Completed IM-HSIP-0051(272) 005 I-5, Castle Rock To Sr505 - Paving/Safety Knife River Corporation-Northwest DENYS TAK 06/24/2008 05/27/2009 8,240,278.75

007553 Completed STATE/NICKEL/LOCA 900 Sr 900, Se 78th St Vic To Newport Way Vic And I-90 Cpm Development Corporation DAVE LINDBERG 07/14/2008 05/08/2015 19,354,286.62

007556 Completed BH-0101(278) 101 Us 101 Humptulips Riv Br Scour Repair Granite Northwest Inc JOHN L. HART 06/26/2008 03/26/2009 613,730.50

007557 Completed NH-0004(205) 004 E Of County Line Park, Rockfall Work Hi Tech Rockfall Construction, Inc. DENYS TAK 06/06/2008 11/14/2008 385,287.00

007559 Completed STATE Brem/Kingston Ferry Term O'Head Load Control Totem Electric Of Tacoma, Inc. JOHN CALLAHAN 06/24/2008 02/05/2009 164,998.00

007563 Completed STATE 161 Sr 167 E/Bound Ramp - Safety Cpm Development Corporation HOWARD DIEP 06/27/2008 09/02/2009 2,191,620.35

Dec 25, 2019 108 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007564 Completed IM-0904(120) 090 I-90, Sr 21-Fishtrap Pavement Repair Granite Northwest Inc DARREL MCCALLUM 07/01/2008 01/08/2009 1,105,105.00

007565 Completed STATE 101 Blyn Vicinity - Passing Lanes Bruch & Bruch Construction Inc JERRY MOORE 06/30/2008 12/23/2009 1,602,440.00

007566 Completed NH-0166(007) 166 Sr16 To Blackjack Creek, Paving & Signal Ace Paving Co., Inc. BRENDEN CLARKE 07/28/2008 10/07/2009 1,300,498.30

007567 Completed STATE 395 Us395 Col Dr Br & Court St Br - Bridge Repair N.A. Degerstrom, Inc. MOE DAVARI 06/30/2008 01/09/2009 741,348.79

007568 Completed BH-0002(286) 002 Us 2, Deep Creek Bridge - Spokane Vic - Special Re West Company, Inc. BOB HILMES 07/09/2008 04/01/2009 504,628.00

007569 Completed STATE 161 Sr 161/ Stone Creek Noise Wall Tri-State Construction Inc ALETA BORSCHOWA 07/11/2008 11/01/2013 959,281.00

007571 Completed STATE Cw Branch Rehabilitation Balfour Beatty Rail Services Inc KEN OLSON 07/09/2008 09/22/2009 717,320.00

007572 Completed NH-0101(303),STAT 101 Us 101, Hoquiam Riv Br To Boulder Cr Bridge Safety Lakeside Industries, Inc. JOHN L. HART 07/17/2008 06/02/2009 2,559,062.45

007573 Completed STATE 002 Vic Sultan- Wb Bus Pullout & Sidewalk Safety Trimaxx Construction, Inc. DAVE LINDBERG 07/03/2008 10/29/2009 103,575.79

007574 Completed CBI-NH-0097(127) 097 Sr 97, Brewster/Main Ave Ped Improvements Hurst Construction Llc TERRY MATTSON 07/11/2008 11/05/2012 807,347.30

007575 Completed STATE 099 Sr 99, Alaskan Way Viaduct- Replacement S Mass St Frank Coluccio Construction PAUL E. JOHNSON 07/28/2008 05/10/2011 17,039,595.21

007576 Completed STATE 902 Medical Lake Interchange Improvements Half Moon Construction And KEN OLSON 07/09/2008 04/02/2009 198,289.50

007577 Completed BR-0101(276) 101 Purdy Creek Bridge - Replacement Quigg Bros., Inc. NEAL UHLMEYER 07/09/2008 05/30/2013 7,697,284.00

007578 Completed NH0002(288) 002 W Side Stevens Pass Electronic Signage North Sky Communications, Inc. KEVIN WALIGORSKI 07/22/2008 12/08/2009 779,268.00

007579 Completed BH0901(459) 090 I-90, Homer M Hadley Bridge Repair General Construction Company HIEN TRINH 07/30/2008 06/14/2011 5,695,042.50

007581 Completed STATE P & L Branch Rehabilitation Railworks Track Systems, Inc. KEN OLSON 07/28/2008 03/23/2009 549,201.00

007582 Completed ER-STPF0701(009) 002 Us 2/ 1 Mile East Of Index Slope Stabilize Scarsella Bros., Inc. DAVE LINDBERG 07/23/2008 06/10/2011 1,123,123.23

007583 Completed STATE Pv Hooper Rehabilitation Balfour Beatty Rail Services Inc KEN OLSON 07/30/2008 09/22/2009 698,000.00

007584 Completed BH-0053(923) 005 I-5, Mcallister Creek Bridge Repair Quigg Bros., Inc. NEAL UHLMEYER 08/12/2008 12/02/2009 339,532.00

007586 Completed STATE 005 Wbnv-Pre Cn Sanitary Sewer Relocate Rodarte Construction Inc HOWARD DIEP 08/07/2008 02/27/2009 156,663.00

007587 Completed STATE 006 Sr 6, S Fork Chehalis Riv Br Replacement Scarsella Bros., Inc. COLIN NEWELL 08/13/2008 10/21/2010 7,854,340.30

007588 Completed STATE 016 Sr16 New Tnb Exp Joint Noise Mitigation Tri-State Construction Inc RUMINA SUAFOA 08/19/2008 12/21/2009 531,698.00

007589 Completed STATE Port Townsend Slip 1 Wingwall Replacement Manson Construction Co. JOHN CALLAHAN 08/29/2008 04/27/2009 1,264,055.00

007590 Completed ER0801(011) 101 Us 101, Holiday Hills Emergency Slide Repair- Unst Tri-State Construction Inc JOHN MCNUTT 08/12/2008 11/04/2009 463,095.00

007591 Completed STATE/TPA 005 I-5, Central King To S Snohomish Bridges Seismic Granite Construction Company CHAD BROWN 09/22/2008 02/17/2011 6,734,000.00

007592 Completed STATE 007 North Of Alder, Unstable Slope Hi Tech Rockfall Construction, Inc. MARYLOU NEBERGALL 08/13/2008 05/18/2009 123,279.00

007593 Completed ER-0802(002) 206 Mt Spokane State Park - Rebuild Roadway West Company, Inc. DARREL MCCALLUM 08/22/2008 02/04/2009 214,960.50

Dec 25, 2019 109 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007594 Completed STATE 005 I-5/Sr16 Wb Nalley Valley I/C Guy F. Atkinson Construction, Llc. JON DEFFENBACHER 10/21/2008 08/01/2012 119,924,730.00

007596 Completed STPF-0261(006) 261 Smith Hollow Rd - Stabilize Slope Hi Tech Rockfall Construction, Inc. WILL SMITH 08/25/2008 12/04/2008 144,558.00

007597 Completed STATE-LOCAL 519 Sr 519, I-90 To Sr 99 Intermodal Access I/C Improv Kiewit Infrastructure West Co. DAVID SOWERS 10/16/2008 07/15/2011 66,969,343.00

007598 Completed STATE 509 D St Pond Reconstruction Glacier Environmental Services RUMINA SUAFOA 08/12/2008 03/09/2009 124,079.55

007599 Completed STATE Seattle Terry Term Timber Trestle Preserv Klm Construction, Inc. JOHN CALLAHAN 09/24/2008 06/09/2009 666,148.00

007600 Completed STATE 026 Sr 26, E. Of Vantage Guardrail & Drainage Frank Gurney, Inc. KEVIN WALIGORSKI 09/11/2008 12/10/2008 129,512.50

007601 Completed STATE 530 Sauk River Site 2, Stabilize River Bank Jansen Inc. MARK HAMMER 09/02/2008 12/23/2009 2,115,080.60

007602 Completed STATE/TPA 021 Lincoln County Roadside Safety Improvements Coral Construction Company CHAD SIMONSON 10/02/2008 04/01/2009 595,555.00

007605 Completed STATE 020 Sr 20, Best Road Pedestrian Improvements Petersen Brothers, Inc. JANICE MARLEGA 10/06/2008 04/28/2009 47,195.15

007606 Completed STPF0410(052) 410 Sr 410, Erosion Repair E Of Chinook Pass Pile Contractors, Inc. PAUL GONSETH 09/26/2008 12/26/2008 235,647.00

007608 Completed LOCAL 182 I-182, Road 68 Interchange Modifications Granite Northwest Inc MOE DAVARI 09/30/2008 02/20/2009 183,686.50

007609 Completed STATE Edmonds Term Unocal Pier Removal Manson Construction Co. JOHN CALLAHAN 11/13/2008 08/03/2009 1,301,378.00

007610 Completed STATE 395 Us 395, Nsc - Us 2 Lowering Graham Construction & BOB HILMES 11/13/2008 01/15/2014 42,849,073.80

007611 Completed ER-0801(019) 008 Sr8 0.6 Mi E Of Winslow Rd Unstable Slope Scarsella Bros., Inc. JOHN MCNUTT 09/23/2008 11/13/2009 896,907.75

007612 Completed ITS-CMAQ-2003(062 395 Sr 395, Appleway Trunkline Its Phase 2 Spokane Colvico, Inc. DARREL MCCALLUM 10/20/2008 01/05/2010 372,104.00

007613 Completed STPF-0169(024) 169 Sr 169, Unstable Slope Stg 2, Green River Bridge Tri-State Construction Inc MIKE ASKARIAN 10/09/2008 06/02/2010 471,750.00

007614 Completed STATE-FUNDS Eagle Harbor Maintenance Building Remodel And Dock Mowat Construction Company JOHN CALLAHAN 12/02/2008 07/01/2011 10,829,673.50

007616 Completed BH-0026(027),STAT 026 Sr 26, Palouse River Br - Deck Repair Penhall Company DARREL MCCALLUM 11/13/2008 12/08/2009 445,345.50

007619 Completed STATE 395 Us 395, Columbia Dr To Sr 240- Rebuild Interchange Klb Construction, Inc. MOE DAVARI 12/12/2008 01/21/2011 11,519,676.33

007620 Completed NH-0097(126) 097 Us 97, N Of Blewett Pass Stabilize Slope Hi Tech Rockfall Construction, Inc. KEVIN WALIGORSKI 11/12/2008 12/11/2009 582,716.00

007621 Completed IM-0055(225)/STAT 005 I-5, Bakerview Rd To Nooksack R Bridge- Pavement R Penhall Company CHRIS DAMITIO 11/25/2008 10/08/2009 2,799,873.70

007622 Completed BH-0901(446)/STAT 090 I-90, Richards Rd To Winery Rd Vic Seismic Retrof Imco General Construction, Inc. PAUL E. JOHNSON 12/02/2008 11/29/2011 5,998,535.00

007623 Completed STATE 005 I-5, Boeing Access Rd Vic To King/ Snohomish Co Li Interstate Improvement Inc ALETA BORSCHOWA 12/04/2008 04/16/2012 9,874,896.68

007624 Completed STATE 405 I-405, I-5 To Sr 169 Stage 2 Widening And Sr 515 I I-405 Corridor Design Builders LISA HODGSON 03/16/2009 09/12/2013 83,599,000.00

007625 Completed NH-0055(236) 005 I-5 West View School Noise Wall Interwest Construction, Inc. MARK HAMMER 12/30/2008 03/09/2011 526,870.00

007626 Completed STATE 090 I-90 E Fork Issaquah Cr Br To Raging R & Sr 599 S Petersen Brothers, Inc. ALETA BORSCHOWA 11/26/2008 11/06/2009 492,818.83

007627 Completed STATE-LOCAL 532 Sr 532 Corridor Improvements, Camano Island To I-5 Ptg/Kuney A Joint Venture ROBYN BOYD 02/23/2009 01/20/2012 50,415,851.00

Dec 25, 2019 110 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007629 Completed STATE 005 I-5 To 12th Ave S Seismic Retrofit Pcl Construction Services Inc ALETA BORSCHOWA 12/29/2008 06/13/2011 5,703,221.58

007630 Completed IM-0054(267) 005 I-5, Arlington City Limit Vic To Stillaguamish Riv Cemex Pacific Holdings, Llc JANICE FAHNING 12/17/2008 06/28/2011 2,151,389.00

007631 Completed IM-0054(276) 005 I-5, 172nd St Ne (Sr 531) Interchange Modification Northwest Construction, Inc. CHAD BROWN 01/30/2009 06/13/2013 12,975,831.69

007632 Completed BH-0905(099) 090 I-90, Medical Lake Rd Br - Bridge Deck Repair James W. Fowler Co. CHAD SIMONSON 12/19/2008 11/02/2009 337,200.00

007633 Completed STATE Edmonds Ferry Terminal Utility Casting Extension Interwest Construction, Inc. JOHN CALLAHAN 01/07/2009 08/18/2009 233,424.50

007634 Completed STATE 509 Sr 509, Vic South 112th St Pedestrian Improvements Trimaxx Construction, Inc. ALETA BORSCHOWA 12/29/2008 07/13/2010 104,875.50

007636 Completed STATE Kingston Ferry Terminal, Slip 2 Transfer Span Upgr Manson Construction Co. TOM CASTOR 12/30/2008 08/03/2009 1,132,499.00

007637 Completed STATE 520 Sr 520/ W Lake Sammamish Pkwy To Sr 202 Hov And Sr Pcl Construction Services Inc HIEN TRINH 03/30/2009 08/01/2014 37,736,270.05

007638 Completed STPF-NH-9999(528) 002 Ncr Sign Update 2009- Us2, Sr17, Sr20, Us97, Sr153 Construction Ahead, Inc. Dba ERIC PIERSON 01/05/2009 05/18/2010 583,978.00

007639 Completed STPF-0009(054) 009 Sr 9, Martin Rd Vic To Thunder Cr- Realignment And Marshbank Construction, Inc. HAMMER/SPAHR 01/05/2009 03/20/2013 1,687,701.41

007640 Completed NH-0520(038) 520 Sr 520/ I-405 To Wlsp I/C Paving Granite Construction Company CARL BARKER, ACTING 02/04/2009 06/14/2011 5,794,000.00

007641 Completed STATE/TPA 104 Sr 307 & Sr 104 Spot Improvements Safety Petersen Brothers, Inc. JERRY MOORE 02/04/2009 06/02/2010 1,081,049.97

007642 Completed STATE 005 I-5 Alaskan Way Replacement Travel Time Signs Transtech Electric, Inc. JOHN CHI 01/14/2009 06/21/2010 470,665.92

007643 Completed BH-0097(128) 097 Us 97, South Of Tonasket Bridge Deck Repair Penhall Company KEN OLSON 01/05/2009 12/17/2009 403,144.00

007644 Completed STATE 525 Mukilteo Ferry Terminal Generator Relocation Dalton Electric Company JOHN CALLAHAN 01/14/2009 07/17/2009 158,535.00

007645 Completed STPF-9999(501) 028 Sr 28 & Sr 281, Quincy Area Paving Central Washington Asphalt, Inc. ERIC PIERSON 02/04/2009 04/19/2010 2,574,636.90

007646 Completed ER-0803(001) 005 I-5/ Sr 11, Interchange- Chuckanut Overcrossing Br Vetch Construction Llc MARK HAMMER 01/08/2009 03/23/2010 467,631.00

007647 Completed IM-0053(947) 005 I-5, Guardrail Retrofit - Safety Tri-State Construction Inc JANICE FAHNING 01/28/2009 07/20/2011 1,325,768.00

007648 Completed STPF-0542(030) 542 Sr 542, Britton Rd To Coal Cr Br Vic - Paving Granite Construction Company MARK HAMMER 02/11/2009 12/20/2010 3,566,333.00

007649 Completed STATE/LOCAL 005 I-5, Mountlake Terrace Freeway Station Midmountain Contractors, Inc. CHAD BROWN 04/03/2009 07/24/2013 17,747,153.15

007652 Completed NH-0012(181) 012 Us 12, West Side White Pass Stabilize Slopes Midwest Rockfall Inc PAUL GONSETH 01/30/2009 12/02/2009 777,189.00

007653 Completed STPF-9999(495) 536 Sr 536 & Sr 538, Sr 20 Vic To Skagit Riv Freeway D Cemex Pacific Holdings, Llc DAVE CRISMAN 02/17/2009 05/17/2010 2,749,325.05

007654 Completed STPF9999(532) 020 Ncr Seal 2009 & Sr 20 Roadside Safety Improvements Central Washington Asphalt, Inc. KEN OLSON 02/04/2009 05/10/2010 5,732,952.50

007655 Completed HP-1998(030) 005 Avery Road, Southbound Off Ramp Turn Pocket R G/Bowers Construction Joint COLIN NEWELL 02/02/2009 11/19/2009 133,542.60

007656 Completed NH0101(305) 101 Us 101/ Hoodsport Vicinity Slope Repair Active Construction, Inc. NEAL UHLMEYER 02/04/2009 08/04/2010 179,972.71

007657 Completed NH-0104(039) 104 Sr 104, 1.2 Mi. W Hcb - Fish Passage Seton Construction, Inc. JERRY MOORE 03/06/2009 12/04/2012 572,409.00

007658 Completed STATE 195 Us 195 Centerline Rumble Strips North Star Enterprises 1, Inc. HAROLD WHITE 04/08/2009 06/15/2009 95,609.25

Dec 25, 2019 111 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007659 Completed STATE/TPA 542 Sr 542 / Warnick Bluff Site Tapani Underground Inc CHRIS DAMITIO 03/09/2009 10/21/2010 395,154.51

007660 Completed IM-0053(930) 005 I-5, S 272nd St To Southcenter Parkway Ramp Paving Tucci & Sons, Inc. MARK SAWYER 03/09/2009 10/08/2011 2,040,839.86

007661 Completed ER-0901(462) 169 Sr 169, Green River Bridge Embankment Failure Scarsella Bros., Inc. ALETA BORSCHOWA 02/11/2009 02/24/2012 3,208,021.05

007662 Completed BH-0433(009) 433 Sr 433/ Lewis & Clark Bridge- Substructure Painter Certified Coatings Company Inc. DENYS TAK 03/16/2009 02/15/2011 5,148,109.00

007668 Completed NH0002(284) 002 Us 2, E End Odabashian Bridge- Loop Trail Connecti Granite Northwest Inc KEVIN WALIGORSKI 03/02/2009 01/21/2010 184,184.00

007669 Completed IM-NH9999(541) 005 I-5/ 52nd Ave W To Sr 526 Nb Paving Granite Construction Company JOHN CHI 03/13/2009 11/02/2011 4,929,000.00

007670 Completed STPF-9999(540) 102 Sr 102 & Sr 106, Corrections Center To Us 101 And Doolittle Construction, Llc JERRY MOORE 03/27/2009 04/09/2010 1,067,440.20

007671 Completed IM-0054(262) 005 I-5, Sr 532 To Hill Ditch Bridge Concrete Pavement Tri-State Construction Inc DAVE CRISMAN 04/03/2009 08/16/2010 4,718,501.85

007672 Completed STPF0020(162) 020 Sr 20 And Sr 21, Rock Slope Scaling - Unstable Slo Kc Equipment Llc CHAD SIMONSON 03/18/2009 09/24/2009 179,760.50

007674 Completed IM-0054(271) 005 I-5, Snohomish River To Ebey Slough - Nb Paving Cemex Pacific Holdings, Llc JANICE FAHNING 03/20/2009 07/11/2011 1,633,363.90

007675 Completed NH-0002(290) 002 Us 2, East Of Orondo-Slope Stabilization Hi Tech Rockfall Construction, Inc. ERIC PIERSON 03/18/2009 12/14/2009 1,096,250.00

007677 Completed STATE 285 Sr 285, George Sellar Bridge Additional Eb Lane Max J. Kuney Company KEVIN WALIGORSKI 04/13/2009 06/10/2013 12,884,988.00

007678 Completed STATE Sr 525/ Mukilteo- Park Street Sidewalk Replacement Schwetz Construction, Inc. TOM CASTOR 12/19/2008 04/20/2009 14,602.16

007679 Completed STATE 160 Sr 160, Sr 16 To Long Lake Road Vic. R G/Bowers Construction Joint BRENDEN CLARKE 03/18/2009 04/20/2011 3,148,190.04

007680 Completed STATE 509 Sr 509, Property Management Grading & Fencing End General Construction, Inc. MARK SAWYER 03/20/2009 02/08/2010 346,124.47

007681 Completed STPX-STPXP-2008(0 Vancouver Rail Project W. 39th Street Bridge Cascade Bridge Llc CHRIS TAMS 04/22/2009 12/14/2012 11,646,360.95

007684 Completed STATE 026 Sr 26, Othello Vicinity- Roadside Safety Improveme Frank Gurney, Inc. ERIC PIERSON 03/25/2009 09/01/2009 239,176.05

007685 Completed HSIP-0906(213) 090 I-90, Spokane Area Rut Repair And Ramp Paving Cpm Development Corporation DARREL MCCALLUM 04/08/2009 02/23/2011 8,091,333.68

007686 Completed STATE 240 Sr 240, Beloit Rd To Kingsgate Way- Widen Roadway Imco General Construction, Inc. MOE DAVARI 04/03/2009 06/03/2010 6,764,418.32

007687 Completed STATE 530 Sr 530/534 Roadside Safety Improvements Coral Construction Company MARK HAMMER 03/25/2009 02/07/2011 521,125.00

007688 Completed BH-0051(275) 005 I-5, North Fork Lewis River Bridge- Southbound Exp Mowat Construction Company CHRIS TAMS 04/17/2009 03/30/2010 329,023.40

007689 Completed PNRS(AC)STPF0099- 005 I-5, Boeing Access Rd To I-90 I/C- Sign Bridges C.A. Carey Corporation MARK SAWYER 04/03/2009 08/25/2011 3,851,852.00

007690 Completed STPF-0099(099) 099 Sr99, 14th Ave S I/C- Illumination Rebuild Signal Electric, Inc. JANICE FAHNING 04/03/2009 07/22/2010 1,126,478.00

007691 Completed NH-0101(313) 101 Us 101, S. Of W. Fork Hoquiam River Bridge To N. O Doolittle Construction, Llc NEAL UHLMEYER 04/27/2009 07/01/2010 2,422,679.97

007692 Completed STATE 090 I-90, Snoqualmie Pass East - Phase 1a Hyak To Crys Klb Construction, Inc. WILL SMITH 04/20/2009 06/01/2010 3,298,002.00

007693 Completed STPF-0169(020) 169 Sr 169, Se 264th St To Vic Witte Road - Paving And Lakeside Industries, Inc. ALETA BORSCHOWA 04/01/2009 10/17/2011 1,151,617.25

007695 Completed STATE 016 Sr 16, Tacoma Narrows Bridge Crossover Barrier Petersen Brothers, Inc. RUMINA SUAFOA 04/10/2009 09/09/2009 198,991.20

Dec 25, 2019 112 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007696 Completed STPF-0020(157) 020 2007-2009 Er Roadside Safety Improvements Roadside Frank Gurney, Inc. BOB HILMES 04/14/2009 05/13/2010 2,355,048.87

007697 Completed STPF-9999(527) 020 2009 Eastern Region Chip Seal Granite Northwest Inc CHAD SIMONSON 05/08/2009 05/19/2010 6,330,905.00

007698 Completed BH-0053(924) 005 I-5, Nisqually River Bridge Special Repair Mowat Construction Company NEAL UHLMEYER 04/17/2009 12/02/2009 582,577.87

007699 Completed STATE 525 Sr 525 Low Cost Enhancement Restriping Trimaxx Construction, Inc. DAVE CRISMAN 04/15/2009 03/09/2010 135,127.00

007700 Completed IM-BH-9999(533) 005 I-5, Us 12/ Capitol Blvd Bridge & Black River Brid Purcell P & C, Llc Dba Purcell JOHN MCNUTT 04/28/2009 06/14/2010 794,963.00

007701 Completed STATE Vashon Ferry Terminal Dolphin Replacement Manson Construction Co. JOHN CALLAHAN 05/14/2009 05/25/2010 2,109,725.00

007702 Completed (AC)HP-IM-STPUS-1 182 I-182, Rd. 100/ Broadmoor Blvd- Improvements Apollo Inc MOE DAVARI 04/20/2009 05/20/2010 994,965.67

007704 Completed STATE 101 Sr 101, Sol Duc River Bridge Rail Retrofit Coral Construction Company JERRY MOORE 04/23/2009 08/17/2009 107,777.00

007705 Completed ARRA-0902(260) 090 I-90 Keechelus Dam To Cabin Cr Eb- Pavement Restor Columbia Asphalt & Gravel, Inc. WILL SMITH 04/15/2009 01/28/2010 2,725,920.80

007706 Completed ARRA-0902(259) 090 I-90, Yakima River To W Ellensburg- Paving Columbia Asphalt & Gravel, Inc. WILL SMITH 04/15/2009 12/04/2009 1,657,733.85

007707 Completed STPF-0112(019) 112 Sr 112, Makah Reservation To Us 101 Stage 2 - Safe Petersen Brothers, Inc. JERRY MOORE 04/27/2009 09/02/2010 2,667,540.53

007708 Completed STPF-9999(546) 101 Us 101/Sr 103, Fort Columbia Vic/Long Beach Vic - Knife River Corporation-Northwest DENYS TAK 04/23/2009 11/16/2009 1,888,133.45

007709 Completed NH-0101(309) 101 Us 101, S Of Olympic National Park Rd To S Of Lost Lakeside Industries, Inc. JERRY MOORE 04/28/2009 04/07/2010 1,243,561.57

007710 Completed STATE 007 Sr 7, 304th/ Kapowsin Highway- Signal Tst Inc Dba Travers Electric RUMINA SUAFOA 05/01/2009 07/30/2010 236,970.15

007711 Completed STATE Anacortes Ferry Terminal Timber Trestle Preservati American Construction Co., Inc. TOM CASTOR 04/28/2009 02/05/2010 173,404.00

007712 Completed STPF-0112(020) 112 Sr 112, Falls Creek Bridge To Sr 113 And Burnt Mou Lakeside Industries, Inc. JERRY MOORE 05/05/2009 03/31/2010 547,723.30

007713 Completed STATE 004 Sr 4/401 Roadside Safety Improvements Petersen Brothers, Inc. DENYS TAK 04/27/2009 10/29/2009 265,995.27

007714 Completed STPF-9999(543) 019 Sr 19, Sr 116/ State Hwys In Jefferson County- Chi Lakeside Industries, Inc. JERRY MOORE 05/20/2009 03/31/2010 1,445,255.32

007715 Completed PNRS-0099(096) 099 Sr 99, Alaskan Way Viaduct - Replacement S Holgate Gary Merlino Construction Co., Inc. PAUL E. JOHNSON 05/08/2009 10/24/2011 8,569,569.15

007716 Completed NH-0002(293) 002 Us 2 West Of Leavenworth Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 05/01/2009 12/01/2009 1,683,781.53

007717 Completed STPF-0542(026) 542 Sr 542, Bruce Ck & Baptist Ck Culverts Realign Rdw Klb Construction, Inc. CHRIS DAMITIO 05/08/2009 10/27/2010 969,075.12

007718 Completed NH-0002(280) 002 Us 2 & Us 97, Baker Flats To Orondo- Paving And Pa Central Washington Asphalt, Inc. ROBERT ROMINE 05/13/2009 09/20/2010 3,546,628.13

007719 Completed STATE 003 Sr 3/ Jct Us 101 To Mill Creek - Safety Petersen Brothers, Inc. NEAL UHLMEYER 05/01/2009 12/03/2009 139,859.27

007720 Completed NH-9999(506) 101 Us 101 & Sr 109, Oak St. To Little Hoquiam River B Lakeside Industries, Inc. NEAL UHLMEYER 05/20/2009 08/03/2010 2,165,345.47

007721 Completed STATE 005 I-5, Fisher Cr Vic To Squalicum Cr Vic Storm Drain G G Excavation, Inc. MARK HAMMER 05/08/2009 01/25/2011 398,013.96

007722 Completed NH-0109(012) 109 Sr 109, N. Of Harborview Court To Grass Creek Brid Granite Construction Company NEAL UHLMEYER 05/14/2009 10/21/2009 759,558.00

007724 Completed ARRA-9999(547) 017 Sr 17, Sr 282/ Moses Lake To Ephrata - Paving And Granite Northwest Inc ERIC PIERSON 05/14/2009 06/08/2010 6,235,235.00

Dec 25, 2019 113 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007725 Completed CBI-0097(132-134) 097 Us 97/ Sr 155 Intersection And Border Vic. Improve Mccandlish Electric Inc KEVIN WALIGORSKI 05/18/2009 03/30/2010 613,330.00

007726 Completed ARRA-4053(858) 405 I-405, Ne 8th St To Sr 520 Braided Ramps- Intercha Guy F. Atkinson Construction, Llc. SEEMA JAVERI 11/25/2009 06/27/2014 107,500,000.00

007727 Completed BH-0153(005) 153 Sr 153 Methow River Bridge- 153/04 Repair Wesslen Construction, Inc. ROBERT ROMINE 05/18/2009 12/10/2009 236,783.00

007729 Completed ER0902285-288,341 097 Us 97, Blewett Pass Emergency Flood Repair- Stage Pipkin Inc., Dba Pipkin Constructio KEVIN WALIGORSKI 04/14/2009 03/23/2010 1,109,407.19

007730 Completed STPF-0106(003) 106 Sr 106, X Trib Skokomish- Fish Passage R-V Associates, Inc. NEAL UHLMEYER 05/20/2009 04/12/2010 557,083.50

007731 Completed NH-0026(029) 026 Sr 26, Reynolds Road Intersection And Illumimation Cpm Development Corporation ROBERT ROMINE 05/18/2009 02/17/2010 325,197.35

007732 Completed BH-0542(027) 542 Sr 542, N Fork Nooksack River Bridge- Painting Purcell P & C, Llc Dba Purcell CHRIS DAMITIO 05/22/2009 10/26/2010 518,400.00

007733 Completed ARRA-9999(548) 155 Sr 262, Sr 243, Sr 155/ Ncr Seal 2009- Stage 2 Central Washington Asphalt, Inc. ROBERT ROMINE 05/13/2009 06/17/2010 2,983,566.25

007734 Completed STATE 509 Sr 509, Murray Morgan Bridge- Wire Rope Replacemen Rognlin'S, Inc. RUMINA SUAFOA 06/08/2009 04/27/2010 998,704.00

007735 Completed NH-0012(176) 012 Us 12, Touchet River Bridge At Touchet- Br Repair West Company, Inc. MOE DAVARI 05/28/2009 12/14/2009 185,169.00

007736 Completed NH-0012(191) 012 Us 12, White Pass Vicinity Paver Granite Northwest Inc COLIN NEWELL 05/21/2009 12/29/2009 608,608.00

007737 Completed STATE Port Of Columbia- Dayton Rail Crossing Upgrades Granite Northwest Inc PAUL GONSETH 05/20/2009 11/16/2009 196,350.00

007738 Completed ARRA-0002(300) 002 Us 2, Monroe City Limit To Sultan - Paving Lakeside Industries, Inc. DAVE LINDBERG 05/28/2009 04/12/2010 1,407,299.60

007739 Completed STATE 101 Us 101, Sr 108/ 2008 Olympic Region Centerline Rum Apply-A-Line, Inc. NEAL UHLMEYER 06/03/2009 09/18/2009 77,261.00

007740 Completed BH-0509(023) 509 Sr 509, Fb Hoit And Joes Creek Bridges Bridge Pain Long Painting Company JANICE FAHNING 06/15/2009 11/05/2010 1,584,729.57

007741 Completed STATE 005 I-5 Friday Creek Vicinity Hma Paving Cemex Construction MARK HAMMER 05/13/2009 12/08/2009 73,220.00

007742 Completed STATE 005 I-5. Nb 260th St O-Xing Bridge Deck Overlay Lakeside Industries, Inc. DAVE LINDBERG 05/20/2009 09/28/2009 129,643.10

007743 Completed BR-0012(122) 012 Us 12, Tieton River Crossings W & E- Replace Bridg Scarsella Bros., Inc. PAUL GONSETH 06/18/2009 11/08/2011 6,547,277.50

007744 Completed ARRA0395(09) 395 Us 395, Loon Lake To Immel Rd - Paving Central Washington Asphalt, Inc. CHAD SIMONSON 06/30/2009 02/16/2012 5,446,776.00

007745 Completed ARRA-0822(131) 082 I-82, Granger To W Grandview Wb- Dowel Bar Retrofi Granite Northwest Inc PAUL GONSETH 06/10/2009 03/29/2010 4,690,744.15

007746 Completed ARRA-IM-0052(202) 005 I-5, Koontz Road To Harrison Ave. Vic.-Paving Lakeside Industries, Inc. COLIN NEWELL 05/28/2009 04/26/2011 5,399,567.92

007747 Completed ARRA-0014(062) 014 Sr 14, Cliffs Rd Vicinity To Chamberlain /Goodnoe Granite Northwest Inc CHRIS TAMS 06/10/2009 11/12/2009 369,369.00

007748 Completed NH-0101(291) 101 Us 101/ Sr 6 To Grays Harbor County Line- Paving Granite Construction Company COLIN NEWELL 06/10/2009 04/29/2010 2,833,069.20

007749 Completed STATE 008 Sr 8, Elma Rest Area Paving Lakeside Industries, Inc. NEAL UHLMEYER 05/05/2009 08/24/2009 82,483.00

007751 Completed ARRA-0395(088) 395 Us 395, Spokane Co Line To Loon Lake - Paving Hap Taylor And Sons, Inc. Dba BOB HILMES 06/22/2009 04/02/2010 1,675,705.72

007752 Completed ARRA-IM-0054(272) 005 I-5, Marysville To Stillaguamish River Bridge- Med Tri-State Construction Inc CHAD BROWN 07/07/2009 11/28/2012 13,262,231.00

007753 Completed ARRA-IM-0054(277) 005 I-5/ Sr 532 Vic To Starbird Rd Vic- Pccp Rehab Granite Construction Company DAVE CRISMAN 06/18/2009 08/08/2011 5,311,989.00

Dec 25, 2019 114 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007754 Completed STPF-0531(008) 531 Cougar Creek Culvert Replacement Culvert Replaceme Tri-State Construction Inc DAVE LINDBERG 06/16/2009 12/22/2011 546,628.50

007755 Completed NH-0012(192) 012 Us 12, Naches To Mitchell Rd Vicinity- Paving Granite Northwest Inc PAUL GONSETH 06/29/2009 04/08/2010 3,012,012.00

007756 Completed IM-0821(091) 082 I-82, Naches River Bridge Repairs Klm Construction, Inc. PAUL GONSETH 06/23/2009 02/14/2011 821,457.70

007757 Completed ARRA-0902(302) 090 I-90, Lake Easton Vic To Bullfrog Rd I/C Vic Wb- R Gary Merlino Construction Co., Inc. WILL SMITH 06/15/2009 12/21/2010 13,812,438.81

007758 Completed ARRA-0902(283) 090 I-90, Snoqaulmie Summit To Hyak Wb- Dowel Bar Retr Vetch Construction Llc WILL SMITH 06/17/2009 01/24/2011 2,927,574.60

007759 Completed ARRAIMSTPF0051277 005 I-5, N Kelso To Castle Rock Concrete Pavement Reha Granite Northwest Inc DENYS TAK 06/02/2009 04/01/2010 9,889,889.00

007760 Completed ARRA-0097(140) 097 Us 97, Centerville Rd Vic To Bickleton Rd Bridge A Granite Northwest Inc CHRIS TAMS 06/16/2009 08/30/2010 2,948,948.00

007761 Completed ARRA-4053(859) 405 I-405, Ne 195th St To Sr 527 - Auxiliary Lane- Des Kiewit Infrastructure West Co. CHAD BROWN 09/11/2009 09/19/2011 19,263,000.00

007762 Completed ARRA-0206(003) 206 Sr 206, Jct Us 2 To Bruce Rd - Paving Cpm Development Corporation DARREL MCCALLUM 06/17/2009 12/17/2009 544,445.00

007763 Completed ARRA-0002(301) 002 Us 2, Jct Sr 211 To Newport - Paving Cpm Development Corporation CHAD SIMONSON 06/24/2009 05/19/2010 5,182,153.00

007764 Completed STATE/TPA 122 Sr 122, Harmony Resort Vic Fish Passage Steele Trucking Inc. COLIN NEWELL 06/23/2009 11/03/2009 188,896.90

007765 Completed STATE 005 I-5, Cook Road Bridge Deck Overlay Lakeside Industries, Inc. MARK HAMMER 06/03/2009 09/29/2009 89,005.50

007766 Completed ITS-9999(509) 005 I-5 Et All, Active Traffic Management System- Desi Elcon Corporation JENNIFER CHARLEBOIS 07/13/2009 05/23/2012 34,450,000.00

007767 Completed IM-0052(200) 005 I-5, Martin Way O'Xing Bike Lanes Tri-State Construction Inc NEAL UHLMEYER 07/07/2009 07/18/2012 1,160,349.10

007768 Completed ARRA-0104(046) 195 2009 Eastern Region, Centerline Rumble S North Star Enterprises 1, Inc. BOB HILMES 07/17/2009 10/06/2010 314,413.00

007769 Completed ARRA-STPR-C350(00 004 Sr 4, Skamokawa To Coal Creek Road Paving/Guardrai Lakeside Industries, Inc. LEON WINGER 06/17/2009 10/07/2010 6,499,399.35

007770 Completed STPE-0097(139) 097 Us 97a, North Of Wenatchee- Wildlife Fence - Stage Thg Construction, Llc MITCH REISTER 06/23/2009 08/30/2010 844,530.50

007771 Completed ITS-9999(509) 090 Lake Washington Congest Mgmt Sign Bridges Sign Bri Mowat Construction Company BRYANT BULLAMORE 07/17/2009 06/22/2011 5,841,106.77

007772 Completed IM-0052(201) 005 Tumwater Blvd I/C Paving & Ramp Widening Paving & Granite Construction Company MARYLOU NEBERGALL 07/10/2009 03/22/2010 500,895.50

007773 Completed CM0906(218) 090 I-90, Geiger I/C To Wsp District Office Its Colvico, Inc. DARREL MCCALLUM 07/09/2009 12/15/2009 47,730.50

007774 Completed LOCALRR & STATE 509 Sr 509, Puyallup River Bridge Special Repairs Granite Construction Company RUMINA SUAFOA 07/09/2009 11/02/2010 2,853,000.00

007775 Completed STPF-0410(051) 410 Sr410 Clay Crk Outfall Washout Repair Weber Construction, Inc. JEFF MINNICK 07/06/2009 05/28/2013 444,988.40

007776 Completed STATE Pccra P & L Branch Rehabilitation Railroad Materials Salvage, Inc. KEN OLSON 08/06/2009 06/03/2011 1,245,147.40

007777 Completed STATE 395 Nsc Us 2 To Wandemere Vicinity Graham Construction & DARREL MCCALLUM 08/17/2009 03/05/2015 37,540,555.55

007778 Completed ARRA-HSIP-0002(30 002 Us 2 Wilbur Pedestrian Improvements West Company, Inc. KEN OLSON 07/15/2009 11/03/2010 289,764.00

007779 Completed ARRA-IM-0053(948) 005 I-5, Port Of Tacoma Road To King County Line - Hov Tri-State Construction Inc SUAFOA/NEBERGALL/MUE 07/23/2009 10/17/2014 31,015,383.05

007780 Completed ARRA-9999(549) 020 Sr 20/Us 395/Sr 26, Har Sites Upgrade Aztech Electric Inc CHAD SIMONSON 07/01/2009 09/20/2010 162,565.97

Dec 25, 2019 115 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007781 Completed STATE 532 Sr 532, 84th Ave Nw Bridge Deck 532/6 Bridge Deck Penhall Company ROBYN BOYD 07/21/2009 05/24/2010 979,504.00

007782 Completed STATE 016 Sr 16, Tacoma Nature Center- Wetland Mitigation Olson Brothers Excavating, Inc. RUMINA SUAFOA 07/06/2009 10/12/2010 763,266.93

007783 Completed STATE Pccra Cw Branch Rehabilitation Railroad Materials Salvage, Inc. CHAD SIMONSON 08/06/2009 06/03/2011 1,301,463.00

