academic & event scheduling tool & integrated workplace ......academic & event...

23
Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group November 21, 2017

Upload: others

Post on 25-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

Academic & Event Scheduling Tool & Integrated Workplace Management SystemProgram ImplementationCollege Officers GroupNovember 21, 2017

Page 2: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Academic & Event Scheduling (AES) Tool Implementation Project Update– Scheduling Policy Review

• Integrated Workplace Management System (IWMS) Vendor Selection Update

• Overall Program Implementation – Communications, Resources

Topics

COG11/21/17 2

Page 3: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

Academic & Event Scheduling Tool

11/21/17 COG 3

Page 4: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Selected 25Live by CollegeNET• Town Hall – 10/24

o https://it.cornell.edu/spacetools• Implementation kicked off mid-Oct• Planned go-live Fall 2018 for events and spring semester

class scheduling• Vetting policies related to scheduling

AES Status Update

11/21/17COG

4

Page 5: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Space Management Principles− Provides a basis for making consistent decisions about space management throughout the

University− States that ownership of space begins with the President and Provost and is delegated out to the

units, and that accountability for space management begins locally and proceeds upward through organizational hierarchies

• Space Management Principles as applied to Cornell Instructional Space− Defines the Provost as the steward for all instructional space and the final decision-maker

regarding best use of instructional space− States the need for the provost and deans to work together to optimize the use of these spaces

• Fees for Internal Users of Cornell Physical Space− Increase access to space or mission-driven activities− Promote more efficient use of space− Fees for internal users must be justified and approved

Policy Implementation – Existing, Unchanged

11/21/17COG

5

Page 6: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Advance Scheduling Policy re-proposed as Access to Space for Events− Confirms ability to schedule event spaces after 4:30 on weekdays, on weekends,

during breaks, summer, etc. based on group size− Proposed revisions attempt to simplify the overall procedure while emphasizing that

this is a general policy regarding access to space for events, and not constrained to advance scheduling issues alone, esp. related to the summer

• Use of Central Scheduling Tools− Defines rooms that should have been included in R25− Will be updated to reflect 25Live implementation and rooms will be loaded in

accordance with this policy− Vice Provost over OUR will serve as policy executive

• Event Registration Form (formerly UUP)− Business analysis – how can we manage risks identified and managed through the

Event Registration process through 25Live workflow?

Policy Implementation – Existing, Under Revision

11/21/17COG

6

Page 7: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Instructional Space Scheduling Policy− Classes scheduled to encourage fuller use of day and week, meeting pattern

compliance, and scheduling order by enrollment (largest first)− Revision discussion led through Associate Deans with Interim Vice Provost for

Undergraduate Education stewarding – planned vote by ADs on 12/21− VPUE will serve as policy executive

Policy Implementation – New in Development

11/21/17COG

7

Page 8: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

Integrated Workplace Management System

11/21/17 COG 8

Page 9: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

IWMS Vendor Selection

COG11/21/17 9

• RFP to 4 vendors• Evaluated RFP responses, selected finalists (2)• Held proposal demo with one (FM:Systems), other

cancelled based on concerns over fit raised after proposal evaluation

• Survey analysis, leadership consensus meeting• Advisory Group and Executive Sponsor Group

endorsed proceeding with further testing of finalist• Reference checking in process

Page 10: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Finalize FM:Systems reference checks• Further Testing, on-site (11/28)

Proceed according to full or partial fito Full fit: final negotiation, contract, begin implementationo Partial fit: as above with continued research into point

solutions

• Facilitate discussion re. Cornell’s response to FASB compliance requirements and role of IWMS

IWMS Next Steps

11/21/17COG

10

Page 11: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

Overall Program Implementation

11/21/17 COG 11

Page 12: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Updates at standing meetings: COG, UMWG, ITSG, SFG/SBG, UFDs

• Advisory Committees• Demos and Town Hall meetings• Project Functional Leads listening tours• Project team email lists• Project website• Testing team• Training

