agenda. wp1 – project management start m0, finish m36 cip lead progress to date & plans for...
TRANSCRIPT
WISDOMWISDOMAgendaTopic Speaker Time
Coffee and welcome 10:00 - 10:15
Project update over 1st 12 months Graeme Maxwell (general stuff, financials etc)
10:15 - 11:00
Workpackage updates & plans for next 6 months + discussion
Workpackage leaders 11:00 - 13:00
Lunch 13:00 - 14:00
Outline of ideas for final demonstrator + discussion on implications for workpackages
Alistair Poustie + All 14:00 - 15:00
Plans: 1st annual review in Brussels
Graeme Maxwell + All 15:00 - 15:30
Coffee break 15:30 - 15:45
AOB 15:45 - 16:15
Tour of FORTH-ICS Evangelos Markatos 16:15 - 17:00
WISDOMWISDOMWP1 – Project Management
• Start M0, finish M36• CIP lead
• Progress to date & plans for next 6 months:– Deliverables– Financials– Annual review– Audits
WISDOMWISDOMProgress To Date:
DeliverablesDeliverable
NoDeliverable title Delivery
dateNature Dissemination
level
D7.1 Project presentation M03 P PU
D1.1 Mid-year technical progress report M06 R CO
D2.1 Optical firewall architecture with target specifications for the optical sub-systems
M06 R RE
D2.2 Outline proposals for algorithm design M06 R CO
D7.2 Web site development M06 P PU
D4.1 Optical sub-system boundary conditions M09 R CO
D1.2 First year technical, administrative and future plan report M12 R CO
D3.1 Security Applications Partitioning M12 P CO
D4.2 Hybrid optical circuit layouts M12 R PU
WISDOMWISDOMSums Distributed
Partner
Pre-payment distribution (for the first
12 months)
Total (from the start of the project)
CIP 144,970 144,970
BT 44,380 44,380
UCC 121,690 121,690
Avanex 61,160 61,160
FORTH 83,800 83,800
TOTAL 456,0004€ 456,000€
WISDOMWISDOMFinancials Planned &
Actual for 1st year
• Currently underspending. Need to have plan in place before review to be able to get back on track
• Planned spend is based on calendarised figure – not completely accurate, but used for indication purposes
WISDOMWISDOMExternal Spend
WISDOMWISDOMAnnual Review
• Date not finalised, but proposal is for a day during week beginning 16th July
• All deliverables need to be up to date– D1.2 First year technical, administrative and future plan report– D3.1 Security Applications Partitioning– D4.2 Hybrid optical circuit layouts
• Financial forms (form C and summary financial report) as well as audit certificates will be needed (timescale to be confirmed)
• Representation by and presentations from all partners– Pre-meeting the afternoon before in Brussels
• Need a view of final demonstrator for review
Microsoft Excel Worksheet
WISDOMWISDOMProvisional Second
Year Distribution
• Total possible distribution from EU is 408,400€ which represents 35.82% of total• Not known at the moment if underspending current on the project effects this
WISDOMWISDOMWorkplanning
WP MM
1 10
2 9
3 29
4 56
5 21
6 12
7 6
WISDOMWISDOMManpower CIP BT UCC Avanex FORTH TOTAL
PARTNERS Research/innovation activities
WP2: Definition of photonic firewall architecture
2 2 2 1 2 9
WP3: New security algorithm design
1 9 1 0 18 29
WP4: Optical processing sub-system development
38 0 10 7 1 56
WP5: Wirespeed photonic firewall security validation
3 2 4 6 6 21
WP6: Manufactureability, scaleability and functionality study
5 1 1 4 1 12
WP7: Dissemination and exploitation
2 1 1 1 1 6
Total research/innovation
51 15 19 19 29 133
Consortium management activities
WP1: Project management
6 1 1 1 1 10
Total consortium management
6 1 1 1 1 10
TOTAL ACTIVITIES 57 16 20 20 30 143
WISDOMWISDOMNext Year
• WP3 & WP4 main focus
• Need to decide on final demonstrator(s)
• WP6 and WP7 will move up the agenda in terms of requiring dedicated effort
WISDOMWISDOMDeliverables For Year 2