007784 Completed STATE 101 Us 101, Mosquito Creek-Fish Passage Rognlin'S, Inc. NEAL UHLMEYER 07/20/2009 11/07/2012 728,349.25

007785 Completed STATE Pccra Pv Hooper Branch Rehabilitation Railworks Track Systems, Inc. CHAD SIMONSON 07/23/2009 10/18/2010 1,770,190.00

007786 Completed STATE 090 I90 Hi Point To Preston Ped/Bike Trail Klb Construction, Inc. JOHN CHI 08/11/2009 04/24/2013 1,971,676.50

007787 Completed ARRA-0904(118) 090 I-90, Moses Lake- Paving Central Washington Asphalt, Inc. ERIC PIERSON 08/04/2009 03/24/2011 3,242,563.03

007788 Completed STPF-ER-0902(253) 108 Sr 108, Slide Repair 0.8 Miles W. Of Eich Rd.- Uns Balmelli Contracting, Inc. MARYLOU NEBERGALL 08/04/2009 03/03/2010 114,593.00

007789 Completed ER-0902(287)(288) 097 Us 97, Blewett Pass Vicicinity- Emergency Flood Re Pipkin Inc., Dba Pipkin Constructio KEVIN WALIGORSKI 08/04/2009 04/07/2010 586,473.00

007790 Completed ARRA-9999(554) 002 Us 2 Et Al, Eastern Washington Centerline Rumble S North Star Enterprises 1, Inc. PAUL GONSETH 08/17/2009 01/06/2010 515,515.51

007791 Completed ARRA-9999(557) 005 I-5 Et Al, Western Washington- Cable Barrier Dirt And Aggregate Interchange, Inc CHRIS DAMITIO 08/07/2009 08/20/2010 889,919.00

007793 Completed ARRA-9999(556) 009 Sr 9 Et Al., Northwest Region - Centerline Rumble Apply-A-Line, Inc. DAVE LINDBERG 08/11/2009 07/15/2010 727,298.50

007794 Completed ARRA-0051(281) 005 I-5/ I-205 Jct To Dike Road - Cable Barrier Coral Construction Company PAUL GONSETH 08/17/2009 07/20/2010 1,227,777.00

007795 Completed ARRA-9999(558) 090 Thorpe Vic & Moses Lake - Cable Barrier Frank Gurney, Inc. ROBERT ROMINE 08/17/2009 01/05/2010 689,076.90

007796 Completed ARRA-NH-0051(278) 005 I-5, Sr 501 Ridgefield Interchange Tapani Underground Inc CHRIS TAMS 08/25/2009 12/28/2012 15,794,701.50

007797 Completed NH-0012(190) 012 Us12 1.4 Mi W Of White Pass Emergency Stg 2 Northwest Cascade, Inc. COLIN NEWELL 08/10/2009 03/22/2010 249,878.00

007798 Completed STATE 005 I-5, 5th Ave To Ne 92nd Noise Wall - Stage 2 Massana Construction, Inc. BRYANT BULLAMORE 08/24/2009 01/31/2014 1,475,061.00

007801 Completed STATE 005 I-5, Sb Military Rd O-Xing Bridge Deck Overlay Woodworth & Company, Inc. DAVE LINDBERG 08/18/2009 12/29/2009 263,900.18

007802 Completed BH-9999(538) 090 I-90 & Sr 520, Lake Washington Floating Bridges An General Construction Company JOHN CHI 08/26/2009 01/12/2011 2,925,184.00

007805 Completed NH-9999(506) 101 Us 101/Sr 109, Myrtle St To Endresen Ave & Us 101 Granite Construction Company SCOTT IRELAND 09/22/2009 04/05/2011 1,425,687.00

007806 Completed STATE-LOCAL 195 Us195, Cheney-Spokane Rd R-Turn Lane Cameron-Reilly Llc CHAD SIMONSON 08/18/2009 04/12/2010 214,177.25

007808 Completed BR-0101(276) 101 Us 101, Purdy Creek Mitigation R W Rhine, Inc. NEAL UHLMEYER 09/11/2009 01/19/2010 99,140.00

007809 Completed STATE 099 Sr 99, Bridge 99/560 Pedestrian Fence Massana Construction, Inc. ALETA BORSCHOWA 10/12/2009 10/18/2012 2,948,206.00

007810 Completed NH-ER-0902(278) 112 Sr 112 Emergency Slide Repair 9.4 Miles W Of Reyno Primo Construction, Inc. JERRY MOORE 09/15/2009 03/21/2010 757,766.43

007811 Completed STATE 520 Sr 520, Evergreen Point Bridge Vicinity- Pile Driv General Construction Company MARK SAWYER 09/25/2009 02/23/2010 766,504.00

007812 Completed STATE 520 Sr 520, Advanced Construction Methods And Engineer Quigg Bros., Inc. SCOTT IRELAND 09/15/2009 05/29/2012 2,756,201.15

007813 Completed STATE Systemwide On-Call Wingwall/Dolphin Repair American Construction Co., Inc. JOHN CALLAHAN 09/30/2009 06/30/2011 1,232,498.95

Dec 25, 2019 116 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007814 Completed STATE Anacortes Ferry Terminal, Holding Lanes Interwest Construction, Inc. JOHN CALLAHAN 09/22/2009 12/14/2009 185,680.00

007815 Completed STATE Terminal On-Call Maintenance Painting 09-11 Long Painting Company JOHN CALLAHAN 09/30/2009 07/15/2011 546,389.00

007816 Completed CM-0906(219) 090 I90 Sullivan Rd E To Vic Idaho Line Its Vic Idaho Colvico, Inc. DARREL MCCALLUM 11/03/2009 09/12/2011 913,269.00

007817 Completed ARRA-0195(047) 195 Us 195, Hatch Rd To Jct I-90 - Dowel Bar Retrofit Acme Concrete Paving, Inc. CHAD SIMONSON 11/10/2009 03/29/2011 2,449,266.12

007819 Completed STPF-0097(129) 097 Us 97a, N Of Wenatchee Stabilize Slope Slope Stabi Hi Tech Rockfall Construction, Inc. ROBERT ROMINE 10/21/2009 11/29/2011 3,664,568.94

007820 Completed ITS-9999(509) 520 Sr520 Et Al, Lake Wa Congest Mgmt E Side Signs Eas Elcon Corporation MARK SAWYER 10/27/2009 06/05/2012 1,251,953.00

007821 Completed STATE 002 Us 2 N Glen Elk Chatteroy Rd I/S Improve - Cpm Development Corporation BOB HILMES 10/28/2009 10/13/2010 379,000.00

007822 Completed ARRA-0053(949) 005 I-5, Martin Way To 48th St- Nb And Sb Concrete Pav Penhall Company NEAL UHLMEYER 11/23/2009 06/15/2011 8,404,077.30

007826 Completed BR-0520(043) 520 Sr 520 Pontoon Construction Design-Build Project General Construction Co. DEWAYNE MATLOCK 02/12/2010 01/21/2016 367,330,000.00

007827 Completed ER-0903(027) 097 Us 97, Beebe Bridge 97/240 Emergency Repair Klm Construction, Inc. BRANTLEY BAIN 09/05/2009 02/14/2011 500,000.00

007828 Completed STPUL4001(001) Havana Street Overcrossing Phase 1 Noble Excavating, Inc. DARREL MCCALLUM 11/16/2009 02/07/2011 595,705.00

007830 Completed STATE 016 Sr16 Union Ave To Jackson Ave- Roadside Restoratio Watershed Environmental RUMINA SUAFOA 11/23/2009 05/15/2012 1,252,319.04

007831 Completed STATE Seattle Ferry Terminal Slip 2 Overhead Loading- De Vetch Construction Llc JOHN CALLAHAN 11/13/2009 04/22/2010 147,694.00

007832 Completed STATE 028 Sr28/Us2/Us97, Intersection Improvements Box Culve Selland Construction, Inc. ROBERT ROMINE 11/02/2009 02/14/2011 734,927.20

007833 Completed STPF-9999(529) Nc Region, Guardrail Update 2010 Frank Gurney, Inc. KEVIN WALIGORSKI 11/24/2009 09/02/2010 369,013.25

007834 Completed ARRA-0008(012) 008 Sr 8, Elma To Us 101 Cable Barrier Petersen Brothers, Inc. SCOTT IRELAND 11/18/2009 09/13/2010 1,414,731.43

007835 Completed STATE 005 I-5, Sr 432, Talley Way Interchange Northwest Construction, Inc. LORI FIGONE 01/05/2010 04/16/2015 20,528,756.00

007836 Completed STATE Pccra Cw Branch Fence Replacement Northwest Fence Company CHAD SIMONSON 12/22/2009 05/04/2010 256,669.25

007837 Completed STATE 099 Sr99, E Marginal Way & Ellis Ave S- To N 145th St Signal Electric Inc JOHN CHI 11/25/2009 10/20/2011 2,408,537.88

007838 Completed STPH-0024(026) 026 Sr 26, Othello At First St I/S Improvements Stage Mrm Construction, Inc. ROBERT ROMINE 11/23/2009 12/08/2010 398,712.00

007839 Completed STATE 022 Sr 22, I-82 To Toppenish - Irrigation Irrigation Steele Trucking Inc. WILL SMITH 12/03/2009 05/14/2010 148,498.50

007840 Completed STATE Ncr Intersection Illumination 2010 Mccandlish Electric Inc KEVIN WALIGORSKI 12/09/2009 06/10/2010 163,704.00

007842 Completed STATE Seattle Ferry Terminal Fire Sprinkler Repairs Anderson-Magruder Co. JOHN CALLAHAN 12/22/2009 04/12/2010 125,999.00

007843 Completed IM-0901(460) 090 I-90, Bellevue Way Interchange Ramps- Paving Lakeside Industries, Inc. HIEN TRINH 12/10/2009 08/22/2011 1,079,865.67

007844 Completed STATE 099 Sr 99 Et Al, 1st Ave S To S 112th St And S 120th S Signal Electric Inc DAVE LINDBERG 12/14/2009 08/19/2013 2,482,582.10

007845 Completed FT56001 Seattle Ferry Terminal- Slip 1 Seismic Retrofit General Construction Company JOHN CALLAHAN 12/09/2009 04/02/2010 82,255.00

007846 Completed FT56001 Edmonds Ferry Terminal Seismic Retrofit Manson Construction Co. JOHN CALLAHAN 12/09/2009 04/02/2010 40,400.00

Dec 25, 2019 117 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007847 Completed PNRS-0099(096)97( 099 Sr 99, Alaskan Way Viaduct - Replacement S Holgate Skanska Usa Civil West California PAUL JOHNSON 05/24/2010 02/11/2015 114,569,194.25

007848 Completed STPF-9999(561) 017 Ncr Seal 2010 Granite Northwest Inc ERIC PIERSON 01/04/2010 03/07/2011 4,149,149.00

007849 Completed ARRA-IM-0901(478) 090 I-90, Two-Way Transit & Hov Operations- Dowel Bar Interstate Improvement Inc MARK SAWYER 01/08/2010 10/21/2010 7,591,034.17

007850 Completed STATE 027 Sr27, Replace Pine Creek Bridge Thompson Bros. Excavating, Inc. CHAD SIMONSON 02/08/2010 06/06/2013 2,301,453.50

007851 Completed STATE Keystone Ferry Terminal Wingwall Replacement American Construction Co., Inc. JOHN CALLAHAN 12/18/2009 07/02/2010 987,617.00

007852 Completed STATE 090 I-90, Hyak To Snowshed Vicinity Phase 1b- Add Lane Max J. Kuney Company WILL SMITH 02/08/2010 12/01/2014 76,699,232.66

007853 Completed ARRA-IM-0051(283) 005 I-5 N Kelso To Harrison Paving & Safety Kerr Contractors Oregon, Inc. DENYS TAK 02/02/2010 09/02/2011 6,191,301.98

007855 Completed CMAQ-0014(060) 014 Sr 14, East Of I-5 & I-205 Atis Infill Mill Plain Electric, Inc. CHAD HANCOCK 01/19/2010 05/23/2011 665,000.00

007856 Completed STATE 203 Sr 203 Corridor Safety Improvements King & Snohomi Tri-State Construction Inc CHAD BROWN 01/22/2010 09/12/2012 2,968,786.68

007857 Completed NH-0002(287) 002 Us 2, Stevens Pass Summit- Pedestrian Safety Tri-State Construction Inc PIERSON/PATRICK 01/11/2010 01/21/2014 1,785,325.20

007858 Completed ARRA-0822(128) 082 I-82, Valley Mall Blvd. Interchange Rebuild Interc Apollo Inc JEFF MINNICK 03/10/2010 10/16/2013 19,079,869.61

007859 Completed STATE 011 Sr 11, I-5 Interchange - Josh Wilson Rd Rebuild In Interwest Construction, Inc. HAMMER/SPAHR 02/19/2010 04/01/2014 4,794,882.15

007860 Completed IM-0053(946) 005 I-5 Reverse Express Lane To/From Sr 522- Safety Petersen Brothers, Inc. JOHN CHI 01/11/2010 06/02/2011 468,993.12

007861 Completed NH-0014(051) 014 Sr 14 Rockfall Mitigation- White Salmon Vicinity Hi Tech Rockfall Construction, Inc. CHRIS TAMS 01/26/2010 08/22/2011 2,398,717.50

007862 Completed NH-0906(210) 090 I-90 Spokane Poe Weigh Station Relocation Selland Construction, Inc. CHAD SIMONSON 03/05/2010 05/05/2015 6,704,332.55

007864 Completed BR-0241(026) 241 Sr 241 Dry Creek- Construction Box Culvert Apollo Inc MOE DAVARI 01/27/2010 08/05/2010 299,348.10

007865 Completed IMG-0053(952) 005 I-5 Berkley St To 47th Ave Sw- Median Barrier Repl Petersen Brothers, Inc. NEAL UHLMEYER 02/02/2010 03/10/2011 852,344.43

007866 Completed STATE 410 Sr 410/ 214th Ave E To 234th Ave E- Widening J. R. Hayes & Sons, Inc. MARYLOU NEBERGALL 03/01/2010 04/04/2014 6,783,945.32

007867 Completed STATE 520 Sr 520-Pontoon, Anderson And Middleton- Site Resto Steele Trucking Inc. SCOTT IRELAND 02/02/2010 05/17/2010 286,703.80

007869 Completed ARRA-IM-0051(270) 005 I-5/Todd Rd., To Kelso Weigh Station Vic Paving An Lakeside Industries, Inc. LEON WINGER 03/17/2010 01/20/2011 4,579,035.14

007870 Completed LOCAL&SOUNDTRANSI 090 I-90, Two-Way Transit & Hov Operations Stage 2 Gary Merlino Construction Co., Inc. SAWYER/TRINH 03/22/2010 07/17/2013 11,578,632.30

007871 Completed STATE 026 Sr 26, W Of Othello- Passing Lane Selland Construction, Inc. ROBERT ROMINE 02/11/2010 02/07/2011 608,774.15

007872 Completed STPULFMSIBFRA4001 Havana St Overcrossing Phase 2 Phase 2 Graham Construction & DARREL MCCALLUM 03/23/2010 04/14/2015 7,874,534.21

007873 Completed STATE 005 I-5, Ship Canal Bridge Noise Study Penhall Company MARK SAWYER 02/22/2010 03/15/2011 1,560,038.00

007874 Completed CBI-IMD-OO55(227) 005 I-5, Blaine Exit Interchange Improvements Interwest Construction, Inc. CHRIS DAMITIO 03/02/2010 03/21/2014 2,765,789.35

007875 Completed STATE 542 Sr 542, Ced/ E Church Mt Rd-Roadway Realignment Interwest Construction, Inc. CHRIS DAMITIO 02/26/2010 06/15/2012 2,138,448.20

007876 Completed STATE 142 Sr 142, Sr 14 To Us 97 Roadside Safety- Phase 2 James Dean Construction, Inc. CHAD HANCOCK 02/17/2010 10/13/2010 721,771.00

Dec 25, 2019 118 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007879 Completed STATE 510 Sr 510 Yelm Loop Stage 1 Stage 1 Scarsella Bros., Inc. NEAL UHLMEYER 03/24/2010 01/10/2013 4,146,936.01

007880 Completed NH0512(015) 512 Sr 512, I-5 To 108th St. S.- Paving Tucci & Sons, Inc. MARYLOU NEBERGALL 03/01/2010 05/16/2011 1,147,246.75

007881 Completed STATE 020 Sr 20 & 525, Roadside Safety Improvement Coral Construction Company DAVE CRISMAN 02/19/2010 11/17/2010 557,777.00

007882 Completed STATE 503 Sr 503 Lewisville Park Vic Climbing Lanes Rotschy, Inc. LEON WINGER 04/05/2010 04/25/2011 3,701,706.53

007883 Completed STATE 082 I-82, Terrace Heights Off Ramp Improvements Granite Northwest Inc PAUL GONSETH 03/18/2010 02/15/2011 381,381.10

007884 Completed STATE Seattle Ferry Term Lobby Restroom Remodel Tec Construction, Inc. MARK SCOTT 03/18/2010 08/05/2010 57,900.00

007885 Completed ARRA-IM-0822(132) 082 I-85 Granger To Grandview Concrete Rehab Penhall Company MOE DAVARI 03/19/2010 03/15/2011 4,798,496.52

007886 Completed STATE Anacortes Ferry Term Holding Lanes Paving Cemex Construction JOHN CALLAHAN 03/23/2010 06/18/2010 154,793.20

007887 Completed ARRA-FT-56-0001 Vashon Island Ferry Term Seismic Retrofit Mcclure And Sons, Inc. JOHN CALLAHAN 04/06/2010 12/27/2010 47,751.00

007888 Completed ARRA-FT-56-001 Bainbridge Island Term Seismic Retrofit Mowat Construction Company JOHN CALLAHAN 03/25/2010 11/02/2010 49,859.00

007889 Completed NH-0004(210) 004 Germany Creek Vic Rockfall Prevention Granite Construction Company DENYS TAK 03/24/2010 08/17/2010 109,806.00

007890 Completed STATE 016 Sr 16 6th Ave W/B Off-Ramp Noise Wall Repair Tri-State Construction Inc RUMINA SUAFOA 03/22/2010 03/14/2011 333,079.15

007892 Completed ARRA/STPF-9999(555) 006 Sr 6 Et Al., Western Washington - Centerline Rumbl North Star Enterprises 1, Inc. PAUL GONSETH 03/17/2010 01/10/2011 630,418.20

007894 Completed ER-0601(007) 530 Sr 530 Skaglund Hill Slide Wetland Mitigation Trimaxx Construction, Inc. DAVE CRISMAN 04/07/2010 06/07/2012 593,288.40

007895 Completed ARRA-BH-0433(010) 433 Sr 433, Lewis And Clark Bridge Superstructure Pain Odyssey/Geronimo Jv LORI FIGONE 06/08/2010 05/26/2015 33,774,714.00

007896 Completed STPF-0112(021) 112 Sr 112, Murphy Rd To Charlie Creek-Weel Rd- Pedest Larry Brown Construction, Inc. JERRY MOORE 03/25/2010 07/07/2010 82,281.12

007897 Completed ARRA-NH-0195(045) 195 Us 195, Idaho State Line To Colton - Paving Poe Asphalt Paving, Inc. CHAD SIMONSON 05/06/2010 03/31/2011 2,014,005.15

007898 Completed STATE Seattle Ferry Term Anchor Chain Replacement Richard Phillips Marine TOM CASTOR 04/26/2010 09/30/2010 147,244.98

007899 Completed ARRA-NHG-0395(090 395 Us 395, Wandermere To Vicinity Half Moon Rd - Medi Frank Gurney, Inc. BOB HILMES 05/03/2010 11/18/2010 541,792.00

007900 Completed ARRA-NH-9999(577) 097 Ncr Seal 2010 - Stage 2 Central Washington Asphalt, Inc. ROBERT ROMINE 04/07/2010 04/26/2011 2,821,498.76

007901 Completed ARRA-IM-NH-9999(5 005 I-5 Et Al, State-Wide Cable Barrier Coral Construction Company PAUL GONSETH 04/12/2010 01/18/2011 1,347,777.00

007902 Completed STATE 169 Sr 169 & 900 - Roadside Safety Improvements Coral Construction Company JOHN CHI 04/07/2010 02/28/2011 637,777.00

007903 Completed STATE 005 I-5, Blakeslee Junction Rr Xing To Grand Mound I/C Tri-State Construction Inc COLIN NEWELL 05/10/2010 06/30/2014 19,730,514.90

007904 Completed NH-0395(087) 395 Us395, Spokane-Stevens Cty - Paving/Safety County Cpm Development Corporation CHAD SIMONSON 04/27/2010 04/08/2011 4,076,235.00

007906 Completed ARRA-SPTF-0097(14 097 Us97, Chelan Falls Passing Lane & Seal Passing Lan Granite Construction Company ERIC PIERSON 04/19/2010 05/17/2011 1,622,622.00

007907 Completed STPF-NH-9999(573) 101 Us 101 & Sr 105, State Hiways, Bst Overlay Columbia Asphalt & Gravel, Inc. SCOTT IRELAND 04/08/2010 06/24/2011 1,122,334.95

007908 Completed IM-0901(450) 090 I-90, Mt Baker Tunnel & Mercer Island Lid Plc Rep Totem Electric Of Tacoma, Inc. MIKHAIL BRUSSER 05/10/2010 07/23/2012 1,380,004.00

Dec 25, 2019 119 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007910 Completed ARRA-STPF-0503(02 503 Sr 503, One Mile E Of Rock Cr Br To Fredrickson Rd Kerr Contractors Oregon, Inc. DENYS TAK 05/04/2010 02/09/2011 1,785,725.69

007911 Completed STATE 542 Sr 542, Gallup Creek Bridge Replacement Scarsella Bros., Inc. CHRIS DAMITIO 04/28/2010 06/10/2013 2,707,707.07

007912 Completed STATE 003 Sr 3, Old Sr 3 To 0.4 Miles S. Of Anderson Hill Rd Granite Construction Company JERRY MOORE 04/23/2010 10/14/2011 1,741,830.40

007914 Completed ARRA-NH-9999(576) 101 Us 101 Et Al, Olympic Reg. Cable Barrier Coral Construction Company SCOTT IRELAND 04/28/2010 03/03/2011 769,967.00

007915 Completed STPF9999(544) 021 Eastern Region, Chip Seal 2010 Central Washington Asphalt, Inc. CHAD SIMMONSON 05/04/2010 05/04/2011 6,683,574.35

007916 Completed STATE 002 Us 2 Safety Improvements Vetch Construction Llc DAVE CRISMAN 05/18/2010 04/18/2014 2,932,708.10

007917 Completed IM-0901(461) 090 I90, Sunset Way Connection I/C Mods Tri-State Construction Inc HIEN TRINH 05/19/2010 07/22/2013 1,305,983.00

007919 Completed STPUL0054(279) 005 I-5, 164th St Sb Off Ramp Channelization Signal Electric Inc CHAD BROWN 04/27/2010 09/03/2013 155,778.30

007920 Completed STATE 009 Sr 9, Lundeen Parkway To Sr 92 Intersection Improv Granite Construction Company DAVE CRISMAN 06/10/2010 03/20/2015 10,921,000.00

007921 Completed STPF-0516(021) 516 Sr 516, 160th Ave To Covington City Limits - Pavin Lakeside Industries, Inc. MARK SAWYER 06/02/2010 06/02/2011 1,079,312.62

007922 Completed STATE Shaw Dolphin Project General Construction Co. JOHN CALLAHAN 05/12/2010 01/13/2011 1,878,998.00

007925 Completed STATE 090 I-90,Sr 520, Br90/50n & Sr 520/I-405 Vicinity Seis Guy F. Atkinson Construction, Llc. JOHN CHI 05/28/2010 04/02/2013 3,728,681.76

007926 Completed BR-0303(005) 303 Sr 303, Manette Bridge 303/4a - Bridge Replacement Manson-Mowat, A Joint Venture MICHELE BRITTON 06/24/2010 07/25/2013 44,127,374.00

007927 Completed IM-0051(282) 005 I5, Sw Region Pavement Markings Apply-A-Line, Inc. LEON WINGER 04/30/2010 10/04/2010 156,511.60

007929 Completed NH-0016(017) 016 Sr 16, Tacoma Narrows Bridge Electrical Signal Electric Inc RUMINA SUAFOA 06/08/2010 03/07/2013 1,933,142.00

007931 Completed STPF-0124(015) 012 Us12,Sr124 Burbank Vicinity - Paving Granite Northwest Inc MOE DAVARI 05/24/2010 12/03/2010 832,204.25

007932 Completed IM-0906(223) 090 I-90 Broadway I/C Signal System Rehab Colvico, Inc. BOB HILMES 05/18/2010 01/19/2011 117,154.00

007933 Completed STPF-9999(579) 012 Us 012 Et Al 2010 Region Wide Chip Seal Granite Northwest Inc PAUL GONSETH 05/13/2010 03/03/2011 2,098,098.00

007934 Completed STATE 005 I-5, Variable Message Signs Replacement Signal Electric Inc JANICE FAHNING 05/26/2010 03/07/2013 500,874.00

007935 Completed STATE 090 I90, Keechelus Dam To Cabin Creek Wb - Paving Granite Northwest Inc WILL SMITH 06/07/2010 01/21/2011 1,980,480.00

007936 Completed STATE 005 I-5, Sr 161/Sr 18 Interchange Improvements Mowat Construction Company ALETA BORSCHOWA 07/08/2010 07/01/2015 50,778,922.50

007937 Completed NH-0003(114) 003 Sr3/Sr104 Hood Canal Bridge Vicinity Improvements Signal Electric Inc JEFF COOK 06/08/2010 12/08/2011 330,454.00

007938 Completed STATE 522 Sr 522, Us 2 Interchange Flyover Ramp Scarsella Bros., Inc. DAVE V. LINDBERG 06/15/2010 07/13/2015 15,514,435.30

007939 Completed NH-0012(197) 012 Us12 Elma Vic To Old Hwy 9 Sw - Paving & Centerlin Granite Construction Company SCOTTY IRELAND 06/07/2010 05/17/2011 1,453,914.70

007940 Completed (STPF)ER-0902(242) 018 Sr18, Issaquah-Hobart Rd - Retaining Wall Repair Sb Structures Llc ALETA BORSCHOWA 05/28/2010 08/17/2012 935,794.25

007941 Completed ER-0902(236) 542 Sr542 Marshall Hill Rd - Culvert Replacement Interwest Construction, Inc. MARK HAMMER 06/02/2010 05/24/2012 311,928.00

007942 Completed STPF-0006(020) 006 Sr 6, Pe Ell To I5, With Exceptions - Paving With Lakeside Industries, Inc. COLIN NEWELL 07/13/2010 02/24/2011 1,969,190.70

Dec 25, 2019 120 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007944 Completed NH-0305(016) 305 Sr305 Unnamed Tributary & Bjorgen Creek - Fish Pas Frank Coluccio Construction JERRY MOORE 05/28/2010 01/12/2012 3,847,643.00

007945 Completed STATE 005 I-5, 196th St (Sr 524) I/C Sb Braided Ramp Northwest Construction, Inc. MARK SAWYER 07/15/2010 11/24/2015 18,727,000.00

007946 Completed STATE 005 I-5, Portland Ave To Port Of Tacoma Rd - Nb Hov St Scarsella Bros., Inc. NEAL UHLMEYER 07/07/2010 10/13/2014 16,392,704.34

007947 Completed NH-0303(011) 303 Sr303, Port Washington Narrows Bridge - Bridge Rai C.A. Carey Corporation JEFF COOK 06/29/2010 04/29/2011 1,169,752.00

007948 Completed STATE 529 Sr 529, Ebey Slough Br - Replace Bridge Granite Construction Company MARK SAWYER 07/02/2010 01/11/2017 21,541,000.00

007950 Completed NH-0101(323) 101 Us 101, Chehalis River Bridge To Oak St Paving Granite Construction Company SCOTTY IRELAND 06/29/2010 05/17/2011 990,545.60

007951 Completed STATE 090 I-90, Eb West Portal Mercer Island Lid Drainage Re Award Construction, Inc. HIEN TRINH 06/24/2010 01/31/2012 303,451.13

007953 Completed NH-0101(320) 101 Us 101, Simdars Rd To Old Gardiner Rd Paving Lakeside Industries, Inc. JERRY MOORE 07/07/2010 06/29/2011 2,279,711.80

007954 Completed STATE 090 I-90, Intelligent Transportation System - Flow Map Signal Electric Inc RICK F. GIFFORD 07/07/2010 03/11/2013 499,728.32

007955 Completed ER-0902(346) 508 Sr 508 Davison Rd Vic Bank Erosion Repair Granite Construction Company COLIN NEWELL 07/02/2010 02/28/2011 821,644.31

007956 Completed NH-0002(309) 002 Regionwide Crack Sealing Crack Sealing Central Washington Asphalt, Inc. CHAD SIMONSON 07/07/2010 02/22/2011 834,004.25

007957 Completed STATE 097 Us 97 Blewitt Pass - Passing Lane Granite Construction Company PIERSON/PATRICK 07/20/2010 04/14/2012 881,188.00

007958 Completed NH-0028(044) 028 Sr 28, East Wenatchee To Rock Island Paving Granite Construction Company KEVIN WALIGORSKI 07/29/2010 07/05/2011 2,274,274.00

007959 Completed NH-0099(109) 099 Sr 99, S Hudson St To Ward St Automated Viaduct Cl Signal Electric Inc DAVE LINDBERG 08/18/2010 09/25/2013 1,434,793.73

007960 Completed STPF-0097(151) 097 Us 97a, North Of Wenatchee - Wildlife Fence - 2010 Wesslen Construction, Inc. KEVIN WALIGORSKI 07/16/2010 04/20/2011 342,584.42

007961 Completed STATE Vashon Ferry Terminal, Timber Trestle Pr Manson Construction Co. JOHN CALLAHAN 07/12/2010 02/11/2011 672,944.00

007962 Completed IM-ITS-0055(238) 005 I-5 Downtown Bellingham On/Off Ramps - Ramp Recons Vetch Construction Llc CHRIS DAMITIO 09/07/2010 08/15/2014 4,439,672.03

007963 Completed STATE 520 Sr 520, Eastside Transit And Hov Project A Design Eastside Corridor Constructors MARK ALLISON 11/29/2010 06/17/2019 306,278,000.00

007964 Completed STATE 525 Mukilteo Ferry Terminal Floating Dolphin General Construction Company JOHN CALLAHAN 07/30/2010 06/17/2011 1,993,750.00

007967 Completed TIGER-0395(091) 395 Us 395, Nsc - Freya St To Farwell Rd Sb Additional Graham Construction & BOB HILMES 08/17/2010 01/13/2015 21,455,920.65

007968 Completed ER-1002(008) 018 Sr 18, Peasley Canyon Vic Unstable Slope (Re-Adver Cpm Development Corporation MARK SAWYER 07/15/2010 06/30/2011 495,800.00

007971 Completed ARRA/IM-0902(315) 090 I-90, Lake Easton Vic To Big Creek Br Vic Eb - Rep Cpm Development Corporation SCOTT GOLBEK 08/18/2010 05/28/2014 14,807,102.55

007972 Completed NH,ARRA-0014(068) 014 Sr 14, I-5 To 164th Ave Interchange Paving Kerr Contractors Oregon, Inc. CHRIS TAMS 07/26/2010 11/14/2011 3,042,697.50

007973 Completed NH-0432(014) 432 Sr 432, 38th Ave Signal Replacement Mill Plain Electric, Inc. DENYS TAK 08/16/2010 11/03/2011 353,030.61

007974 Completed STATE 005 I-5 Tacoma Hov Mitigation Scarsella Bros., Inc. RUMINA SUAFOA 07/30/2010 06/03/2013 1,487,229.43

007975 Completed STPF-9999(562) 101 Us 101/Sr 112, 2010 Olympic Region Centerline Rumb Apply-A-Line, Inc. JERRY MOORE 07/26/2010 02/03/2011 285,498.59

007976 Completed NH-0002(097) 002 Us 2, Euclid Ave To Francis Ave Paving - Rebid Cpm Development Corporation BOB HILMES 08/26/2010 07/13/2012 2,383,719.15

Dec 25, 2019 121 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

007977 Completed HSIP-PFH-0014(040 014 Sr14, Cape Horn Br Vic To Cape Horn Rd Safety Impr Rotschy, Inc. CHRIS TAMS 10/14/2010 02/21/2013 4,333,222.11

007978 Completed STATE 020 Sr 20, Wauconda Summit East - Pavement Repair Granite Northwest Inc ROBERT ROMINE 07/29/2010 11/05/2010 711,117.00

007979 Completed STATE Systemwide Counterweight Cable Replacement Manson Construction Co. JOHN CALLAHAN 08/19/2010 03/03/2011 465,899.00

007980 Completed STATE 532 Sr 532, Pioneer Highway To 72nd Ave Nw - Sidewalk Interwest Construction, Inc. ROBYN BOYD 08/03/2010 03/07/2011 114,383.00

007983 Completed STATE Pt Townsend Slip Timber Dolphin Replace Const American Construction Co., Inc. JOHN CALLAHAN 08/26/2010 06/21/2011 1,663,275.00

007984 Completed STPF-0105(020) 105 Sr 105, Norris Slough Culvert Replacement Boss Construction Inc COLIN NEWELL 09/07/2010 09/13/2013 1,765,584.61

007985 Completed STATE 2010 Pcc Drainage Rehabilitation Railworks Track Systems, Inc. CHAD SIMONSON 09/08/2010 03/06/2012 767,641.00

007986 Completed STATE Seattle Terminal Sheet Pile Wall Repair Imco General Construction, Inc. JOHN CALLAHAN 09/03/2010 12/21/2010 201,819.00

007987 Completed TCSP-9999(509) 520 Sr 520 Evergreen Point Floating Bridge Toll Signin Elcon Corporation BRYANT BULLAMORE 09/10/2010 08/23/2012 452,646.00

007988 Completed STATE Eastmont Extension Stg 3 Canyon B Bridge Cascade Bridge Llc PIERSON/PATRICK 07/20/2010 06/20/2013 5,988,865.50

007989 Completed NH-2010(029) 020 Anacortes Terminal Upland Holding/Traffic Interwest Construction, Inc. JOHN CALLAHAN 10/12/2010 09/23/2011 964,901.00

007990 Completed STATE 090 I-90 Indian John Hill Vicinicy Wb - Pavement Repai Granite Northwest Inc WILL SMITH 09/07/2010 01/17/2011 139,299.00

007992 Completed NH-2010(030) 104 Edmonds Ferry Term Trestle Pavement Preserv Granite Construction Company JOHN CALLAHAN 10/29/2010 08/10/2011 228,079.00

007993 Completed ER-1001(003) 410 Sr 410 Detour, Carmack Lane - Approach Improvement Petersen Brothers, Inc. PAUL GONSETH 09/27/2010 01/11/2011 39,826.75

007996 Completed STATE 525 Sr 525 Nb Front St I/Section Signal & R Turn Signa Klb Construction, Inc. JOHN CALLAHAN 10/04/2010 08/18/2011 212,182.00

007997 Completed BH-0906(224) 090 I-90 Spokane Viaduct Column Repair Max J. Kuney Company CHAD SIMONSON 09/16/2010 02/22/2011 69,815.00

007998 Completed NICKEL_FUNDS 005 I-5, Grand Mound To Maytown Stage Two - Replace In Tri-State Construction Inc ENGEL/NEBERGALL 12/14/2010 03/18/2016 15,517,831.55

007999 Active **-0099(111/113) 099 Sr 99, Bored Tunnel Alternative - Design Build Pro Seattle Tunnel Partners CHRIS BROWN 01/06/2011 1,089,700,002.00

008000 Completed STATE 163 Sr 163, Point Defiance Security Gate Insp Trestle Mowat Construction Company JOHN CALLAHAN 10/13/2010 06/22/2011 62,699.00

008001 Completed STATE 101 Us 101, Simpson Avenue Bridge Interim Pier Stabili Rognlin'S, Inc. SCOTTY IRELAND 08/13/2010 03/03/2011 1,300,000.00

008003 Completed STATE Pcc Bridge Rehabilitation M.J. Hughes Construction, Inc. CHAD SIMONSON 10/12/2010 12/06/2012 414,004.00

008004 Completed STPF-0021(017) 021 Sr 21, 1 Mile N Of Manila Creek Rd - Slope Stabili Northwest Cascade, Inc. BOB HILMES 10/13/2010 04/04/2011 470,795.00

008005 Completed HSIP-IM-NH-9999(5 005 Sr 3,5,7,12,101,105,512 Olympic Region Basic Safet Petersen Brothers, Inc. SCOTT IRELAND 11/02/2010 04/02/2012 1,703,588.43

008007 Completed STATE 302 Sr 302, Key Peninsula Hwy To Purdy Vic - Safety An Totem Electric Of Tacoma, Inc. JEFF COOK 11/09/2010 04/28/2011 151,214.50

008008 Completed IM-0999(602) 205 I-205,I-5 Clark County Ramp Paving Wildish Standard Paving Co LEON WINGER 11/09/2010 12/15/2011 2,193,673.00

008010 Completed LOCAL_GCA6522 532 Sr 532, North Leque Island Slope Protection Klb Construction, Inc. ROBYN BOYD 11/01/2010 03/24/2011 194,421.25

008011 Completed NHG-0195(051) 195 Us195, Cashup Flats-Sr271 Improve Guardrail Guardr Frank Gurney, Inc. BOB HILMES 10/06/2010 04/26/2011 795,836.18

Dec 25, 2019 122 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008012 Completed STATE 020 Sr 20, Red Cabin Creek - Ced Interwest Construction, Inc. HAMMER/SPAHR 11/16/2010 05/14/2013 1,939,941.40

008013 Completed ARRA-0026(031) 026 Sr 26 Grant County Line To Sr 17 Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 10/28/2010 03/26/2012 1,594,632.03

008015 Completed STPF-9999(604) 020 Eastern Region Chip Seal 2010 2010 - Hma Conversio Central Washington Asphalt, Inc. CHAD SIMONSON 12/01/2010 01/10/2013 6,307,668.72

008016 Completed IM-0055(242) 005 I-5, Joe Leary Slough To Nulle Rd Vic Paving Desig Granite Construction Company PATRICK FULLER 02/18/2011 01/13/2017 14,553,000.00

008017 Completed ARRA-NH-0395(092) 395 Us395, Lee Rd To Jct I-90, Paving Central Washington Asphalt, Inc. CHAD SIMONSON 11/12/2010 06/26/2012 4,723,890.55

008018 Completed IM-0906(225) 090 I-90 Geiger Rd To Spokane Viaduct Pccp Rehab Pccp Acme Concrete Paving, Inc. CHAD SIMONSON 11/22/2010 11/07/2013 7,849,447.77

008019 Completed NH-2010(028) 525 Sr 525, Mukilteo Transfer Span Mech/Elect System Razz Construction, Inc. JOHN CALLAHAN 11/10/2010 08/10/2011 826,480.00

008020 Completed NH-2010(031) 020 Anacortes Ferry Term O/Head Loading Rehab Overhead Razz Construction, Inc. JOHN CALLAHAN 11/15/2010 11/18/2011 698,999.00

008021 Completed STATE 021 1.4 Mi N Of Manila Cr Rd, Stabilize Slope Slope St Midwest Rockfall Inc BOB HILMES 11/17/2010 04/20/2011 314,247.00

008022 Completed NH-0906(226) 090 I-90 Sullivan Rd To Barker Rd Additional Lanes Acme Concrete Paving, Inc. DARREL MCCALLUM 12/22/2010 01/05/2017 14,949,578.24

008023 Completed STATE 090 I-90, Wb Altamont Variable Message Sign Replace Si Aztech Electric Inc DARREL MCCALLUM 11/03/2010 10/18/2011 145,284.00

008024 Completed STPF-9999(605) 002 Ncr Traffic Controller Replacement 2011 Mccandlish Electric Inc KEVIN WALIGORSKI 11/16/2010 06/27/2011 367,504.00

008027 Completed IM-0054(278) 005 I-5/Sr 532 To Hill Ditch Br - Signing Coral Construction Company DAVE CRISMAN 11/19/2010 06/07/2011 150,000.00