Stakeholder Engagement

11/21/17COG

12

Page 13: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

Space policies:http://dbp.cornell.edu/home/offices/space-planning/resources/

Project website:http://www.it.cornell.edu/spacetools

Email contacts:Andy Slusar, Project Manager [email protected] project: [email protected] project: [email protected]

Resources

COG11/21/17 13

Page 14: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

DISCUSSION

Page 15: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

Thank You

Page 16: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

Appendix Slides

Page 17: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Improve scheduling of space for both classes and events• Enhance user experience with more embedded

workflow/automation of related processes• Integrate with related University systems • Provide robust analytic and reporting functionality • Provide standardized space data • Increase the ability to drive space-related strategic

decision-making throughout the entire organization

AES Objectives

11/21/17COG

17

Page 18: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Data alignment and data governance through new Space-Related Data Elements Stewardship Advisory Group

• Policy implementation ✭• Sustainment

− Ongoing business practice evaluation and improvement− Governance− Help!− Training

AES – Related Objectives

11/21/17COG

18

Page 19: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

• Meets academic scheduling needs significantly better than primary competitor (EMS)

• Meets events scheduling needs • Supports reporting needs• Demonstrated ability to serve as a university-wide

integrated solution• Reputation for responsiveness and support• Many positive relevant peer references that use the

product institution-wide• User interface completely web-based• Near real-time integration with PeopleSoft

AES Vendor Selection: CollegeNET 25Live

COG11/21/17 19

Page 20: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

11/21/17 20COG

Milestone Start FinishAES Contract Signed PO issued Mon 8/30/17 Mon 8/30/17Implementation Phase I Project Kickoff Wed 10/11/17 Wed 10/11/17R25 migration to SaaS Tue 9/11/17 Jan-Feb 2018Upgrade to 25Live Kickoff Feb 2018 Feb 2018Communication and Campus Readiness Tue 8/8/17 Apr 2019User Acceptance Testing Aug 2018 Oct-Nov 2018Roll out Sep 2018 Oct-Nov 2018Go-Live Oct-Nov 2018 Oct-Nov 2018Stabilization Period Oct-Nov 2018 Mar Apr 2019Project Closed Apr 2019 Apr 2019

Page 21: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

IWMS Demo Results

COG11/21/17 21

Vendor Strengths/Weaknesses Cost in Thousands

FM:Systems Strengths:• Highly configurable• Space inventory, indirect cost recovery• Best price• Higher-ed experienceWeaknesses:• FASB accounting, mineral rights

$237

Planon (findings from conference call with vendor)

Strengths:• Property management Weaknesses:• Inability to support indirect cost recovery – this alone is a deal

breaker for Cornell.• Lack of a graphical user interface with CADD drawings to do

queries and maintenance• Lack of mineral rights and other real estate functionality• Limited ability to add functionality without customization• Price

$746

Page 22: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

IWMS Demo Survey Results

11/21/17COG

22

Definitelyyes:6:25%

Probablyyes:11:46%

Mightormightnot:7:29%

Would FMSystemsworkforCornell(AllRespondents)

Page 23: Academic & Event Scheduling Tool & Integrated Workplace ......Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation College Officers Group

FM:Systems Decision Table

11/21/17COG

23

Determination Action ResultFM:Systems is a fit

• Negotiate contract• Implementation SPAR approval• Begin implementation

• One integrated solution that meets Cornell’s needs

• 3-6 month elongation of timeline

FM:Systems is a partial fit

• Negotiate contract• Implementation SPAR approval• Implement subset of FM:Systems

modules• Conduct vendor selection for

necessary point solutions• Integrate FM:Systems with point

solutions

• Multiple solutions must be implemented, integrated and maintained

• Higher cost• Timeline pushed out 6-12

months

FM:Systems is not a fit

• Reissue RFP • Consider point solutions (best of

breed)

• Timeline pushed out timeline impact tbd