Line stopping at Heathrow For details of our additional services such as Purging, Shrink Fitting & Removal, Probe & Instrument Insertion and Squeeze Off contact us now on FREEPHONE 0800 037 0377 In 2006 further construction took place for the new Pier 6, built specifically to accommodate the new Airbus A380 superjumbo. At a height of 24.1m, the A380 is higher than four double decker buses stacked on top of each other. We were appointed by contractors Target Site Services to freeze the hot and cold water mains to enable isolation valves to be cut in. In order to get the hot water cold and non- flowing, we had to carry out a line stop to the 28mm copper hot water return pipework, located in T3 arrivals. Working in a riser in an office, we bolted on a line-stop tee, then carried out an inflated balloon line-stop. Having stopped the hot water circulation, the pipework was able to cool down sufficiently to be able to freeze the pipe and carry out the pipe work modifications, crimping in new isolation valves, giving control of the area downstream from the new valves. We were able to carry out the whole process within 5 hours, on schedule and enabling Target Site Services to continue with their works. Terminal 3 at Heathrow handles over 19 million passengers a year to long-haul destinations. First built in 1961 and expanded in 1970, the terminal then underwent extensive refurbishment between 1987 and 1990. IPS Group Services Recent Projects No.4 www.ipsgroup.net “On a project such as Heathrow everything we do is critical to the smooth running of the whole operation. Any minor shutdowns can have a major impact. We need to know that the suppliers we use are totally reliable and that’s exactly what you get with IPS. When you need complete reassurance and confidence of a job well done then IPS is the answer.” Director, Target Site Services

Upload: steve-turner

Post on 16-Feb-2017

63 views

Category:

Documents


2 download

TRANSCRIPT

Line stopping at Heathrow

For details of our additional services such as Purging, Shrink Fitting & Removal, Probe & Instrument Insertion and Squeeze Off contact us now on FREEPHONE 0800 037 0377

In 2006 further construction took place for the new Pier 6, built specifically to accommodate the new Airbus A380 superjumbo. At a height of 24.1m, the A380 is higher than four double decker buses stacked on top of each other.We were appointed by contractors Target Site Services to freeze the hot and cold water mains to enable isolation valves to be cut in. In order to get the hot water cold and non-flowing, we had to carry out a line stop to the 28mm copper hot water return pipework, located in T3 arrivals.Working in a riser in an office, we bolted

on a line-stop tee, then carried out an inflated balloon line-stop. Having stopped the hot water circulation, the pipework was able to cool down sufficiently to be able to freeze the pipe and carry out the pipe work modifications, crimping in new isolation valves, giving control of the area downstream from the new valves.We were able to carry out the whole process within 5 hours, on schedule and enabling Target Site Services to continue with their works.

Terminal 3 at Heathrow handles over 19 million passengers a year to long-haul destinations. First built in 1961 and expanded in 1970, the terminal then underwent extensive refurbishment between 1987 and 1990.

IPS Group Services Recent Projects No.4

www.ipsgroup.net

“On a project such as Heathrow everything we do is critical to the smooth running of the whole operation. Any minor shutdowns can have a major impact. We need to know that the suppliers we use are totally reliable and that’s exactly what you get with IPS. When you need complete reassurance and confidence of a job well done then IPS is the answer.” Director, Target Site Services