008028 Completed IM-0822(133) 082 I-82, Yakima River Br Vic To Granger - Dowel Bar R Interstate Improvement Inc MOE DAVARI 01/11/2011 04/16/2012 10,118,866.42

008029 Completed STATE/LOCAL 823 Sr 823, Selah Vicinity - Reroute Highway (Re-Ad) Hurst Construction Llc JEFF MINNICK 12/08/2010 10/03/2013 3,573,162.05

008031 Completed STPF-0017(039) 017 Sr 17, Moses Lake Vicinity - Median Barrier Tri-State Construction Inc PIERSON/PATRICK 12/13/2010 05/24/2013 1,257,232.00

008032 Completed STATE 101 Us 101, Simpson Avenue Bridge - Pier Repairs - Eme Quigg Bros., Inc. SCOTTY IRELAND 10/29/2010 05/02/2011 4,058,703.00

008033 Completed STATE 012 Us 12, Sr 124 Intersection - Build Interchange Selland Construction, Inc. MOE DAVARI 02/25/2011 10/15/2013 11,478,642.61

008034 Completed STPF-9999(568) 002 Us 2, Us 97, Us 97a, Sr 28, Sr 150, Sr 207 & Sr 28 Construction Ahead, Inc. Dba BOB ROMINE 12/10/2010 09/26/2011 334,754.00

008035 Completed STPF-NH-0529(016) 529 Sr 529, Bnsf Rr Br 529/006 To North Access Road Pa Lakeside Industries, Inc. JANICE FAHNING 01/07/2011 03/26/2012 774,134.00

008038 Completed BH-0052(205) 005 I-5, Capital Blvd Bridge - Upgrade Bridge Rail Cascade Bridge Llc MARYLOU NEBERGALL 12/10/2010 03/17/2012 518,762.75

008039 Completed NHG-0195(050) 195 Us195, Vic Cornwall To Jct I-90 Median Barrier Coral Construction Company BOB HILMES 12/10/2010 07/18/2011 287,777.00

008040 Completed STATE 022 Sr 22, I-82 To Toppenish - Irrigation Phase 1b Tapani Underground Inc PAUL GONSETH 12/10/2010 02/22/2012 384,192.75

008041 Completed USFS_GRANT_WA_PFH 002 Us 2, Stevens Pass Recessed Plastic Edge Lines Specialized Pavement Marking Inc. PIERSON/PATRICK 12/14/2010 01/18/2012 287,168.00

008043 Completed STATE 020 Sr 20 Keystone Ferry Term Seismic Retrofit Epic Construction Llc JOHN CALLAHAN 12/22/2010 05/13/2011 30,602.00

008044 Completed STATE Bremerton Ferry Term Slip 1 Seismic Retrofit Redside Construction JOHN CALLAHAN 12/27/2010 08/22/2011 55,498.00

008045 Completed STATE 028 Sr 28, Us 2/97 Intersection Improvements Selland Construction, Inc. BOB ROMINE 12/29/2010 01/16/2013 3,829,670.00

Dec 25, 2019 123 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008046 Completed IM-0905(100) 090 I-90 Ritzville To Tokio Pave Outside Lanes Paving Poe Asphalt Paving, Inc. BOB HILMES 01/05/2011 02/22/2012 2,427,550.92

008047 Completed STATE 005 I-5, Exit 111 Lacey Vic. Noise Walls Mowat Construction Company MARYLOU NEBERGALL 01/28/2011 05/07/2013 2,867,054.20

008048 Completed STPF-9999(610) 011 Sr 11, Sr 20 Wsp Entrance Vic To Cook Rd Rocky Cr Granite Construction Company MARK HAMMER 01/03/2011 05/01/2012 597,597.00

008049 Completed STATE 012 Us 12, Allan Rd - Intersection Improvements Granite Construction Company BILL PRESTON 01/11/2011 02/22/2012 379,379.00

008050 Completed STPF-9999(584) 017 Sr 17, Sr 174, Sr 28 Ncr Seal 2011 Columbia Asphalt & Gravel, Inc. PIERSON/PATRICK 01/05/2011 05/08/2012 2,487,892.77

008051 Completed STPF-0900(025) 900 Sr 900, Bronson Way N To Sunset Blvd N Paving Cpm Development Corporation HIEN TRINH 01/14/2011 11/07/2012 710,667.60

008052 Completed NH-STPF-9999(616) 202 Sr 202/Sr 522 I/C To Sammamish R Br & Sr 522/102nd Watson Asphalt Paving Company, JANICE FAHNING 02/01/2011 05/03/2012 1,345,051.80

008053 Completed STATE 405 I-405, Ne 116th Street Interchange And Street Impr Gary Merlino Construction Co., Inc. HIEN TRINH 03/25/2011 02/25/2015 10,693,960.80

008054 Completed IM-0054(273) 005 I-5 / Sr 530 To Us/Canada Border Mma Striping Specialized Pavement Marking Inc. CHRIS DAMITIO 01/28/2011 11/10/2011 903,444.90

008055 Completed NH-STPF-9999(611) 167 Sr 167 / I-405 I/C Vic To S Grady Way & Sr 509 / S Lakeside Industries, Inc. HIEN TRINH 02/01/2011 08/29/2013 694,858.95

008056 Completed STPF-0150(010) 150 Sr 150, 3 Mi E Of Manson Slope Stabilization Hi Tech Rockfall Construction, Inc. BOB ROMINE 01/07/2011 12/07/2011 1,377,777.00

008058 Completed STPF-9999(574) 017 Ncr Major Drainage 2011 Strider Construction Co., Inc. PIERSON/PATRICK 02/01/2011 12/17/2012 528,361.00

008059 Completed NH-0099(108) 099 Sr 99, S Atlantic St To I-90 / S Dearborn St - Fib Totem Electric Of Tacoma, Inc. DAVE LINDBERG 01/28/2011 07/19/2012 443,270.00

008060 Completed ER-0601(007) 530 Sr 530, Skaglund Hill Slide - Permanent Repair Vetch Construction Llc DAVE CRISMAN 02/25/2011 02/27/2014 3,297,816.00

008063 Completed STATE Coupeville/Pt Townsend New Tollboth & Relocate Stouder General Construction JOHN CALLAHAN 02/11/2011 03/07/2012 439,926.04

008064 Completed STPF-0155(016) 155 Sr 155, S Of Electric City - Rock Slopes Stabiliza Krci Llc BOB ROMINE 01/25/2011 09/13/2011 631,206.73

008065 Completed STATE 530 Sr 530, Sauk River Bank Erosion Realign Roadway Trimaxx Construction, Inc. HAMMER/SPAHR 02/04/2011 03/12/2015 2,480,567.66

008066 Completed BRNHSTPF0520(047) 520 Sr 520 / I-5 To Medina - Evergreen Point Floating Kiewit General Manson Joint Venture ROBYN BOYD 08/31/2011 01/31/2018 586,561,000.00

008067 Completed STATE 090 I-90, Kittitas Vicinity - Variable Message Sign Aztech Electric Inc RICK GIFFORD 02/07/2011 10/10/2011 110,654.00

008068 Completed IM-0822(134) 082 I-82, Grandview To Prosser - Dowel Bar Retrofit An Interstate Improvement Inc MOE DAVARI 06/01/2011 03/29/2012 4,431,969.06

008069 Completed STATE 005 I-5, Clover Creek Bridge - Bridge Deck C.A. Carey Corporation JON DEFFENBACHER 02/11/2011 10/17/2012 645,811.00

008070 Completed IM-0906(222) 090 I-90, Eastern Region Bridge Deck Repair - 09/11 West Company, Inc. CHAD SIMONSON 02/09/2011 03/07/2012 941,631.50

008071 Completed STPF-9999(570) 243 Sr 243, Us 97a, Ncr Major Electrical 2011 Valley Electric Co Of Mt Vernon Inc KEVIN WALIGORSKI 02/08/2011 04/17/2012 453,604.00

008073 Completed BH-0002(299) 002 Us 2, 43rd Ave Se Vic To 50th Ave Se Vic Bridge Re M.J. Hughes Construction, Inc. CHAD BROWN 03/09/2011 08/17/2012 4,168,313.50

008074 Completed STPF-0171(016)+ 171 Sr 171, Moses Lake Paving Granite Construction Company BOB ROMINE 02/11/2011 01/15/2013 2,014,000.00

008076 Completed IM-0053(953) 005 I-5, 1.3 Mi S Of Berkeley St To Gravelly Lake Dr - Tucci & Sons, Inc. RUMINA SUAFOA 02/14/2011 01/28/2013 1,590,109.82

008077 Completed STATE 011 Sr 11, Chuckanut Park And Ride Interwest Construction, Inc. HAMMER/SPAHR 03/07/2011 07/09/2013 3,198,800.80

Dec 25, 2019 124 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008078 Completed STATE 005 I-5, Columbia River Bridge Temporary Pile Test Pro American Construction Co., Inc. FRANK GREEN 01/28/2011 06/06/2011 811,204.00

008079 Completed NH-0500(016) 500 Sr 500, St. Johns Blvd - Interchange Tapani Underground Inc LORI FIGONE 05/20/2011 09/17/2017 27,237,397.12

008080 Completed STPF-BH-0099(101) 099 Sr 99, Aurora Ave - G Washington Memorial Br Seism Massana Construction, Inc. JOHN CHI 04/27/2011 03/06/2015 6,157,383.00

008081 Completed STPF-0020(165) 020 Sr 20, North Cascades Highway - Chip Seal Central Washington Asphalt, Inc. PIERSON/PATRICK 03/08/2011 04/26/2013 2,664,395.23

008085 Completed STATE 007 Sr 7 / Sr 702 - Install Signal Totem Electric Of Tacoma, Inc. JON DEFFENBACHER 04/01/2011 04/03/2012 295,844.76

008086 Completed STATE 542 Sr 542, Everson Goshen Rd Vic To Sr 9 Vic Intersec Boss Construction Inc CHRIS DAMITIO 03/24/2011 11/05/2013 2,740,818.32

008087 Completed BH-0410(054) 410 Sr 410, White River Bridge - Bridge Scour Scarsella Bros., Inc. JON DEFFENBACHER 03/17/2011 04/16/2013 217,236.75

008088 Completed STATE 519 Wsf Seattle Terminal Bike Entry Gate Improv Thornberg Construction Company, JOHN CALLAHAN 04/11/2011 08/03/2011 126,615.04

008089 Completed STATE 548 Sr 548, Terrell Creek - Fish Passage Klb Construction, Inc. CHRIS DAMITIO 04/14/2011 11/15/2012 672,411.90

008090 Completed NH-0012(204) 012 Us 12 / Sr 125 I/S To Harbert Rd Vic - Paving Granite Construction Company MOE DAVARI 04/19/2011 03/08/2012 2,519,519.00

008091 Completed STPF-NH-9999(618) 012 Us 12 Et Al, Scr 2011 Region Wide Chip Seal Granite Construction Company MOE DAVARI 04/08/2011 02/08/2012 1,883,388.00

008092 Completed STPF-9999-(583) 021 Eastern Region Chip Seal 2011 Chip Seal - 2011 Columbia Asphalt & Gravel, Inc. CHAD SIMONSON 05/02/2011 04/03/2012 5,509,208.22

008093 Completed STATE 020 Sr 20, Sr 25 Unstable Slopes Rock Scaling Rock Slo Rock & Co Dba Ock Ray DARREL MCCALLUM 03/31/2011 11/02/2011 291,331.00

008094 Completed STATE 004 Sr 4, 4 Miles East Of Cathlamet Rock Scaling Janod Inc DENYS TAK 04/01/2011 08/15/2011 145,894.00

008096 Completed CM-2009(039) 005 I-5, Traveller Information And Incident Management Northeast Electric, Llc CHAD HANCOCK 04/08/2011 05/21/2012 550,284.00

008097 Completed STPF-0165(014) 165 Sr 165, 5 Miles S Of Carbonado To Pershing Ave - C Granite Construction Company RUMINA SUAFOA 04/08/2011 02/23/2012 306,604.00

008098 Completed NH-0012(196) 012 Us 12, Lewis County - Stabilize Slopes Janod Inc BILL PRESTON 04/29/2011 07/25/2012 2,733,420.19

008099 Completed STATE 005 I-5, Sb Off-Ramp To 128th St Sw Interwest Construction, Inc. JANICE FAHNING 04/14/2011 08/20/2012 681,878.95

008100 Completed IMG-9999(565) 005 I-5 & I-205, Southwest Region I-5 And I-205 Median Dirt And Aggregate Interchange, Inc LEON WINGER 04/21/2011 11/15/2011 665,994.00

008101 Completed STPE-1140(030) 519 Sr 519 / I-90 To Sr 519 Pedestrian Trail Tri-State Construction Inc DAVE LINDBERG 04/27/2011 10/24/2013 1,107,911.00

008102 Completed IM-0053(955) 005 I-5, Express Lane Automation Elcon Corporation JOHN CHI 04/28/2011 11/12/2014 3,419,556.00

008103 Completed NH-0020(159) 020 Sr 20, Harbor Vista Dr To Ne Narrows Ave - Paving Lakeside Industries, Inc. DAVE CRISMAN 04/27/2011 10/03/2012 3,179,639.22

008104 Completed NH-0395(093) 395 Us 395 / I-82 To W Kennewick Ave - Paving Cpm Development Corporation MOE DAVARI 05/11/2011 03/22/2012 2,095,095.95

008105 Completed STATE 014 Sr 14, Camas / Washougal - Add Lanes And Build Int Tapani Underground Inc CHRIS TAMS 05/11/2011 03/10/2016 28,618,803.65

008106 Completed NH-0101(330) 101 Us 101, Indian Creek To Nicholas Rd. - Paving Lakeside Industries, Inc. JERRY MOORE 04/27/2011 05/16/2012 2,497,252.20

008108 Completed STPF-NH-9999(619) 224 Sr 224 & Sr 240, W Richland Vic - Paving Granite Construction Company MOE DAVARI 05/12/2011 05/24/2012 1,731,000.00

008109 Completed IM-0053(959) 005 I-5, Marvin Road To Thorne Lane Its Improvements Totem Electric Of Tacoma, Inc. MARYLOU NEBERGALL 05/16/2011 01/23/2013 1,640,565.03

Dec 25, 2019 125 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008110 Completed STPF-9999(601) 082 I-82 Et Al, Scr Region Wide Safety-Shield Redirect Dirt And Aggregate Interchange, Inc BILL PRESTON 05/04/2011 02/23/2012 309,456.50

008111 Completed BH-0002(312) 002 Us 2, Anderson Creek Bridge - Bridge Repair Razz Construction, Inc. DAVE CRISMAN 04/29/2011 02/08/2013 185,193.75

008112 Completed IM-CM-0054(274) 005 I-5, North Everett To Sr 528 - Its And Paving Elcon Corporation DAVE CRISMAN 05/06/2011 07/16/2013 3,206,517.65

008113 Completed BH-0518(011) 518 Sr 518, Bridges - Seismic Retrofit Graham Construction & ALETA BORSCHOWA 05/18/2011 07/25/2013 3,707,899.00

008114 Completed STPF-0515(013) 515 Sr 515/Sr 516 To Se 232nd St Vic Paving Lakeside Industries, Inc. HIEN TRINH 05/12/2011 08/29/2013 1,394,858.88

008115 Completed STATE 020 Sr20 Coupeville/Keystone Term Ada Comply Larry Brown Construction, Inc. JOHN CALLAHAN 05/16/2011 08/15/2011 81,943.95

008116 Completed STPF-0410(053) 410 Sr 410, Twin Cr To Mather Memorial Pk Pull-Out Pav Tucci & Sons, Inc. HIEN TRINH 05/17/2011 11/01/2012 1,678,913.50

008117 Completed NH-0101(327) 101 Us 101, Lincoln St To Golf Course Rd - Paving Lakeside Industries, Inc. JERRY MOORE 05/20/2011 04/20/2012 997,998.75

008118 Completed STPF-0024(027) 024 Sr 24, Riverside Rd To Faucher Rd - Paving Columbia Asphalt & Gravel, Inc. BILL PRESTON 05/24/2011 09/19/2012 1,510,328.30

008119 Completed NH-STPUS-0022(013 022 Sr 22/I-82 To Toppenish - Safety Improvements Granite Construction Company BILL PRESTON 05/13/2011 05/28/2013 2,144,144.00

008120 Completed NH-9999(592) 017 Sr 17 & Sr 26, Nc Region Guardrail Update 2011 Petersen Brothers, Inc. KEVIN WALIGORSKI 05/12/2011 09/21/2011 297,317.43

008121 Completed STATE 002 Us 2, Wagley'S Creek Tributary - Fish Passage Anderson Environmental Contracting DAVE CRISMAN 05/17/2011 01/22/2013 338,103.06

008122 Completed NH-0002(296) 002 Us 2, W Of Leavenworth - Slope Stabilization Rock & Co Dba Ock Ray PIERSON/PATRICK 05/25/2011 09/26/2012 1,415,245.00

008123 Completed 2008-GB-T8-0081 020 Sr 20 Kystn/Pt Twnsnd Term Phys Security Dalton Electric Company JOHN CALLAHAN 07/15/2011 04/20/2012 575,060.00

008124 Completed NH-0101(317) 101 Us 101, South Branch Big Creek - Fish Passage Tri-State Construction Inc SCOTT IRELAND 05/20/2011 09/20/2012 965,364.35

008125 Completed STATE Eagle Harbr Maint Bldg Bent Pilecap Repair Quigg Bros., Inc. JOHN CALLAHAN 06/06/2011 10/03/2011 79,328.00

008126 Completed NH-0003(119) 003 Sr 3, Judy Lane Vicinity - Drainage Dahl Construction Co Inc JERRY MOORE 05/24/2011 12/12/2011 79,899.00

008127 Active STATE 090 I-90, Snowshed To Keechelus Dam Phase 1c - Replace Guy F. Atkinsonconstruction, Llc. JERRY WOOD 08/19/2011 177,144,342.66

008128 Completed NICKEL 522 Sr 522, Snohomish River Bridge To Us 2 Vic Widenin Scarsella Bros., Inc. DAVE LINDBERG 06/16/2011 10/23/2017 73,138,890.32

008129 Completed NH-9999(620) 005 I-5 And Sr 16, Stormwater Retrofit Cat Works, Llc NEAL UHLMEYER 06/01/2011 11/12/2013 471,404.50

008130 Completed STPF-0020(164) 020 Sr 20, Barrier Creek Culvert Replacement Razz Construction, Inc. HAMMER/SPAHR 05/18/2011 01/07/2014 1,521,958.00

008131 Completed STATE 020 Wsf Anacortes Terminal Slip 1 Seismic Retrofit Manson Construction Co. JOHN CALLAHAN 05/31/2011 09/26/2011 71,349.00

008132 Completed STATE 020 Wsf Orcas Ferry Terminal Seismic Retrofit American Construction Co., Inc. JOHN CALLAHAN 06/16/2011 12/02/2011 49,599.00

008133 Completed ER-1102(003) 395 Us 395, Court Street Bridge - Replace/Repair Girde Cascade Bridge Llc MOE DAVARI 06/02/2011 03/20/2012 433,357.00

008134 Completed STATE 195 Us 195, S. Fork Palouse River Bridge- Ada Modifica Wm. Winkler Company DARREL MCCALLUM 05/12/2011 08/25/2011 32,897.86

008135 Completed NH-0012(198) 012 Us 12, Davis Lake Road Vic To Surrey Creek Vic - P Granite Construction Company COLIN NEWELL 05/25/2011 04/03/2012 3,132,964.00

008137 Completed STPF-9999(624) 007 Sr 7 & Sr 122 Resurfacing Granite Construction Company COLIN NEWELL 05/25/2011 03/07/2012 1,820,597.00

Dec 25, 2019 126 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008138 Completed STPF-9999(598) 026 Sr26, 27 & 127 Centerline Rumblestrips Penhall Company BOB HILMES 06/22/2011 03/02/2012 424,909.88

008139 Completed BR-0002(283) 002 Us 2, Tumwater Canyon Bridge Replacements Selland Construction, Inc. BOB ROMINE 07/13/2011 03/28/2016 8,485,707.28

008140 Completed STATE 009 Sr 9, 212th St Se To 176th St Se Stage 3 Widening Northwest Construction, Inc. MARK SAWYER 07/12/2011 07/24/2017 24,297,000.00

008141 Completed NH-0020(105) 020 Sr 20/Sr 525, Libbey Rd Vic To Sidney St Vic Reali Interwest Construction, Inc. DAVE CRISMAN 06/13/2011 05/23/2013 2,269,936.16

008142 Completed NH-0018(037) 018 Sr 18, Military Rd Vic To Auburn Black Diamond Rd Tucci & Sons, Inc. HIEN TRINH 06/14/2011 07/23/2013 1,182,402.24

008143 Completed NH-0026(030) 026 Sr26 Longmeir Rd To Dusty Rd Guardrail Improve Frank Gurney, Inc. BOB HILMES 06/01/2011 10/12/2011 1,304,359.65

008144 Completed ER-0902(252)/(331 161 Sr 161, Mashel River Bridge - Bridge Scour And Slo Stan Palmer Construction, Inc. JON DEFFENBACHER 06/21/2011 02/18/2016 1,612,149.00

008145 Completed IM-0052(204) 005 I-5 / Sr 121 To Tumwater Blvd Paving Granite Construction Company STEVE FUCHS 06/21/2011 11/26/2013 1,839,306.00

008146 Completed STPF-0097(152) 097 Us97a, North Of Wenatchee Wildlife Fence Stage 2 Rm Shearer Inc KEVIN WALIGORSKI 06/13/2011 02/13/2012 467,360.00

008147 Completed STPF-0142(021) 142 Sr 142, Little Klickitat River To Us 97 Paving Granite Construction Company CHRIS TAMS 06/13/2011 10/12/2012 810,018.00

008148 Completed IM-0051(287) 005 I-5 / Sr 500, Interstate Bridge To 39th Street Vic Granite Construction Company LEON WINGER 06/15/2011 05/16/2012 2,070,070.00

008149 Completed CM-2009(038) 005 I-5 Et Al, Advanced Traveler Information Freeway I Mill Plain Electric, Inc. CHAD HANCOCK 06/20/2011 03/22/2012 139,640.85

008150 Completed IM-0051(285) 005 I-5, E Fork Lewis River Bridge To Todd Road Vicini Granite Construction Company LORI FIGONE 07/12/2011 03/05/2015 4,250,250.00

008151 Completed STATE 2011 Cw Fence Overland Fence And Construction, CHAD SIMONSON 05/23/2011 01/19/2012 185,543.15

008153 Completed STATE 005 I-5 / I-205, Ne 134th St Interchange (I-5 / I-205) Rotschy, Inc. LORI FIGONE 07/01/2011 10/30/2015 19,949,910.16

008155 Completed STATE 101 Us 101, Unnamed Trib To Lower Salmon Creek - Fish Rognlin'S, Inc. SCOTTY IRELAND 06/15/2011 01/10/2012 896,851.00

008156 Completed STATE Wsf Anacortes Term Bldg Roof Replacement Roof Repl Axiom-Division 7, Inc. JOHN CALLAHAN 06/29/2011 12/20/2011 246,644.00

008157 Completed NH-0167(045) 167 Sr 167, Vicinity I-5 To Puyallup River Bridge - Pa Miles Resources, Llc JON DEFFENBACHER 07/01/2011 12/04/2012 1,226,135.20

008158 Completed STPF-0500(018) 500 Sr 500, Se 3rd Ave Vic To Se 7th Ave Paving Granite Construction Company CHRIS TAMS 07/08/2011 01/06/2012 581,581.00

008159 Completed STPF9999(571) 002 Us 2 Er Preventative Maint Chip Seal Chip Seal - A Central Washington Asphalt, Inc. CHAD SIMONSON 06/28/2011 01/22/2013 2,854,900.22

008161 Completed STATE Wsf Vashon Ferry Term Slip 2 Seismic Retrofit Manson Construction Co. JOHN CALLAHAN 07/05/2011 10/11/2011 50,499.00

008162 Completed STATE Systemwide On-Call, Off-Shore Maintenanc American Construction Co., Inc. JOHN CALLAHAN 07/13/2011 11/05/2013 1,512,098.95

008164 Completed STPF-9999(600) 099 Sr 99, Fife Vicinity - Paving Cpm Development Corporation MARYLOU NEBERGALL 07/11/2011 07/02/2012 1,051,663.58

008165 Completed STATE 109 Sr 109 / Sr 520 Pontoon Grass Creek Mitigation Rognlin'S, Inc. SCOTTY IRELAND 07/01/2011 03/11/2013 1,223,878.50

008166 Completed NH0028(045) 028 Sr 28, E. End Of The George Sellar Br. Construct B Klb Construction, Inc. KEVIN WALIGORSKI 07/19/2011 06/23/2017 16,363,377.90

008168 Completed STATE Wsf Edmonds Term Rt Inner Dolphin Replace Orion Marine Contractors, Inc. JOHN CALLAHAN 06/29/2011 11/30/2011 424,707.00

008169 Completed STATE 163 Sr 163 Pt Defiance Bridge Seat Seism Rtroft Seismi American Construction Co., Inc. JOHN CALLAHAN 07/13/2011 01/12/2012 106,498.00

Dec 25, 2019 127 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008170 Completed CM-9999(581) 005 I-5/Sr 525/Sr 528, Sb On-Ramp & Paine Field Blvd - Granite Construction Company JANICE FAHNING 07/29/2011 07/16/2012 391,313.81

008171 Completed CM0195044 195 Us195 Cheney-Spokane Rd Congestion & Safety Aztech Electric Inc BOB HILMES 07/19/2011 03/18/2013 780,097.03

008172 Completed STATE 503 Sr 503 4th Plain / Sr 500 Intersection Improvement Kerr Contractors Oregon, Inc. LEON WINGER 07/11/2011 04/16/2012 281,071.34

008175 Completed IM-0902(432) 090 I-90, Price Creek Snopark To Easton Hill - Pavemen Columbia Asphalt & Gravel, Inc. WILL SMITH 07/19/2011 12/13/2011 730,060.00

008176 Completed STATE 520 Sr 520 - Pontoon Grays Harbor Moorage Kiewit General Manson Joint Venture SCOTT IRELAND 07/29/2011 11/29/2012 4,457,702.00

008177 Completed NH-0002(313) 002 Us 2, Rice Road Intersection - Safety Improvements Lakeside/Tri-State Joint Venture DAVE LINDBERG 10/05/2011 12/20/2016 2,170,507.00

008179 Completed STATE 519 Seattle Term Slip 3 Ohl/Transfer Span Rep Transfer Vetch Construction Llc JOHN CALLAHAN 08/01/2011 02/08/2012 184,699.00

008180 Completed NH-0012(210) 012 Us 12, Gulch Bridge To Tieton Rd Vicinity - Paving Columbia Asphalt & Gravel, Inc. BILL PRESTON 07/19/2011 06/11/2012 2,814,006.55

008181 Completed STATE 104 Sr 104, Kingston Tml-Steel Sheetpile Bul Sealevel Bulkhead Builders Inc. JOHN CALLAHAN 07/28/2011 01/26/2012 101,588.00

008182 Completed STPF-0020(165) 020 Sr 20, North Cascades Highway - Drainage Repair Trimaxx Construction, Inc. PIERSON/PATRICK 07/27/2011 07/02/2013 298,194.00

008183 Completed BH-9999(627) 097 Us97 Et Al, Yakima & Benton County Bridges - Scour Apollo Inc MOE DAVARI 08/02/2011 03/19/2012 264,935.00

008184 Completed STATE 009 Sr 9, 212th St Se To 176th St Se Stage 3 Wetland M Tri-State Construction Inc JOHN CHI 08/05/2011 10/08/2014 1,252,399.90

008185 Completed NH-0003(120) 003 Sr 3, 0.7 And 1.1 Miles South Of Sr 304 - Unstable Rock & Co Dba Ock Ray JERRY MOORE 07/25/2011 05/07/2012 1,300,928.25

008186 Completed NH-0101(323) 101 Us 101, Chehalis River Bridge To Oak St - Ada Ramp Nova Contracting Inc SCOTT IRELAND 08/11/2011 10/15/2012 745,831.50

008187 Completed STATE Wsf Terminal Oncall Maint Painting Maintenance Pai Long Painting Company JOHN CALLAHAN 08/01/2011 09/13/2013 659,599.00

008189 Completed STATE 005 I-5 / Sr16, Eastbound Nalley Valley I/C - Hov Mowat Construction Company NEAL UHLMEYER 10/13/2011 11/23/2015 74,687,777.28

008190 Completed BR0104(025) 104 Sr 104, Hcb Un Anchor Cable And Hatch Dog Repairs Northwest Underwater Construction JEFF COOK 08/23/2011 01/08/2013 230,404.00

008191 Completed STPF-9999(606) 003 2011 Olympic Region Centerline Rumble Strips Safet Apply-A-Line, Inc. SCOTTY IRELAND 07/25/2011 11/22/2011 197,747.60

008192 Completed STATE Sr 519/Seattle Ferry Terminal, Slip 2 Mechanical & American Construction Co., Inc. JOHN CALLAHAN 09/20/2011 08/29/2013 1,558,713.00

008193 Completed STATE Walla Walla To Dayton Bridge & Tie Rehabilitation Balfour Beatty Rail Inc Dba MOE DAVARI 08/18/2011 10/04/2012 143,014.00

008195 Completed TIGER0395(091) 395 Us395 Nsc Parksmith Interchange Max J. Kuney Company BOB HILMES 09/21/2011 09/07/2016 6,917,161.46

008197 Completed NHSTPF9999(626) 101 Us 101 And Sr 117, Port Angeles Signals Major Elec Olympic Electric Company Inc JERRY MOORE 08/24/2011 08/08/2012 796,621.00

008198 Completed STATE 519 Seattle Terminal Elect Distrib Sstm Upgrade System Mcclure And Sons, Inc. JOHN CALLAHAN 09/21/2011 04/09/2015 2,969,687.60

008199 Completed CM-0161(029) 161 Sr 161, 24th St East To Milton Way Widening Tri-State Construction Inc MICHELE BRITTON 09/07/2011 01/04/2016 11,927,623.80

008200 Completed STATE 090 I-90, 2.0 Miles W Of Summit Wb - Rockfall Mesh Rep Hi Tech Rockfall Construction, Inc. WILL SMITH 08/18/2011 11/16/2011 94,949.00

008201 Completed STATE 003 Sr 3 / Sr 106 To Sr 300 - Paving Miles Resources, Llc MARYLOU NEBERGALL 08/16/2011 11/21/2011 421,867.65

008202 Completed STATE Pierce County Peo Tenant Improvements Phillips Construction Services Llc JON DEFFENBACHER 09/22/2011 04/11/2013 843,262.00

Dec 25, 2019 128 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008203 Completed BH0101(334) 101 Us 101, Lost Lake Rd Bridge Seismic Retrofit Tri-State Construction Inc SCOTT IRELAND 09/20/2011 05/08/2012 112,142.00

008204 Completed STATE 405 I-405, Ne 6th St To I-5 Widening And Express Toll Flatiron Constructors Inc LISA HODGSON 02/01/2012 09/12/2018 155,500,001.00

008205 Completed STATE Pt Defiance/Tahlequah Transfer Span Overlays Trans Tri-State Construction Inc JOHN CALLAHAN 09/20/2011 12/08/2011 142,529.00

008211 Completed STATE 005 I-5, S 216th St Vic To I-405 I/C Vic Pccp Panel Re C.A. Carey Corporation HIEN TRINH 09/30/2011 01/22/2013 794,432.00

008212 Completed HSIP-0507(025) 507 Sr 507, East Gate Road - Install Signal Tst Inc Dba Travers Electric JON DEFFENBACHER 10/19/2011 10/18/2012 304,439.96

008213 Completed ER-1103(013) 536 Sr 536, Skagit River Bridge - Dolphin Replace Pacific Pile & Marine, L.P. MARK HAMMER 09/30/2011 02/01/2012 335,464.00

008214 Completed STATE 395 Us 395 Children Of The Sun Trail Mead Conn. Mountain Crest Enterprises, Inc. BOB HILMES 10/18/2011 06/13/2012 46,093.00

008216 Completed STATE 009 Sr 9 / Sr 92 Intersection Improvements Design Buil Guy F. Atkinson Construction, Llc. SEEMA JAVERI 02/15/2012 01/11/2016 3,346,888.00

008217 Completed STATE 395 Us 395, North Of Orient - Unstable Slope Krci Llc CHAD SIMONSON 10/04/2011 05/08/2012 232,819.00

008218 Completed STATE 167 Sr 167, 24th St E Bridge Special Repair Pcl Civil Constructors, Inc. MARYLOU NEBERGALL 11/23/2011 09/07/2012 539,880.46

008219 Completed STATE Seattle Ferry Terminal Roof Repairs Roof Repairs Roof Toppers Inc JOHN CALLAHAN 11/04/2011 07/26/2012 98,500.00

008220 Completed STATE 016 Sr 16, Olympic Drive Nw Bridge Special Repair Pcl Civil Constructors, Inc. MARYLOU NEBERGALL 11/23/2011 09/07/2012 580,581.80

008222 Completed STATE 009 Sr 9/Sr 531, 172nd St Ne & Eaglefield Dr Intersect Interwest Construction, Inc. HAMMER/SPAHR 12/08/2011 09/02/2014 4,995,958.40

008223 Completed NH-0901(466) 090 I-90, East Fork Issaquah Creek Fish Passage Tri-State Construction Inc HIEN TRINH 11/28/2011 09/14/2014 1,451,881.70

008226 Completed NH-0002(824) 002 Us 2 At Grant County Line Culvert Repair Selland Construction, Inc. BOB ROMINE 12/27/2011 05/01/2012 134,654.00

008227 Completed STATE Fauntleroy Terminal Upgrade Upgrade Dalton Electric Company JOHN CALLAHAN 12/29/2011 08/23/2012 156,114.00

008228 Completed STATE Wsf San Juan Islands Stub Pile Repair Pacific Pile & Marine, L.P. JOHN CALLAHAN 01/06/2012 04/25/2012 99,880.00

008229 Completed NH-0002(282) 002 Us 2, Stevens Pass West Slope Stabilization Midwest Rockfall Inc KEVIN WALIGORSKI 01/20/2012 06/28/2018 5,291,071.20

008231 Completed IMD-0051(268) 005 I-5, Columbia River Crossing Drilled Shaft And Dri Max J. Kuney Company FRANK GREEN 01/09/2012 11/07/2013 4,220,000.00

008232 Completed STPF-0097(145) 097 Us 97a, 0.5 Mile So. Of Rocky Reach Dam Slope Stab Janod Inc BOB ROMINE 01/26/2012 01/15/2014 3,110,680.96

008233 Completed NH-4053(860) 405 I-405 / Sr 522, Ne 85th I/C & Sr 522/Sr 523 I/S Pe Marshbank Construction, Inc. HIEN TRINH 02/01/2012 03/12/2013 195,359.00

008234 Completed NH-0101(325) 101 Us 101, S Of Beacon Point Dr Culvert Replacement Thompson Bros. Excavating, Inc. JERRY MOORE 01/26/2012 02/10/2014 260,401.25

008235 Completed STATE Wsf Lopez Island Term Float Wingwall Rehab Razz Construction, Inc. JOHN CALLAHAN 02/09/2012 12/18/2013 1,949,049.00

008236 Completed STATE 099 Sr 99, Yesler Way To Spring Street Nb Alaskan Way Titan Earthwork Llc DAVE LINDBERG 02/07/2012 10/01/2012 330,540.00

008239 Completed CBI-0055(240) 005 I-5, Samish Way And Northwest Ave To Birch Bay Lyn Valley Electric Co Of Mt Vernon Inc CHRIS DAMITIO 04/10/2012 04/14/2014 5,343,782.60

008240 Completed ER-1001(003) 410 Sr 410, Nile Valley Landslide - Re-Construct Route Apollo Inc JEFF MINNICK 02/21/2012 03/04/2014 4,083,066.15

008241 Completed CBI0021,STPF0021019 021 Sr21 Curlew St Pk To N Of Rincon Cr Rd Pave N Of R Poe Asphalt Paving, Inc. CHAD SIMONSON 02/24/2012 11/25/2013 4,235,606.62

Dec 25, 2019 129 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008244 Completed BR-NH-0097(084) 097 Us 97, Satus Creek Vicinity - Replace Br. 97/106 A William Charles Construction Llc MOE DAVARI 03/05/2012 09/12/2014 8,830,731.60

008245 Completed NH-0167(045) 167 Sr 167, Vic I-5 To Puyallup River Bridge Sidewalk Active Construction, Inc. JON DEFFENBACHER 03/12/2012 10/29/2012 546,990.09

008246 Completed HP-0501(022) 501 Sr 501, Ridgefield Interchange Stage Ii - Roadway Nutter Corporation Dba Nutter CHRIS TAMS 04/04/2012 04/05/2013 2,823,532.22

008247 Completed STPF-NH-9999(622) Us 2, Sr 20, Sr 26, Us 97, Sr 172, 2012 Ncr Chip S Central Washington Asphalt, Inc. KEVIN WALIGORSKI 04/10/2012 06/12/2014 6,176,935.85

008248 Completed ER-1001(003) 410 Sr 410, Nile Valley Landslide - Building Removal Groat Bros Inc BILL PRESTON 03/14/2012 10/31/2012 34,786.00

008250 Completed IBRD-9999(509) 005 I-5, North 45th St Vicinity Sign Bridge Replacemen M.J. Hughes Construction, Inc. JOHN CHI 03/19/2012 09/12/2013 376,213.00

008251 Completed ER-1105(003) 005 I-5, 113th Ave Sw Bridge Special Repair Carter & Company, Inc. Dba DENNIS ENGEL 04/02/2012 01/10/2013 265,423.00

008252 Completed STATE 020 Sr20 Vehicle Reservation Ph1 Its Systems Its Syste Valley Electric Co Of Mt Vernon Inc HAMMER/SPAHR 04/13/2012 12/13/2013 696,460.00

008254 Completed STATE 020 Sr 20, Port Townsend Ferry Terminal Slip 1 Transfe American Construction Co., Inc. JOHN CALLAHAN 04/10/2012 04/11/2014 2,027,079.00

008255 Completed STPF-0124(018) 124 Sr 124, 1 Mile E Of Neff Rd To Old Bnrr Bridge - P Cpm Development Corporation MOE DAVARI 04/10/2012 09/07/2012 816,000.00

008257 Completed STATE Orcas Island Ferry Terminal Trestle Paving Trestle Lakeside Industries, Inc. JOHN CALLAHAN 04/16/2012 07/26/2012 74,706.50

008258 Completed BH-0901(481) 090 I-90 / Sr 18 Interchange Wb Bridge Bridge Deck Reh C.A. Carey Corporation HIEN TRINH 04/24/2012 06/18/2014 459,481.50

008259 Completed HSIP-9999(590) 008 Sr 8, Sr 99, Us 101, Sr 165, Sr 167, 2011 Olympic Petersen Brothers, Inc. SCOTTY IRELAND 05/01/2012 03/14/2013 1,438,609.05

008260 Completed ER-0801(007) 405 I-405 / Sr 167, Thunder Hills Creek Mitigation Fis Scarsella Bros., Inc. SEEMA JAVERI 04/27/2012 01/31/2018 3,164,254.80

008261 Completed BH-0010(010) 010 Sr 10, Bristol Fill Bridge Deck Replacement Conway Construction Company MOE DAVARI 04/30/2012 08/06/2013 1,375,769.80

008262 Completed STPF-9999(642) 002 Eastern Region Chip Seal 2012 Chip Seal 2012 Central Washington Asphalt, Inc. CHAD SIMONSON 05/03/2012 04/03/2013 8,374,295.85

008263 Completed IM-0053(965) 005 I-5, Mounts Rd Vicinity To Berkley St Median Barri Construction Ahead, Inc. Dba DENNIS ENGEL 05/07/2012 05/07/2013 1,008,538.71

008264 Completed STATE 305 Sr305 Eagld Harbor Maint Fac Slip E Slip E Mech Re Quigg Bros., Inc. JOHN CALLAHAN 05/02/2012 03/14/2013 225,999.00

008265 Completed BH-0101(335) 101 Us 101, Simpson Avenue Bridge Remaining Pier 2 Sta Bergerson Construction Inc SCOTTY IRELAND 05/14/2012 03/11/2013 4,241,664.00

008266 Completed NH-0012(208) 012 Us12 Stabilize Slopes Clear Creek Vic Ais Construction Company SCOTT GOLBEK 06/06/2012 07/28/2015 1,951,774.31

008267 Completed BH-0008(013) 101 Sr 8 / Us 101 Overcrossing - Seismic Retrofit M.J. Hughes Construction, Inc. STEVE FUCHS 05/07/2012 07/08/2013 545,208.00

008268 Completed STATE 009 Sr 9, 176th St Se Vic To Sr 96 Paving Cadman Materials Inc JOHN CHI 05/14/2012 12/03/2014 2,508,376.28

008269 Completed STATE 530 Sr 530, Fortson Creek Culvert - Fish Barrier Ram Construction General Contractor DAVE CRISMAN 05/09/2012 01/08/2014 811,871.00

008270 Completed NH-0002(829) 002 Us 2, Stevens Pass Variable Message Signs Colvico, Inc. KEVIN WALIGORSKI 05/24/2012 09/20/2016 1,407,513.00

008271 Completed WA-PFH-0060(005) 542 Sr 542, Fossil Cr To Wells Cr Rd Vic - Paving Granite Construction Company CHRIS DAMITIO 06/06/2012 02/20/2013 1,038,293.00

008272 Completed STATE 005 I-5, Mellen Street To Blakeslee Junction - Stage 1 Cascade Bridge Llc COLIN NEWELL 05/21/2012 02/08/2017 21,596,149.85

008274 Completed STATE Sr 160, Southworth Ferry Terminal Exit Lanes Lumin Transportation Systems, Inc. JOHN CALLAHAN 05/21/2012 03/19/2014 136,975.00

Dec 25, 2019 130 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008275 Completed NH-STPF-9999(635) 012 Us 12 Et Al, 2012 Scr Region Wide - Chip Seal Granite Construction Company MOE DAVARI 05/21/2012 01/28/2013 5,510,055.00

008276 Completed NH-9999(632) 005 I-5, Lewis County Detour For Freight Mobility Its Mill Plain Electric, Inc. CHAD HANCOCK 06/14/2012 04/25/2013 1,335,692.00

008277 Completed STPF-0019(005) 019 Sr 19, S Of West Valley Rd To S Of Theater Rd - Pa Lakeside Industries, Inc. JERRY MOORE 06/06/2012 01/03/2013 1,199,343.15

008278 Completed NH-0014(604) 014 Sr 14, Clark Co Line To Prindle Vic. Paver Kerr Contractors Inc CHRIS TAMS 05/21/2012 04/30/2013 2,123,175.00

008279 Completed IM-0054(282) 005 I-5, Dayton Ave N To 128th St Sw Its Rehabilitatio Elcon Corporation MARK SAWYER 05/21/2012 08/27/2014 1,291,496.00

008280 Completed IM-0053(964) 005 I-5, 48th St To M St Bridge Concrete Pavement Reha C.A. Carey Corporation JON DEFFENBACHER 06/13/2012 11/15/2013 2,233,510.00

008282 Completed STPF-0706(006) 706 Sr 706, E Of 182nd Ave Ct E To W Of 314th Ave Ct E Granite Construction Company MARY LOU NEBERGALL 06/13/2012 01/08/2013 766,200.00

008283 Completed STATE Rail Office, New Creston Livestock Feed Track Railworks Track Systems, Inc. CHAD SIMONSON 06/05/2012 11/09/2012 276,777.00

008284 Completed HSIP-0097(099) 097 Us 97, North Blewett Pass Safety Improve Petersen Brothers, Inc. KEVIN WALIGORSKI 05/21/2012 03/13/2013 111,909.43

008286 Completed NH-0002(311) 002 Us 2, Bickford Ave I/C Safety And Culvert Replacem Granite Construction Company MARK SAWYER 06/11/2012 10/10/2017 14,311,311.00

008288 Completed STATE 520 Sr 520, Evans Creek Eastside Wetland Mitigation Goodfellow Bros Inc ALETA BORSCHOWA 06/11/2012 03/02/2017 3,856,069.00

008289 Completed NH0195(053) 195 Babbit Road To Colfax Paving Central Washington Asphalt, Inc. DARREL MCCALLUM 06/04/2012 02/13/2014 1,961,182.40

008290 Completed BR-0099(119) 099 Sr 99, Awv S Holgate St To S King St Stage 3 - Atl Guy F. Atkinson Construction, Llc. PATRICK FULLER 06/20/2012 11/28/2016 29,371,123.00

008291 Completed NH-0051(228) 005 I-5, Ne 179th St To Koontz Rd Vic. With Exceptions Lakeside Industries, Inc. LEON WINGER 06/06/2012 09/21/2012 337,985.05

008292 Completed BR-0101(312) 101 Us 101, Bone River Bridge Replace Bridge Cascade Bridge Llc LORI FIGONE 06/15/2012 08/26/2014 5,715,393.20

008293 Completed STATE 097 Us 97, North Of Goldendale, Wildlife Habitat Conne Rotschy, Inc. CHRIS TAMS 06/11/2012 07/27/2015 2,113,354.68

008294 Completed IM0905(101) 090 Bn Rr Br To Vic Geiger Rd Paving Cpm Development Corporation DARREL MCCALLUM 07/05/2012 07/24/2013 1,667,683.18

008295 Completed BH-0395(096) 395 Us 395, Pioneer Memorial Bridge Joint Repair C.A. Carey Corporation MOE DAVARI 06/08/2012 08/07/2013 1,141,183.00

008296 Completed NH0395(098) 395 Us 395, Nsc Francis Avenue Improvements Graham Construction & DARREL MCCALLUM 08/23/2012 12/30/2015 14,045,942.90

008297 Completed STPF-0112(022) 112 Sr 112, Nelson Creek Remove Fish Barrier Delhur Industries Inc JERRY MOORE 06/06/2012 02/21/2013 1,154,877.57

008298 Completed STPF-0112(024) 112 Sr 112, Unnamed Tributary To Pysht River Fish Barr Bruch & Bruch Construction Inc JERRY MOORE 06/06/2012 12/19/2012 417,466.00

008299 Completed STATE 502 Sr 502 / I-5 To Battle Ground Add Lanes Stage 1 Tapani Underground Inc CHRIS TAMS 06/26/2012 12/29/2014 5,194,042.60

008300 Completed STPF-0112(023) 112 Sr 112 & 113, State Highways In Nw Clallam County Doolittle Construction, Llc JERRY MOORE 06/13/2012 01/25/2013 2,805,195.76

008301 Completed BH-0012(218) 012 Us 12 Et Al, 2012 Scr Region Wide Deck Rehabilitat Penhall Company JEFF MINNICK 06/26/2012 09/19/2013 1,264,595.15

008302 Completed STPF-9999(646) 012 Us 12 Et Al, 2010-2011 Scr Region Wide Safety Coral Construction Company MOE DAVARI 06/20/2012 09/30/2014 849,929.00

008303 Completed BH-0529(018) 529 Sr 529, Sb Snohomish River Bridge Special Bridge R Pcl Civil Constructors, Inc. MARK SAWYER 06/19/2012 03/15/2016 1,711,104.00

008304 Completed STPF-0100(011) 100 Sr 100/Sr 100 Spur - Paving Granite Construction Company LORI FIGONE 06/15/2012 07/31/2013 747,747.00

Dec 25, 2019 131 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008305 Completed STPF-0503(025) 503 Sr 503, Ham Rd Vic To Rudy Ross Rd Vic Resurfacing Granite Construction Company LORI FIGONE 06/15/2012 04/05/2013 1,849,849.00

008306 Completed NH-STPF-9999(597) 002 Sr Us 2/97, Sr 97a, West Of Wenatchee Paving And I Central Washington Asphalt, Inc. BOB ROMINE 06/13/2012 01/22/2015 2,891,203.15

008307 Completed HSIP-0096(004) 096 Sr 96, Dumas Road Channelization Marshbank Construction, Inc. MARK SAWYER 06/29/2012 09/06/2013 297,788.50

008308 Completed HP-9999(415) 182 I-182 / I-90, Rd 100 Vic. And N Bend To Ellensburg Aztech Electric Inc JEFF MINNICK 06/25/2012 03/18/2014 1,748,420.86

008309 Completed NH-9999(644) 003 Sr 3 / Sr 16, Gorst To Sherman Hill And Jackson Av Lakeside Industries, Inc. MARYLOU NEBERGALL 06/26/2012 03/18/2013 2,655,867.98

008310 Completed STATE 285 Sr 285, W End Of George Sellar Bridge Intersection Selland Construction, Inc. BOB ROMINE 07/09/2012 07/11/2016 9,787,325.01

008311 Completed STATE 005 I-5 / I-205, Ne 134th St. Interchange(I-5/I-205) S Max J. Kuney Company LORI FIGONE 07/19/2012 12/06/2017 43,416,928.50

008312 Completed NH-0101(338)(340) 101 Us 101 / Sr 110, State Highways In Clallam County Granite Construction Company SCOTTY IRELAND 06/26/2012 05/07/2013 2,784,000.00

008313 Completed STATE 007 Sr 7, Alder Canyon Slide - Emergency Repair Slope Rhine Group Dba Rhine Demolitionllc JON DEFFENBACHER 05/04/2012 07/30/2012 90,000.00

008314 Completed IM-0053(961) 005 I-5, Military Rd To Ne 117th St Pavement Repair Interstate Improvement Inc HIEN TRINH 07/03/2012 07/28/2014 5,004,744.22

008315 Completed STPF-0014(067) 014 Sr 14, Maryhill Rd Vic To Wood Cr Br - Bst Columbia Asphalt & Gravel, Inc. CHRIS TAMS 07/02/2012 12/14/2012 2,269,664.79

008317 Completed ER(STP)-1203(001) 090 I-90, Bandera Rd - Bridge Repair Guy F. Atkinson Construction, Llc. WILL SMITH 05/11/2012 11/09/2012 1,042,201.68

008320 Completed BH0395(097) 395 Us395 Col River Bridge Deck Rehab Bridge Deck Razz Construction, Inc. BOB HILMES 06/27/2012 08/02/2013 1,165,284.00

008321 Completed BH-0006(022) 006 Sr 6, Chehalis River Riverside Bridge - Deck Overl Quigg Bros., Inc. COLIN NEWELL 07/09/2012 04/18/2013 350,492.50

008323 Completed STATE 016 Sr 16 / I-5, Two Year Plant Establishment Terra Dynamics Inc KIM MUELLER 06/18/2012 07/31/2014 300,223.00

008324 Completed STATE Pt Townsend Term Slip 2 Seismic Seismic Retrofit American Construction Co., Inc. JOHN CALLAHAN 07/09/2012 11/06/2012 28,499.00

008325 Completed STATE 005 I-5, Port Of Tacoma Rd To King Co Line Floodplain Scarsella Bros., Inc. KIM MUELLER 07/16/2012 03/12/2014 478,358.90

008327 Completed NH-0008(014) 008 Sr 8, Sr 119, Us 101, South Of Quilcene Chip Seal Doolittle Construction, Llc SCOTTY IRELAND 07/09/2012 01/17/2013 1,175,846.10

008328 Completed NH-HSIP-0014(040) 014 Sr 14, Marble Rd Vic Safety Improvements Nutter Corporation Dba Nutter CHRIS TAMS 07/31/2012 09/06/2016 3,835,534.22

008329 Completed CM0906(219) 090 I90 Vic Idaho Rd-State Line Its Colvico, Inc. DARREL MCCALLUM 08/06/2012 10/23/2014 530,434.00

008330 Completed STATE 090 I-90, Easton Hill Eb - Replace Sign Structure Northeast Electric, Llc BILL PRESTON 07/19/2012 03/04/2013 71,504.00

008331 Completed STATE 020 Lopez Island Term Trestl Rehab Timber Trestle Reha Interwest Construction, Inc. JOHN CALLAHAN 07/23/2012 11/01/2013 264,868.50

008332 Completed ER(NH)1202(001) 003 Sr 3, Emergency Slide - Shelton Vic Mp 3.5 Unstabl Rognlin'S, Inc. SCOTT IRELAND 06/20/2012 11/19/2012 1,298,193.00

008333 Completed STATE 020 Pt Townsend Transfer Span Replace Transfer Span Re American Construction Co., Inc. JOHN CALLAHAN 08/09/2012 01/06/2014 3,068,815.00

008334 Completed HSIP-0507(023) 507 Sr 507, 8th Ave S To 208th St E Safety Miles Resources, Llc KIM MUELLER 07/30/2012 05/15/2014 889,752.75

008335 Completed IM-0901(483) 090 I-90, Asahel Curtis Vicinity Eb - Culvert Repair Trimaxx Construction, Inc. JEFF MINNICK 07/30/2012 05/28/2013 323,524.50

008337 Completed 2008GBT80081 Friday Harbor Term Phys Security Physical Security Dalton Electric Company JOHN CALLAHAN 08/13/2012 03/13/2013 274,174.00

Dec 25, 2019 132 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008338 Completed STATE 028 I-90 / Sr 28, Ncr Major Electrical 2012 Aztech Electric Inc KEVIN WALIGORSKI 08/06/2012 02/28/2014 395,403.75

008339 Completed STATE Orcas Island Term Transfer Span Repair Transfer Sp Quigg Bros., Inc. JOHN CALLAHAN 08/13/2012 06/25/2013 521,799.00

008340 Completed STATE Sr 519, Seattle Ferry Terminal Timber Trestle Pres Pacific Pile & Marine, L.P. JOHN CALLAHAN 08/10/2012 07/30/2013 615,910.40

008341 Completed STATE 002 Sr2 Update Ped Fac To Meet Ada Stndrds Cameron-Reilly Llc DARREL MCCALLUM 08/03/2012 08/06/2013 204,209.80

008342 Completed STATE 021 South Nanamkin Creek Culvert Replacement West Company, Inc. BOB HILMES 08/20/2012 06/05/2014 597,957.50

008343 Completed STATE 002 Us 2, Sr 20, Us 97, Ncr Roadside Improvements Curv Construction Ahead, Inc. Dba ROBERT ROMINE 08/07/2012 03/18/2013 164,322.80

008344 Completed BR-0101(207) 101 Us 101, Middle Nemah Riv Br. Replace Bridge Sb Structures Llc LORI FIGONE 08/10/2012 04/09/2015 3,253,051.05

008345 Completed BR-0105(022) 105 Sr 105, Smith Creek And North River Replace Bridge Scarsella Bros., Inc. JOANNA LOWREY 09/25/2012 09/06/2016 15,345,188.11

008346 Completed NH-0902(437) 090 I-90, S Cle Elum Rd Bridge Eb - Approach Slab Repa M.J. Hughes Construction, Inc. JEFF MINNICK 08/20/2012 08/29/2013 299,193.00

008349 Completed STATE Wsf Edmonds/Seattle Term Ohl Plc Elect Upgrade Ohl Valley Electric Co Of Mt Vernon Inc JOHN CALLAHAN 08/21/2012 02/19/2013 135,198.00

008350 Completed HSIP-0002(826) 002 Us 2, Intersection Improvements @ Peshastin Sail Electric, Inc. KEVIN WALIGORSKI 08/13/2012 03/04/2013 180,714.00

008352 Completed IM-0053(960) 005 I-5, Spokane Street Interchange Vic Special Bridge Mowat Construction Company ALETA BORSCHOWA 09/04/2012 05/01/2015 2,400,400.00

008354 Completed BH-0012(216) 012 Us 12, Railroad Bridge Seismic Retrofit Massana Construction, Inc. SCOTTY IRELAND 09/06/2012 05/07/2013 150,288.00

008358 Completed STATE 161 Sr 161, Ohop Valley Extension Rd To S. Of 304th St Totem Electric Of Tacoma, Inc. STEVE FUCHS 09/04/2012 07/10/2013 864,988.71

008361 Completed STATE 020 Sr 20, West Of Twisp Wire Mesh Repair Hi Tech Rockfall Construction, Inc. KEVIN WALIGORSKI 09/11/2012 03/10/2014 158,851.00

008362 Completed STATE 002 Us 2 Et Al, Statewide Durable Striping Re-Advertis Specialized Pavement Marking Inc. JEFF MINNICK 09/11/2012 03/06/2014 1,874,250.67

008363 Completed STATE 009 Sr 9, Pilchuck Creek Replace Bridge Granite Construction Company DAVE CRISMAN 10/29/2012 02/07/2017 8,891,323.69

008366 Completed STPE-0104(047) 104 Sr 104, Hood Canal Bridge Shoulder Retrofit Razz Construction, Inc. MICHELE BRITTON 10/03/2012 12/03/2013 916,323.00

008368 Completed STPF9999(637) 021 Sr 21 Et Al, Eastern Region - Safety Res Frank Gurney, Inc. DARREL MCCALLUM 11/02/2012 02/06/2014 1,273,710.25

008369 Completed IM-0052(206) 005 I-5, Barnes Road And Us 12 Interchanges Illuminati Tst Inc Dba Travers Electric LORI FIGONE 09/28/2012 08/06/2013 179,997.10

008371 Completed ER(NH)-1201(001) 090 I-90, Raging River Bridge Vicinity Slope Stablizat Carter & Company, Inc. Dba HIEN TRINH 10/10/2012 02/12/2014 354,900.25

008372 Completed STATE Pcc Railroad Rehabilitation Cw Line H & H Engineering Construction CHAD SIMONSON 11/06/2012 11/25/2013 1,522,758.00

008374 Completed FBD-2011(043) Friday Harbor Term Ped/Safety Improve Pedestrian & Strider Construction Co., Inc. JOHN CALLAHAN 11/30/2012 09/13/2013 283,032.00

008375 Completed BH-0024(018) 024 Sr 24, S Of Othello Sagehill Wasteway Deck Repair Penhall Company KEVIN WALIGORSKI 11/28/2012 06/03/2014 312,822.50

008376 Completed BR-NH-0101(307) 101 Us 101, Shore Rd To Kitchen-Dick Rd Widening Scarsella Bros., Inc. JERRY MOORE 12/11/2012 10/07/2019 27,069,690.00

008377 Completed BH-0020(170) 020 Sr 20, Snc Railroad Bridge Seismic Retrofit Nordland Construction JERRY MOORE 12/03/2012 10/23/2013 204,776.00

008378 Completed HSIP0195(054) 195 Cheney-Spokane Road New I/C - New Interchange Selland Construction, Inc. CHAD SIMONSON 12/07/2012 12/21/2017 6,408,374.60

Dec 25, 2019 133 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008379 Completed BH/STPF0099(102) 099 Sr 99, Spokane Street Overcrossing Timber Replacem Midmountain Contractors, Inc. HIEN TRINH 12/19/2012 08/14/2015 9,213,158.00

008380 Completed BH0016(025) 016 Tnb Special Repair Mowat Construction Company MARYLOU NEBERGALL 11/28/2012 04/23/2014 434,604.00

008381 Completed CM-HSIP-STPE0099(110 099 Sr 99, Lincoln Way Vic To Airport Rd Vic Sb Sidewa Interwest Construction, Inc. MARK SAWYER 01/08/2013 01/13/2015 1,278,347.10

008383 Completed IM0906229 090 I-90, Spokane Viaduct Latah Creek To Divison St - Northeast Electric, Llc BOB HILMES 12/12/2012 01/06/2014 1,193,873.67

008384 Completed STATE 020 Sr 20, Challenger Rd Vicinity Unstable Slope (#673 Trimaxx Construction, Inc. SHANE SPAHR 12/11/2012 08/06/2013 354,903.50

008385 Completed NH-0002(825) 002 Us 2, E Of Coles Corner Box Culvert Selland Construction, Inc. ROBERT ROMINE 12/31/2012 05/11/2015 644,193.20

008386 Completed IM0906(228) 090 I-90 Div St To Lib Park Illumin Rebuild Liberty Pa Northeast Electric, Llc BOB HILMES 01/03/2013 03/17/2014 1,196,590.00

008387 Completed STPF-0101(345) 101 Us 101, Commercial Street Signal Replacement Mill Plain Electric, Inc. LORI FIGONE 01/14/2013 09/30/2013 339,135.00

008388 Completed HSIP-9999(440) 005 I-5 / Sr 16, Olympic Region Redirectional Landform Petersen Brothers, Inc. STEVE FUCHS 12/31/2012 05/14/2013 179,962.01

008390 Completed HSIP-0016(026) 016 Sr 16, S Of Burnham Dr To Sr 302 Safety Improvemen Petersen Brothers, Inc. MICHELE BRITTON 12/14/2012 05/21/2013 286,732.50

008392 Completed NH-HSIP-0097(160) 097 Us 97, N Of Daroga State Park Turn Lanes Selland Construction, Inc. ROBERT ROMINE 12/31/2012 06/18/2014 227,055.00

008393 Completed IM/NHS-9999(460) 405 Concrete Pavement Rehabilitation Guy F. Atkinson Construction, Llc. MARY ANN REDDELL 03/04/2013 07/25/2014 7,277,888.00

008394 Completed CM9999(639) 090 Variable Message Signs Replacement Replacement - I Colvico, Inc. BOB HILMES 01/11/2013 12/05/2014 790,104.00

008395 Completed BH0904(121) 090 I90 2013 Er Bridge Deck Replace Mowat Construction Company CHAD SIMONSON 01/22/2013 10/28/2013 497,991.50

008397 Completed STPF0009(067) 009 Sr 9, Np Creek Fish Passage Barrier Removal Stremler Gravel Inc SHANE SPAHR 02/05/2013 11/17/2014 351,486.00

008399 Completed NH-0821(093) 082 Us12 To Valley Mall Vic Paving Columbia Asphalt & Gravel, Inc. SCOTT GOLBEK 02/13/2013 04/28/2014 2,671,716.65

008400 Completed IM-HSIP-9999(442) 090 Sr 92 / I-90, Intersection Improvements & Regionwi Graham-Marshbank Jv DAVE LINDBERG 04/16/2013 10/21/2019 7,131,691.00

008402 Completed FBD0021(022) 021 Keller Ferry Terminal Rehab Terminal Rehabilitatio Max J. Kuney Company BOB HILMES 02/20/2013 10/26/2015 1,930,000.00

008403 Completed IM-4053(962) 405 Nb Sr167 Ramp-Nb 405 Major Drainage Rep Major Drai Active Construction, Inc. ALETA BORSCHOWA 03/05/2013 01/14/2016 489,405.21

008404 Completed STPF0730(003) 730 Us730 Spur Paving - Paving Cpm Development Corporation MOE DAVARI 02/28/2013 10/14/2013 1,332,332.32

008405 Completed IM0053(940) 005 Sign Replace/Lane Electrical & Express Lane Electr Valley Electric Co Of Mt Vernon Inc HIEN TRINH 02/19/2013 03/17/2015 4,878,672.00

008406 Completed IM-0053(968) 005 Sr510-Sr512 Its Fiber Improvements I-5 Magnum Power Llc KIM MUELLER 02/25/2013 06/11/2014 1,104,454.09

008407 Completed CMAQ2009(39) 005 I5 Traveler Info/Incident Mgmt Ph2 Incident Manage Northeast Electric, Llc CHAD HANCOCK 01/30/2013 09/09/2013 157,534.00

008408 Completed GBT8081 163 Pt Defiance/Tahlequa Trans Span O/Lays Physical Se Dalton Electric Company JOHN CALLAHAN 02/20/2013 10/14/2013 399,949.00

008409 Completed CBI0097(155) 097 N Ov Riverside Nb Passing Lane Nb Passing Lane Selland Construction, Inc. KEVIN WALIGORSKI 02/04/2013 06/12/2014 829,108.19

008411 Completed NH/STPF-0000(635) 012 Us12 Scr Region-Wide Safety Construction Ahead, Inc. Dba MOE DAVARI 02/09/2013 10/15/2013 376,897.75

008412 Completed STATE Anacortes Term Pavement/Overlay Rehab Pavement And Interwest Construction, Inc. JOHN CALLAHAN 03/12/2013 12/03/2013 257,365.00

Dec 25, 2019 134 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008413 Completed NH-0101(162) 101 Us101 Ennis St Signal Rebuild Rebuild Signal Taurus Industries Inc JERRY MOORE 03/04/2013 06/13/2014 256,646.00

008414 Completed BH-0053(962) 005 I-5, Seattle Area Bridges Phase 1 Deck Rehab And E Mowat Construction Company ALETA BORSCHOWA 04/15/2013 06/17/2015 3,950,268.66

008415 Completed HSIP0026(026) 026 Sr26 Othello @1st St Ph 2 Phase 2 Granite Construction Company ROBERT ROMINE 03/18/2013 06/03/2014 1,043,493.44

008416 Completed CBI-0539(014) 539 Sr 539 / I-5 To Horton Road Access Management Colacurcio Brothers, Inc. CHRIS DAMITIO 04/29/2013 05/30/2014 1,685,790.15

008417 Completed STATE 017 Sr 17 & Sr 28, Ncr Ada Rural Upgrades 2013 Halme Builders Inc ROBERT ROMINE 03/11/2013 01/06/2014 169,178.00

008418 Completed CBI-0546(006) 546 Sr 546, Depot Rd And Bender Rd Intersection Improv Colacurcio Brothers, Inc. CHRIS DAMITIO 04/02/2013 03/02/2015 2,149,051.85

008419 Completed BH-0902(435) 090 I-90, Easton To Ellensburg Vic Wb And Eb Bridges - Penhall Company SCOTT GOLBEK 04/19/2013 01/14/2015 3,526,488.99

008420 Completed STPR24AQ(001) Sr 155, Town Of Coolee Dam Crest Drive Paving Granite Construction Company KEVIN WALIGORSKI 03/20/2013 02/25/2014 149,909.00

008421 Completed STPF-0291(023) 291 Sr 291, Division St To Stevens Co Line Paving Shamrock Paving, Inc. BOB HILMES 05/08/2013 10/29/2014 3,791,714.75

008423 Completed ER-0701(006) 020 Sr 20, Skagit River - Ced Permanent Restoration Trimaxx Construction, Inc. SHANE SPAHR 05/01/2013 01/27/2016 5,164,771.35

008424 Completed CBI0097158 097 Us97 N Of Brewster - Passing Lane Granite Construction Company KEVIN WALIGORSKI 04/02/2013 03/31/2015 979,499.91

008427 Completed STPF-NH-0097(122) 097 Us 97, W Wapato Rd To Lateral A - Paving & Replace Columbia Asphalt & Gravel, Inc. MOE DAVARI 04/08/2013 03/10/2014 3,019,524.80

008428 Completed NH-0395(052) 395 Us 395, Lind Rd Vicinity - Intersection Improvemen Central Washington Asphalt, Inc. MOE DAVARI 04/10/2013 03/25/2014 442,292.50

008429 Completed ITS2003062 014 Sr14 Traveler Info Enhancements Ph Ii Phase Ii Northeast Electric, Llc CHAD HANCOCK 04/02/2013 01/06/2014 146,654.00

008431 Completed STPF0112025 112 Sr 112, Colville Creek - Fish Barrier Removal Thompson Bros. Excavating, Inc. JERRY MOORE 04/11/2013 03/03/2014 995,503.70

008432 Completed BR-0520(051) 520 Sr 520 West Connection Bridge Mowat-American Jv JOHN CHI 05/08/2013 03/25/2015 22,129,243.20

008433 Completed STPF-0014(071) 014 Sr 14, 2 Miles E Of Christy Rd To I-182 Paving Granite Construction Company MOE DAVARI 04/18/2013 12/09/2013 2,214,307.00

008434 Completed STATE Sr 20, Coupeville Ferry Terminal Ada Compliance Im Larry Brown Construction, Inc. JOHN CALLAHAN 04/19/2013 08/09/2013 40,834.00

008435 Completed BH-0053(969) 005 I-5, Nisqually River Bridges Bridge Painting Intech Contracting Llc KIM MUELLER 04/25/2013 11/13/2014 4,993,368.87

008436 Completed STPF-0011(040) 011 Sr 11, Padden Creek Fish Barrier Removal Ram Construction General Contractor CHRIS DAMITIO 04/22/2013 05/06/2015 1,761,155.40

008437 Completed STPF-9999(650) 023 Sr 23 Et Al, 2013 Eastern Region Chip Seal Poe Asphalt Paving, Inc. CHAD SIMONSON 05/02/2013 12/03/2013 5,059,746.75

008438 Completed STPF-0531(009) 531 43rd Ave To Sr 9 Paving Granite Construction Company MARK SAWYER 05/07/2013 11/16/2015 1,229,150.50

008439 Completed IM-0053(063) 005 Sr 104 To 52nd/220th Sw Paving I-5/220th St Sw I/C Granite Construction Company MARK SAWYER 04/22/2013 07/19/2018 3,624,239.33

008440 Completed CMAQ-2012(019) 205 I-205, Padden Pkwy-Ne 134th St Traveler Info Mill Plain Electric, Inc. CHAD HANCOCK 04/29/2013 03/24/2014 751,804.00

008441 Completed NHPP0012(203) 012 Us12 Pave Sargent Blvd-Wynooche Riv Granite Construction Company SCOTT IRELAND 04/30/2013 01/13/2014 1,066,000.00

008442 Completed NH-0101(163) 101 Us 101 Couplet, Aberdeen Signals Rehabilitation Mill Plain Electric, Inc. SCOTTY IRELAND 04/23/2013 01/27/2015 683,830.00

008443 Completed IM-0902(445) 090 I-90, Mp 65.54 To Easton Hill Eb & Wb - Paving Granite Construction Company SCOTT GOLBEK 05/17/2013 08/14/2015 5,359,359.00

Dec 25, 2019 135 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008444 Completed STATE 007 Sr 7, Muck Cr Trib To Nisqually River - Fish Barri Active Construction, Inc. STEVE FUCHS 05/13/2013 12/16/2015 1,125,102.00

008445 Completed NH-0018(039) 018 Sr 18, Eb Carey Creek Tributary To Issaquah-Hobart Watson Asphalt Paving Company, HIEN TRINH 05/01/2013 08/06/2014 1,169,961.60

008446 Completed STPF-0027(014) 027 Sr27 32nd Ave To Jct Sr 290 Pave R Knife River Corporation-Northwest CHAD SIMONSON 05/21/2013 07/28/2014 1,880,924.90

008447 Completed CBI-0021(021) 021 Sr 21, 1.1 Miles North Of Rin Con Creek Road To Ca Central Washington Asphalt, Inc. CHAD SIMONSON 05/30/2013 05/12/2014 2,087,572.03

008448 Completed NHS-0503(026) 503 Ne 65th - Padden Pkwy - Median Curb Nutter Corporation Dba Nutter CHRIS TAMS 04/30/2013 12/09/2013 195,017.00

008449 Completed NHPP/STPF-9999(434) 012 Us 12 Et Al, 2013 Scr Region-Wide Chip Seal Granite Construction Company MOE DAVARI 06/24/2013 05/25/2014 5,644,683.25

008450 Completed NHPP-0097(135) 097 Us97 I-90 Br To Desmond Rd Paving Granite Construction Company SCOTT GOLBEK 05/28/2013 11/13/2014 700,800.00

008452 Completed BH-0107(007) 107 Sr 107, Chehalis River Bridge Seismic Retrofit Quigg Bros., Inc. RICKY BHALLA 05/13/2013 04/22/2014 1,131,004.00

008453 Completed DEMO-0031(029) 031 Sr31, Pend Orielle County Pedestrian Improvements Knife River Corporation-Northwest BOB HILMES 05/30/2013 11/10/2014 569,663.50

008455 Completed NH-0512(016) 512 Sr512 Jct I-5 To Ne Of 104th Paving Tucci & Sons, Inc. JON DEFFENBACHER 05/28/2013 05/09/2014 2,779,289.70

008456 Completed STPF-0411(014) 411 Sr411 Tenant Way-Lincoln St Concrete Rehabilitatio Selby Bridge Company Inc LORI FIGONE 05/13/2013 01/09/2014 267,919.50

008457 Completed BH/NH-0018(038-03 018 Sr18/Sr99 Vic To Green River Bridge Paving And Bri Tucci & Sons, Inc. ALETA BORSCHOWA 05/20/2013 03/03/2016 1,813,430.00

008458 Completed CBI-0097(157) 097 Us 97, Cameron Lake Rd Intersection Improvements Granite Construction Company KEVIN WALIGORSKI 05/20/2013 05/13/2015 889,550.32

008460 Completed NHPP-0053(966) 005 I-5 M St & I-705 Overcrossings Seismic Retrofit Quigg Bros., Inc. KIM MUELLER 05/30/2013 05/07/2015 3,237,136.00

008461 Completed NHPP-0522(054) 522 Sr 522, Echo Lake Rd Vic To Snohomish River Br Pav Lakeside Industries, Inc. JOHN CHI 05/24/2013 10/27/2014 981,511.35

008462 Completed NHPP-2051(283) 005 I-205 / I-5, Sr 14 To I-5 Merge Concrete Rehabilit Penhall Company CHRIS TAMS 05/14/2013 06/13/2014 2,240,474.35

008463 Completed NH-0101(339) 003 Sr3, Us101 To End Front St - Paving Northwest Asphalt Inc SCOTTY IRELAND 06/10/2013 10/07/2014 2,037,908.08

008464 Completed STATE 006 Sr6, Willapa River Bridge - Replace Bridge Rotschy, Inc. COLIN NEWELL 05/20/2013 04/26/2016 4,077,489.75

008465 Completed NY0101(169) 101 Us101 & Sr 108, S Of Skookum Creek Bridge To E Of Lakeside Industries, Inc. STEVE FUCHS 06/04/2013 01/22/2014 1,201,485.24

008468 Completed STATE Pt Townsend Ferry Terminal Emerg Gen 250 Kw Emerge Valley Electric Co Of Mt Vernon Inc JOHN CALLAHAN 05/24/2013 11/26/2013 151,175.75

008470 Completed HP-9999(415) 182 Sr182, Road 100 Interchange Vic - Its Improvements Colvico, Inc. MOE DAVARI 06/10/2013 09/24/2013 83,534.00

008471 Completed STATE 005 I-5, Squalicum Creek Channel Fish Passage Razz Construction, Inc. CHRIS DAMITIO 06/10/2013 08/24/2015 947,436.00

008472 Completed STPF-0510(015) 510 Sr 510, Reservation Road Vicinity Intersection Imp Klb Construction, Inc. STEVE FUCHS 06/11/2013 09/21/2015 2,630,698.60

008473 Completed STATE 005 I-5, Mellen Street To Blakeslee Junction - Stage 2 Scarsella Bros., Inc. COLIN NEWELL 07/16/2013 03/30/2018 48,221,444.44

008474 Completed STPF-0007(023) 007 Sr 7, Alder Canyon Slide Emergency Slope Stabiliza Scarsella Bros., Inc. JON DEFFENBACHER 06/13/2013 03/28/2014 507,508.09

008477 Completed STATE Pcc Railroad Rehabilitation P & L Line / Pv Hooper Balfour Beatty Rail Inc Dba CHAD SIMONSON 07/19/2013 02/12/2015 1,274,905.00

008478 Completed NH-0101(149) 101 Us 101, Purdy Canyon Vic Slide Stabilized Slope Quigg Bros., Inc. STEVE FUCHS 07/25/2013 07/21/2015 1,126,831.75

Dec 25, 2019 136 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008479 Completed STATE 020 Sr 20 Spur, Friday Harbor Ferry Terminal Transfer Interwest Construction, Inc. JOHN CALLAHAN 06/20/2013 12/03/2013 95,749.00

008481 Completed STATE Sr 20 Spur, Friday Harbor & Orcas Ferry Terminals Manson Construction Co. JOHN CALLAHAN 06/26/2013 03/10/2014 1,338,018.00

008482 Completed NHPP0051(290,291) 005 I-5, Nb & Sb, Ne 179th St To North Fork Lewis Rive Kerr Contractors Oregon, Inc. LORI FIGONE 06/24/2013 09/30/2015 4,468,700.00

008483 Completed STATE 002 Us 2 Et Al, 2013 Statewide Durable Striping Apply-A-Line, Inc. SCOTT GOLBEK 07/15/2013 04/08/2014 2,427,629.86

008484 Completed NHPP-0012(214,215 012 Us 12, E Of Silverbrook Rd And E Of Slide Bridge - Sterling Breen Crushing Inc JEFF MINNICK 07/10/2013 04/14/2014 344,401.38

008485 Completed STPF-9999(416) Ncr Sign Update 2013 Construction Ahead, Inc. Dba KEVIN WALIGORSKI 06/25/2013 03/07/2016 625,384.00

008486 Completed STATE 530 Sr 530, N Brooks Cr Rd To Squire Cr Vic Stormwater Taylor'S Excavators Inc DAVE CRISMAN 07/01/2013 12/23/2013 336,444.20

008487 Completed NHPP-0052(207)IM- 005 I-5, Carpenter Rd Vic Stormwater Retrofit Nova Contracting Inc STEVE FUCHS 07/01/2013 09/24/2014 218,978.00

008488 Completed STATE Sr 160, Southworth Ferry Terminal Upland Parking L Transportation Systems, Inc. JOHN CALLAHAN 07/17/2013 04/24/2014 188,450.50

008489 Completed STATE 005 I-5, Chamber Way Bridge Special Repair Olivas Valdez Inc CHRIS TAMS 07/11/2013 06/06/2014 408,303.00

008491 Completed STATE 005 I-5, M St To Portland Ave Vault Removal Midmountain Contractors, Inc. JON DEFFENBACHER 07/15/2013 05/27/2014 1,693,757.00

008492 Completed NHPP-0902(443) 090 I-90, Oakes Ave, Thorp Rd, Indian John Hill Eb/Wb Northeast Electric, Llc SCOTT GOLBEK 07/16/2013 08/07/2014 995,364.09

008493 Completed STATE 162 Sr 162, Ball Creek Culvert Replacement Whh Nisqually Federal Services, Llc STEVE FUCHS 07/08/2013 05/26/2015 571,143.15

008494 Completed STPF-0106(005) 106 Sr 106, Twanoh Falls Chronic Environmental Deficie Tri-State Construction Inc MICHELE BRITTON 07/09/2013 07/16/2014 1,422,477.00

008495 Completed STP-0906(231) 090 I-90, Liberty Lake Roundabout Wm. Winkler Company DARREL MCCALLUM 07/31/2013 03/05/2015 1,217,332.08

008496 Completed TIGER4-0395(100) 395 Us 395, Nsc - Bnsf Railway Structures/Realignment Apollo Inc BOB HILMES 10/03/2013 09/12/2018 15,368,729.52

008497 Completed STATE 305 Sr 305, Eagle Harbor Maintenance Facility Pavement Lakeside Industries, Inc. JOHN CALLAHAN 07/15/2013 11/04/2013 97,299.00

008498 Completed NH-2013(079) 104 Sr 104, Kingston Tml Slips Dolphin Preservation - Orion Marine Contractors, Inc. JOHN CALLAHAN 07/26/2013 04/15/2014 187,388.00

008499 Completed NHPP-0051(289/288 005 I-5, N Fork Lewis River Bridge Nb And Sb Painting Geronimo Painting Company LORI FIGONE 08/01/2013 03/27/2015 11,981,648.40

008500 Completed ER-1303(001) 005 I-5, Skagit River Bridge Permanent Bridge Replacem Max J. Kuney Company PATRICK FULLER 06/19/2013 02/18/2015 6,875,800.00

008501 Completed IM-0053(968) 005 I-5, Sr 510 To Sr 512 Congestion Management Granite Construction Company KIM MUELLER 08/05/2013 08/09/2017 9,823,887.57

008502 Completed STATE Wsf Terminal On-Call Maintenance Painting Hci Industrial & Marine Coatings TOM CASTOR 08/13/2013 05/02/2016 987,094.00

008503 Completed STATE 005 I-5, Sb S 320th St Vicinity Noise Wall Replacement Massana Construction, Inc. ALETA BORSCHOWA 07/24/2013 09/16/2014 201,147.00

008504 Completed BH-0009(059) 009 Sr 9, Getchell Road Bridge Seismic Razz Construction, Inc. JOHN CHI 08/01/2013 06/09/2015 116,157.57

008505 Completed STATE Systemwide On-Call Off-Shore Maintenance Manson Construction Co. TOM CASTOR 08/01/2013 03/07/2016 1,106,399.00

008506 Completed NHPP-0014(069&070 014 Sr 14, Cape Horn Vic And Ice House Lake Culvert Re Nutter Corporation Dba Nutter CHRIS TAMS 08/05/2013 03/18/2014 375,119.22

008507 Completed STATE 231 Sr 231, Rosenoff Rd Drainage Culvert Replacement N.A. Degerstrom, Inc. DARREL MCCALLUM 08/06/2013 04/21/2014 392,052.39

Dec 25, 2019 137 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008508 Completed IM-0053(960),BH(962) 005 I-5, Seattle Area Bridges - Phase 2 Expansion Join Pcl Civil Constructors, Inc. ALETA BORSCHOWA 09/08/2013 06/01/2015 2,160,423.83

008509 Completed STATE 020 Sr 20, Port Townsend Ferry Terminal Pavement Prese Lakeside Industries, Inc. JOHN CALLAHAN 08/27/2013 12/05/2013 148,950.00

008510 Completed STPF-ER-0902(431) 097 Us 97, Dry Creek W Of Ellensburg - Construct Bridg Apollo Inc SCOTT GOLBEK 08/26/2013 03/10/2015 1,436,900.00

008512 Completed STATE 272 Sr 272, Colfax Area Drainage Improvements H.L.T. Construction Inc CHAD SIMONSON 08/30/2013 10/28/2013 204,931.00

008513 Completed BR-0167(047) 167 Sr 167, Puyallup River Bridge - Bridge Replacement Guy F. Atkinson Construction, Llc. BRENDEN CLARKE 10/18/2013 12/21/2017 23,220,888.00

008514 Completed STATE Northwest Region Traffic Management Center Project Pcl Construction Services Inc ERIC YATES 11/22/2013 12/17/2015 8,934,000.00

008515 Completed STPF105(021)NHPP101( 105 Sr 105, Heather Rd And Us 101 0.5 Mi N Of Raymond Scarsella Bros., Inc. LORI FIGONE 09/08/2013 03/11/2014 335,250.50

008516 Completed STPF-0507(026) 507 Sr 507, Reynolds Ave Signal Replacement Project Tst Inc Dba Travers Electric COLIN NEWELL 09/17/2013 08/28/2014 438,095.55

008517 Completed STPUS-0097(162) 002 Us 2/97, Easy St Link Stop Wb Central Washington Asphalt, Inc. KEVIN WALIGORSKI 09/11/2013 08/20/2014 102,985.50

008518 Completed STPF-ER-1303(001) 005 I-5, Skagit River Bridge Bridge Elements Repair Pcl Civil Constructors, Inc. DAVE CRISMAN 08/23/2013 11/24/2014 2,739,075.00

008519 Completed HSIP-0101(348) 101 Us 101, Fairmount Rd Vicinity Safety Improvements Lakeside Industries, Inc. JERRY MOORE 09/08/2013 02/14/2014 64,472.95

008520 Completed NHPP-0902(446) 090 I-90, 1.0 Mile W Of Snoqualmie Summit Eb - Rockfal Guy F. Atkinson Construction, Llc. WILL SMITH 09/19/2013 02/20/2014 308,837.00

008521 Completed STPF-9999(649) Olympic Region Major Electrical Rehabilitation Reb Mill Plain Electric, Inc. STEVE FUCHS 09/17/2013 09/30/2014 485,598.42

008524 Completed STATE 163 Sr 163, Point Defiance Ferry Terminal Trestle Repa Manson Construction Co. JOHN CALLAHAN 10/08/2013 10/20/2014 129,099.00

008525 Completed STATE 017 Sr 17, Moses Lake Noise Barrier Wall Drainage Upda Krci Llc ROBERT ROMINE 09/30/2013 04/22/2014 158,343.50

008529 Completed STPF-0142(022) 142 Sr 142, Glenwood Road Vicinity Culvert Replacement Thompson Bros. Excavating, Inc. CHRIS TAMS 10/07/2013 02/19/2014 160,115.50

008530 Completed HSIP-0171(017) 171 Sr 171, Moses Lake Area Pedestrian Improvements Colvico, Inc. JOSH PATRICK 10/14/2013 10/27/2014 401,568.00

008533 Completed FBD-2013(071) 020 Sr 20 Spur, Lopez Island Ferry Terminal Upland Ada Matia Contractors Inc JOHN CALLAHAN 11/12/2013 12/23/2014 318,984.90

008535 Completed NH-0002(180) 002 Us 2, Espanola Rd To Jct I-90 - Paving Cpm Development Corporation BOB HILMES 12/09/2013 02/29/2016 5,108,782.97

008536 Completed STPF-0203(017) 203 Sr 203, Tolt River Bridge To Mcdougall St - Paving Watson Asphalt Paving Company, MARK SAWYER 12/03/2013 02/26/2015 4,285,223.94

008538 Completed NHPP-0904(122) 090 I-90, Grant Co Line To Sr 21 - Paving Central Washington Asphalt, Inc. DARREL MCCALLUM 12/23/2013 03/05/2015 4,815,095.70

008539 Completed STPF-0904(123) 904 Sr 904, Betz Rd To I-90 - Paving Cpm Development Corporation CHAD SIMONSON 11/20/2013 11/26/2014 872,473.24

008540 Completed NHPP-0905(103) 090 I-90, Lincoln Co Line To Salnave Rd - Paving Cpm Development Corporation DARREL MCCALLUM 12/12/2013 07/28/2015 3,687,413.40

008541 Completed STATE 104 Sr 104, Edmonds Ferry Terminal Entry Replacement Thornberg Construction Company, TOM CASTOR 12/05/2013 05/09/2014 40,001.00

008542 Completed BH-0901(270) 090 I-90, Wb East Channel Bridge Expansion Joint Repla Mowat Construction Company HEIN TRINH 12/05/2013 01/02/2015 1,153,044.74

008543 Completed STPF-0101(351) 101 Us 101, W Of Steamboat Island Rd To Black Lake Blv Lakeside Industries, Inc. STEVE FUCHS 12/03/2013 01/07/2015 894,042.06

008544 Completed IM-0053(968) 005 I-5, Sr 510 To Sr 512 Its And Ramp Revisions Tucci & Sons, Inc. KIM MUELLER 12/24/2013 11/25/2015 2,322,690.40

Dec 25, 2019 138 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008545 Completed BH-0108(007) 108 Sr 108, Wildcat Creek Bridge 108/4 Scour Repair Rognlin'S, Inc. STEVE FUCHS 12/31/2013 12/17/2014 117,719.00

008546 Completed STATE 163 Sr 163, Point Defiance Ferry Terminal Floating Dol Orion Marine Contractors, Inc. JOHN CALLAHAN 12/20/2013 02/17/2015 1,655,998.00

008547 Completed IM0902(445)STPF(4 090 I-90, Price Creek Vicinity To Mp 65.54 - Paving Columbia Asphalt & Gravel, Inc. SCOTT GOLBEK 12/18/2013 06/23/2015 5,944,899.20

008548 Completed CBI-9999(638) 539 Sr 539 / Sr 9, Advanced Traveler Information Syste Valley Electric Co Of Mt Vernon Inc CHRIS DAMITIO 12/16/2013 05/12/2015 1,875,189.10

008549 Active STPF-0099(122) 099 Sr 99, Alaskan Way Viaduct - Replacement North Acc Guy F. Atkinsonconstruction, Llc. PATRICK FULLER 01/24/2014 41,640,622.60

008550 Completed STPH-2002(009) 305 Sr 305, Bainbridge Ferry Terminal - Main Terminal Phc Asani Inc Dba Phc Construction JOHN CALLAHAN 12/18/2013 09/16/2016 1,940,274.00

008551 Completed CM-0195(155) 195 Us 195, Hatch Rd To Cheney-Spokane Rd Congestion & Colvico, Inc. BOB HILMES 01/08/2014 12/09/2014 610,254.00

008553 Completed NHPP-STPF-9999(607) 012 Us 12 Et Al, 2014 Scr Region Wide Chip Seal Poe Asphalt Paving, Inc. MOE DAVARI 01/13/2014 10/17/2014 5,785,946.58

008557 Completed NH-0002(830) 002 Us 2, Westwood Rd To Pend Oreille Co Line - Paving Spokane Rock Products Inc BOB HILMES 01/15/2014 12/15/2014 1,600,000.00

008558 Completed STPF-DEMO-0902(39 090 I-90, Snoq. Pass Vic - Pccp Rehab Eb/Stormwater Re Acme Concrete Paving, Inc. SCOTT GOLBEK 02/10/2014 01/13/2016 6,425,000.00

008559 Completed BH-0053(967) 005 I-5, S 272nd St Vic To S Rose St Seismic Retrofit Quigg Bros., Inc. ALETA BORSCHOWA 01/23/2014 12/19/2016 8,504,188.00

008560 Completed HSIP-0009(068) 009 Sr 9, 32nd St Se & 84th St Ne - Safety Improvement Rodarte Construction Inc DAVE LINDBERG 03/18/2014 11/12/2019 5,699,005.00

008564 Completed IM-0906(230) 090 I-90, Vicinity Liberty Park To Havana St - Illumin Colvico, Inc. BOB HILMES 01/15/2014 10/05/2015 1,105,094.00

008565 Completed BH-0053(695) 005 I-5, Sr 18 I/C To S 288th St Seismic Retrofit Ceccanti, Inc. ALETA BORSCHOWA 01/15/2014 06/08/2016 4,644,837.00

008566 Completed STPF-NHPP-9999(441) 002 Ncr Seal 2014 Central Washington Asphalt, Inc. CHAD SIMONSON 02/03/2014 10/22/2015 15,496,657.95

008567 Completed STPF-9999(617) 155 Sr 155 & Sr 215, Omak Area Paving Granite Construction Company KEVIN WALIGORSKI 03/12/2014 07/26/2017 3,184,187.96

008568 Completed NHPP-0903(073) 090 I-90, W Of George - Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 02/10/2014 04/07/2015 2,872,536.80

008569 Completed STATE 090 I-90, Two-Way Transit & Hov Operations Stage 3a - Midmountain Contractors, Inc. HEIN TRINH 04/01/2014 10/10/2016 7,399,235.00

008570 Completed STPU-0097(164) 097 Us 97a & Sr 150, Traffic Signal And Channelization Neppel Electrical & Controls, L L C KEVIN WALIGORSKI 03/03/2014 04/22/2015 188,226.10

008572 Completed STPF-0006(021) 006 Sr 6, Rock Creek Bridges - Replace Bridges 6/102 & Scarsella Bros., Inc. COLIN NEWELL 02/25/2014 07/05/2017 11,612,612.12

008573 Completed STATE 502 Sr 502, I-5 To Battle Ground Add Lanes Stage 2 Rotschy, Inc. DEVIN RECK 04/09/2014 09/11/2018 27,544,360.31

008575 Completed HSIP-0243(003) 243 Sr 243, Mattawa - Intersection Improvements West Company, Inc. JOSH PATRICK 03/20/2014 04/23/2015 1,254,587.48

008576 Completed BH-STPF-0410(055) 410 Sr 410, Scatter Creek Bridge Seismic Massana Construction, Inc. ALETA BORSCHOWA 03/18/2014 05/04/2016 697,344.00

008577 Completed CMAQ-0099(125) 099 Sr 99, Airport Road Intersection Transit Queue Byp Totem Electric Of Tacoma, Inc. MARK SAWYER 04/21/2014 08/23/2016 504,206.01

008579 Completed CM-0503(027) 503 Sr 503, Traveler Information Incident Management A Mill Plain Electric, Inc. CHAD HANCOCK 04/14/2014 08/03/2015 639,867.16

008580 Completed STP-0129(008) 129 Sr 129, Oregon State Line Vic To Mp 11.35 Vic - St Strider Construction Co., Inc. MOE DAVARI 03/20/2014 09/16/2014 431,860.00

008581 Completed STPF-9999(563) 509 Sr 509, Wapato Creek To Norpoint Way Ne - Paving Tucci & Sons, Inc. KIM MUELLER 04/14/2014 01/11/2016 1,327,620.30

Dec 25, 2019 139 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008582 Completed BR-0054(283) 005 I-5, Stillaguamish River Bridge Major Bridge Rehab Mowat Construction Company DAVE CRISMAN 05/20/2014 06/10/2015 5,877,201.96

008583 Completed STPF-HISP9999(669 164 Sr 164 & Sr 410, High Point St To Sr 410 Watson St Cpm Development Corporation HEIN TRINH 04/09/2014 02/19/2016 2,139,174.50

008584 Completed STATE 018 Sr 18, Taylor Creek Scour Protection Matia Contractors Inc ALETA BORSCHOWA 04/01/2014 03/31/2015 138,989.70

008585 Completed NH-0099(118) 099 Sr 99, Spokane St Bridge To Alaskan Way Viaduct Co Penhall Company JOHN CHI 04/23/2014 07/28/2015 954,447.00

008586 Completed STPF-0410(060) 410 Sr 410, 0.47 Mi To 1.45 Miles E Of Chinook Pass - Kc Equipment Llc MOE DAVARI 04/24/2014 06/08/2015 832,126.00

008587 Completed NHPP-STPF-9999(664) 002 Us 2 Et Al, 2014 Eastern Region Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 04/14/2014 06/18/2015 8,876,791.30

008588 Completed STATE Wsdot Facilities, Swr Hq Admin Bldg - Hvac System Robert G Davis & Associates Dba SAM LEIREN 04/17/2014 08/18/2016 47,515.00

008589 Completed STPUL,STPF0051293 527 Sr 527, I-405 Interchange To Sr 524 Vicinity Pavin Granite Construction Company MARK SAWYER 04/21/2014 01/03/2018 2,247,000.00

008594 Completed NHPP-0055(229) 005 I-5, Nooksack River Bridges Painting Dunkin & Bush Inc CHRIS DAMITIO 04/30/2014 03/21/2016 3,389,833.00

008597 Completed NH-0520(052) 520 Sr 520, 108th Ave Ne To W Lk Sammamish Pkwy Paving Granite Construction Company MARK SAWYER 05/05/2014 08/21/2017 2,975,187.23

008598 Completed STPF(ER)1302(006) 016 Sr 16, Olympic Drive Nw Bridge Special Repair Massana Construction, Inc. KIM MUELLER 05/05/2014 10/29/2015 898,827.25

008600 Completed STPF-0410(059) 410 Sr 410, Enumclaw Golf Course Vicinity To National Granite Construction Company MOE DAVARI 05/05/2014 12/17/2014 2,539,002.00

008601 Completed NHPP-4053(863) 405 I-405, Sb Se 8th St To Northup Way Vic - Paving C.A. Carey Corporation MARK SAWYER 05/19/2014 05/22/2017 3,787,597.50

008602 Completed BH-0016(024) 016 Sr 16, Tacoma Narrows Bridge Replace Maintenance T Pcl Civil Constructors, Inc. KIM MUELLER 07/21/2014 09/15/2016 7,365,713.00

008603 Completed STATE 020 Sr 20, Coupeville Ferry Terminal Bridge Abutment R Matia Contractors Inc TOM CASTOR 05/19/2014 10/16/2014 76,924.00

008604 Completed STPF-9999(675) 009 Sr 9, 132nd St Ne Vic To Sr 542 Bst Granite Construction Company SHANE SPAHR 05/28/2014 01/15/2015 1,771,500.00

008605 Completed NHPP-0002(277) 002 Us 2, Stevens Pass East Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 05/27/2014 07/26/2016 4,045,000.00

008606 Completed BR-0099(132) 099 Sr 99, Alaskan Way Viaduct - Replacement South Acc Condon-Johnson & Associates Inc PATRICK FULLER 06/30/2014 03/31/2015 1,628,157.30

008607 Active STATE 005 I-5, M St To Portland Ave - Hov Max J. Kuney Company JON DEFFENBACHER 07/01/2014 98,175,443.97

008608 Completed CBI-0539(015) 539 Sr 539, Lynden Aldergrove Port Of Entry Improvemen Granite Construction Company CHRIS DAMITIO 05/27/2014 02/12/2016 3,262,708.80

008609 Completed NH-0101(311) 101 Us 101, Hoh River Erosion Site #2 Bank Stabilizati Strider Construction Co., Inc. RICKY BHALLA 06/02/2014 12/23/2015 2,212,436.00

008610 Completed NHPP-0004(212) 004 Sr 4, Elochoman River Vic. Culvert Replacements Olivas Valdez Inc JOANNA LOWREY 06/02/2014 05/11/2017 1,355,826.00

008611 Completed NHPP-0906(232) 090 I-90, Barker Rd To Idaho State Line - Paving Cpm Development Corporation LARRY LARSON 06/10/2014 09/21/2015 2,365,237.48

008612 Completed STPF-0141(023) 141 Sr 141, White Salmon River Bridge Painting Geronimo Painting Company CHRIS TAMS 06/17/2014 02/12/2015 722,122.10

008614 Completed STPF-NHPP-9999(672) 014 Sr 14 Et Al, Klickitat Co. Chip Seals Granite Construction Company CHRIS TAMS 06/02/2014 01/21/2015 5,140,335.00

008615 Completed ER-1402(001) 530 Sr 530, Slide-Access Road Maintenance And Traffic Granite Construction Company MARK SAWYER 04/25/2014 02/13/2015 3,383,659.00

008616 Completed STPF-0161(034) 161 Sr 161, Lynch Cr Rd To South Cr Bridge-Paving And Doolittle Construction, Llc STEVE FUCHS 06/10/2014 12/10/2014 624,748.70

Dec 25, 2019 140 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008617 Completed FEMA-1402(002) 530 Sr 530, Slide - Roadway Clearing Imco General Construction, Inc. MARK SAWYER 05/02/2014 02/09/2016 4,959,924.00

008618 Completed NHPP-0053(972) 005 I-5, Vicinity Tumwater Blvd To Gravelly Lake Dr - Tucci & Sons, Inc. RICKY BHALLA 06/10/2014 10/30/2015 3,806,279.50

008619 Completed STPF-0108(008) 108 Sr 108, N Of Curran St To S Of Little Creek Casino Granite Construction Company RICKY BHALLA 06/24/2014 01/30/2015 445,759.90

008620 Completed NHPP-2014(086) 304 Sr 304, Bremerton Ferry Terminal Slip 2 Timber Win Orion Marine Contractors, Inc. JOHN CALLAHAN 06/18/2014 05/18/2015 1,209,769.00

008622 Completed STPF-0508(009) 508 Sr 508, I-5 To Sr 7 Chip Seal Doolittle Construction, Llc LORI FIGONE 06/17/2014 02/19/2015 2,068,739.93

008623 Completed STATE 532 Sr 532, Davis Slough Bridge Replacement Widening F Scarsella Bros., Inc. SHANE SPAHR 07/07/2014 09/25/2017 11,718,294.66

008624 Completed SNPP-003(127) 003 Sr 3 & Sr 16, Vic Burley Olalla To Sr 303 Paving Granite Construction Company MICHELE BRITTON 06/17/2014 10/14/2015 2,517,038.70

008625 Active BR-NHPP-0520(053) 520 Sr 520, Montlake To Evergreen Pt. Bridge West Appr Flatiron West Inc STEVE STRAND 08/20/2014 199,537,370.50

008626 Completed NHPP-0008(016) 008 Sr 8, S Of E Fork Wildcat Creek Bridge To S Of Coo Granite Construction Company RICKY BHALLA 06/16/2014 02/27/2015 724,216.70

008627 Completed VPPP-0167(049) 167 Sr 167, Express Toll Lanes Continuous Access Specialized Pavement Marking Inc. ALETA BORSCHOWA 06/24/2014 03/31/2015 242,025.00

008628 Completed CM-0052(210) 005 I-5, Trosper Rd To Marvin Road Signal Upgrade Transportation Systems, Inc. STEVE FUCHS 07/08/2014 12/22/2015 526,705.00

008629 Completed STPUS-0028-(048) 028 Sr 28, Rock Island Road Intersection Improvements Granite Construction Company KEVIN WALIGORSKI 07/02/2014 05/12/2015 260,000.00

008630 Completed ER-1402(003) 530 Sr 530, Skaglund Hill Vic To C-Post Road Vic - Eme Guy F. Atkinson Construction, Llc. DAVE LINDBERG 06/03/2014 12/20/2016 20,570,001.00

008631 Completed LOCAL 082 I-82, Yakima Transit Center Park & Ride Expansion Columbia Asphalt & Gravel, Inc. SCOTT GOLBEK 07/23/2014 11/26/2014 124,086.00

008632 Completed HSIP-0507(027) 507 Sr 507, Yew Street Intersection Improvements Northeast Electric, Llc COLIN NEWELL 07/09/2014 11/03/2015 535,492.75

008633 Completed NHPP-0005(012) 005 I-5, Ne 117th St To Sr 104 Pavement Repair And Its Granite Construction Company DAVE LINDBERG 07/17/2014 06/06/2017 9,287,455.00

008634 Completed NHPP-0005(013) 005 I-5, Ne 39th St Vic To Ne 99th St - Paving Granite Construction Company LEON WINGER 07/07/2014 06/15/2015 1,964,964.00

008636 Completed NHPP-0097(080) 097 Us 97, Biggs Rapids Bridge Painting Intech Contracting Llc SUSAN FELL 07/29/2014 02/17/2016 8,791,665.29

008638 Completed NH-0903(074) 090 I-90, West Of Ryegrass Rest Area Wb - Paving Central Washington Asphalt, Inc. MOE DAVARI 07/07/2014 11/12/2014 461,109.30

008639 Completed STATE 104 Sr 104, Edmonds City Park Vicinity Mid Block Pedes Transportation Systems, Inc. DAVE LINDBERG 08/25/2014 01/20/2016 322,505.65

008640 Completed STATE-TPA 302 Sr 302, Key Peninsula Highway To Purdy Vic. Safety Tucci & Sons, Inc. STEVE FUCHS 07/15/2014 06/22/2015 1,314,684.45

008642 Completed CM-2012(019) 205 I-205, Traveler Information Phase 2 Northeast Electric, Llc CHAD HANCOCK 07/14/2014 04/13/2015 164,345.50

008643 Completed STATE 241 Sr 241, Mabton-Sunnyside Bridge - Emergent Need Re Mowat Construction Company MOE DAVARI 07/22/2014 11/04/2014 344,004.00

008645 Completed STATE 082 I-82, Selah Creek Eb/Wb Rv Dump Station Rehabilita J & K Earthworks Llc SAM LEIREN 09/02/2014 03/08/2016 472,500.00

008647 Completed STATE 090 I-90, Sprague Lake Eb Rv Dump Station Rehabilitati West Company, Inc. SAM LEIREN 09/02/2014 02/01/2016 250,000.00

008649 Completed STATE 012 Us 12,Pecan St Sw - Mp 45.20 Granite Construction Company STEVE BENNETT 07/29/2014 12/11/2015 75,602.00

008652 Completed STATE Dayton Ave Boiler And Control System Replacement A Holmberg Company ERIC YATES 08/19/2014 01/13/2017 758,900.00

Dec 25, 2019 141 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008653 Completed HSIP-0012(222) 012 Us 12, 0.80 Miles E Clear Creek Falls Viewpoint - Rock Supremacy Llc MOE DAVARI 08/25/2014 01/05/2015 280,819.00

008654 Completed STPF-9999(656) 002 Us 2 & Sr 207, Ncr 13-15 Low Cost Pavement Repair Central Washington Asphalt, Inc. JOSH PATRICK 09/02/2014 01/22/2015 111,111.11

008656 Completed STATE Tumwater Mats Lab Hvac And Access Controls - Upgra Mccarthy Jay T Dba SAM LEIREN 09/15/2014 07/16/2015 168,717.00

008657 Completed NH-0901(486) 090 I-90, Lake Washington Floating Bridges Anchor Cabl Orion Marine Contractors, Inc. DAVE LINDBERG 09/26/2014 10/12/2017 2,380,744.00

008658 Completed ER-WA-1403(005) 005 I-5, Klickitat Dr - Unstable Slope A-1 Landscaping And Construction, MIKE ASKARIAN 09/10/2014 08/23/2016 633,327.00

008660 Completed CM-0005(011) 005 I-5 & I-205, Bi-State Corridor Travel Time - Add S Northeast Electric, Llc CHAD HANCOCK 09/23/2014 06/23/2015 661,654.00

008661 Completed TAP-0017(041) 017 Sr 17, City Of Soap Lake Lane Reconfig. & Safety I Apply-A-Line, Inc. KEVIN WALIGORSKI 08/18/2014 05/12/2015 80,169.95

008662 Active TIGER-2014(088) 090 I-90, Two-Way Transit & Hov Operations Stage 3 Imco General Construction, Inc. HEIN TRINH/BORSCHOWA 12/03/2014 120,105,661.15

008664 Completed STATE 205 I-205, Mill Plain Interchange To Ne 18th St Build Cascade Bridge Llc LORI FIGONE 10/22/2014 04/09/2019 24,309,057.10

008665 Completed STATE 167 Sr 167 / 8th St E Vic To S 277th St Vic - Southbou Guy F. Atkinsonconstruction, Llc. SHARIF SHAKLAWUN 12/30/2014 09/16/2019 53,999,888.00

008666 Completed STATE Mt. Baker Tunnel Operations Building Hvac Washingt Design Air Ltd JIM RODGERS 10/31/2014 10/16/2015 194,400.00

008667 Completed STATE 305 Sr 305, Bainbridge Ferry Terminal Slip Maintenance American Construction Co., Inc. JOHN CALLAHAN 10/29/2014 11/25/2015 295,139.00

008668 Completed STPF-9999(661,678 Or Region Wide Basic Safety Guardrail & Signing Petersen Brothers, Inc. STEVE FUCHS 10/31/2014 04/29/2016 931,602.44

008670 Active STATE 005 I-5, Portland Avenue To Port Of Tacoma Road - Nort Hamilton Construction Co. CHUCK MEADE 12/22/2014 134,709,929.50

008671 Completed STPF-0509(027) 509 Sr 509, S 160th St Vic To S 112th St Vic Sb Paving Tucci & Sons, Inc. ALETA BORSCHOWA 12/04/2014 01/27/2016 1,396,690.65

008672 Completed ER-NHPP-1401(003) 012 Us 12, East Of Clear Creek Falls Viewpoint - Culve Wesslen Construction, Inc. SCOTT GOLBEK 10/23/2014 01/16/2015 105,724.18

008673 Completed NHPP-0018(040) 018 Sr 18, Green River (Neeley) Bridge Painting Intech Contracting Llc ALETA BORSCHOWA 12/03/2014 06/09/2016 1,547,080.14

008674 Completed STATE 519 Sr 519, Seattle Ferry Terminal Timber Trestle Pres Pacific Pile & Marine, L.P. JOHN CALLAHAN PE 11/26/2014 05/27/2016 813,880.00

008675 Completed 1404(003)(004) 020 Sr 20 & Sr 153, Methow Valley Flood Repair Emergen Pipkin Inc., Dba Pipkin Constructio KEVIN WALIGORSKI 10/29/2014 02/18/2016 931,893.70

008676 Completed STPR-0203(018) 203 Sr 203, Coe-Clemons Creek Ced Pcl Civil Constructors, Inc. DAVE LINDBERG 02/10/2015 05/25/2017 1,772,452.07

008677 Completed NHPP-0104(053) 104 Sr 104, Hood Canal Bridge - Anchor Cable Replaceme Manson Construction Co. MICHELE BRITTON 12/17/2014 10/06/2017 7,324,203.00

008680 Completed STPF-9999(682) Ncr Sign Update 13-15 A Small Works Roster Project Construction Ahead, Inc. Dba KEVIN WALIGORSKI 12/30/2014 03/16/2016 170,403.00

008681 Completed STATE 016 Sr 16,Vms Rehabilitation - Update Variable Message Northeast Electric, Llc KIM MUELLER 12/29/2014 02/23/2016 489,249.50

008682 Completed STPF-9999(685) Ncr Guardrail Update 13-15 Frank Gurney, Inc. KEVIN WALIGORSKI 01/06/2015 12/30/2015 439,700.35

008683 Completed HSIP0097(163) 097 Us 97 & Sr 241,Us 97/Branch Rd & Sr 241/Mabton - R Central Washington Asphalt, Inc. MOE DAVARI 01/13/2015 02/23/2016 614,000.00

008685 Completed STATE 162 Sr 162, Puyallup River Bridge - Bridge Replacement Selby Bridge Company Inc DEWAYNE MATLOCK 01/05/2015 04/01/2017 5,482,395.00

008687 Completed HSIP-9999(673) 014 Sr 503 Spur, Sr 14, Swr Region Wide Basic Safety - Columbia River Contractors Inc CHRIS TAMS 01/05/2015 07/15/2015 440,156.30

Dec 25, 2019 142 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008688 Completed STPF-0014(075) 014 Sr 14, Sr 221 To 2 Miles E Of Christy Rd - Paving Central Washington Asphalt, Inc. MOE DAVARI 02/02/2015 09/14/2015 2,943,214.50

008689 Completed CBI(0055(243) 005 I-5, Sb Mount Vernon To Joe Leary Slough - Paving Cadman Materials Inc DAVID CRISMAN 01/28/2015 03/24/2016 2,381,922.40

008690 Completed HSIP-0020(174) 020 Sr 20, S Burlington Blvd - Railroad Crossing Impro Colacurcio Brothers, Inc. SHANE SPAHR 12/04/2014 06/11/2015 47,457.00

008691 Completed WA-90-X580 Sr 525, Mukilteo Ferry Terminal (Phase 1) Tank Far Pacific Pile & Marine, L.P. JOHN CALLAHAN 02/20/2015 01/30/2017 8,158,480.00

008693 Completed STATE Pcc Hooper Branch, Pcc Railroad Rehabilitation Hoo Railworks Track Systems, Inc. CHAD SIMONSON 02/18/2015 01/12/2016 517,558.50

008694 Completed STATE 020 Sr 20, Coupeville Ferryterminal - Apron Replacemen American Construction Co., Inc. JOHN CALLAHAN 01/29/2015 03/08/2016 423,499.00

008695 Completed STPF9999(683)NHPP 002 Us 2, Sr 20, Us 97 & I-90, Ncr Its Power Backup An Northeast Electric, Llc KEVIN WALIGORSKI 02/02/2015 03/07/2016 493,453.00

008696 Completed NHPP-0181(017) 181 Sr 181, S 180th St To Southcenter Blvd Paving & Tucci & Sons, Inc. HIEN TRINH 02/02/2015 08/30/2016 1,592,826.90

008697 Completed STPF-9999(667) 2 I-90, Er Region Wide Basic Safety - Guardrail Frank Gurney, Inc. CHAD SIMONSON 02/02/2015 08/06/2015 397,460.30

008698 Completed STATE 099 Sr 99, W Fork Hylebos Creek Fish Passage Scarsella Bros., Inc. ALETA BORSCHOWA 02/10/2015 11/04/2017 1,332,012.12

008699 Completed STATE 161 Sr 161, 22nd St Vic - Drainage Small Works Roster Rw Scott Construction Co MICHELE BRITTON 02/25/2015 06/03/2015 100,392.00

008700 Completed NHPP-0395(102) 395 Us 395, Foster Wells Road Vic To E Elm Road Sb - P Central Washington Asphalt, Inc. MOE DAVARI 02/23/2015 09/17/2015 1,627,907.30

008701 Completed STP-0097(168) 097 Us 97a, Entiat Pedestrian Improvements Halme Builders Inc KEVIN WALIGORSKI 02/11/2015 03/28/2016 239,579.90

008703 Completed BH-0903(060) 090 I-90, Columbia River Vantage Bridge - Painting Abhe & Svoboda, Inc. DAN LEWIS 03/23/2015 01/31/2019 6,711,770.00

008704 Completed STATE Sr 160 & 305 System Wide Ferry Facilities Roof Rep Scholten Roofing, Inc JOHN CALLAHAN 03/17/2015 09/08/2015 249,068.00

008705 Completed NHPP-0195(058) 195 Us 195, Jct Sr 27 To Babbitt Rd - Paving Poe Asphalt Paving, Inc. BOB HILMES 02/10/2015 11/12/2015 1,842,716.11

008707 Completed HSIP-9999(666) 002 Us 2, Er Region Wide Basic Safety - Signing Construction Ahead, Inc. Dba LARRY LARSON 02/17/2015 10/26/2015 168,504.00

008708 Completed STATE Mount Vernon Siding Extension Road Improvements Ro Trimaxx Construction, Inc. DAVE CRISMAN 03/26/2015 09/16/2015 156,381.40

008709 Completed STPF-0303(013) 303 Sr 303, S Of Wm E Sutton Rd To Silverdale Way - Pa Lakeside Industries, Inc. JERRY MOORE 03/06/2015 07/13/2016 2,193,176.93

008710 Completed STPF-NHPP-0020(175) 020 Sr20, Frostad Rd Vic To Sharpes Corner Vic - Pavin Lakeside Industries, Inc. DAVE CRISMAN 04/06/2015 01/06/2016 2,502,023.90

008711 Completed HSIP-STPF-9999(66 017 Sr 17, 26, 28, 207 & 281 Ncr Seal 2015 Central Washington Asphalt, Inc. KEVIN WALIGORSKI 03/16/2015 08/01/2016 3,573,055.73

008715 Active STATE 090 I-90, Keechelus Dam To Stampede Pass Phase 2a- Add Guy F. Atkinsonconstruction, Llc. SCOTT GOLBEK 05/07/2015 72,777,532.41

008716 Completed STATE Pines Road Facility Improvements Washington State Dardan Enterprises, Inc. KEVIN REYNOLDS 03/27/2015 07/14/2016 608,449.00

008717 Completed HSIP-0281(038) 281 Sr 281, South Of Quincy At Road 9 Nw Left Turn Lan Central Washington Asphalt, Inc. KEVIN WALIGORSKI 03/23/2015 05/16/2016 408,273.74

008718 Completed NHPP-0167(050) 167 Sr 167, Nb S 277th St To Green River Bridge Paving Cpm Development Corporation DAVE LINDBERG 04/07/2015 03/28/2017 467,578.77

008719 Completed STPF-9999(686) 020 Sr20, Etal, Er-Regionwide Curve Warning Signing- C Road Products Inc. LARRY LARSON 04/08/2015 07/28/2015 155,064.00

008720 Completed STPF-0009(072) 009 Sr9, Lake Creek Fish Passage Strider Construction Co., Inc. SHANE SPAHR 04/10/2015 01/19/2017 1,345,271.00

Dec 25, 2019 143 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008721 Completed NHPP-STPR-9999(65 012 Us 12 Et Al South Central Chip Seal Poe Asphalt Paving, Inc. MOE DAVARI 04/08/2015 01/14/2016 2,874,734.60

008722 Completed STPF-0285(019) 285 Sr 285 Co, Wenatchee Area - Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 04/17/2015 06/24/2016 1,117,117.00

008723 Completed NHPP,NH,BH-0101(324) 101 Us 101, Hoquiam River -Simpson Ave Bridge-Bridge Hercules Painting Company, Inc. RICKY BHALLA 04/28/2015 03/28/2016 4,410,156.00

008727 Completed NHPP-0099(069) 099 Sr 99, George Washington Memorial Bridge - Paintin Hercules Painting Company, Inc. DAVE LINDBERG 06/08/2015 06/30/2017 15,869,269.00

008728 Completed STPF-9999(667) 002 Us 2, Et Al, 2015 Eastern Region Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 04/24/2015 03/23/2016 6,984,887.99

008731 Completed FHWA,FBP-2014(084 Sr 160, Vashon Ferry Terminal (Stage 1) Pile Fabri Massana Construction, Inc. JOHN CALLAHAN 04/23/2015 02/02/2016 1,020,275.00

008732 Completed STPF/NHPP-0195(059) 195 Sr 195, Colfax To Dry Creek-Paving Poe Asphalt Paving, Inc. CHAD SIMONSON 05/04/2015 03/01/2016 2,028,765.84

008733 Completed NHPP0518(015) 518 Sr 518, Wb 24th Ave S Vic To I-5 I/C Vic Paving Tucci & Sons, Inc. MARK SAWYER 05/05/2015 09/27/2016 1,589,615.50

008736 Completed FBP-2015(087) 020 Sr 20 Spur, Anacortes Ferry Terminal Tie-Ups Slips Orion Marine Contractors, Inc. JOHN CALLAHAN 05/11/2015 08/02/2016 3,436,409.00

008737 Completed STPF0101354C05200 101 Us 101, S Of Mansfield Rd To W Of Shore Rd - Pavin Lakeside Industries, Inc. JERRY MOORE 05/12/2015 07/13/2016 3,084,409.30

008738 Completed STPF/HSIP0290(023 290 Sr 290, Sullivan Rd To Idaho State Line - Paving Poe Asphalt Paving, Inc. BOB HILMES 05/12/2015 01/17/2019 3,700,980.92

008739 Completed STPF-0164(016) 164 Sr 164, Hemlock St To Se 408th St Paving And Ada C Cpm Development Corporation MIKE ASKARIAN 05/22/2015 07/15/2016 2,789,761.25

008740 Completed NHPP/IM0902(199) 090 I-90, Oakes Ave I/C To Peoh Rd Bridge Vic Wb - Rep Midmountain Contractors, Inc. JEFF MINNICK 05/22/2015 04/04/2017 10,632,683.70

008741 Completed STPF-0410(061) 410 Sr 410, N Of Meyers Rd E To 214th Ave E - Paving Tucci & Sons, Inc. KIM MUELLER 06/10/2015 05/10/2016 1,224,269.15

008742 Completed STPF-0507(030) 507 Sr 507, Old Hwy 99 To E Of Water St - Paving Granite Construction Company STEVE FUCHS 05/15/2015 07/11/2016 2,512,023.10

008743 Completed STATE 020 Sr 20 Spur, Vehicle Reservations Phase 2 - Its Sys Sail Electric, Inc. CHRIS DAMITIO 05/21/2015 03/21/2016 687,346.00

008746 Completed STPF-0501(023) 501 Sr 501, Gee Creek Bridge Vic To 56th - Paving Granite Construction Company LORI FIGONE 05/15/2015 10/25/2016 742,742.00

008747 Completed STPF-0509(028) 509 Sr 509, S Normancy Rd Vic To 174th I/S Paving & Ad Tucci & Sons, Inc. ALETA BORSCHOWA 06/10/2015 09/12/2016 1,021,582.00

008748 Completed 2013(017) 020 Sr 20, Winthrop Vms, A Small Works Roster Project Northeast Electric, Llc DAN LEWIS 05/20/2015 10/05/2015 110,015.00

008749 Completed FBP-2014(084) 160 Sr 160, Vashon Ferry Terminal (Stage 2) Timber Tre Quigg Bros., Inc. JOHN CALLAHAN 07/10/2015 12/21/2016 8,489,064.00

008751 Completed STATE 002 Us 2/97 & Sr 28, Intersection Improvements Dual Le Apply-A-Line, Inc. KEVIN WALIGORSKI 05/22/2015 11/20/2015 198,465.50

008752 Completed ER-1301(004) 504 Sr 504, 1.3 Miles East Of Sr 505 Slope Stabilizati Advanced Excavating Specialists, JOANNA LOWREY 05/22/2015 03/08/2016 354,114.00

008753 Completed STPF-0542(038) 542 Sr 542, Anderson Creek Culvert Granite Construction Company CHRIS DAMITIO 06/04/2015 02/13/2017 4,728,673.00

008754 Completed NHPP-0195(056) 195 Us 195, Plaza Rd To Cornwall Rd - Paving Shamrock Paving, Inc. LARRY LARSON 06/10/2015 09/06/2016 1,777,777.77

008755 Completed STPF-0012(219) 012 Us 12, 0.8 Miles West Of Chapman Rd. Erosion Prote Conway Construction Company JOANNA LOWREY 06/02/2015 02/18/2016 1,587,478.00

008756 Completed NHPP-0101359 101 Us 101, N Of Salmon Creek Bridge - Stabilize Slope Rognlin'S, Inc. RICKY BHALLA 06/02/2015 03/23/2016 3,699,355.00

008757 Completed STPF,NHPP-0195(05 195 Us 195, Elcelsior Rd To Jct I-90 Sb Lanes - Pccp R Wm. Winkler Company CHAD SIMONSON 06/10/2015 07/12/2016 4,798,211.57

Dec 25, 2019 144 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008758 Completed NHPP/NH0395(103) 395 Us 395, Sr 17 To Muse Rd Sb - Paving Central Washington Asphalt, Inc. MOE DAVARI 06/10/2015 11/23/2015 3,965,745.68

008759 Completed STPF-0432(020) 432 Sr 432, I-5 At Old Hwy 99 Intersection Improvement Advanced Excavating Specialists, JOANNA LOWREY 06/23/2015 12/09/2015 406,338.90

008760 Completed STATE 003 Sr 3, Belfair Area - Widening & Safety Widening & Ceccanti, Inc. MICHELE_BRITTON 06/16/2015 09/12/2019 10,255,073.00

008761 Completed NHPP-0099(108) 099 Sr 99, Aurora To Nwr Hq Tmc Fiber Optic Connection Wiseman Utilities, Inc. DAVE LINDBERG 05/05/2015 02/08/2016 264,077.00

008762 Completed STATE 160 Sr160, Fauntleroy & Southworth Ferry Terminals Pav Massana Construction, Inc. JOHN CALLAHAN 06/16/2015 02/11/2016 147,224.00

008763 Completed STPF-0129(009) 129 Sr 129, Rattlesnake Creek - Fish Barrier Removal Award Construction, Inc. MOE DAVARI 06/10/2015 02/23/2016 691,035.00

008764 Completed CM/NHPP-0014(072) 014 Sr 14, Traveler Information 164th Ave To Nw 6th Av Northeast Electric, Llc RICK KENISTON 06/10/2015 03/31/2016 881,634.80

008765 Completed FBP-0104(050) 104 Sr 104, Kingston Ferry Terminal Trestle Pavement R Lakeside Industries, Inc. JOHN CALLAHAN 06/12/2015 08/18/2016 1,117,540.00

008766 Completed NHPP-0014(079) 014 Sr 14, 6th St To Bingen - Chip Seal Granite Construction Company DEVIN RECK 06/16/2015 07/02/2018 3,988,988.00

008767 Completed WADOT-542(1) 542 Sr 542/Sr 547, Intersection Improvement Granite Construction Company CHRIS DAMITIO 06/30/2015 12/05/2016 1,055,296.50

008768 Completed NHPP-9999(692) 090 I-90 Easton Hill Vic To Kachess River Bridge Eastb Granite Construction Company SCOTT GOLBEK 07/21/2015 12/23/2016 4,187,187.00

008769 Completed ER/NHP-1501(007) 101 Us 101, Mp 316.5 Emergency Slope Stabilization Stan Palmer Construction, Inc. RICKY BHALLA 06/08/2015 03/21/2016 1,014,989.50

008770 Completed STPF-9999(656) 017 Ncr 13-15 Low Cost Pavement Repair A Small Works R Granite Construction Company KEVIN WALIGORSKI 06/15/2015 09/16/2015 87,571.00

008773 Completed CBI-0054(286) 005 I-5, Union, Steamboat, & Ebey Slough Bridge Specia Pcl Civil Constructors, Inc. MARK SAWYER 07/02/2015 08/04/2017 3,656,924.26

008774 Completed FR-HSR-0017-11-01 005 I-5, Kelso To Martin Bluff New Siding Retaining Wa Massana Construction, Inc. JOANNA LOWREY 07/14/2015 04/18/2017 1,243,285.00

008775 Completed NHPP-0503(029) 503 Sr 503/Sr 500, Orchards To Battle Ground - Grind & Granite Construction Company LORI FIGONE 06/23/2015 05/11/2017 4,404,404.00

008776 Completed STPF-1502(002) 004 Sr 4, 3.1 Miles East Of Us101 Culvert Replacement Thompson Bros. Excavating, Inc. JOANNA LOWREY 06/30/2015 06/16/2016 637,613.00

008780 Completed STPF-0410(063) 410 Sr 410, 0.5 Miles E Of Chinook Pass - Emergent Nee Wesslen Construction, Inc. MOE DAVARI 08/10/2015 12/03/2015 242,492.84

008781 Completed NHPP-0512(017) 512 Sr 512, Sr 7 To I-5 Congestion Management Prime Electric, Inc. KIM MUELLER 07/21/2015 08/16/2016 1,018,358.57

008782 Completed CM-STPF-0099(071) 099 Sr 99, Nb Gibson Rd Vic To Airport Rd Vic - Pedest Granite Construction Company MARK SAWYER 07/22/2015 07/27/2017 936,613.00

008783 Completed STPF-9999(671) 203 Sr 203 Et Al Northwest Region Basic Safety - Guard Petersen Brothers, Inc. MARK SAWYER 07/27/2015 08/30/2017 1,257,421.18

008784 Completed STATE Sr 163, Tahlequah Ferry Terminal Timber Finger Pie Blackwater Marine, Llc JOHN CALLAHAN 08/17/2015 01/20/2016 167,998.00

008785 Completed STPF-9999(687) 002 Us 2 Et Al, Er Ada I/S Features Cameron-Reilly Llc CHAD SIMONSON 07/27/2015 01/13/2016 377,956.80

008786 Completed NHS/STPF-9999(665 090 I-90, Scr Region Wide Basic Safety - Guardrail Re- Dirt And Aggregate Interchange, Inc JEFF MINNICK 07/31/2015 04/15/2016 379,497.00

008787 Completed STPF-9999(663) 005 I-5, Martin Way To S 38th Street Concrete Panel Re Midmountain Contractors, Inc. STEVE FUCHS 07/27/2015 12/16/2015 351,593.00

008788 Completed STATE Systemwide On-Call Off-Shore Maintenance Wsf Termi Pacific Pile & Marine, L.P. BRIAN ENDRES 08/24/2015 08/10/2017 1,320,999.00

008789 Completed HSIP-2013(088) Loomis Trail Road And Protal Way Road Improvements Trimaxx Construction, Inc. CHRIS DAMITIO 07/31/2015 12/17/2015 212,964.20

Dec 25, 2019 145 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008792 Completed ER-1403(003) 007 Sr 7, Ohop Vicinity Slide - Emergency Slope Stabil Scarsella Bros., Inc. STEVE FUCHS 07/31/2015 01/21/2016 552,252.00

008794 Completed STATE Spokane Street Shop Building 02 Roof - Replacement Queen City Sheet Metal & Roofing SAM LEIREN 08/11/2015 08/18/2016 184,000.00

008795 Completed STATE 532 Sr532, Davis Slough Bridge Replacement Dugualla Ba Trimaxx Construction, Inc. DAVE CRISMAN 08/19/2015 04/26/2019 4,209,169.90

008796 Completed STATE Colfax Maintenance Facility Septic Tank Replacemen Ball & Ball Inc. Dba Roto Rooter JEFF COOK 08/20/2015 06/14/2016 108,230.00

008797 Completed STATE 020 Sr 20 Spur, Lopez Ferry Terminal Floating Wingwall Pacific Pile & Marine, L.P. JOHN CALLAHAN 08/26/2015 07/01/2016 343,428.00

008798 Completed STATE Winchester Eb Sra Minor Rehabilitation Washington Wesslen Construction, Inc. JIM RODGERS 08/28/2015 06/14/2016 84,564.00

008800 Completed ER-1505(002) 410 Sr410, White River Bridge 410/101 Bridge Element R Abhe & Svoboda, Inc. MIKE ASKARIAN 09/21/2015 04/17/2017 937,770.00

008801 Completed ER-1504(002) 005 I-5, Nbcd Over 41st Division Dr Special Repair Interwest Construction, Inc. GAIUS SANOY 09/30/2015 09/13/2016 488,888.00

008807 Completed STPF-9999(694) 009 Sr 9 Et Al, Whatcom County Bst Granite Construction Company JASON KORESKI 11/13/2015 11/01/2016 3,404,619.20

008808 Completed STPF-9999(721) 009 Sr 9 Et Al Mt Baker Area Bst 2016 Doolittle Construction, Llc DAVE CRISMAN 11/17/2015 03/08/2017 3,486,783.70

008810 Completed ER-1506(001) 005 I-5, Birch Bay Lynden Rd Bridge - Bridge Repair Midmountain Contractors, Inc. JASON KORESKI 11/13/2015 03/02/2017 517,392.00

008811 Active STATE&FED 405 Design Build I-405, Sr 167 Interchange Direct Conn Guy F. Atkinsonconstruction, Llc. SHARIF SHAKLAWUN 07/13/2016 115,899,599.00

008812 Completed STATE 224 Sr224 & Sr225, Benton City- Construct Intersection Rotschy, Inc. MOE DAVARI 12/02/2015 02/22/2018 2,517,477.50

008813 Completed ER-1505(003) 090 I-90, Front Street Bridge 90/66s - Girder Replacem Massana Construction, Inc. MARK SAWYER 11/24/2015 04/18/2017 587,070.00

008815 Completed STATE Sr20, Spur Anacortes Tml Ohl Painting, Siding & Ro Purcell P & C, Llc Dba Purcell JOHN CALLAHAN 12/15/2015 05/27/2016 440,999.00

008816 Active NHPP-0053(971) 005 I-5, Sb S 320th St To Duwamish River Br- Concrete Midmountain Contractors, Inc. MIKE ASKARIAN 01/11/2016 20,471,129.35

008817 Completed STPF-HSIP-WA11(00 020 Sr 20, Morris Road To Jacobs Road Safety Improveme Interwest Construction, Inc. DAVE CRISMAN 12/14/2015 11/27/2018 2,245,555.55

008818 Active STATE&FED 005 Design Build - I-5 / Sr16 Realignment - Hov Struct Skanska Usa Civil West California GAIUS SANOY 08/29/2016 121,575,000.00

008819 Completed NHPP-0901(488) 090 I-90, Sr 202 I/C To S Fork Snoqualmie River - Pavi Lakeside Industries, Inc. MARK SAWYER 12/22/2015 11/20/2017 1,778,387.80

008820 Completed STPF-0548(008) 548 Sr 548, Unnamed Creek To Drayton Harbor Fish Passa Tiger Construction, Ltd. JASON KORESKI 12/30/2015 10/30/2017 371,233.50

008821 Completed STPF-9999(747) 003 Sr3/Sr303, Bremerton Area Curb Ramps Ada Improveme Massana Construction, Inc. MICHELE BRITTON 01/11/2016 11/29/2016 707,285.00

008822 Completed STPF-0990(026) 900 Sr 900 Tukwila Ncl To Sr 167 Concrete Pavement Reh Midmountain Contractors, Inc. DAVE LINDBERG 01/11/2016 09/12/2017 2,367,709.00

008823 Completed STATE Euclid Ave Administration Facility Consolidation P Garco Construction, Inc. JIM RODGERS 10/19/2016 02/15/2019 8,690,000.00

008824 Completed NHPP-CBI-0055(248 005 I-5, Nulle Road To Iowa St Vic Paving Granite Construction Company JASON KORESKI 01/11/2016 10/26/2016 1,746,516.10

008825 Completed NHPP-0054(287) 005 I-5, Nb Sr 531 Vic To Stillaguamish River - Paving Granite Construction Company MARK SAWYER 01/11/2016 02/14/2018 1,906,800.20

008827 Completed LOCAL-GCB1959 305 Sr 305, Suquamish Way I/S Improvements Port Madison Enterprises MICHELE BRITTON 02/08/2016 01/04/2017 1,033,586.96

008828 Completed ER-STPF-1505(004) 090 I-90, Stampede Pass Interchange - Bridge Repair M.J. Hughes Construction, Inc. SCOTT GOLBEK 01/11/2016 11/17/2016 429,113.02

Dec 25, 2019 146 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008830 Active STATE 522 Sr522, Snohomish River Bridge To Us 2 Vic Roadside A-1 Landscaping And Construction, SHAWN NEIL WENDT 02/08/2016 2,987,786.00

008831 Completed STPF-0532(018) 532 Sr532, Pilchuck Creek Tributary (Secret Creek) - F Faber Construction Corp. DAVE LINDBERG 02/08/2016 04/04/2018 1,920,293.50

008832 Completed NHPP-0055(245) 005 I-5, Nb Nooksack River To Blaine - Paving Lakeside Industries, Inc. JASON KORESKI 03/03/2016 03/03/2017 5,137,473.00

008834 Completed NHPP-9999(690) 097 Us 97 And Sr 14 Rockfall Projects For 2015 Jal Construction, Inc. SUSAN FELL 02/19/2016 07/11/2016 278,704.00

008839 Completed STPF-0112(027) 112 Sr 112, Jansen Creek - Remove Fish Barrier Mp 5.13 Interwest Construction, Inc. JERRY MOORE 03/07/2016 11/27/2017 1,484,078.85

008840 Completed STATE 005 I-5, Fisher Creek - Fish Passage Interwest Construction, Inc. SHANE SPAHR 04/01/2016 08/19/2019 5,358,535.35

008841 Completed NHPP-STPF-9999(69 012 Us 12 Et Al, 2016 Scr Region Wide Chip Seal Chip S Central Washington Asphalt, Inc. MOE DAVARI 03/10/2016 02/14/2017 5,093,000.00

008842 Completed NHPP-9999(756) 012 Us 12 Et Al, Tri-Cities Vicinity Paving & Ada Comp Central Washington Asphalt, Inc. MOE DAVARI 03/21/2016 11/28/2018 5,867,933.39

008843 Completed STATE 090 I-90, Peoh Rd Bridge To Elk Heights Rd Vic Wb-Repl Acme Concrete Paving, Inc. JEFF MINNICK 03/28/2016 06/14/2018 17,712,492.11

008844 Completed NHPP-0901(487) 090 I-90, Wb Mercer Slough To W Lake Sammamish Parkway Lakeside Industries, Inc. MARK SAWYER 03/28/2016 11/20/2017 4,242,692.40

008845 Completed NHPP-99(754) 082 I-82, Yakima River Bridge To Yakitat Rd Vic - Pavi Cpm Development Corporation MOE DAVARI 04/29/2016 02/21/2017 2,359,938.20

008846 Completed HSIP-0546(007) 546 Sr546, Northwood Rd Intersection Improvements Colacurcio Brothers, Inc. JASON KORESKI 04/01/2016 01/06/2017 237,333.60

008847 Completed STATE 520 Sr 520, Union Bay Natural Area West Approach Wetla Matia Jansen Jv ROBYN BOYD 04/26/2016 08/07/2019 4,377,478.37

008848 Completed STATE 906 Sr 906, W. Summit To Hyak & I-90 Interchanges - Pa Columbia Asphalt & Gravel, Inc. JEFF MINNICK 04/01/2016 05/17/2017 2,451,321.00

008849 Completed STPF-0108(009) 108 Sr 108, Little Skookum Creek Remove Fish Barrier Quigg Bros., Inc. JOHN ROMERO 04/01/2016 12/12/2017 1,447,929.00

008850 Completed NHPP-0101(364) 101 Us 101, Skookum Creek Br To Deschutes Parkway - Pa Granite Construction Company J. DEWAYNE MATLOCK 04/13/2016 03/13/2017 2,234,555.25

008851 Completed WA-DOT-542(3) 542 Sr 542, High Creek - Fish Passage Interwest Construction, Inc. SHANE SPAHR 04/01/2016 11/15/2018 1,082,012.00

008852 Completed STPF-0002(839) 002 Us 2, Spotted Road To I-90 - Its Power City Electric, Inc. BOB HILMES 04/29/2016 01/16/2018 375,984.00

008853 Completed STPF-0121(004) 121 Sr 121/ Blooms Ditch - Remove Fish Barriers Granite Construction Company J. DEWAYNE MATLOCK 04/13/2016 10/31/2017 1,394,000.00

008854 Completed STPF-0002(839) 167 Sr 18 & Sr 167, Eb W Valley To C St Sw & Nb S 212t Lakeside Industries, Inc. MIKE ASKARIAN 04/19/2016 08/16/2017 1,868,654.34

008855 Completed NHPP-9999(693) 090 I-90, Us 97 To Stevens Rd Vic - Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 04/12/2016 03/12/2018 5,987,356.24

008856 Completed NHPP-0902(449) 090 I-90, Price Creek Snopark Vic To Cabin Creek Vic W Columbia Asphalt & Gravel, Inc. SCOTT GOLBEK 04/19/2016 04/26/2018 1,929,246.70

008857 Completed STPF-0101(356) 101 Us 101, Swanson Creek - Remove Fish Barrier Interwest Construction, Inc. JERRY MOORE 04/13/2016 04/09/2018 1,369,000.00

008859 Completed STBG-9999(761) 307 Sr 104 & Sr 307, North Kitsap Co - Remove Fish Bar Nordland Construction BOB HILMES 04/21/2016 02/22/2018 2,149,447.00

008860 Completed HSIP-9999(741) 082 I-90, Scr 15-17 Region Wide - Median Cable Barrier Petersen Brothers, Inc. JEFF MINNICK 04/29/2016 04/07/2017 1,706,105.54

008861 Completed STBG-0016(027) 016 Sr 16, Anderson Creek Trib To Sinclair Inlet - Fis Scarsella Bros., Inc. MICHELE BRITTON 04/19/2016 07/12/2018 4,375,812.60

008862 Completed STPF-9999(759) 507 Sr 507 & Sr 510, Golphnee Lp Se To 295th St S - Pa Miles Resources, Llc J. DEWAYNE MATLOCK 04/26/2016 10/27/2016 1,055,397.00

Dec 25, 2019 147 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008863 Completed NHPP-0054(289) 005 I-5 & Sr 534, Hill Ditch Bridge To Joe Leary Sloug Granite Construction Company DAVE CRISMAN 04/26/2016 05/08/2018 7,305,100.20

008864 Completed STPF-9999(689) 002 Us 2 Et Al, 2016 Eastern Region Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 04/26/2016 01/03/2017 3,559,141.75

008865 Active STPF-0202(055) 202 Sr 202, Little Bear Creek Fish Barrier Removal Olson Brothers Excavating, Inc. SHAWN NEIL WENDT 04/29/2016 4,995,036.50

008866 Completed STPF-9999(713) 202 Sr 202 & Sr 203, Ne 124th St Vic-Tolt River Bridge Watson Asphalt Paving Company, ALETA BORSCHOWA 04/26/2016 01/04/2018 3,329,139.60

008867 Completed STPF-0507(028) 507 Sr 507, Lacamas Crk Trib To Muck Crk - Remove Fish M.J. Hughes Construction, Inc. J. DEWAYNE MATLOCK 04/29/2016 10/06/2017 1,075,988.00

008869 Completed STPF-0161(035) 161 Sr 161, South Creek - Remove Fish Barrier M.J. Hughes Construction, Inc. DEWAYNE MATLOCK 05/12/2016 10/25/2017 699,999.00

008870 Completed NHPP-9999(760) 101 Us 101 And Us 12/Grays Harbor County - Chip Seal Granite Construction Company JOHN ROMERO 05/17/2016 11/21/2016 435,000.00

008871 Completed STATE 082 Selah Creek Eb Sra - Water System Improvements Pha Gregory Drilling, Inc. SAM LEIREN 05/12/2016 02/28/2017 99,500.00

008872 Completed STBG-NHPP0509(030 509 Sr 509 & I-705, Schuster Pkwy To E 11th St - Pavin Tucci & Sons, Inc. GAIUS SANOY 05/09/2016 02/08/2017 1,562,278.60

008873 Completed ER-1602(002) 012 Us 12, Palisades Viewpoint To Wildcat Creek Vic - Graham Contracting, Ltd. JEFF MINNICK 05/05/2016 07/11/2017 1,532,036.70

008874 Completed STPF-0112(028) 112 Sr 112, Joe Creek - Remove Fish Barrier Rognlin'S, Inc. JERRY MOORE 05/12/2016 08/18/2017 1,063,913.00

008875 Completed HSIP-9999(718) Ncr Regionwide Curve Warning Signing Road Products Inc. KEVIN WALIGORSKI 05/18/2016 07/31/2018 465,603.00

008876 Completed STPF-9999(720) 005 I-5 & I-90, Regionwide Safety High Friction Surfac Specialized Pavement Marking Inc. ALETA BORSCHOWA 05/23/2016 12/09/2016 246,717.50

008877 Completed STBG-0129(010) 129 Sr 129/2nd Street To Highland Ave - Paving & Ada C Poe Asphalt Paving, Inc. MOE DAVARI 05/13/2016 06/13/2017 1,396,070.02

008878 Completed HSIP-9999(729) 002 2015-17 Eastern Region Regionwide Basic Safety - G Frank Gurney, Inc. BOB HILMES 05/23/2016 02/25/2019 706,205.48

008879 Completed NHPP-0117(003) 117 Sr 117/Us 101 To Marine Dr - Paving Lakeside Industries, Inc. JERRY MOORE 05/17/2016 03/31/2017 549,969.60

008880 Completed NHPP-0101(365) 101 Us 101/S Of Kalaloch To S Of Mansfield Rd - Chip S Granite Construction Company JERRY MOORE 05/17/2016 03/31/2017 1,423,000.00

008881 Completed CM-0090(020) 090 I-90/Freya St Interchange - Ramp Improvements Shamrock Paving, Inc. LARRY LARSON 05/18/2016 07/17/2018 2,120,185.00

008882 Completed NHPP-STPF-9999(757) 525 Sr 99/Sr 525 Interchange Vic To Lincoln Way Vic - Cadman Materials Inc DAVE LINDBERG 05/18/2016 01/24/2018 3,353,816.47

008883 Completed STATE 005 I-5, S 200th St/Military Rd - Intersection Improve Johansen Construction Co Inc MIKE ASKARIAN 06/01/2016 08/27/2018 2,192,284.40

008884 Completed HSIP-0009(075) 544 Sr 9, Sr 536 And Sr 544 - Rumblestrip Installation Apply-A-Line, Inc. JASON KORESKI 05/13/2016 08/23/2016 183,782.20

008886 Completed STATE 405 I-405, Ne 6th St To I-5 Nb Hard Shoulder Running & Graham Contracting, Ltd. CHUN-HO CHEN 12/21/2016 11/14/2018 7,290,000.00

008887 Completed NHPP-0008(020) 008 Sr 8 & Sr 107, Mccleary And Montesano Vic - Paving Lakeside Industries, Inc. JOHN ROMERO 06/01/2016 02/09/2017 1,058,815.50

008888 Completed STBG-0142(023) 142 Sr 142/ Klickitat River Bridge - Replace Bridge M.J. Hughes Construction, Inc. DEVIN RECK 05/13/2016 05/01/2017 2,097,016.00

008890 Completed HSIP-STPF-9999719 002 Us 2, Ncr Seal 2016 Central Washington Asphalt, Inc. DAN LEWIS 05/24/2016 05/14/2018 5,521,950.60

008891 Completed STPF-0022(014) 022 Sr 22, Sr 221/Sr 223 Intersections - Replace Light Northeast Electric, Llc MOE DAVARI 05/13/2016 01/18/2017 118,922.00

008892 Completed HSIP-9999(727) 002 Us 2, Sr17, Sr 20, Sr 24, Sr 28, Us 97a, Ncr 15-17 North Star Enterprises 1, Inc. DAN LEWIS 05/24/2016 06/06/2017 791,391.06

Dec 25, 2019 148 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008894 Completed HSIP-9999(701) Southwest Region Regionwide Safety - Rumblestrips Construction Ahead, Inc. Dba RICK KENISTON 06/01/2016 09/22/2017 757,876.95

008895 Completed FR-HSR-00171-11-0 Tacoma Amtrak Cascades Station / Freight House S Garco Construction, Inc. FRANK GREEN 06/01/2016 05/03/2018 10,317,000.00

008896 Completed STATE 525 Sr 525, Clinton Ferry Terminal Park And Ride Lot S Larry Brown Construction, Inc. JOHN CALLAHAN 06/10/2016 10/28/2016 80,671.75

008897 Completed STBG-0092(006) 092 Sr 92, Pilchuck River - Ced Marshbank Construction, Inc. DAVE LINDBERG 05/23/2016 03/14/2018 1,594,934.00

008899 Completed STATE Sr 20, Coupeville Ferry Terminal Bridge Timber Tow Pacific Pile & Marine, L.P. JOHN CALLAHAN 06/02/2016 04/04/2017 729,880.75

008900 Completed NHPP-0052(211) 005 I-5, Cowlitz River Bridge To Koontz Rd Vicinity - Lakeside Industries, Inc. COLIN NEWELL 06/13/2016 02/05/2018 5,070,331.96

008901 Completed STBG-0504(008) 504 Sr 500 & Sr 504, Pavement Rehabilitation Doolittle Construction, Llc DEVIN RECK 06/13/2016 05/09/2017 3,138,219.20

008902 Completed HSIP-9999(708) 205 Sw Region/Clark County Locations - High Friction S M.J. Hughes Construction, Inc. RICK KENISTON 06/13/2016 11/14/2016 269,240.50

008903 Completed NHPP-9999(762) 003 Sr 3 & Sr 310, N Of Cokelet Ln To Sr 303 And Sr 3 Lakeside Industries, Inc. MICHELE BRITTON 06/13/2016 04/07/2017 2,298,655.05

008904 Completed STBGSTPF0410(065) 410 Sr 410, Sr 167 To 192nd Ave. E. Paving Paving Tucci & Sons, Inc. BRENDEN CLARKE 06/16/2016 02/22/2017 1,587,117.20

008905 Completed NHPP-0016(029) 016 Sr 16, Tacoma Narrows Bridge Paving Tucci & Sons, Inc. GAIUS SANOY 06/13/2016 03/07/2017 999,185.80

008906 Completed NHPP-0503(033) 503 Sr 503, Lewis River (Yale) Bridge Paving - Paving Granite Construction Company LORI FIGONE 06/20/2016 06/08/2017 118,118.00

008907 Completed CMAQ-9999(722) 005 I-5 Et Al, Vancouver Urban Its Device Infill Elcon Corporation RICK KENISTON 06/16/2016 02/25/2019 648,115.00

008908 Completed STATE Sr 20 Spur, Shaw Ferry Terminal Trestle Emergency American Construction Co., Inc. JOHN CALLAHAN 07/19/2016 02/02/2017 268,999.00

008909 Completed HSIP-9999(737) 002 Us 2 Et Al, Eastern Region Intersection Safety Imp Specialized Pavement Marking Inc. CHAD SIMONSON 06/20/2016 02/26/2019 1,526,969.55

008910 Completed CMAQ-0395(104) 395 Us 395, Hawthorne Rd - Intersection Improvements I Power City Electric, Inc. BOB HILMES 06/14/2016 01/11/2018 398,578.00

008912 Completed NHPP-STBG-0012(22 012 Us 12 & Sr 506, Pavement Rehabilitation Granite Construction Company COLIN NEWELL 07/05/2016 04/06/2018 5,658,547.77

008913 Completed NHPP-0432(021) 432 Sr 432/I-5 At Kalama River Road Illumination Upgra Mill Plain Electric, Inc. JOANNA LOWREY 06/28/2016 04/13/2017 576,099.00

008914 Completed STATE 097 Us 97, Biggs Rapids Bridge To Prairie Rd Vic - Pav Granite Construction Company LORI FIGONE 06/13/2016 12/20/2016 2,099,999.00

008915 Completed STPF-NHPP-0432(02 004 Sr 4 Et Al, Pavement Rehabilitation Granite Construction Company JOANNA LOWREY 06/20/2016 08/17/2018 4,539,539.00

008916 Completed NHPP-0012(228) 012 Us 12, Old Naches Highway Vic To I-82 And Sr 823/Y Interstate Concrete & Asphalt SCOTT GOLBEK 06/28/2016 06/19/2018 4,455,260.44

008917 Completed STPF-9999(770) 017 Ncr, Strategic Pavement Preservation 15-17 Area 2 Granite Construction Company KEVIN WALIGORSKI 06/20/2016 10/24/2016 460,862.00

008918 Completed NHPP-0051(297) 005 I-5, I-205 To North Fork Lewis River Bridge - Reha Granite Construction Company LORI FIGONE 06/13/2016 05/09/2018 3,950,950.00

008919 Completed STBG-0153(445) 153 Sr 153, Methow River Bridge Deck Rehabilitation N.A. Degerstrom, Inc. DAN LEWIS 06/28/2016 07/12/2017 1,207,564.83

008920 Completed HSIP-0097(169) 090 I-90/Us 97, Ellensburg Vic-Install Vms, Camera And Northeast Electric, Llc SCOTT GOLBEK 06/28/2016 01/20/2017 397,014.00

008921 Completed NHPP-0099(136) 099 Sr 99, Alaskan Way Viaduct-Replacement South Acces Interwest Construction, Inc. PATRICK FULLER 07/11/2016 11/02/2017 3,564,142.05

008922 Completed HSIP-0240(020) 240 Sr 240, Steptoe Roundabout Improvements Construction Ahead, Inc. Dba MOE DAVARI 06/27/2016 02/14/2017 152,631.00

Dec 25, 2019 149 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008923 Completed HSIP-9999(699) 018 Sr 18 Et Al, Northwest Region Guardrail & Glarescr Petersen Brothers, Inc. MIKE ASKARIAN 07/05/2016 05/09/2017 478,714.32

008924 Completed NHPP-0904(125) 090 I-90, 2016 Eastern Region Bridge Deck Repair West Company, Inc. BOB L HILMES 06/28/2016 08/13/2018 1,566,196.00

008926 Completed STATE 112 Sr 112, W Of West Twin River Bridge Culvert Replac Rognlin'S, Inc. JERRY MOORE 07/07/2016 03/07/2017 305,219.00

008927 Completed HSIP-0012(231) 012 Us 12, Oakville City Limits To Huntington St Sw-Sa Apply-A-Line, Inc. JOHN ROMERO 07/11/2016 11/30/2016 275,306.00

008928 Completed HSIP-9999(726) 023 Sr 23 Et Al, Eastern Region Regionwide Curve Warni Sharp-Line Industries, Inc. LARRY LARSON 06/27/2016 12/01/2016 82,734.00

008929 Completed STATE 005 Variable Message Sign Replacement Replacement Prime Electric, Inc. MIKE ASKARIAN 07/22/2016 09/20/2017 538,301.00

008930 Completed HSIP-9999(717) 005 I-5 Et Al, Swr Intersection Safety Implementation Construction Ahead, Inc. Dba DEVIN RECK 07/19/2016 07/24/2018 528,295.30

008931 Completed HSIP-0008(019) 008 Winslow Dr Sw To Vic Us 101 Safety Improvements Petersen Brothers, Inc. JOHN ROMERO 07/25/2016 05/25/2017 540,677.94

008932 Completed STBG-NHPP-9999(74 090 Scr 15-17 Region Wide Ada Compliance Cameron-Reilly Llc MOE DAVARI 07/22/2016 01/17/2017 742,817.00

008933 Completed HSIP-9999(732) 005 I-5 Et Al, Swr Regionwide Basic Safety Guardrail ( Petersen Brothers, Inc. DEVIN RECK 08/10/2016 09/22/2017 578,422.61

008934 Completed STATE 012 Us 12, Schouweiler Rd Intersection Improvements Rognlin'S, Inc. JOHN ROMERO 08/02/2016 04/24/2017 903,086.50

008935 Completed STBG-9999(771) 097 Us 2, Us 97 & Sr 285, Ncr Strategic Pavement Prese Central Washington Asphalt, Inc. KEVIN WALIGORSKI 08/02/2016 12/02/2016 516,953.35

008936 Completed ER-1602(003) 005 I-5, Vicinity Mp 88 Slide Slope Stabilization Slop Scarsella Bros., Inc. DEWAYNE MATLOCK 07/29/2016 01/12/2017 648,391.50

008938 Completed NHPP-0395(108) 395 Us 395, Nsc-Wellesley Ave/Freya St Intersection Im Halme Construction, Inc. LARRY LARSON 08/08/2016 07/17/2018 1,507,368.50

008939 Completed HISP-0104(058) 104 Sr 104, E Of Balmoral Pl Ne To Kingston Ferry - Pa Lakeside Industries, Inc. CHRISTOPHER BRUNING 08/10/2016 06/05/2018 882,857.00

008940 Completed STATE 020 Sr 20 Spur, Orcas Ferry Terminal Facility Ada Comp Mike Carlson Enterprises, Inc. JOHN CALLAHAN 09/29/2016 10/02/2017 759,415.42

008941 Completed STATE 305 Sr 305, Bainbridge Ferry Terminal Slip 1 Transfer Purcell P & C, Llc Dba Purcell JOHN CALLAHAN 08/16/2016 02/14/2017 427,499.00

008942 Completed HSIP-0002(842) 002 Us2/Us 97, Lower Sunnyslope Road Access Control Construction Ahead, Inc. Dba KEVIN WALIGORSKI 08/10/2016 06/23/2017 199,349.90

008944 Completed STATE 520 Sr 520, 84th Ave Ne And 92nd Ave Ne Added Truck Ap C.A. Carey Corporation MARK ALLISON 08/18/2016 07/25/2018 287,128.50

008946 Completed ER-1604(002) 012 Us 12, W Of Porter - Emergency Slope Stabilization Hi Tech Rockfall Construction, Inc. GAIUS SANOY 08/15/2016 01/24/2017 288,983.94

008950 Completed STPF-CMAQ-0524014 524 Sr 524, Wb 21st Ave To 196th Pl Sw Pedestrian Impr Trimaxx Construction, Inc. DAVE LINDBERG 09/06/2016 10/17/2017 492,498.00

008951 Completed NHPP0002851NHS002 002 Us 2, W Of Alice Rd Br Deck Rehab C.A. Carey Corporation KEVIN WALIGORSKI 08/29/2016 02/16/2017 379,039.00

008952 Active NHPP-0053(974) 005 Design Build I-5, Nb Mlk Jr Way To Ne Ravenna Brid Guy F. Atkinsonconstruction, Llc. DAVE LINDBERG 05/31/2017 38,599,899.00

008954 Completed HSIP-0155(020) 155 Sr 155, Coulee City North - Centerline Rumble Stri Central Washington Asphalt, Inc. DAN LEWIS 09/06/2016 07/11/2017 847,701.42

008955 Completed STATE Vancouver Main Street Office Building 02-Roof Repl American Guaranteed Roofing & SAM LEIREN 09/07/2016 02/28/2017 147,000.00

008956 Completed STATE 090 I-90, Golf Course Rd-Improve Park & Ride Lot Scarsella Bros., Inc. SCOTT GOLBEK 08/29/2016 02/17/2017 118,474.00

008957 Completed ER-NHPP-1604(010) 104 Sr 104, Ne 195th St Gabion Rock Wall Emergency Rep Granite Construction Company DAVE LINDBERG 10/04/2016 08/22/2017 590,052.00

Dec 25, 2019 150 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008958 Completed STPF-0302(008) 302 Sr 302, 1.15 Miles S Of E Victor Rd Major Drainage Active Construction, Inc. MICHELE BRITTON 09/06/2016 02/15/2018 422,422.00

008959 Completed STATE 405 I-405, Ne 30th St & Ne 44th St Ramp Improvements Graham Contracting, Ltd. MIKE ASKARIAN 09/29/2016 06/25/2018 818,133.00

008963 Completed ER-1602(008) 002 Us 2, Pine Canyon Emergency Repair Hi Tech Rockfall Construction, Inc. DAN LEWIS 10/03/2016 08/04/2017 404,244.00

008965 Completed STATE 099 Sr 99, Alaskan Way Viaduct-Replacement 60 Yesler W Titan Earthwork Llc PATRICK FULLER 10/24/2016 06/13/2017 220,392.50

008966 Completed STPF-ER-1403(003) 007 Sr 7, Ohop Vicinity Slide - Install Drainage Mike Mcclung Construction Co. DEWAYNE MATLOCK 10/17/2016 05/17/2017 131,429.00

008967 Completed STATE 522 Sr 522, Emergency Tree Removal Razz Construction, Inc. DAVE LINDBERG 10/27/2016 05/04/2017 87,682.00

008968 Completed NH-0104(055) 104 Sr 104, Hood Canal Bridge Special Repair Gear Box Northbank Civil And Marine, Inc. MICHELE BRITTON 11/17/2016 11/07/2019 2,643,803.00

008969 Completed ER-NHPP-1601(017) 018 Sr 18, Green River Bridge Vic Emergency Slide Repa Klb Construction, Inc. MIKE ASKARIAN 10/19/2016 07/07/2017 322,678.00

008970 Completed STPF-HSIP-9999(776) 512 15-17 Or Region Wide, I/S Implementation And Basic Massana Construction, Inc. MICHELE BRITTON 11/09/2016 05/30/2017 949,217.00

008971 Completed HSIP-0124(019) 124 Sr 124, Monument Dr/Rr Xing - Construct Bridge Scarsella Bros., Inc. ALEX SANGUINO 12/17/2016 05/20/2019 6,442,878.67

008972 Completed STATE Pcc Railroad Rehabilitation P & L Branch/Wim Branc Railworks Track Systems, Inc. CHAD SIMONSON 12/02/2016 02/11/2019 908,955.00

008973 Completed STATE 101 Us101, Sr167, Sr410 & Sr512, Region Wide Har Impro Transportation Systems, Inc. JON KEETH 12/15/2016 12/06/2017 357,794.00

008974 Completed HSIP-0503(032) 005 I-5 And Sr 503, Intersection Improvement Northeast Electric, Llc LORI FIGONE 11/09/2016 03/29/2018 505,077.00

008976 Active STATE 008 Sr 8 Middle And East Forks Wildcat Creek Remove Fi Ceccanti, Inc. JOHN ROMERO 12/28/2016 10,708,835.01

008977 Active NHPF-0905(104) 090 I-90 Adams County Line To Spokane County Line Pavi Kerr Contractors Oregon, Inc. CHAD SIMONSON 01/10/2017 9,721,681.27

008978 Completed ER-1603(001) 005 I-5, 93rd Ave Sw And Koontz Rd Bridges - Special R Stellar J. Corporation DEWAYNE MATLOCK 12/15/2016 10/19/2017 980,116.00

008979 Completed HSIP-9999(735) 005 15-17 Olympic Region Rumble Strips - Install Rumbl Specialized Pavement Marking Inc. MICHELE BRITTON 12/27/2016 03/05/2018 281,154.80

008980 Completed STATE 002 Us 2, Mp 118.00 To 119.60, W Of Wenatchee Vms A Sm Neppel Electrical & Controls, L L C DAN LEWIS 12/27/2016 08/09/2017 203,853.00

008981 Completed STPF-0542(044) 542 Sr 542, Cornell Creek Rd Vic To Nooksack River Gua Petersen Brothers, Inc. GABE NG 12/28/2016 12/19/2017 212,742.66

008982 Completed STBG-0823(066) 082 I-82/1 Mile W Of Benton City To I-182 , Cpm Development Corporation ALEX SANGUINO 12/27/2016 02/21/2018 1,475,103.10

008984 Completed NHPP-0097(173) 097 Us97 & I-82, Lateral A To Ahtanum Cr And I-82/S Of Granite Construction Company JERRY WOOD 12/27/2016 03/05/2018 2,608,608.00

008985 Completed STATE 519 Seattle Ferry Terminal Timber Trestle Preservation Massana Construction, Inc. JOHN CALLAHAN 12/29/2016 06/20/2017 436,898.00

008986 Completed STATE 005 I-5, Mp 128.91, Sb 84th St Replace Signal Replace Transportation Systems, Inc. JON KEETH 01/04/2017 01/05/2018 360,608.00

008987 Completed HSIP-9999(745) 002 Ncr Guardrail Update 15-17 Frank Gurney, Inc. KEVIN WALIGORSKI 01/10/2017 07/24/2018 557,488.75

008988 Completed STPF-0164(017) 164 Sr 164, Se 408th St To 196th Ave Se Vic Pavement R C.A. Carey Corporation ALETA BORSCHOWA 02/02/2017 12/05/2017 1,975,151.50

008989 Completed STATE 020 Sr 20, Sedro Woolley To Concrete Vicinity - Bst Bs Granite Construction Company DAVE CRISMAN 01/10/2017 04/02/2018 2,918,335.10

008990 Completed STATE 005 I-5 Silver Lake Sb Rv Dump Station Rehabilitation Allied Construction Associates, Inc MIKE ASKARIAN 01/10/2017 07/30/2018 472,391.00

Dec 25, 2019 151 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

008991 Active ER-STPF-1605(001) 005 I-5 Chamber Way Bridge - Replacement Quigg Bros., Inc. FRANK GREEN 05/25/2017 10,930,002.00

008992 Active STATE 005 I-5, Nb S 260th St To Duwamish River Br Concrete P Gary Merlino Construction Co., Inc. MIKE ASKARIAN 02/07/2017 30,811,328.77

008993 Completed STATE 005 I-5, Mounts Rd To Center Dr Auxiliary Lane Extensi Scarsella Bros., Inc. JON KEETH 01/18/2017 01/23/2019 7,878,787.87

008994 Completed NHPP-0410(066) 410 Sr410, White River Bridge To Sr164 Paving And Ada Cpm Development Corporation MIKE ASKARIAN 02/02/2017 04/12/2018 1,988,350.25

008995 Completed STATE Region Headquarters Building Chiller Replacement - Macdonald Miller Facility SAM LEIREN 02/10/2017 01/26/2018 498,357.00

008998 Completed STATE 104 Sr104, Kingston Terminal - Slip 1 Bridge Seat Scou American Construction Co., Inc. TOM CASTOR 12/16/2016 03/20/2017 220,098.00

008999 Completed STPF-0020(186) 020 Sr 20, Winthrop Vicinity - Paving Central Washington Asphalt, Inc. DAN LEWIS 02/07/2017 03/13/2019 1,258,802.30

009000 Completed STATE 167 Sr 167, Sw Of Grandview Ave To W Of 87th Ave E - P Miles Resources, Llc JON KEETH 02/10/2017 01/05/2018 749,207.10

009001 Completed STATE 008 Sr 8, W Of Old Sand Ck Rd To Jct Us 101 - Paving Lakeside Industries, Inc. JOHN ROMERO 02/07/2017 10/16/2017 1,259,616.00

009002 Completed STPF-0532(014) 532 Sr 532, Church Creek - Fish Passage Strider Construction Co., Inc. SHANE SPAHR 02/07/2017 03/21/2019 3,732,622.00

009003 Completed STATE 097 Us 97, Centerville Rd To Yakima Co Variable Messag Northeast Electric, Llc RICK KENISTON 02/02/2017 03/08/2018 356,929.00

009004 Completed STATE 542 Sr 542, Hedrick Creek Fish Barrier Tree Clearing A Tiger Construction, Ltd. GABE NG 02/02/2017 04/17/2017 40,378.00

009005 Completed STPF-0150(013) 150 Sr 150, W Of Chelan Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 02/10/2017 09/11/2018 2,797,797.79

009006 Completed STBG-9999(771) 002 Ncr 2017, Pavement Rehabilitation And Seal Granite Construction Company DAN LEWIS 02/22/2017 06/20/2018 9,603,928.00

009007 Completed NHPP-0016(030) 016 Sr 16, Union Ave To Jackson Ave Ada Ramps A Small Totem Electric Of Tacoma, Inc. MICHELE BRITTON 02/10/2017 04/29/2019 231,851.65

009008 Completed STATE 395 Us 395, Nsc - Spokane River To Francis Ave - Gradi Red Diamond Construction Inc CHAD SIMONSON 02/22/2017 06/22/2018 382,482.30

009009 Completed STATE 112 Sr 112 / Us 12 / Sr 109, Chip Seal Doolittle Construction, Llc CHRIS BRUNING 02/10/2017 05/25/2018 3,608,234.45

009010 Completed STPF-0150(013) 150 Sr 150, No-See-Um Road Intersection Improvements Strider Construction Co., Inc. KEVIN WALIGORSKI 03/29/2017 04/18/2019 5,283,745.45

009011 Active STATE 395 Us 395, Nsc Freya St - Structures Max J. Kuney Company MARK V. ALLEN 02/21/2017 7,655,561.00

009012 Completed STPF-0129(011) 129 Sr 129, Spur Intersection - Replace Signal Power City Electric, Inc. ALEX SANGUINO 02/21/2017 02/22/2018 342,723.80

009015 Active STATE 520 Sr 520, Montlake To Lake Washington I/C And Bridge Graham Contracting, Ltd. ROBYN BOYD 11/15/2018 455,349,888.00

009016 Completed HSIP-9999(775) 002 Us 2 Et Al, Er Hma Route Rumble Strips - Install R North Star Enterprises 1, Inc. MARK V. ALLEN 02/23/2017 12/20/2017 175,223.10

009017 Active NHPP-0525(039) 525 Sr 525, Sb Alderwood Mall Pkwy Intersection Improv Totem Electric Of Tacoma, Inc. SHAWN NEIL WENDT 03/02/2017 683,384.90

009018 Active NHPP-0101(355) 101 Us 101 Coffee Creek - Remove Fish Barrier Parsons/Scarsella Jv JOHN ROMERO 11/07/2017 13,889,997.00

009019 Completed NHPP-0900(027) 900 Sr 900, Green Creek Remove Fish Barrier Marshbank Construction, Inc. MIKE ASKARIAN 03/06/2017 05/10/2018 893,661.64

009020 Completed NHPP-0101(357) 101 Us 101, Matriotti Creek Remove Fish Barrier Interwest Construction, Inc. CHRIS BRUNING 03/14/2017 06/04/2019 1,436,932.00

009021 Completed NHPP-0052(213) 005 I-5, N Of Maytown Rd To Martin Way Paving Tucci & Sons, Inc. BRIAN WHITEHOUSE 03/27/2017 09/25/2018 4,013,437.40

Dec 25, 2019 152 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009022 Completed NHPP-0016(032) 003 Sr 3 And Sr 16, Olympic Dr Nw To Sr 305 Install Ca Massana Construction, Inc. MICHELE BRITTON 03/14/2017 06/25/2018 1,662,953.00

009023 Completed NHPP-0052(214) 005 I-5, Sb Cowlitz River Bridge Repair Bridge Massana Construction, Inc. COLIN NEWELL 03/14/2017 10/18/2017 291,004.00

009024 Completed STPF-9999(734) 904 Us 2 Et Al, Er Regionwide Ada Project Pedestrian A Wm. Winkler Company TOM BRASCH 03/14/2017 05/02/2018 1,093,778.00

009025 Completed NHPP-0002(844) 002 Us 2, Fern Bluff Rd Vic To 10th St Vic Paving & Ad Lakeside Industries, Inc. MARK SAWYER 03/22/2017 07/19/2018 3,054,339.65

009026 Completed STATE 097 Us 97, Dolarway Intersection - Intersection Improv Kiewit Infrastructure West Co. JERRY WOOD 04/21/2017 07/16/2018 2,687,606.55

009027 Completed NHPP-0516(023) 516 Sr 516, 102nd Pl Se Vic To 132nd Ave Se Paving And Miles Resources, Llc MIKE ASKARIAN 03/28/2017 02/14/2019 2,465,697.24

009028 Active NHPP-0054(288) 005 I-5, Ebey Slough Bridge To Sr 531 I/C Paving & Ada Cadman Materials, Inc. MARK SAWYER 03/27/2017 6,847,568.91

009029 Completed HSIP-0397(012) 397 Sr 397- S Yew St To S 10th Avepaving And Roadside Central Washington Asphalt, Inc. ALEX SANGUINO 03/22/2017 04/25/2019 2,353,055.58

009030 Completed HSIP-0012(233) 012 Us 12, Low Rd - Intersection Saftey Improvements Interstate Concrete & Asphalt JERRY WOOD 03/14/2017 11/29/2017 457,860.00

009031 Active HSIP-9999(755) 021 Sr 21 Et Al, 2017 Eastern Region Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 03/22/2017 9,909,028.27

009032 Completed NHPP-0901(491) 090 I-90 & I-82, Easton Vic And Ellensburg Vic Eb & Wb M.J. Hughes Construction, Inc. SCOTT GOLBEK 04/04/2017 02/16/2018 3,160,912.50

009033 Completed HSIP-0028(051) 028 Ncr 15-17, Electrical Service And Safety Upgrade Northeast Electric, Llc DAN LEWIS 04/03/2017 03/02/2018 185,207.00

009034 Completed STBG-0097(180) 097 Us 97, Sr 22 Vic To 2nd Ave Vic - Paving & Roadsid Interstate Concrete & Asphalt SCOTT GOLBEK 04/03/2017 10/02/2018 4,200,060.90

009035 Completed STATE 025 Sr 25, Northport Bridge Emergency Traffic Control North Star Enterprises 1, Inc. CHAD SIMONSON 02/09/2017 12/21/2017 175,230.00

009036 Active NHPP-0901(490) 090 I-90, 468th Ave Se To W Summit Rd Concrete, Deck, Imco General Construction, Inc. SCOTT GOLBEK 04/05/2017 27,799,358.66

009037 Completed STATE 195 Us 195 & Us 395, Eastern Region Expansion Joint Re N.A. Degerstrom, Inc. TOM BRASCH 04/03/2017 01/22/2018 292,723.50

009038 Active NHPP-0822(139) 082 I-82 Wb & Us 97, Yakima County - Deck Rehabilitati Conway Construction Company JERRY WOOD 04/19/2017 1,420,504.74

009039 Completed HSIP-9999(743) 017 Sr 17 & 171, Moses Lake Safety Improvements North Central Construction, Inc. KEVIN WALIGORSKI 04/10/2017 03/06/2019 213,609.50

009040 Active NHPP-0901(485) 090 I-90, N Fork Issaquah Creek Fish Passage Scarsella Bros., Inc. SHAWN NEIL WENDT 03/29/2017 5,186,640.40

009041 Completed STBGF-0112(029) 112 Sr 112, Nordstrom Creek Remove Fish Barrier Nordland Construction CHRIS BRUNING 04/10/2017 04/15/2019 1,428,341.00

009042 Active STPF-0542(036) 542 Sr 542 Hedrick Creek Fish Barrier Strider Construction Co., Inc. GABE NG 04/12/2017 3,722,089.00

009043 Completed STATE 090 Sr 529, Northbound Steamboat Slough - Bridge Paint Abhe & Svoboda, Inc. MARK SAWYER 04/17/2017 05/30/2019 5,743,770.00

009044 Completed WA-2017-007 525 Sr 525, Mukilteo Ferry Terminal (Phase 2) Trestle Massana Construction, Inc. JOHN CALLAHAN 04/19/2017 11/06/2017 1,208,939.00

009045 Completed NHPP-0012(235) 012 Us 12 / White Pass & Indian Cr, To Wildcat Crk Bri Interstate Concrete & Asphalt JERRY WOOD 04/25/2017 12/13/2018 4,027,265.00

009046 Completed STBG-9999(769) 002 Ncr 15-17, Safety Implementation And Sign Update Transportation Systems, Inc. DAN LEWIS 04/20/2017 02/26/2019 1,076,073.00

009047 Completed STPF-9999(765) 010 Sr 10 Et Al, 2017 Scr Region Wide-Chip Seal Central Washington Asphalt, Inc. ALEX SANGUINO 04/12/2017 03/26/2018 7,422,422.42

009048 Completed STATE Eastern Region Roof Repairs-Er Washington State Fa Cobra Bec, Inc. MARK STEINGREBE 04/05/2017 01/05/2018 432,380.00

Dec 25, 2019 153 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009050 Completed NHPP-9999(753) 020 Sr 20 And Sr 525, Bob Galbreath Rd To Holbrook Rd Granite Construction Company SHANE SPAHR 12/12/2016 02/28/2018 11,849,264.80

009051 Active STPF-NHPP-9999(742) 509 Sr 509, S 168th St To S 112th St Vic - N Paving An Tucci & Sons, Inc. ALETA BORSCHOWA 04/27/2017 3,246,925.30

009052 Completed HSIP-NHPP-0240(02 240 Sr 240 & Us 395/Tri-Cities Vic. - Paving, I/S Impr Granite Construction Company ALEX SANGUINO 05/02/2017 01/04/2019 6,157,323.00

009053 Active NHPP-0526(011) 526 Sr 526 Et Al, 5th Ave W Vic To I-5 Paving & Ada Co Cadman Materials, Inc. SHAWN NEIL WENDT 05/16/2017 3,381,312.45

009054 Completed NHPP-0906(234) 090 I-90, 3rd Ave Bridge - Special Repair - Eb West Company, Inc. CHAD SIMONSON 04/17/2017 02/12/2019 1,659,797.75

009055 Completed 0020(193) 020 Sr 20, N Of Eaglemount Half Bridge Culvert Replace Interwest Construction, Inc. CHRIS BRUNING 04/25/2017 06/05/2018 396,396.00

009056 Completed STPF-0162(020) 162 Sr 162, Sr 410 To S Of 96th St E Paving And Ada Co Tucci & Sons, Inc. JON KEETH 05/18/2017 05/25/2018 1,433,933.50

009057 Completed HSIP-9999(700) 169 Sr 169 Et Al, Intersection Safety Improv Active Wa Totem Electric Of Tacoma, Inc. MIKE ASKARIAN 05/05/2017 06/12/2019 518,508.60

009058 Active NHPP-0823(068) 082 I-82, Columbia River Bridge Eb - Truss Deck Replac Max J. Kuney Company ALEX SANGUINO 05/11/2017 9,467,594.50

009060 Completed STPF-0528(007) 528 Sr 528, 55th Dr Ne Vic To 83rd Ave Ne Vic Paving A Lakeside Industries, Inc. DAVE LINDBERG 05/16/2017 05/21/2018 2,467,995.90

009062 Completed NHPP-0270(008) 270 Sr 270, Jct Us 195 To Bishop Blvd Paving Poe Asphalt Paving, Inc. TOM BRASCH 05/11/2017 09/03/2019 2,324,173.64

009063 Completed NHPP-0002(843) 002 Us 2 Francis Ave To Division Wye - Paving Paving Cpm Development Corporation TOM BRASCH 05/01/2017 04/04/2019 1,777,500.00

009064 Completed STATE 101 Us 101, Sol Duc River Bridges Bridge Painting Southern Road & Bridge, Llc CHRIS BRUNING 05/18/2017 05/25/2018 2,297,848.00

009065 Completed NHPP-0012(207)(235) 012 Us 12, Rimrock Lake Vicinity - Stabilize Slope Krci Llc JERRY WOOD 05/18/2017 07/31/2018 1,648,936.00

009068 Completed STPF-0904(124) 904 Sr 904, Mullenix Rd To Betz Rd Paving Shamrock Paving, Inc. TOM BRASCH 05/10/2017 08/28/2019 1,624,312.00

009069 Completed NHPP-0303(015) 303 Sr 303, Sr 304 To Wm E Sutton Rd Ne Paving Lakeside Industries, Inc. CHRIS BRUNING 05/18/2017 01/31/2019 3,181,584.88

009070 Completed STATE 101 Us 101, N Of Lower Salmon Cr Culvert Replacement Quigg Bros., Inc. JOHN ROMERO 05/18/2017 09/18/2017 130,119.00

009071 Completed NHPP-0169(027) 169 Sr 169, 140th Ave Se To Blaine Dr Vic Paving & Ada Lakeside Industries, Inc. PATRICK FULLER 05/18/2017 03/27/2018 2,839,075.40

009072 Completed NHPP-0290(024) 290 Sr 290, Mission Ave To Sullivan Rd Paving Cpm Development Corporation TOM BRASCH 05/18/2017 04/11/2019 3,464,647.27

009073 Completed NHPP-0020(189) 020 Sr 20, Collins Rd To Sr 9 Paving & Ada Compliance Lakeside Industries, Inc. SHANE SPAHR 05/08/2017 05/02/2018 1,781,906.67

009074 Active FTA(PFG)(5307) Seattle Multimodal Terminal At Colman Dock Hoffman-Pacific Llc, Joint Venture CARL VOGT 05/05/2017 24,079,471.00

009075 Completed STATE Systemwide On-Call, Off-Shore Maintenanc American Construction Co., Inc. BRIAN ENDRES 05/23/2017 09/30/2019 1,110,948.00

009076 Completed STATE 105 Sr 105, W Of Constantine Way To Edward P Smith Dr Granite Construction Company JOHN ROMERO 05/24/2017 01/04/2018 889,802.00

009077 Completed STATE 119 Sr 119, Us 101 To Lake Cushman Rec Area Chip Seal Doolittle Construction, Llc DEWAYNE MATLOCK 05/24/2017 12/13/2017 679,832.20

009078 Active STATE 518 Sr 518, Eb Off-Ramp To Des Moines Memorial Dr Inte Graham Contracting, Ltd. ALETA BORSCHOWA 06/22/2017 8,229,999.91

009079 Completed HSIP-9999(748) 002 Us 2 Et Al, 2015-17 Er Regionwide Basic Safety - S Belarde Company, Inc. TOM BRASCH 05/18/2017 03/22/2019 680,500.00

009080 Completed HSIP-0026(033) 026 Sr 26, Intersection Improvements Central Washington Asphalt, Inc. KEVIN WALIGORSKI 06/22/2017 09/13/2019 615,931.42

Dec 25, 2019 154 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009082 Completed STPF-STBG-0531(01 531 Sr 531, Edgecomb Creek Fish Passage Mcclure And Sons, Inc. MARK SAWYER 06/06/2017 05/15/2019 881,529.00

009083 Completed NHPP-0012(234) 012 Us 12 Mcnary Pool To Old Highway 12 & Clarkston - Central Washington Asphalt, Inc. ALEX SANGUINO 05/26/2017 04/26/2019 5,642,696.70

009084 Completed ER-1701(002) 971 Sr 971, Mp 10.55 Emergency Slope Repair Rock Supremacy Llc KEVIN WALIGORSKI 04/19/2017 07/31/2017 282,073.00

009085 Completed WFL-2015(012) 002 Us 2, Eagle Falls Vic. To Tye Creek Resurfacing Central Washington Asphalt, Inc. KEVIN WALIGORSKI 06/14/2017 08/07/2018 3,288,343.95

009086 Completed STATE 031 Sr 31, South Of Metaline - Emergent Slide Repair Scarsella Bros., Inc. MARK V. ALLEN 04/05/2017 12/08/2017 50,000.00

009087 Completed STATE 006 Sr 6 And Sr 105, Pacific County Chip Seal Doolittle Construction, Llc COLIN NEWELL 05/24/2017 01/25/2018 5,170,174.83

009089 Completed STATE 003 Sr 3, Sr 304 I/C Interchange Modification Granite Construction Company MICHELE BRITTON 06/22/2017 02/01/2018 1,593,152.00

009090 Completed STATE 025 Sr 25, Northport Columbia River Crossing Bridge Re Northbank Civil And Marine, Inc. MARK V. ALLEN 06/06/2017 02/22/2018 548,928.00

009091 Completed STBG-0007(25) 007 Sr 7, N Of Morton To Sr 706 Paving And Culvert Reh Granite Construction Company COLIN NEWELL 06/20/2017 06/28/2018 6,421,640.00

009093 Completed STBG-0501(024) 501 Sr 501, 26th St Ext Vicinity To End Of Road - Chip Granite Construction Company JOANNA LOWREY 06/14/2017 11/06/2018 889,889.00

009094 Completed NSIP-9999(763)(768) 010 15-17 Scr Region Wide, Signing & Intersection - We Massana Construction, Inc. ALEJANDRO SANGUINO 06/14/2017 11/28/2018 657,389.40

009096 Active NHPP-0051(301) 005 I-5, Sb Bridges 5/40w And 5/105w Resurfacing Granite Construction Company SUSAN FELL 06/14/2017 2,087,087.00

009097 Completed ER-1701(007) 129 Sr 129, Grand Ronde River To Rattlesnake Creek Vic Scarsella Bros., Inc. JERRY WOOD 04/25/2017 09/12/2017 1,124,755.50

009098 Completed STBGNHPP-0097(181 097 Us97 & Sr 14, Paving - Klickitat County Interstate Concrete & Asphalt DEVIN RECK 06/12/2017 07/11/2018 4,600,520.00

009099 Completed STATE 104 Sr 104, Kingston Ferry Terminal Painting Preservat Purcell P & C, Llc Dba Purcell TOM CASTOR 06/16/2017 06/04/2018 489,904.00

009100 Completed STATE 195 Us 195, Colfax To Spangle Add Passing Lanes Selland Construction, Inc. MARK V. ALLEN 07/10/2017 03/26/2019 3,199,999.00

009101 Completed HSIP-0002(841) 002 Us 2, Coles Corner Vicinity Safety Improvements Taylor'S Excavators Inc KEVIN WALIGORSKI 07/10/2017 04/30/2019 703,078.00

009103 Completed STPF-9999(772) 017 Sr 17, Strategic Pavement Preservation 2017 Central Washington Asphalt, Inc. KEVIN WALIGORSKI 06/22/2017 08/07/2018 316,833.50

009105 Completed NHPP-0395(107) 395 Us 395, Arden To Colville Paving Central Washington Asphalt, Inc. MARK V. ALLEN 06/26/2017 07/10/2019 3,491,873.66

009106 Completed ER-1701(004) 021 Sr21, South Of Republic Gold Creek Bridge Emergent Cpm Development Corporation MARK ALLEN 04/17/2017 01/22/2018 50,000.00

009107 Completed ER-1701(003) 020 Sr 20, Loup Loup Pass Emergency Repair 2017 Phase Krci Llc DANIEL LEWIS 05/19/2017 08/02/2018 2,223,786.00

009108 Completed ER-1701(005) 395 Us 395 South Of Orient - Matsen Creek Washout Emer Wm. Winkler Company TOM BRASCH 04/17/2017 07/10/2019 730,000.00

009109 Completed SECT164-0028(050) 028 Sr 28, East Wenatchee Area Safety Improvements Hurst Construction Llc DAN LEWIS 07/14/2017 06/24/2019 1,608,066.55

009111 Completed NHPP-0500(021) 500 Sr 500, Sr 503 To Ne 4th Plain Blvd. Paving Granite Construction Company LORI FIGONE, P.E. 07/05/2017 05/25/2018 3,264,264.00

009112 Completed STP-0153(446) 153 Sr 153, Methow River Bridges Structural Rehabilita Stellar J. Corporation DAN LEWIS 07/13/2017 03/27/2018 612,995.00

009113 Completed NHPP-0012(236) 012 Us 12, Coal Creek Bridge To Gulch Bridge Paving Lakeside Industries, Inc. DEVIN RECK 06/30/2017 05/08/2018 3,327,442.40

009116 Completed CMAQ-0503(031) 503 Sr 503, Atis Infill - I/S Bypass 4th Plain To Main Mill Plain Electric, Inc. DEVIN RECK 07/17/2017 06/11/2018 523,311.60

Dec 25, 2019 155 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009117 Completed NHPP-0432(023) 432 Sr 432, Cowlitz River Bridge No. 432/10s Repair An Hamilton Construction Co. JOANNA LOWREY 07/26/2017 06/01/2018 898,446.75

009118 Completed WA-2017-007-00 525 Sr 525, Mukilteo Ferry Terminal (Phase 2) Trestle Orion Marine Contractors, Inc. _MARK SAWYER 08/16/2017 05/21/2019 4,648,053.50

009120 Completed STATE 090 I-90, 1.5 Miles E Of Cabin Creek Rd To Kachess Riv Granite Construction Company SCOTT GOLBEK 07/24/2017 01/19/2018 1,391,391.00

009121 Active NHPP-0901(498) 090 I-90, Lacey V Murrow Bridge Electrical Rehabilitat Northeast Electric, Llc SHAWN NEIL WENDT 08/03/2017 391,001.00

009122 Completed NHPP-0104(053) 104 Sr 104, Hood Canal Bridge Remove Steel Bands Global Diving & Salvage, Inc. MICHELE BRITTON 08/09/2017 01/09/2018 90,504.00

009123 Completed HSIP-9999(750) 101 2017, Olympic Region Guardrail And Cable Barrier Dirt And Aggregate Interchange, Inc BRIAN WHITEHOUSE 08/17/2017 11/15/2018 1,214,432.00

009124 Active NHPP-0002(848) 002 Us 2, Deer Rd To Colbert Corridor Improvements And Cpm Development Corporation MARK V. ALLEN 07/28/2017 4,228,000.00

009125 Completed ER-STBG-1701(001) 503 Sr 503 Mp 34.34 Vic, Speelyai Slide-Slope - Phase Rock Supremacy Llc LORI FIGONE 07/25/2017 05/08/2018 1,615,219.00

009126 Completed HBP-0082(012) 082 I-82, Selah Creek Bridge Eb - Paving & Bridge Join Interstate Concrete & Asphalt JERRY WOOD 08/14/2017 10/09/2019 661,717.00

009127 Active STATE 099 Sr 99, Awv Demolition Decommissioning & Surface St Kiewit Infrastructure West Co. PATRICK FULLER 06/21/2018 93,749,999.00

009128 Completed ER-1604(003) 112 Sr 112, Mp 0.50 And Mp 1.83 Slides Stabilize Slope Interwest Construction, Inc. CHRIS BRUNING 08/14/2017 06/05/2018 673,514.00

009129 Completed STATE 163 Sr 163, Point Defiance Ferry Terminal Emergency Ge Colvico, Inc. TOM CASTOR 09/05/2017 08/09/2018 218,868.00

009130 Completed STPF-0105(025) 105 Sr 105, North Cove Vicinity Erosion Protection 201 Quigg Bros., Inc. COLIN NEWELL 08/11/2017 06/12/2018 2,352,181.00

009132 Completed HSOP-9999(768)(763) 15-17 Scr Region Wide, Signing & Intersection - Ea Construction Ahead, Inc. Dba ALEJANDRO SANGUINO 08/28/2017 05/14/2018 430,397.75

009133 Active STATE 005 I-5, Steilacoom-Dupont Rd To Thorne Lane Corridor Guy F. Atkinsonconstruction, Llc. BRIAN WHITEHOUSE 06/15/2018 180,895,595.00

009135 Active STPF-0504(010) 504 Sr 504 / Wooster Creek, Culvert Replacement Chroni Hamilton Construction Co. MIKE BRIGGS 09/12/2017 2,095,588.20

009136 Completed STATE 539 Sr 539, Nooksack River Bridge Special Repair Razz Construction, Inc. GABE NG 09/18/2017 03/18/2019 267,933.00

009138 Completed STATE 005 I-5, Mounts Road Vicinity Vms Install Northeast Electric, Llc JON KEETH 10/10/2017 03/12/2018 231,193.00

009140 Completed STATE 090 I-90, Vantage Vic - Emergency Guardrail Repair Frank Gurney, Inc. SCOTT GOLBEK 08/08/2017 12/13/2017 362,900.00

009142 Completed STATE Burlington Peo Tenant Improvements Washington Stat Faber Construction Corp. JIM RODGERS 09/27/2017 02/27/2018 464,970.00

009143 Active STPF0530(027) 530 Sr 530, Trafton Creek & School Yard Creek Fish Pas Kiewit Infrastructure West Co. MIKKEL LAMAY 06/20/2018 12,572,772.00

009144 Active HSIP-9999(778) 005 I-5 Et Al, Nwr Cable Barrier Upgrade Petersen Brothers, Inc. SHANE SPAHR 11/21/2017 4,428,212.62

009145 Active STATE 195 Us 195, Colfax To Spangle Add Passing Lanes Phase N.A. Degerstrom, Inc. MARK V. ALLEN 10/23/2017 4,073,200.10

009146 Completed STATE 012 Us 12, 2 Miles E Of Clear Creek Falls Viewpoint -R Hi Tech Rockfall Construction, Inc. JERRY WOOD 08/30/2017 12/18/2017 285,205.00

009147 Completed STATE 005 I-5, S 188th St To Ne 80th St Camera Installation Northeast Electric, Llc MARK SAWYER 11/15/2017 02/21/2019 421,496.00

009150 Completed WA-90-X604 525 Sr 525, Mukilteo Ferry Terminal (Phase 2) Deep Sto Imco General Construction, Inc. MARK SAWYER 11/22/2017 05/14/2019 2,259,586.00

009151 Active NHFP-NHPP-0901(497) 090 I-90, Floating Bridges Replace Anchor Cables American Bridge Company SHAWN NEIL WENDT 11/20/2017 5,755,000.00

Dec 25, 2019 156 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009152 Completed ER-1701(009) 101 Us 101, Hoodsport Vicinity Slide Debris Fence Repa Hi Tech Rockfall Construction, Inc. BRIAN WHITEHOUSE 10/12/2017 04/25/2018 199,865.20

009154 Completed STATE 026 Sr 26 & Us 195, Safety Improvements Colvico, Inc. GLENN WAGEMANN 10/25/2017 10/08/2018 115,662.00

009155 Completed STATE 012 Us 12 / Us 101 / Sr 109, Aberdeen / Hoquiam Signal Northeast Electric, Llc JOHN ROMERO 11/20/2017 02/26/2019 2,947,841.00

009156 Active STATE 522 Sr 522, Elliot Road Vic Sandfilter Interwest Construction, Inc. SHAWN HEIL WENDT 11/13/2017 561,646.00

009157 Active STATE 005 I-5, Portland Avenue To Port Of Tacoma Road - Sout Guy F. Atkinsonconstruction, Llc. GAIUS SANOY 08/13/2018 159,875,295.00

009158 Active ER-STBG-1701(004) 021 Sr 21, South Of Republic Gold Creek Bridge Emergen N.A. Degerstrom, Inc. CHAD SIMONSON 09/13/2017 179,999.66

009159 Active LOCAL 005 Emergency Contract North Metro Base, Mp 175.5 Imco General Construction, Inc. MARK SAWYER 09/26/2017 410,000.00

009160 Active STATE 099 Sr 99, Alaskan Way Viaduct - Replacement South Acc Scarsella Bros., Inc. PATRICK FULLER 12/26/2017 22,583,904.00

009161 Completed STATE 005 I-5, Lake Samish Vic Stormwater Pipe Relacement Faber Construction Corp. GABE NG 11/13/2017 10/31/2018 588,595.69

009164 Completed NHPP-0902(451) 090 I-90, Easton To Ellensburg Vic Interchange Paving Interstate Concrete & Asphalt SCOTT GOLBEK 12/04/2017 11/07/2019 1,941,242.00

009165 Completed STBG-0016(033) 016 Sr 16, W Of Se Burley Olalla Rd To Jct S - Paving Miles Resources, Llc MICHELE BRITTON 12/11/2017 03/05/2019 1,298,272.72

009166 Completed STATE 005 I-5, Elm St, To North Kelso Ave Interchange - Illu Northeast Electric, Llc JOANNA LOWREY 12/11/2017 05/20/2019 669,688.00

009167 Active STATE 009 Sr9, Gribble Creek Fish Passage Interwest Construction, Inc. SHANE SPAHR 12/11/2017 1,616,161.61

009168 Active STBG-0099(137) 099 Sr 99, George Washington Bridge Painting (Stage 2) Liberty Maintenance, Inc. SHAWN NEIL WENDT 01/03/2018 30,851,133.05

009170 Active STATE 012 Us12, Wildcat Creek Bridge - Replace Bridge - Desi Graham Contracting, Ltd. SCOTT GOLBEK 04/18/2018 4,799,336.00

009171 Completed STBG-0020(192) 020 Sr 20, W Of 4 Corners Rd To E Of Water St Paving A Lakeside Industries, Inc. JERRY MOORE 01/08/2018 04/15/2019 2,420,914.00

009172 Completed CBI-0542(045) 542 Sr 542, Sr 9 East Junction Intersection Improvemen Colacurcio Brothers, Inc. GABE NG 01/17/2018 10/17/2018 989,557.80

009173 Completed STATE 002 Us 2, Nsc, Pittsburg Rd - Intersection Closure Wm. Winkler Company TOM BRASCH 12/28/2017 02/06/2019 139,800.00

009176 Completed NHPP-0053(973) 005 I-5, Martin Way To Marvin Road Stormwater Retrofit Scarsella Bros., Inc. BRIAN WHITEHOUSE 01/08/2018 09/21/2018 167,989.00

009177 Completed STATE 020 Sr20, Sharpes Corner Vicinity Improvements Mp 47.0 Tapani, Inc. GABE NG 01/11/2018 11/20/2019 7,224,164.00

009179 Active STATE 530 Sr 530, I-5 Interchange To Sr 9 Paving And Ada Com Cadman Materials, Inc. SHANE SPAHR 01/03/2018 1,885,439.45

009180 Completed NHPP-0020(185) 020 Sr 20 Spur, Sharpes Corner To Anacortes Paving & A Lakeside Industries, Inc. SHANE SPAHR 01/08/2018 06/19/2019 5,432,290.80

009181 Completed HSIP-9999(808) 017 Ncr, Pavement Rehab 2018 Central Washington Asphalt, Inc. DAVID KIENINGER 01/31/2018 11/12/2019 6,941,941.00

009182 Active STBG-9999(744) 164 Sr 164, Sr 18 To 17th St Se Paving And Ada Compli Tucci & Sons, Inc. MIKE ASKARIAN 03/13/2018 2,373,740.50

009183 Active STBG-0002(853) 002 Us 2, I-5 I/C To Bickford Ave Vic Paving Lakeside Industries, Inc. MARK SAWYER 03/01/2018 9,542,991.10

009184 Active STBG-0409(005) 409 Sr 409, Columbia River Br. At Puget Island - Paint Royal Bridge Inc. JOANNA LOWREY 02/26/2018 13,678,650.76

009185 Active STATE 005 I-5, Mtb Cantilever Signs And Landscaping Massana Construction, Inc. COLIN NEWELL 01/23/2018 1,344,750.80

Dec 25, 2019 157 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009186 Active STATE 092 Sr 92, Little Pilchuck Creek Fish Passage Graham Contracting, Ltd. MARK SAWYER 02/26/2018 4,416,999.00

009187 Active NHPP-0002(850) 002 Us 2, Jct I-90 To Euclid Ave Paving Cpm Development Corporation CHAD SIMONSON 02/06/2018 4,046,000.00

009188 Completed STPF-9999(792) 002 Us 2 Et Al, Strategic Pavement Preservation 2018 Central Washington Asphalt, Inc. DAN LEWIS 01/31/2018 06/24/2019 1,389,826.30

009189 Active HSIP-9999(795) 902 Sr 902, Medical Lake To I-90 Paving Shamrock Paving, Inc. MARK ALLEN 02/06/2018 1,872,436.30

009190 Completed STATE 240 Sr 240, Kingsgate Way Signalize Intersection Northeast Electric, Llc ALEJANDRO SANGUINO 02/12/2018 01/07/2019 430,761.00

009192 Active STBG-0203(022) 203 Sr 203, Langlois Creek Fish Passage Northwest Construction, Inc. SHAWN NEIL WENDT 03/01/2018 914,277.00

009193 Active NHPP-9999(691) 009 Sr 9 Et Al, Mt Baker Area Bst - 2018 Granite Construction Company SHANE SPAHR 02/12/2018 7,804,095.05

009194 Completed STATE 009 Sr 9, 136th St Se Vic To Sr 96 Vic Channelization Road Construction Northwest, Inc. SHAWN NEIL WENDT 02/06/2018 12/09/2019 816,763.00

009195 Active STPF-9999(806) 009 Sr 9 & Sr 92 108th I/S & 147th Ave To Quarry Rd I/ Granite Construction Company MARK SAWYER 03/01/2018 4,204,000.00

009196 Active STATE 182 I-182, Queensgate Dr - Interchange Improvements Central Washington Asphalt, Inc. ALEJANDRO SANGUINO 04/11/2018 2,400,000.00

009197 Active STPF-0508(010) 508 Sr 508, S. Fork Newaukum River Bridge Replacement Oregon State Bridge Construction, JOANNA LOWREY 03/05/2018 5,010,135.15

009198 Active NHPP-0096(005) 096 Sr 96, I-5 Interchange Vic To Sr 9 Vic - Paving & Cadman Materials, Inc. SHAWN NEIL WENDT 04/02/2018 6,954,955.60

009199 Completed STBG-0730(004) 730 Us 730, 0.2 To 1.8 Miles N Of Oregon Border - Rock L.R.L. Construction Co. ALEJANDRO SANGUINO 03/09/2018 05/13/2019 2,999,099.81

009200 Completed STATE 410 Sr 410, White River Bridge Painting Panther Industrial Painting, Llc. ALETA BORSCHOWA 03/08/2018 07/02/2019 1,681,803.00

009201 Completed NHPP-0128(001) 128 Sr 128, Snake River Red Wolf Bridge - Deck Rehabil Hamilton Construction Co. ALEJANDRO SANGUINO 02/20/2018 05/25/2019 1,277,496.00

009203 Completed STATE Northup Maintenance Facility Equipment Building Wa Harbor Pacific Contractors, Inc. JIM RODGERS 03/26/2018 06/26/2019 1,352,000.00

009204 Active NHPP-0195(061) 195 Us 195, Eastern Region Bridge Deck Repairs N.A. Degerstrom, Inc. MARK ALLEN 03/05/2018 2,075,511.00

009205 Completed NHPP-0082(011) 082 I-82, Selah Creek Eb Sra - Water System Improvemen Selland Construction, Inc. SAM LEIREN 03/22/2018 02/19/2019 360,000.00

009206 Completed STATE 012 Us 12, Naches River Nelson Bridges - Bridge Painti Liberty Maintenance, Inc. JERRY WOOD 03/05/2018 01/22/2019 4,386,659.00

009207 Completed NHPP-1823(064) 182 I-182 & Us 395, Tri Cities Vic - Paving, Ada, And Cpm Development Corporation ALEJANDRO SANGUINO 03/13/2018 10/29/2019 2,660,546.43

009208 Completed STATE 160 Sr 160, Fauntleroy Ferry Terminal Pavement Preserv C.A. Carey Corporation TOM CASTOR 03/15/2018 12/04/2018 344,696.00

009210 Completed STATE 025 Sr 25, Spokane River Bridge N Embankment Repair N.A. Degerstrom, Inc. TOM BRASCH 03/22/2018 01/24/2019 1,426,551.50

009211 Completed NHPP-0012(221) 012 Us 12, Unnamed Tributary To Wynoochee River - Remo Rognlin'S, Inc. JOHN ROMERO 03/26/2018 06/10/2019 2,651,666.50

009212 Active STATE 018 Sr 18 Et Al, Wb W Valley Hwy Vic To Se 231st St - Tucci & Sons, Inc. MIKE ASKARIAN 03/22/2018 6,632,868.50

009213 Active NHPP-0901(492) 090 I-90, E Sunset Way I/C Vic To 436th Ave Vic Paveme Acme Concrete Paving, Inc. ALETA BORSCHOWA 04/03/2018 17,345,998.29

009214 Active NHPP-0902(450) 090 I-90, Yakima River Bridges Cle Elum To Ellensburg Graham Contracting, Ltd. JERRY WOOD 04/16/2018 13,999,349.00

009215 Completed STPF-0112(031) 112 Sr 112, Olsen Creek In Vicinity Of Vista Dr - Remo Interwest Construction, Inc. JERRY MOORE 03/26/2018 06/21/2019 1,681,910.00

Dec 25, 2019 158 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009216 Completed NHPP-4053(865) 405 I-405, Sb Sr 900 To Coal Creek Pkwy Se - Paving Ou Lakeside Industries, Inc. MARK SAWYER 04/05/2018 02/05/2019 1,755,880.00

009217 Completed NHPPSTBG0432(025) 432 Sr432, Cowlitz River Bridge Painting Liberty Maintenance, Inc. JOANNA LOWREY 04/16/2018 10/17/2019 2,493,999.60

009218 Completed STPF-0548(011) 548 Sr 548, Kickerville Rd Intersection Improvement Tiger Construction, Ltd. GABE NG 04/02/2018 08/19/2019 568,383.35

009219 Active STPF-0009(076) 009 Sr 9, Francis Rd Intersection Improvements Mp 53.1 Srv Construction, Inc. SHANE SPAHR 04/03/2018 1,250,081.00

009221 Completed NHPP-0020(191) 020 Sr 9 & Sr 20, I/S Sr 9 & Sr 20 To Park Cottage & H Granite Construction Company SHANE SPAHR 04/16/2018 05/29/2019 3,198,527.50

009222 Active NHPP-0051(302) 005 I-5, E Fork Lewis River Br To Weigh Station Vic - Lakeside Industries, Inc. JOANNA LOWREY 04/18/2018 10,015,451.04

009223 Active STPF-0291(024) 291 Sr 291, Charles Rd To Suncrest Paving Shamrock Paving, Inc. TOM BRASCH 04/11/2018 1,421,494.00

009224 Active STPF-9999(784) 021 Sr 21 Et Al, 2018 Eastern Region Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 04/18/2018 8,887,511.35

009225 Completed NHPP-0012(239) 012 Us 12, Sargent Blvd To Wynoochee River Bridge Pavi Lakeside Industries, Inc. JOHN ROMERO 04/18/2018 11/05/2018 2,032,098.60

009226 Completed NHPP-0101(379) 101 Us 101, Jct Sr 109 To N Of Ocean Beach Rd - Chip S Doolittle Construction, Llc JOHN ROMERO 04/26/2018 11/05/2018 676,298.00

009227 Completed NHPP-0522(061) 522 Sr 522, Sr 9 Vic To Snohomish River Br Paving & Br Lakeside Industries, Inc. SHAWN NEIL WENDT 04/11/2018 12/09/2019 3,748,738.00

009229 Completed STP-0503(036) 503 Sr 503 Spur-Chip Seal And, Sr 503/Rock Creek Rd To Granite Construction Company SUSAN FELL 04/27/2018 05/01/2019 5,347,347.00

009230 Completed NHPP-0167(054) 167 Sr 167, Milwaukee Ave To S Of Pierce Co Line - Pav Tucci & Sons, Inc. LONE (LUNA) MOODY 05/01/2018 01/31/2019 1,319,061.75

009231 Active NHPP-0054(290) 005 I-5, Stillaguamish R Br To Hill Ditch Br - Pccp Re Graham Contracting, Ltd. SHANE SPAHR 04/27/2018 16,999,349.00

009233 Active STPF-0524(016) 524 Sr 524, Locust & Larch Way Intersection Improvemen A-1 Landscaping And Construction, MARK SAWYER 05/17/2018 3,286,716.00

009234 Completed STBG-0102(002) 102 Sr 102, Wa St Corrections Center St To Us 101 - Ch Doolittle Construction, Llc MICHELE BRITTON 04/26/2018 12/13/2018 659,354.60

009235 Active NHPP-0053(976) 005 I-5, Sb S Lucile St To Spring St - Pavement Repair Midmountain Contractors, Inc. MIKE ASKARIAN 05/02/2018 8,989,475.00

009236 Active NHPP-0097(170) 097 Us 97, N. Of Blewett Pass Culvert Replacements Pipkin Inc., Dba Pipkin Constructio DAN LEWIS 05/08/2018 1,088,005.10

009238 Active STATE 101 Us 101 / Sr 6, Raymond Drainage And Sr 6 Roundabou Rognlin'S, Inc. COLIN NEWELL 05/02/2018 2,664,627.00

009239 Active NHPP-9999(811) 099 Sr99 & Sr509, S Cloverdale St To Duwamish River-Pa Tucci & Sons, Inc. ALETA BORSCHOWA 05/01/2018 4,747,015.70

009240 Completed HSIP-9999(788) 020 Sr 20 Et Al, Er Curve Warning Sign Update 2017-19 Kt Contracting Co., Inc. MARK ALLEN 04/27/2018 04/02/2019 733,876.56

009242 Active STATE 405 I-405, Renton To Bellevue Widening And Express Tol Flatiron West, Inc.-The Lane Not Specified 10/01/2019 704,975,000.00

009245 Completed STATE 405 I-405, Sr 167 Interchange Catch Basins - Drainage Klb Construction, Inc. EVELYN PAO 05/08/2018 01/25/2019 1,073,999.00

009246 Completed HSIP-0097(179) 097 Us97, Ncr 17-19, Weathering Steel Guardrail Rehabi Coral Construction Company DAVID KIENINGER 05/10/2018 01/17/2019 977,654.00

009247 Active STATE 082 I-82, South Union Gap Interchange - Construct Ramp Hamilton Construction Co. SCOTT GOLBEK 12/06/2018 14,128,990.00

009248 Completed STP-0007(028) 007 Sr7 & Sr702, 2018 Pierce County Chip Seal Doolittle Construction, Llc BRIAN WHITEHOUSE 05/08/2018 03/05/2019 1,250,000.30

009250 Completed STPF-0123(002) 012 Us 12/Fs Rd 1284 To, White Pass & Sr 123 Us 12 To Interstate Concrete & Asphalt JERRY WOOD 05/25/2018 03/18/2019 1,313,564.20

Dec 25, 2019 159 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009251 Completed STATE 524 Sr 524, Great Dane Creek Fish Passage Klb Construction, Inc. EDWARD W. KANE 05/08/2018 08/12/2019 653,459.40

009252 Active STATE 395 Us 395, Nsc - Columbia To Freya Acme Concrete Paving, Inc. MARK ALLEN 06/05/2018 8,217,202.56

009253 Completed NHPP-0053(752) 005 I-5, Martin Way Bridges Special Repair Hamilton Construction Co. CHUCK MEADE 05/14/2018 11/29/2018 599,754.68

009255 Completed STATE 104 Sr104 / Edmonds Ferry Terminal Painting Preservati Purcell P & C, Llc Dba Purcell TOM CASTOR 05/21/2018 05/31/2019 552,904.00

009256 Active NHPP-099(135) 099 Sr 99, Roy St To N 145th St Paving & Ada Complianc Cpm Development Corporation MIKE ASKARIAN 06/07/2018 15,205,157.26

009257 Active STPF-9999(793) 012 Us 12, Old Highway 12 To E Isaacs Ave Br - Interstate Concrete & Asphalt JERRY WOOD 05/23/2018 1,928,244.30

009258 Active HSIP-0395(109) 395 Us 395, Deer Park Corridor Intersection Improveme Cpm Development Corporation TOM BRASCH 05/23/2018 2,959,959.00

009259 Completed BH-0153(446) 153 Sr 153/Methow River Bridges, Structural Rehabilita Combined Construction, Inc. DAN LEWIS 05/25/2018 03/05/2019 1,772,998.00

009260 Active NHPP-0285(021) 285 Sr 285, Wenatchee Area Paving And Ada Compliance Central Washington Asphalt, Inc. DAVID KIENINGER 06/05/2018 6,069,307.35

009261 Completed USIP-0097(153) 097 Us 97, Brays Landing Rd.Intersection Improvements Hurst Construction Llc DAN LEWIS 05/25/2018 04/08/2019 214,583.80

009262 Completed STATE 500 Sr 500, Leadbetter Rd To Se 3rd Ave. Paving And Ad Granite Construction Company SUSAN FELL 05/30/2018 02/15/2019 2,799,799.00

009263 Completed STATE 410 Sr 410, Buckley Rebuild Signals Northeast Electric, Llc LONE (LUNA) MOODY 05/30/2018 07/25/2019 1,325,839.00

009264 Active NHPP-0901(484) 090 I-90, 2nd Ave W Bridge And 3rd Ave Bridge Wb On-Ra Max J. Kuney Company CHAD SIMONSON 06/12/2018 1,433,333.50

009265 Completed STATE 101 Us 101, D St Vicinity To Water Street Paving And A Granite Construction Company COLIN NEWELL 05/23/2018 01/08/2019 1,363,657.77

009266 Completed STATE 160 Sr160 Fauntleroy,Vashon Ferry Terminal Transfer Sp Leewens Corporation TOM CASTOR 06/14/2018 12/24/2018 148,800.00

009267 Completed NHPP-0014(081) 014 Sr 14/0.5 Miles, East Of Cape Horn Slide Debris Fl Jensen Drilling Company DEVIN RECK 06/11/2018 02/08/2019 238,426.00

009268 Completed STPF0014(078) 014 Sr 14, Cliffs Rd. Vic. To Wood Cr. Bridge Pavement Interstate Concrete & Asphalt DEVIN RECK 06/05/2018 05/23/2019 3,029,040.00

009269 Active STBG-0202(059) 999 Sr 202, Evans Creek & Patterson Creek Fish Passage Hamilton Construction Co. MIKE ASKARIAN 04/24/2019 11,975,000.00

009270 Completed HSIP-0017(044) 017 Sr 17, Prior Farms Left Turn Lane Central Washington Asphalt, Inc. DAN LEWIS 06/11/2018 06/24/2019 269,293.70

009272 Active STATE 005 I5 / Express Lanes Entrance Electronic Sign Replac Northeast Electric, Llc SHAWN NEIL WENDT 06/18/2018 1,877,588.00

009273 Completed STPF-9999(792) 026 2018 Ncr, Strategic Pavement Preservation Area 2 Granite Construction Company DAN LEWIS 06/11/2018 01/30/2019 357,825.36

009274 Completed NHPP-0097(166) 097 Us 97, Mill Culvert- Remove Fish Barrier Hurst Construction Llc DAN LEWIS 06/18/2018 07/15/2019 1,211,129.25

009275 Active STBG-0026(034) 026 Sr 26, Railroad Bridge Deck Repair N.A. Degerstrom, Inc. DAN LEWIS 06/18/2018 1,086,510.00

009276 Completed STATE 090 I-90, Usfs Rd 9030 Interchange - Replace Lighting Northeast Electric, Llc SCOTT GOLBEK 06/19/2018 09/09/2019 376,284.00

009277 Completed STATE 005 I-5, Sb 236th St Sw To 44th Ave W Peak Transit Sho Mccann Construction Enterprises, MARK SAWYER 07/17/2018 02/27/2019 365,218.00

009279 Completed NHPP-0097(183) 097 Us 97, Okanogan River Bridge T Omak- Deck Repair Hamilton Construction Co. DAVID KIENINGER 06/28/2018 03/20/2019 670,534.14

009280 Active STATE Olympic Region Maintenance And Administration Faci Graham Contracting, Ltd. ERIC YATES 03/08/2019 47,999,000.00

Dec 25, 2019 160 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009281 Completed HSIP-9999(814) 012 Us 12 Et Al, Scr 17-19 Region Wide - Rumble Strips Construction Ahead, Inc. Dba ALEJANDRO SANGUINO 06/29/2018 04/15/2019 572,720.05

009282 Active STATE 090 I-90, Eb Mp 23.0 To Sr 18 Active Warning Sign & Ca Northeast Electric, Llc ALETA BORSCHOWA 07/09/2018 593,901.00

009283 Completed NHPP-0101(376) 101 Us 101, Kennedy Creek Bridges Special Repair Associated Underwater Services BRIAN WHITEHOUSE 07/09/2018 01/28/2019 339,504.90

009284 Completed HSIP-9999(797) 004 Sr 4, Shoulder And Us 101 Centerline - Rumble Stri Construction Ahead, Inc. Dba COLIN NEWELL 07/10/2018 03/05/2019 599,047.54

009285 Completed STPF-0006(026) 006 Sr 6, Chehalis River Adna Bridge Replace Expansion Conway Construction Company COLIN NEWELL 07/09/2018 01/08/2019 412,161.00

009286 Completed STATE 903 Sr 903, Cle Elum To National Forest Boundary - Pav Interstate Concrete & Asphalt SCOTT GOLBEK 07/09/2018 02/26/2019 1,605,548.45

009287 Active NHPP-0290(026) 290 Sr 290, Hamilton St To Mission Ave Paving Cpm Development Corporation CHAD SIMONSON 07/10/2018 1,922,922.00

009288 Completed HSIP0012(248) 012 Us 12, Mapleway Rd / Mclaughlin Rd - Intersection Interstate Concrete & Asphalt SCOTT GOLBEK 07/09/2018 02/12/2019 335,285.00

009289 Completed STPG-0020(182) 020 Sr 20, Calispel Lake Drainage Culvert Replacement Wuesthoff Excavation, Inc. MARK ALLEN 07/09/2018 04/01/2019 109,026.30

009291 Completed CRS0503(034) 503 Sr 503, Brush Prairie Rr Xing Bus And Truck Pullou Advanced Excavating Specialists, DEVIN RECK 07/25/2018 03/06/2019 559,974.50

009292 Completed NHPP-0503(039) 503 Sr 503, Drainage Improvements Mcdonald Excavating, Inc. DEVIN RECK 08/06/2018 02/21/2019 547,206.50

009293 Active CMAQ-0503(037) 205 I-205 Ramp Meter, And Sr 503 Variable Message Sign Northeast Electric, Llc MIKE BRIGGS 08/17/2018 539,913.00

009294 Completed STATE 101 Us 101, Lynch Road Intersection Safety Improvement Rognlin'S, Inc. BRIAN WHITEHOUSE 08/02/2018 04/17/2019 1,823,870.40

009296 Completed STBG-0031(030) 031 Sr 31, South Of Metaline Stabilize Slope Pile Contractors, Inc. TOM BRASCH 08/13/2018 01/18/2019 685,703.00

009297 Active STATE 510 I-5, Sr 510 Interchange Reconstruct Interchange Scarsella Bros., Inc. BRIAN WHITEHOUSE 09/27/2018 25,935,935.35

009298 Active STATE 021 Sr 21, Curlew To Canada Flood Repair Wm. Winkler Company TOM BRASCH 08/20/2018 699,998.00

009299 Active STATE 599 Sr 599, Sb S 133rd St & S 124th St Vic Vms Replace Titan Earthwork Llc MIKE ASKARIAN 08/27/2018 665,334.00

009300 Completed STATE Hyak Washbay Sump Improvements -Scr (Small Works R Thornberg Construction Company, SAM LEIREN 09/20/2018 04/21/2019 140,000.00

009301 Completed STP-0906(235) 906 Sr906/Travelers Rest Safety Rest Area-Roof Repair- Thornberg Construction Company, SAM LEIREN 09/20/2018 03/29/2019 135,414.00

009302 Active HSIP-0007(030) 007 Sr7, Pedestrian Crossing Safety Improvement Northeast Electric, Llc LONE (LUNA) MOODY 09/13/2018 954,045.00

009304 Completed STATE 004 Sr 4, 0.3 Miles W Of Germany Creek Slope Stabiliza Cat Works, Llc JOANNA LOWREY 08/23/2018 05/31/2019 1,357,350.00

009305 Completed STATE 165 Sr 165, N. Of Carbon River Bridge Rock Scaling Triptych Construction, Llc LONE (LUNA) MOODY 08/29/2018 01/02/2019 58,881.00

009306 Completed STATE 090 I-90, Kittitas To Vantage - 2018 Emergency Guardra Petersen Brothers, Inc. JERRY WOOD 07/30/2018 02/13/2019 384,555.00

009307 Active STATE 005 I-5, Sb Ne 45th St To Ne 130th St Ramp Meter Modif Northeast Electric, Llc MIKE ASKARIAN 10/11/2018 659,929.00

009308 Active HSIP-0536(001) 020 Sr 20, Railroad Crossing Sail Electric, Inc. GABE NG 09/24/2018 169,366.00

009309 Completed STATE 090 I-90, 1.0 Miles W Of Snoquaimie Summit Eb-Rockfall Triptych Construction, Llc JERRY WOOD 09/13/2018 01/10/2019 236,449.00

009310 Completed STBG-0002(838) 002 Us 2, Easy Street East Pedestrian Trail Pipkin Inc., Dba Pipkin Constructio KEVIN WALIGORSKI 09/24/2018 08/13/2019 254,813.40

Dec 25, 2019 161 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009311 Active HSIP-0906(233) 002 I-90, Us 2 Garden Springs To Broadway Ave - Ramp M Power City Electric, Inc. CHAD SIMONSON 09/11/2018 281,029.00

009312 Completed STATE 500 Sr 500, 42nd And 54th Intersections Safety Improve Cascade Bridge Llc SUSAN FELL 09/24/2018 07/01/2019 337,832.40

009313 Completed FAPA-1801(001) 090 I-90, Tokio Interchange - Bridge Repair N.A. Degerstrom, Inc. MARK ALLEN 08/28/2018 08/09/2019 531,003.00

009318 Active STATE 525 Sr 525, Ferry Dock Rd. - Passenger Drop-Off And Ad Pacific Pile & Marine, L.P. TOM CASTOR 11/30/2018 1,833,755.00

009319 Active NHPP-0901(496) 009 I-90, 468th Ave Se To W Summit Rd Wb - Rehab Concr Acme Concrete Paving, Inc. SCOTT GOLBEK 11/19/2018 21,274,148.25

009321 Active WA-2017(007)(023) 525 Sr 525, Mukilteo Ferry Terminal (Phase 2) Ferry Te Imco General Construction, Inc. MARK SAWYER 01/08/2019 47,948,009.30

009323 Active NHPP-0097(166) 097 Us 97 Boundary Bridge Replacement Remove Fish Barr Whh Nisqually Federal Services, Llc BRIAN PEARSON 12/12/2018 4,244,497.84

009324 Completed STATE 090 I90 Ijh Rest Area Vicinity Wb Pavement Rehabilitat Granite Construction Company JERRY WOOD 10/08/2018 01/24/2019 442,900.00

009327 Completed STPF-9999(749) Ncr, Ada Compliance 2018 Moreno & Nelson Construction KEVIN WALIGORSKI 12/18/2018 11/20/2019 714,113.00

009328 Completed STATE Sr 104, Edmonds Ferry Terminal Dolphin Improvement Manson Construction Co. TOM CASTOR 12/12/2018 05/31/2019 271,054.00

009329 Active NHPP-0526(012) 526 Sr 525 To Boeing Access & Sr 525 Spur Paving & Ada Granite Construction Company MARK SAWYER, P.E. 12/26/2018 2,315,896.00

009330 Active NHPP-0053(975) 104 I-5, Nb Sr 104 Vic To 164th St Sw I/C Paving & Ex Granite Construction Company SHAWN NEIL WENDT 01/24/2019 7,201,723.50

009331 Active STATE 005 I-5, Wscc & Freeway Park Tunnels Lighting Controls Northeast Electric, Llc EVELYN PAO 01/10/2019 549,024.00

009332 Active STATE 002 Us 2 Et Al, Eastern Region Cctv Systems - New Inst Power City Electric, Inc. MARK ALLEN PE 12/10/2018 115,134.00

009333 Active STATE 167 Sr 167, 70th Avenue E. Vicinity Bridge Replacement Guy F. Atkinsonconstruction, Llc. GAUIS SANOY 08/08/2019 40,876,990.00

009335 Active STATE 304 Sr 304/Sr 20 Spur, Bremerton/Lopez Ferry Dolphin I Pacific Pile & Marine, L.P. TOM CASTOR 12/14/2018 879,734.00

009336 Completed HSIP-9999(807) Ncr, Breakaway Cable Terminal Replacement Massana Construction, Inc. KEVIN WALIGORSKI 12/19/2018 11/21/2019 296,411.00

009338 Active TIGER-WA-2017-007 525 Sr 525, Mukilteo Ferry Terminal (Phase 2) Marine S Manson Construction Co. MARK SAWYER 06/06/2019 26,418,348.00

009339 Active NHPP-0097(141) 097 Us 97, South Of Blewett Pass - Paving Central Washington Asphalt, Inc. KEVIN WALIGORSKI 12/19/2018 3,521,102.22

009340 Completed STATE Eagle Harbor, Maintenance Facility Gangplank Mast Massana Construction, Inc. TOM CASTOR 12/22/2018 05/20/2019 96,504.00

009341 Active CMAQ-0014(083) 014 Sr 14, Atis Infill I-5 To Evergreen Mill Plain Electric, Inc. MIKE BRIGGS 01/10/2019 640,307.00

009342 Completed HSIP-9999(796) 012 Swr Regionwide Basic Safety, Guardrail 2017-2019 ( Dirt And Aggregate Interchange, Inc DEVIN RECK 12/26/2018 05/15/2019 229,999.00

009344 Active NHPP-0020(194) 020 Sr 20, Deception Pass And Canoe Pass Bridges Paint Eagle Industrial Painting, Llc SHANE SPAHR 01/31/2019 13,998,005.00

009345 Active NHPP-0018(042) 018 Sr 18, Eb Soosette Cr To Holder Cr Paving & Deck O Tucci & Sons, Inc. MIKE ASKARIAN 01/09/2019 3,593,565.68

009346 Completed STATE 525 Sr 525, Freeland Vicinity Corridor Improvements Northeast Electric, Llc SHANE SPAHR 01/07/2019 12/11/2019 371,435.00

009348 Completed HSIP-9999(823) 097 Ncr, Centerline Rumble Strips 2019 Specialized Pavement Marking Inc. KEVIN WALIGORSKI 01/07/2019 12/05/2019 316,411.50

009349 Active STPF-0904(128) 090 I-90, Sr 21 To Ritzville Paving Central Washington Asphalt, Inc. TOM BRASCH 01/28/2019 6,272,222.00

Dec 25, 2019 162 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009350 Active NHPP-0161(038) 161 Sr 161, Milton Rd S Vic To Sr 18 Paving & Ada Comp Tucci & Sons, Inc. MIKE ASKARIAN 01/09/2019 1,880,808.80

009352 Active HSIP-9999(795) 002 Us 2, Reardan To Espanola Rd Paving Shamrock Paving, Inc. TOM BRASCH 01/10/2019 2,222,222.22

009353 Active HSIP-0510(019) 510 Sr 510, Meridian Rd Se Roundabout And Paving Active Construction, Inc. JOHN ROMERO 01/17/2019 2,484,484.00

009354 Active STBG-021(023) 021 Sr 21, Keller Ferry Terminal And Pontoon Replaceme Imco General Construction, Inc. CHAD SIMONSON 01/30/2019 4,038,058.00

009355 Active NHPP-0181(018) 181 Sr 181, Sr 516 To W James St Paving & Ada Complian Tucci & Sons, Inc. EVELYN PAO 02/06/2019 1,512,745.85

009356 Active NHPP-0536(008) 536 Sr 536, Skagit River To I-5 Paving & Ada Complianc Granite Construction Company SHANE SPAHR 01/10/2019 2,089,546.00

009357 Active NHPP-0018(043) 509 Sr 509 & Sr 518, S 192 St To Normandy Pk & Sr 509 Massana Construction, Inc. JAMES HARPER 02/07/2019 9,030,006.20

009358 Active NHPP-0104(057) 104 Sr 104, Hood Canal Br Column & Crossbeam Sealing(S Combined Construction, Inc. MICHELE BRITTON 02/19/2019 645,323.00

009359 Active HSIP-9999(822) 017 Scr 17-19 Region Wide, Bct Replacement A Guardrail Frank Gurney, Inc. JERRY WOOD 02/06/2019 1,746,059.53

009360 Active STATE 107 Sr 107, Chehalis River Bridge Structural Rehabilit Rognlin'S, Inc. KAREN BOONE 02/21/2019 19,530,453.40

009362 Active HIP-0542(047) 542 Sr 542, I-5 To Britton Road Paving & Ada Complianc Granite Construction Company GABE NG 02/06/2019 4,699,990.80

009363 Active NHPP-0002(854) 002 Us 2 & Sr 9 Bickford Ave To Gold Bar Paving & Join Granite Construction Company MARK SAWYER 02/22/2019 11,870,667.00

009364 Completed NHPP-0101(385) 101 Us 101, Old Gardiner Rd To N Of W Uncas Paving And Lakeside Industries, Inc. CHRIS BRUNING 02/19/2019 11/13/2019 1,373,143.00

009365 Active STBG-9999(818) 243 Sr 243/213/155 Ncr Seal 2019 Granite Construction Company BRIAN PEARSON 03/04/2019 8,587,587.00

009366 Active NHPP-0395(111) 395 Us 395, Pioneer Memorial Bridge - Bridge Painting Blastech Enterprises, Inc. ALEX SANGUINO 03/18/2019 6,503,624.00

009367 Active STBG-0028(053) 028 Sr 28, Ephrata Vic To Soap Lake Paving And Ada Com Interstate Concrete & Asphalt BRIAN PEARSON 02/22/2019 3,615,169.87

009369 Active HSIP-0195(064) 195 Us 195, Thorpe Rd Intersection Improvement Shamrock Paving, Inc. CHAD SIMONSON 02/21/2019 1,227,227.27

009371 Active STPF-9999(828) 999 Kitsap Area, Paving And Ada Compliance - 2019 Tucci & Sons, Inc. MICHELE BRITTON 02/19/2019 5,710,464.70

009372 Active NHPP-STPH-9999(804) 002 Us 2 Et Al, Mt Baker Area Bst - 2019 Doolittle Construction, Llc GABE NG 03/22/2019 6,142,011.70

009373 Active STPF-0507(034) 507 Sr 507, N Of Rainier To Jct Sr 7 Paving Miles Resources, Llc LONE MOODY 02/27/2019 2,343,073.66

009374 Active STATE 009 Sr 9, Sr 204 Intersection Improvements (Stage 1) Marshbank Construction, Inc. MARK SAWYER, P.E. 04/24/2019 1,201,059.80

009375 Active STBG-0002(855) 002 Us 2, Colbert Rd To Westwood Rd Paving Cpm Development Corporation CHAD SIMONSON 03/14/2019 4,606,606.60

009376 Active STATE 090 I-90, Hyak To Stampede Pass Phases 1f & 2f - Fenci Graham Contracting, Ltd. SCOTT GOLBEK 03/25/2019 2,818,862.00

009377 Active STBG-0195(063) 195 Us 195, Sr 271 To Plaza Rd Paving Shamrock Paving, Inc. MARK ALLEN 03/06/2019 3,245,934.98

009378 Active STATE 522 Sr 522, North Creek Bridge To Sr 9 Vic Paving Lakeside Industries, Inc. SHAWN NEIL WENDT 03/22/2019 4,081,626.50

009380 Active STATE 009 Sr 9, Tawes Cr & Two Tributaries To Tawes Cr - Fis Imco General Construction, Inc. GABE NG 04/11/2019 2,661,704.00

009381 Completed STBG-0195(062) 195 Us 195 Smythe Rd To Paradise Rd Paving Shamrock Paving, Inc. MARK ALLEN 03/26/2019 11/21/2019 856,856.00

Dec 25, 2019 163 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009382 Active HSIP-2017(138) 020 Sr 20, Banta Rd Intersection Safety Improvements Srv Construction, Inc. SHANE SPAHR 03/27/2019 2,054,212.85

009384 Active NHPP-0053(893) 005 I-5, Plum St To S Tacoma Way Paving Granite Construction Company BRIAN WHITEHOUSE 04/18/2019 2,241,876.10

009385 Active NHPP-0090(023) 090 I-90, Bullfrog Rd Vic - Concrete Rehab, Bridge Dec Max J. Kuney Company JERRY WOOD 04/08/2019 14,801,298.50

009386 Active NHPP-0082(015) 082 I-82 & Sr 22, Sunnyside Vic To Prosser Vic - Pavin Central Washington Asphalt, Inc. JERRY WOOD 03/20/2019 2,238,377.32

009387 Active STP-0155(021) 155 Sr155, Grand Coulee Bridge Upgrade Illumination Colvico, Inc. KEVIN WALIGORSKI 03/20/2019 242,086.00

009388 Active BH-0153(446) 153 Sr 153/Methow River Bridges, Structural Phase 3 Hamilton Construction Co. BRIAN PEARSON 03/20/2019 1,109,096.00

009389 Completed NHPP-0052(216) 005 I-5, Rush Rd. To 13th St. Crack Sealing Granite Construction Company COLIN NEWELL 03/21/2019 11/14/2019 509,532.60

009390 Active SHIP-0903(076) 090 I-90 & I-82, Ellensburg Vic To Vantage - Paving Interstate Concrete & Asphalt JERRY WOOD 03/26/2019 5,558,319.00

009391 Completed STATE 012 Us 12, Nine Mile Hill To Frenchtown Vic Turnback I Central Washington Asphalt, Inc. ALEX SANGUINO 04/17/2019 12/18/2019 1,120,386.00

009392 Active HSIP-9999(785) 003 Sr 3 Bct Replacement & Roadside Safety Dirt And Aggregate Interchange, Inc MICHELE BRITTON 04/08/2019 1,798,798.00

009393 Completed STATE 020 Sr20 Spur, Anacortes Ferry Terminal Parking Lot An Lakeside Industries, Inc. TOM CASTOR 03/29/2019 07/29/2019 391,684.00

009394 Active NHPP-0014(084) 014 Sr 14, Se 164th Ave To Nw 6th Ave Paving Granite Construction Company MIKE BRIGGS 03/26/2019 2,188,188.00

009395 Completed STATE 002 Us 2, Hayford Rd To Deer Heights Rd Channelization Cameron-Reilly Llc TOM BRASCH 04/03/2019 07/17/2019 342,559.00

009396 Active STATE 012 Us 12, White Pass Vicinity Major Drainage Phase 2 Selland Construction, Inc. JERRY WOOD 04/15/2019 645,588.00

009397 Active STATE 099 Sr 99, Pierce County Line To S 359th St Paving Tucci & Sons, Inc. JAMES HARPER 04/03/2019 868,800.45

009398 Active NHPP-0101(382) 101 Us 101, West Jefferson County Remove Fish Barriers Quigg Bros., Inc. KAREN BOONE 05/13/2019 15,542,998.00

009399 Active WFL-3300(023) 002 Us 2, Stevens Pass Avalanche Deflection Berm Strider Construction Co., Inc. KEVIN WALIGORSKI 04/23/2019 748,525.00

009400 Active SPTF-0002(845) 002 Us 2, Division Wye To Farwell Rd Paving Cpm Development Corporation MARK ALLEN 05/01/2019 2,815,815.00

009401 Completed STATE 520 Sr 520, 80th Ave To 108th Ave Culvert Repairs Active Construction, Inc. EVELYN PAO 04/15/2019 11/19/2019 1,177,177.00

009402 Completed NHPP-0012(249) 012 Us 12, Pomeroy To East Alpowa Vicinity - Chip Sea Central Washington Asphalt, Inc. ALEX SANGUINO 04/16/2019 12/18/2019 1,622,222.22

009403 Active NHPP-0101(366) 101 Us 101, Chehalis River Bridge Scour Repair Quigg Bros., Inc. KAREN BOONE 04/18/2019 1,638,803.00

009404 Active HSIP-9999(817) 002 Us 2 Et Al, 2019-21 Er Regionwide Basic Safety - G Dirt And Aggregate Interchange, Inc MARK ALLEN, PE 04/18/2019 1,690,857.00

009407 Active HSIP-9999(816) 020 Sr 20 Et Al, 2019 Eastern Region Chip Seal Central Washington Asphalt, Inc. CHAD SIMONSON 04/16/2019 9,222,222.22

009408 Completed HSIP-0020(197) 020 Sr 20, Lunz Rd Vic & Cascade Dr To Granite Cr Rumb Granite Construction Company GABE NG 04/10/2019 09/17/2019 667,853.60

009409 Active STATE 305 Sr 305, Agate Pass Bridge Bridge Painting Champion Painting Specialty MICHELE BRITTON 04/24/2019 8,015,044.00

009410 Active STATE Pv Hooper Landslide Emergency Repair Shamrock Paving, Inc. CHAD SIMONSON 03/18/2019 480,000.00

009411 Active NHPP-0008(021) 008 Sr 8, Us 12 To W Of Wilson Rd Paving Granite Construction Company JOHN ROMERO 05/01/2019 3,520,316.20

Dec 25, 2019 164 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009412 Active STBG-0006(025) 006 Sr 6, South Branch Fronia Creek And Fronia Creek - Stellar J. Corporation COLIN NEWELL 04/23/2019 1,383,884.20

009413 Active STATE 099 Sr 99, Duwamish River Bridges Special Bridge Repai Kraemer North America, Llc. JAMES HARPER 05/02/2019 1,848,838.00

009414 Active STBG-0006(024) 006 Sr 6, Salmon Creek Fish Passage Quigg Bros., Inc. COLIN NEWELL 04/24/2019 1,186,934.00

009416 Active STATE 014 Sr 14, Access Improvements Thompson Bros. Excavating, Inc. SUSAN FELL 04/24/2019 4,594,488.50

009417 Completed HSIP-9999(802) 005 Swr, Breakway Cable Terminal Replacement Interstat Dirt And Aggregate Interchange, Inc S. FELL/D. RECK 04/29/2019 12/16/2019 608,597.00

009418 Active TRIBAL 129 Sr 129, Buford Creek Barrier Fish Passage Ascorp, Inc. Dba Debco ALEX SANGUINO 06/05/2019 3,268,371.00

009419 Active STBG-0506(004) 506 Sr 506, Lacamas Creek Bridge Replacement Farline Bridge, Incorporated COLIN NEWELL 04/24/2019 3,238,905.33

009420 Active STATE 005 I-5, Olympia Congestion Management Management Northeast Electric, Llc BRIAN WHITEHOUSE 04/26/2019 927,777.00

009425 Active STATE 090 I-90, Medical Lake I/C-Reconstruction N.A. Degerstrom, Inc. MARK ALLEN, PE 05/29/2019 9,688,216.30

009426 Active STBG-1701(004) 021 Sr 21, W Fork San Poil Bridge-Replace Structure N.A. Degerstrom, Inc. MARK ALLEN 05/21/2019 5,673,976.14

009427 Active STATE 097 Us 97a, Ped. Activated Warning System And Improvem Neppel Electrical & Controls, L L C KEVIN WALIGORSKI 05/21/2019 237,262.50

009429 Active STATE 090 I-90, Eastgate To Sr 900 Corridor Improvements Guy F. Atkinsonconstruction, Llc. JAMES HARPER 06/19/2019 46,898,047.00

009430 Active NHPP-0101(383) 101 Us 101, N Of Sr 107 Stabilize Slope Rognlin'S, Inc. KAREN BOONE 05/30/2019 6,650,000.00

009432 Active NHOO-9999(812) 205 I-205 And I-5, Pavement Rehabilitation Granite Construction Company MIKE BRIGGS 06/04/2019 3,307,307.00

009433 Active NHPP-00519(307) 005 1-5, Sb Toutle River Bridge - Expansion Joint,Deck M.J. Hughes Construction, Inc. COLIN NEWELL 05/30/2019 1,679,068.65

009434 Active STATE 090 I90, Spokane Area Traffic Volume Collection - Rebi Power City Electric, Inc. TOM BRASCH 05/29/2019 221,754.00

009435 Active STATE 529 Sr 529, Steamboat Slough Mitigation Site Trimaxx Construction, Inc. SHAWN NEIL WENDT 05/31/2019 6,338,297.00

009436 Active STPF-0530(030) 530 Sr 530, Sauk-Suiattle Confluence Ced Retrofit Trimaxx Construction, Inc. SHANE SPAHR 05/31/2019 1,811,798.25

009438 Active STATE 162 Sr 162, Spiketon Creek Bridge Temporary Bridge Hamilton Construction Co. LONE MOODY 06/04/2019 2,140,559.35

009439 Active STATE 005 I-5, S 200th St On-Ramp To Sb I-5 Metered Shoulder Titan Earthwork Llc MIKE ASKARIAN 06/03/2019 866,688.00

009440 Completed STATE 017 Sr 17, Mesa Vicinity - Emergency Rockfall N.A. Degerstrom, Inc. ALEJANDRO SANGUINO 04/18/2019 07/18/2019 251,383.00

009441 Active HSIP-9999(820) 017 Us 2 Et Al, Nw Region Breakaway Cable Terminal Rep Petersen Brothers, Inc. Not Specified 06/27/2019 1,109,941.73

009442 Completed STP-0007(029) 007 Sr 7 N. Of Alder - Rock Scaling Boettcher & Sons, Inc. JOHN ROMERO 07/08/2019 11/05/2019 716,652.00

009443 Active STATE 999 Systemwide On-Call, Off-Shore Maintenance Pacific Pile & Marine, L.P. TOM CASTOR 06/20/2019 1,351,743.00

009445 Active STATE 014 Sr 14, Wind River Rd Intersection Improvements Crestline Construction Company, MIKE BRIGGS 06/17/2019 3,399,638.50

009446 Active NHPP-0302(011) 302 Sr 302, E Of Elgin Clifton Rd To Sr 16 - Remove Fi Granite Construction Company MICHELE BRITTON 07/09/2019 10,055,978.60

009447 Active STPF-0116(006) 116 Sr 116, Kilisut Harbor - Remove Fish Barrier Cascade Bridge Llc DAN MCKERNAN 07/10/2019 9,087,681.00

Dec 25, 2019 165 2:32:02 PM

All Contracts

Contract Number

Contract Status Federal Aid Number Contract Primary

SR Number

Contract Title Prime Contractor Name WSDOT Engineer Name Execution Date Contract Completion

Date

Prime Bid Amount

009448 Active NHPP-9999(829) 999 Scr Region Wide, Redirectional Landforms Median Ca Frank Gurney, Inc. SCOTT GOLBEK 07/11/2019 1,457,843.00

009450 Active STATE 167 Sr 509, Sr167 Completion Dem0 #3 Skycorp, Ltd MARK FRYE 06/10/2019 87,464.00

009451 Active NHPP-0395(113) 395 Us 395, Safety Corridor Improvements & E Elm Rd To Central Washington Asphalt, Inc. ALEJANDRO SANGUINO 07/08/2019 12,195,888.85

009452 Active STATE 020 Sr 20, Loup Loup Pass Emergency 2019 Hurst Construction Llc BRIAN PEARSON 05/09/2019 1,320,140.00

009453 Active NHPP-0500(024) 500 Sr 500, Burnt Bridge Creek To 4th Plain - Paving A Granite Construction Company DEVIN RECK 07/01/2019 5,347,347.00

009454 Active NHPP-9999(832) 002 Ncr, Intersection Improvements 2019 Neppel Electrical & Controls, L L C BRIAN PEARSON 07/10/2019 865,014.00

009457 Active STBG-0163(002) 163 Sr 163, N Of N 54th St To Point Defiance Landing Tucci & Sons, Inc. LONE MOODY 07/10/2019 1,036,466.90

009458 Active NHPP-0052(217) 005 I-5 Over Pacific Ave Seismic Retrofit Massana Construction, Inc. BRIAN WHITEHOUSE 08/15/2019 616,235.20

009459 Active STATE 405 I-90 Et Al, Ramp Meter Enhancement And Its Elcon Corporation EVELYN PAO 07/17/2019 1,198,329.90

009462 Active STATE 999 Us 395 / Nsc, Bnsf - 2nd Railroad Realignment Halme Construction, Inc. CHAD SIMONSON 09/05/2019 26,443,011.99

009463 Active NHPP-0902(455) 999 I-90, 0.8 Miles W Of Snoqualmie Summit E Culvert R Rodarte Construction, Inc. SCOTT GOLBEK 08/13/2019 199,897.00

009464 Active NHPP-0051(311) 005 I-5, Ridgefield Weigh Station Preservation Granite Construction Company MIKE BRIGGS 08/08/2019 939,939.00

009465 Active STBG1801(001) 090 Emergency Project: I-90 Mankas Rd Undercrossing Br Halme Construction, Inc. TOM BRASCH 07/10/2016 515,091.18

009466 Active STATE 999 Pcc Railroad Structure Rehabilitation And Replacem Halme Construction, Inc. Not Specified 09/10/2019 1,713,482.08

009469 Active HSIP-0051(308) 500 I-5, Sb Interstate Br To Ne 78th St Vic Active Tra Mill Plain Electric, Inc. MIKE BRIGGS 09/30/2019 4,794,902.00

009471 Active WA-03-0242 020 Sr20 Spur, Anacortes Ferry Terminal Shared Pedestr Taylor'S Excavators Inc Not Specified 09/12/2019 787,922.00

009472 Active STATE 999 Pv Hooper Track Improvements Railworks Track Systems, Inc. Not Specified 10/10/2019 2,728,907.00

009473 Active STATE 005 I-5, Bow Hill Sb Weigh Station Preservation Granite Construction Company Not Specified 09/23/2019 587,478.00

009474 Active STP-0007(029) 007 N Of Pilgrim Rd E Slope Stabilization (Small Works Hi Tech Rockfall Construction, Inc. JOHN ROMERO 09/23/2019 189,899.00

009476 Active STATE 090 I-90, I-90 & Sr 18 Interchange Auxiliary Ramp Road Construction Northwest, Inc. MIKE ASKARIAN 10/03/2019 646,162.00

009479 Active STP-0433(011) 433 Sr 433, Lewis And Clark Bridge Upgrade Electrical Mill Plain Electric, Inc. JOANNA LOWREY 10/14/2019 1,445,006.00

009481 Active HSIP-0503(038) 502 Sr 503, Ne 154th St To Sr 502 Median Barrier Rotschy, Inc. MIKE BRIGGS 10/24/2019 1,788,863.17

009483 Active NHPP-0512(019) 512 Sr 512, Pacific Ave S To Canyon Rd E Paving And Br Tucci & Sons, Inc. LONE MOODY 12/11/2019 1,305,503.50

009485 Active WFL-2015(006) 020 Sr 20, 7 Mi. W Of Rainy Pass Flood Deflection Berm Tiger Construction, Ltd. JAMES REYNOLDS 12/16/2019 497,730.00

009496 Active STATE 099 Sr 99, George Washington Memorial Bridge Emergency Guy F. Atkinsonconstruction, Llc. SHAWN NEIL WENDT 10/30/2019 500,000.00

Dec 25, 2019 166 2:32:02 PM